Loading...
HomeMy WebLinkAbout20140869 Ver 1_AMP_August 18, 2021_20210818ADAPTIVE MANAGEMENT PLAN Vile Creek Mitigation Site Alleghany County, NC NCDEQ Contract No. 5999 DMS ID No. 96582 New River Basin HUC 05050001 USACE Action ID No. SAW-2014-01585 DWR No. 14-0869 Submission Date: August 18, 2021 PREPARED FOR: NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 PREPARED FOR: PREPARED BY: ADAPTIVE MANAGEMENT PLAN Vile Creek Mitigation Site Alleghany County, NC NCDEQ Contract No. 5999 DMS ID No. 96582 New River Basin HUC 05050001 USACE Action ID No. SAW-2014-01585 DWR No. 14-0869 rk� NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 WILDLANDS ENG—INrcRimrl Wildlands Engineering, Inc. 312 W Millbrook Road, Suite 225 Raleigh, NC 27609 Phone: (919) 851-9986 Vile Creek Mitigation Site DIMS ID#: 96582 Adaptive Management Plan August 2021 Page ii FABLE OF CONTENTS 1.0 Introduction.........................................................................................................................1-1 2.0 Monitoring Years 3 and 4 Assessments.................................................................................2-1 2.1 Performance Criteria................................................................................................................. 2-1 2.2 MY3 and MY4 Assessment Results............................................................................................2-1 2.3 Areas of Concern.......................................................................................................................2-2 3.0 Corrective Measures for Implementation..............................................................................3-1 3.1 Site Assessment.........................................................................................................................3-1 3.2 Replanting..................................................................................................................................3-1 3.3 Stream Repairs...........................................................................................................................3-2 4.0 Proposed Monitoring............................................................................................................4-1 4.1 Vegetative..................................................................................................................................4-1 4.2 Stream.......................................................................................................................................4-1 5.0 Conclusion...........................................................................................................................5-1 6.0 References...........................................................................................................................6-1 APPENDICES Appendix 1 Visual Assessment Data Figures 1— 3 Adaptive Management Plan Repairs Photo Log Appendix 2 Year 3 and 4 Monitoring Data Table 1 Project Components and Mitigation Credits Table 2 Vegetation Plot Criteria Attainment Table 3a Planted and Total Stem Counts Table 3b Planted Herbaceous Cover (Bog Cells) Table 4 Morphology and Hydraulic Summary (Dimensional Parameters — Cross -sections) Cross -sections Plots Appendix 3 Approved Planting Plans Approved Planting Plan from Vile Creek Mitigation Plan Vile Creek Mitigation Site DIMS ID#: 96582 Adaptive Management Plan August 2021 Page iii 1.0 Introduction Wildlands Engineering, Inc. (Wildlands) completed a full -delivery stream and wetland mitigation project at the Vile Creek Mitigation Site (Site) for the North Carolina Division of Mitigation Services (DIMS) to restore and enhance a total of 8,056 linear feet (LF) of perennial and intermittent stream and to restore 6.40 acres of riparian wetlands in Alleghany County, NC. The Site is expected to generate 5,053.000 stream mitigation units (SMUs) and 5.703 riparian wetland mitigation units (WMUs) for the New River Basin (Table 1). The Site is located approximately one mile east of the Town of Sparta, NC in the New River Basin eight -digit Hydrologic Unit Code (HUC) 05050001 and the 14-digit HUC 05050001030020. On -site streams consist of Vile Creek and five unnamed tributaries (UT) to Vile Creek including UT1, UT1b, UT1c, UT2, UT3, and a portion of Little River. Vile Creek flows into Little River near the downstream project boundary. The land adjacent to the project streams and wetlands is primarily maintained cattle pasture and forest. The