Loading...
HomeMy WebLinkAbout20211235 Ver 1_Shoreline Stabilization_20210818Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form 48.72KB meredith.pdf Pre -fling Meeting or Request Date 7/2/2021 ID# Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * tomustray@hotmail.com Rease provide an er ail address for payment and requests for more infornation here. Owner Information: Name:' Tom Meredith Email:* tomustray@hotmail.com Phone Number:* (770)316-3768 (xxx)xxx-xxxx Mailing Address:* Street Address 8205 Mill Run Trail Address Line 2 City State / Rovince / Fbgion Whitesburg GA Fbstal / Zip Code Country 30185-2035 Us Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Meredith Seawall If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Latitude:* 35.189946 Street Address 38 South Woods Mountain Trail Address Line 2 City Cullowhee Fbstal / Zip Code 28723 State / Province / Region NC Country US Longitude:*-83.160794 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* drawing lmeredith20210816_10345083.pdf 177.29KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* photo 1.pdf 221.16KB photo2.pdf 196.58KB photo3.pdf 363.87KB 4. Location of the property (where work is to be conducted) Nearest Town:* Glenville County:* Jackson Lake/ river/ ocean adjacent to Glenville property: Subdivisions name or site address:* 38 South Woods Mountain Trail, Cullowhee, NC 28723 Include phasellot nunber Directions to site:* 107 N. to pine creek; left on woods mountain trail; follow to 38 S. Woods Mtn Trail Rease include road narres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residentail Residential, undeveloped, etc. 6. Pro pertySize 1.72 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Install a 90 foot seawall to prevent further erosion; erosion control 8. How will the work be done? * r From Land 17 From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 500 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining w alls, etc.) 360 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) 3 to 4 trees above 3" in diameter and normal shrubs and vegetation Sketch: drawing2meredith20210816 10335896.pdf 174.21KB draw ing3mcredith20210816_10325283.pdf 182.1KB Recorded Survey of 38 S Woods Mtn Trail 885.03KB Property (1).pdf Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Tom Meredith Signature: Initial Review Is this accepted into the review process?* Project Number:* 20211235 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Kaylie Yankura:eads\kyankura Asheville Regional Office - (828) 296-4500 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Tom Meredith tomustray@hotmail.com Tom Meredith Meredith Seawall Jackson Street Address 38 South Woods Mountain Trail Address Line 2 aty Cullowhee Postal / Zip axle 28723 C Yes c: No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification W Shoreline Stabilization Does this project have an existing project ID#?* C Yes c: No State / Province / Pegion NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* Install a 70 foot seawall to prevent further erosion By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 7/2/2021 m � Om�atv.a '0{3 Him np � ut �" HIMM �� ° � E; HIM ° —'" E Hull 111 w 1 U� pppo sV ° a m pti... 05 >_« Ott _'m=umd M„Zb,ice �,61 IL w (a'il N y u3z�3° — �y�� N its ai v a iz 109 iV O O� Q� NVU m am �N 0 u� ti mM �m 0 411 1 by s +r �O�DS - - � I N Ala' I � � y•�F 3 oN��`n � U P I i O N ♦— > .,, to y� .. _ v�q¢ V 0 L ry Z dS V d w W t V F> d®°❑ d� Z L U d DOE °30 z; zmr� d Z i p �22 CNN¢ I � / ` N / `1 80 ap'15 g1 •� — — � SZ2 pa^ed (yaen�dl Mrdw off" — 0 _ _------F-- — o _ 9A 5N y � o 000�o �_cvmvui U _ 3 y o O m — L ` O � z n F f- c I- [ C m + � ® t Q r m � Im D m -Mel . I g D 0 j �o ci lz � f cn A '' 40 ° vs o ..� jm 1 U m rw r I BANK HEIGHT I (ERODED AREA) � r, 7m w S tJ� 120 N N li C:) CLOO A . bdm Q CLOO r t r � r►. ' t _ w" N N li C:) CLOO Cake (At Full Pond/Normal Water Level) Full Pond/ Normal Water No iMW Shoreline 3�4 �'- Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: 55GP 10-2013 Page 3 of 3