HomeMy WebLinkAboutWQ0019687_Regional Office Historical File Pre 2018State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
Kerr T. Stevens, Director
May 1, 2001
Alir;411611111rAii
•
+4�
Lttai
No rl CARotliNg OArrAE )6P OFFICE
ENVIRONMENT AND NATEKtgeFM5a1gE,CES
MAY 0 7 2001
STEPHEN PEELER, DIRECTOR OF PUBLIC WORKS AND UTILITIES
CITY OF LINCOLNTON
POST OH ICE BOX 617
LINCOLNTON, NC 28092
Dear Mr. Peeler:
IVA
ROLUCj
Subject: Permit No. WQ0019687
City of Lincolnton
Oaks Apartments
Wastewater Collection System Extension
Lincoln County
In accordance with your application received February 14, 2001, and additional information received
April 9, 2001, we are forwarding herewith Permit No. WQ0019687, dated May 1, 2001, to the City of Lincolnton
for the construction and operation of the subject wastewater collection system extension. This permit shall be
effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as
specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein
by reference.
Please pay particular attention to Permit Condition 3 which requires that the wastewater collection
facilities be properly operated and maintained in accordance with I5A NCAC 2H .0227 or any individual
system -wide collection system permit issued to the Permittee.
Permitting of this project does not constitute an acceptance of any part of the project that does not meet
15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria
adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned
herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed
Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -
constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in
accordance with North Carolina General Statute § I43-215.6A through § 143-215.6C, construction of additional or
replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer
to the licensing board.
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to City of LincoInton
for the construction and operation of approximately 580 linear feet of 8-inch gravity sewer to serve 19 one -
bedroom, 80 two -bedroom, and 12 three -bedroom units as part of the Oaks Apartments project, and the discharge
of 28,080 gallons per day of collected domestic wastewater into the City of LincoInton's existing sewerage
system, pursuant to the application received February 14, 2001, and in conformity with 15A NCAC 2H .0200;
the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 715-6048
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
as applicable; and other supporting data subsequently filed and approved by the Department of Environment and
Natural Resources and considered a part of this permit.
The sewage and wastewater collected by this system shall be treated in the City of Lincolnton
Wastewater Treatment Facility (NPDES Permit No. NC0025496) prior to being discharged into the receiving
stream.
If any parts, requirements, or Iimitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-
6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Kristin E. Miguez at
(919) 733-5083 extension 524.
Sincerely,
•.
Kerr T. Stevens
cc: Lincoln County Health Department
Mooresville Regional Office, Water Quality Section (WWTF Permit No. NC0025496)
John T. Coxey
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
This permit shall be effective from the date of issuance until rescinded and shall be subject to the following
specified conditions and limitations:
1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance
with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity
Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials unless specifically mentioned herein.
2. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee
shall maintain compliance with an individual system -wide collection system permit for the operation and
maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required,
the following performance criteria shall be met as provided in 15A NCAC 2H .0227:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land
or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the
surface water standards in 15A NCAC 2B .0200.
b. A map of the sewer system shall be developed prior to January 1, 2004 and shall be actively
maintained.
c. An operation and maintenance plan shall be developed and implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected at least three times per
week until July 1, 2000; thereafter, pump stations shall be inspected at least daily, as defined in 15A
NCAC 2B .0503(5), until July 1, 2001; and thereafter, pump stations shall be inspected every day.
Pump stations that are connected to a telemetry system shall be inspected at least once per week.
e. High -priority sewer lines shall be inspected at least once per every six-month period of time.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Inspection and maintenance records shall be maintained for a period of at least three years.
h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
1
4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities
to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted
to the Division accompanied by documentation from the parties involved, and other supporting materials as
may be appropriate. The approval of this request shall be considered on its merits and may or may not be
approved.
5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the existing utilities
nor result in an overflow or bypass discharge of wastewater to the surface waters of the State.
6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy
of the construction record drawings, as well as supporting design calculations for any pump stations
permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer
certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum
Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as
applicable; and other supporting materials. If this project is to be completed in phases and partially
certified, you shall retain the responsibility to track further construction approved under the same permit,
and shall provide a final certificate of completion once the entire project has been completed. A copy of the
construction record drawings, indicating the facilities constructed in the phase being certified, shall be
submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction
Record Drawings", and one copy of the supporting design calculations to the Non -Discharge Permitting
Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.
7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the
wastewater collection facilities.
8. Failure to abide by the conditions and limitations contained in this permit; I5A NCAC 2H .0200; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum
Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials may subject the Permittee to an enforcement action by the
Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C.
9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may be
required by this Division, such as the construction of additional or replacement facilities.
10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (local, state and federal)
which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200,
erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General
Permit NCG0100000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A
NCAC 2H .0500.
11. Noncompliance Notification:
The Permittee shall report by telephone to the Mooresville Regional Office, telephone number (704) 663-
1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the
occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of
adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or
breakage, etc.; or
b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without
treatment of all or any portion of the influent to such station or facility.
2
PFIF.-
Persons reporting such occurrences by telephone shall also file a written report in letter form within five
days following first knowledge of the occurrence. This report must outline the actions taken or proposed to
be taken to ensure that the problem does not recur.
Permit issued this the first day of May, 2001
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
4.a
err Ti.Stevens, Director U
Division of Water Quality
By Authority of the Environmental Management Commission
r
Permit Number WQ0019687
3
Permit No. WQ0019687
May 1, 2001
ENGINEER'S CERTIFICATION
Partial Final
I, , as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (periodically, weekly, full time) the construction of the
project, for the
Project Name Location and County
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance of this permit;
15A NCAC 2H .0200; the Division of Water QuaIity's (Division) Gravity Sewer Minimum Design Criteria
adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's seal, signature, and date:
The above Engineer's Certification shall be completed and submitted to the address below with one copy of the
"Construction Record Drawings" of the wastewater collection system extension as well as supporting design
calculations for any pump stations permitted as part of this project. This project shall not be considered complete
nor allowed to operate until this Engineer's Certification and all required supporting documentation have been
received by the Division. Any wastewater flow made tributary to the wastewater collection system extension
prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject
the Permittee to appropriate enforcement actions.
NORTH CAROLINA DIVISION OF WATER QUALITY
WATER QUALITY SECTION
NON -DISCHARGE PERNIITTING UNIT
1617 MAIL SERVICE CENTER
RALEIGH, NORTH CAROLINA 27699-1617
4