land required for construction, management, and stewardship of the mitigation project included portions of five parcels resulting in 25.04 acres of the conservation easement. Construction activities were completed by Land Mechanic Designs, Inc. in February 2017. Planting and seeding activities were completed by Bruton Natural Systems, Inc. in February 2017. The final Baseline Monitoring Document was completed in April 2017. The Site is currently in Monitoring Year 5 (MY5). Overall, the Site is geomorphically stable, and riparian and wetland vegetation are performing well. Performance criteria for stream hydrology has been met, and all wetland groundwater gauges met their success criteria during MY4. However, isolated stream and vegetation problems areas do exist on -site. One of these areas consisting of erosion on the outside meander bend of Vile Creek Reach 2 was observed during MY1 and discussed during an IRT site walk conducted on July 18, 2017. The remainder of the stream problem areas have occurred and been documented in subsequent monitoring year reports (MY2 — MY4) including damage that occurred during a hurricane and a tropical storm in the fall of 2018 (MY2). In addition, areas of concern related to vegetation performance have been documented. Three supplemental plantings have already occurred. The first was completed to correct the planting of trees in shrub zones, which were intended to minimize shade on the bog areas. Trees were removed from the shrub zones and shrubs were planted to replace them during the winter of 2017. The second supplemental planting consisted of 300 1-gallon trees and was completed in the spring of 2020 on the right bank UT1 R2 starting at UT1C and continuing down to Vile Creek Reach 2. Elderberry live stakes were also planted along the top of bank of UT1 to further shade out the stream. All of the 1-gallon plantings were considered unsuccessful because the deer population located on -site grazed the newly planted stems causing a mortality rate of greater than 50% of the supplementally planted stems. A third supplemental planting was the performed to replace the grazed container plants during the winter of 2021. This planting consisted of 8541-gallon and 3-gallon containerized plants in the same area along UT1 R2 and tree cones were used to prevent deer browse. When these new trees were planted, a pepper pellet was also placed beneath the root ball of many of the trees which gives the leaves and branches a bad taste, also to discourages deer browse. An IRT site visit was conducted on June 24, 2021. During this site visit, potential repairs were discussed with the members of the IRT. A determination was made to move forward with on -site repairs including bank stabilization of four areas, repairs to certain failing structures, reconstruction of a failing angled -log riffle, and multiple small areas of replanting. These repairs are discussed in Section 3.0 of this document. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 1-1 2.0 Monitoring Years 3 and 4 Assessments Annual monitoring and quarterly Site visits have been conducted since project completion to assess the condition of the project. The stream, vegetation, and hydrologic success criteria for the Site follows the approved success criteria presented in the Vile Creek Mitigation Plan (Wildlands, 2016). Stream and vegetative monitoring features and locations are shown in Figures 1 to 3 in Appendix 1. 2.1 Performance Criteria 2.1.1 Vegetation The vegetative success criteria for the Site consists of species survival in three designated zones (trees, shrubs, and bogs) along the open, planted riparian corridor. The vegetative success criteria for tree species will be the final survival of 210 planted stems per acre at the end of the required seventh monitoring period, as well as an interim criteria of the survival of at least 320 planted stems per acre at the end of MY3 and at least 260 stems per acre at the end of MY5. Planted tree height must average 6 feet in height by MY5 and 8 feet in height at the end of the MY7. The vegetative success criteria for shrub species will be the final survival of 105 planted stems per acre at the end of MY7, of at least 160 planted stems per acre at the end of MY3, and at least 130 stems per acre at the end of MY5. There is no height requirement for shrub species. The vegetative success criterium for bog areas is at least 80% herbaceous cover. 2.1.2 Stream Stream channels should maintain a stable pattern and profile considering the hydrologic and sediment inputs to the system, the landscape setting, and the watershed conditions. Bank height ratios should stay below 1.2. Visual assessments should indicate a progression towards stability. Entrenchment ratios should be >1.4 for restored B channels and >_2.2 for C/E channels. Cross -sections should show little change in bankfull area and width -to -depth ratio. 2.2 MY3 and MY4 Assessment Results 2.2.1 Vegetation MY4 (2020) was a reduced monitoring year that does not require detailed vegetation inventory and analysis; therefore, no vegetation plot monitoring was performed in 2020. Visual assessments were conducted in MY4 and indicated isolated areas of low stem density and height. Detailed vegetative inventories were completed in MY3 (September 2019). This resulted in an average planted stem density of 445 stems per acre for woody tree species, 284 stems per acre for shrubs species, and approximately 99% herbaceous cover in bog areas, which exceed the interim requirement of 320 stems per acre for trees and the 160 required for shrub species at MY3, as well as the final 80 percent cover for bog areas. Of the 25 vegetative plots monitored, twelve of the fifteen plots designated for monitoring tree species, both of the plots designated for monitoring shrub species, and all eight plots designated for monitoring herbaceous cover in bog areas, individually met the success criteria with a stem density ranging from 364 to 728 stems per acre for trees and 162 to 405 stems per acre for shrubs and a vegetative cover of 95 — 100% for bog areas. Vegetation plots five, nine, and fourteen did not meet stem density requirements. See Appendix 2 (Tables 2 and 3a-b) for the MY3 vegetation plot monitoring results. 2.2.2 Stream MY4 was a reduced monitoring year that does not require full morphological surveys; therefore, no cross -sectional surveys were performed in 2020; however, pebble counts were conducted and found no significant change in stream bed material throughout the site. Morphological cross -sectional surveys conducted in MY3 (April 2019) indicated, in general, that streams within the Site appeared stable with some areas exhibiting minor bank scour. In general, site streams showed little change in the bankfull Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 2-1 area, maximum depth ratio, and width -to -depth ratio, and fell within the parameters defined for channels of the appropriate stream type (Rosgen, 1994 & 1996). During MY3, cross -sectional survey results showed a bank height ratio greater than 1.2 for cross-section (XS) 2 and XS7. XS7 had degraded during MY1, but remained stable in subsequent years. Cross section two began to degrade in MY1 and continued to degrade through MY3. However, this cross-section is located in between two logs in a log riffle and is expected to see some deepening of a scour pool in this location of the riffle. 2.3 Areas of Concern 2.3.1 Vegetation Invasive species including Japanese barberry (eerberis thunbergii), Oriental bittersweet (Celastrus orbiculatus), and multiflora rose (Rosa multiflora) continue to be present within and around the Site. Although their presence is not impacting survival rates of planted stems at this time, these areas will likely continue to warrant additional treatment to prevent any advancement within the conservation easement and future impacts to the Site. During MY4 areas of low stem density and height were documented on -site and amounted to 18.2% of the planted conservation easement. These areas included: A portion of the left floodplain on UT1 Reach 1, an area along the right floodplain of UT1C, which continues downstream to Vile Creek Reach 2 (this area was replanted a second time during the winter of 2021), and along the left floodplain of UT2 just below the BMP. During the 2021 IRT site visit, low tree density was also observed along both banks of Vile Creek Reach 1 and portions of the left bank of Vile Creek Reach 3. See figures in Appendix 1 for locations of low tree density discussed during the 2021 IRT site visit. 2.3.2 Stream The site has been assessed quarterly since the completion of construction as discussed in Section 2 above. The following areas are experiencing localized bank instability to varying degrees: Vile Creek Reach 1 station 103+90-104+20 (30 LF), Vile Creek Reach 2 stations 118+50-118+80 (30 LF), 120+50-121+00 (50 LF), 121+00 to 121+25 (25 LF), and 122+20-123+00 (80 LF), UT1 Reach 1 station 206+40-206+60 (20 LF), UT2 stations 305+00-305+50 (50 LF), 306+30-306+70 (40 LF), and 310+00-310+15 (15 LF). Aggradation along enhancement II reaches UT1b and UT1c has resulted in the 51 LF and a 115 LF loss of the single - thread channels, respectively. The stormwater best management practice (BMP) at the top of UT2 has formed a headcut at the inlet flowing into the BMP. An area of instability along UT1 Reach 1 (Station 205+10-205+60) that was previously mentioned in the MY3 report, naturally realigned itself (21 LF) in MY4; thereby, abandoning an existing meander bend and creating an ox bow. The newly created channel appears to be stable but resulted in a loss of 14 LF of stream. Stream structures currently failing include: rock sill UT1 Reach 2 at station 220+98, log sill Vile Creek Reach 1 station 104+10, j-hook Vile Creek Reach 2 at station 118+80, rock sill Vile Creek Reach 2 at station 123+00. A constructed angled log riffle has down -cut and has failing log sills on Vile Creek Reach 2 at station 122+25. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 2-2 3.0 Corrective Measures for Implementation 3.1 Site Assessment As previously mentioned in Section 1.0, an IRT site visit was conducted on June 24, 2021. During this visit, areas within the project's conservation easement were discussed for stream repair and additional supplemental planting. Key points discussed during this visit are outlined below and resulted in the proposed corrective measures for implementation. Supplemental planting and stream repair measures are discussed in further detailed in Sections 3.2 and 3.3. • Wildlands to repair the lower end of Vile Creek Reach 2 including bank repairs and repair/replace log sills and a boulder sill. • Wildlands to install container sized plants and live stakes within the bare spots along Vile Creek Reach 1 to provide shade for cold water stream habitat. • Wildlands will not remove and/or repair aggradation areas along UT1b and UT1c. • Wildlands will continue to treat invasives on the project site including multiflora rose, Chinese privet, and Japanese barberry, as needed. • Since cattails are not negatively affecting the performance of the stormwater BMP at the top of UT2, Wildlands is not planning to treat them at this time. • Wildlands will add rock to stabilize the headcut at the inlet to the stormwater BMP. • Wildlands to stabilize the erosion and replant the overflow channel on Vile Creek Reach 3. • Wildlands will perform supplemental planting along the left bank of Vile Creek Reach 3 during the next dormant season. 3.2 Replanting 3.2.1 Areas to Be Replanted A fourth replanting will be completed on a portion of the site during the upcoming dormant season (winter 2022). This planting will focus on the areas discussed at the recent IRT site visit and will include: Vile Creek Reach 1 • Replant with containerized trees within the riparian planting zone (extending 15 feet from top of bank) along both banks of the stream along the entire reach. • Install additional live stakes to streambanks to help with shading the stream. Vile Creek Reach 3 • Replant with containerized trees along the left bank of the stream from approximately station 125+00 to 126+00 and 127+00 to 128+25. • Install additional live stakes on left bank of the secondary high -flow channel on Vile Creek Reach 3 from approximately station 124+80 to 125+60. See Section 3.2.2 and 3.2.3 below for the list of the proposed planted tree and live stake species. 3.2.2 Container Plantings Approximately 200 containerized trees will be replanted during the next dormant season (winter 2022) along both banks of Vile Creek Reach 1 and a small area on the left bank of Vile Creek Reach 3 as shown on the figures in Appendix 1. The total area of the replanting will be approximately 1 acre. The trees will be a combination of one -gallon and three -gallon containers, depending on the availability of stock. The species for replanting were selected based on recent experience with planting similar sites and are listed below. Many of these species were not in the approved Final Mitigation Plan (Wildlands, 2016) and these species are noted below with an asterisk. The proposed trees to plant include: Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 3-1 • Box elder (Acer negundo)* - FAC — 10% • American sycamore (Platanus occidentalis) — FACW — 15% • River birch (Betula nigra) — FACW — 15% • Persimmon (Diospyros virginiana) — FAC — 15% • Red oak (Quercus rubra)* - FACU — 15% • White oak (Quercus alba)* - FACU — 15% • Black gum (Nyssa sylvatica)* - FAC — 15% Potential alternate species will be used if any of the above are not available and include: • Black cherry (Prunus serotina)* - FACU • Tag alder (Alnus serrulata) - OBL • Yellow buckeye (Aesculus flava)* - FACU See Appendix 3 for the approved planting list from the Final Mitigation Plan (Wildlands, 2019). 3.2.3 Live Stakes Live stake plantings will also be conducted during the winter of 2022. The additional live stakes will be placed primarily in areas where repairs are being done. Live stakes will consist of a mix of black willow (Salix nigra), silky willow (Salixsericea), and silky dogwood (Cornus amomum). Both silky willow and silky dogwood were included in the approved Final Mitigation Plan (Wildlands, 2019); however, black willow was not. Wildlands believes that adding black willow as an additional species to the live stake planting list will aid stream bank stabilization with their ability to become quickly established and will further increase species diversity. See Appendix 3 for the approved planting list from the Final Mitigation Plan (Wildlands, 2019). 3.2.4 Soil Amendments Soil amendments will also be applied to the newly planted areas at a rate of approximately 3 ounces to the base of each planted tree. Soil amendments will include humic acid, biochar, dried molasses, slow - release fertilizer (2-4-3), rock phosphate, and azomite (a trace mineral supplement). Beyond boosting macro- and micronutrients in the soil, the addition of these amendments will improve other soil properties including cation exchange capacity, pH, and microbial communities. Expected improvements include greater moisture -holding capacity, organic matter, and nutrient availability for plants. 3.3 Stream Repairs 3.3.1 Areas to be Repaired The following areas will be repaired as described: Vile Creek Reach 2 • Repair eroding right stream bank from station 118+50 to 118+80. • Repair existing J-Hook at station 118+80. • Repair eroding right stream bank from station 120+70 to 121+00. • Repair eroding left stream bank from station 121+00 to 121+25. • Repair eroding right stream banks from station 122+20-123+00. • Rebuild log riffle from station 122+20 to 123+00. • Repair rock sill at station 123+00. Vile Creek Reach 3 Repair eroding left bank of overflow channel from station 125+00 to 125+60 and replant with bare roots. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 3-2 Pre -repair photos of the locations described above are included in Appendix 1. All completed repairs listed above will be documented in the MY5 report. Most other areas of concern listed in Sections 2.3.2 are minor and will continue to be monitored by Wildlands and discussed in upcoming monitoring reports for monitoring years 5 through 7. According to IRT members, the aggradation of UT1b and UT1c may result in the change of credit type from stream to linear wetland. Wildlands will coordinate with the IRT and DIMS prior to closeout to determine the mitigation approach, credit ratios, and acreage of these wetlands so that the appropriate amount of wetland credit can be added to the site and the necessary amount of stream credit can be removed. 3.3.2 Description of Repairs The repairs will be conducted with a small excavator during late summer or early fall of 2021. All of the areas to be repaired are located on the lower half of Vile Creek Reach 2 and access will be limited to one route in and out of that location. All of the bank repairs will consist of building geolifts to stabilize the eroding areas. Live stakes will be installed during the winter of 2022 to add stability to the geolifts. The log riffle to be repaired will be rebuilt to the original design elevation and all of the angled logs will be replaced and keyed into the bank sufficiently to remain stable. The rock sill and j-hook will be repaired by replacing the rocks that washed out and keying them into the bank sufficiently so that they remain stable. 3.3.3 Permitting Wildlands discussed permitting requirements with the U.S. Army Corps of Engineers (USACE) and the NC Division of Water Resources (NCDWR). The project's 401 and 404 permits expired in 2017. However, the USACE indicated that the work would be covered under a non -reporting NW3 and GC4132 because these permits allow for maintenance work on previously authorized modifications, as outlined in paragraph (a) of the NW3. Because the repair work is located within the project's previously permitted stream restoration construction area and with proposed in -stream structures and bank stabilizations consistent with the original restoration design, DWR considers the proposed work to be temporary impacts not requiring written 401 approval. Therefore, for these repairs, no additional 401 or 404 notifications are required. The project repairs will comply with trout moratorium rules. Any other necessary permits will be obtained. A land disturbance permit should not be necessary because less than 1 acre will be disturbed. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 3-3 4.0 Proposed Monitoring 4.1 Vegetative Wildlands will continue to monitor Site vegetation as previously planned. If the monitoring requirements are not met during MY7 in any of the planted areas, including ones with supplemental planting, Wildlands proposes to add another year of vegetation monitoring for those areas. Vegetation monitoring will continue until success criteria are met. We will include two transects in the supplemental planting area that was recently planted in March of 2021 to monitor success for MY5, and MY6, and MY7. Full vegetation monitoring at the site will be conducted in MY6. MY6 is a reduced monitoring year and does not typically include vegetation monitoring. 4.2 Stream Wildlands will continue to monitor the stream as previously planned. However, the portions of UT1C and UT1B that are functioning as wetlands will be tracked in linear footage to determine if the aggraded areas are increasing or decreasing in length. An additional photo point will be added on each of these two reaches and on UT1 Reach 1 at station 205+10-205+60 where the stream realigned itself and formed an oxbow where the channel used to be. In addition, a photo point will be added at each of the seven stream repair areas. This data will be added to the MY5, MY6, and MY7 reports. If other areas of concern begin to threaten the stability of the project, then remedial actions will be implemented and documented for all future reports. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 4-1 5.0 Conclusion In summary, Wildlands proposes to repair damage that has occurred since construction was completed in 2017 to the lower part of Vile Creek Reach 2 during the late summer of 2021. Additional replanting will be done during the following dormant season (Winter 2022). Soil amendments will be placed around each supplementally planted bare root to aid in growth and establishment. Stability of repair areas and growth and health of supplementally planted areas will be reevaluated in the Monitoring Year 5 to 7 reports along with pictures of the addressed areas. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 5-1 6.0 References Wildlands Engineering, Inc. (Wildlands), 2021. Vile Creek Meeting Notes — IRT Site Walk on June 24tn 2021. Sparta, NC. Wildlands, 2020. Vile Mitigation Site Monitoring Year 4 Annual Report. DIMS, Raleigh, NC. Wildlands, 2019. Vile Mitigation Site Monitoring Year 3 Annual Report. DIMS, Raleigh, NC. Wildlands, 2016. Vile Creek Mitigation Site Mitigation Plan. DIMS, Raleigh, NC. Vile Creek Mitigation Site DMS ID#: 96582 Adaptive Management Plan August 2021 Page 6-1 APPENDIX 1 iiOA644ly o_ E aEi = E E E —— o 0 0 0 0 u° 3 3 m° z° u z° 3mm m a u` m rwt . v Fu f =vim 0 m v - E � z° Vile Creek Repairs Photo Log Vile Creek R2: STA 118+50 - 118+80 - Right Bank Erosion 3-17-2021 1 Vile Creek R2: STA 118+80 —J-Hook structure failure 3-17-2021 1 Vile Creek R2: STA 120+70 - 121+00 — Right Bank Erosion. 3-17-2021 Vile Creek R2: STA 122+20 - 123+00 —Angled Log Riffle Failure. 7-01-2021 Vile Creek Mitigation Site Adaptive Management Plan — 2021 Vile Creek R2: STA 122+20 - 123+00 — Right Bank Erosion 3-17-2021 Vile Creek R2: STA 122+20-123+00 — Left Bank Erosion 3-17-2021 Vile Creek R2: STA 123+00 — Rock Sill Failure 3-17-2021 1 Vile Creek R2: STA 121+00 - 121+25 - Left Bank Erosion 5-23-2021 1 Vile Creek R3: STA 125+00 - 125+60 - Secondary Channel Erosion 3-17-2021 Vile Creek Mitigation Site Adaptive Management Plan — 2021 APPENDIX 2 o \ \\ \ \\\ 75 ) - - - \\ � \\��\ \\\ \ &m;!§ � / } ; R , , } } }% \ } , , , , - ) }}\ , c , . , ,mw ok < ZJ 15 _ ? } \ \\ \ \\ \\ \ / \\\\§ } } 2 go I IS � : M. o \\ ` \ \\\\ \ \ o lw \ _ m !! ] ! to � _;/ Table 2. Vegetation Plot Criteria Attainment Vile Creek Mitigation Site DIMS Project No.96582 Monitoring Year 3 - 2019 Plot MY3 Success Criteria Met (Y/N) Tract Mean 1 Y 82% 2 Y 3 Y 4 Y 5 N 6 Y 7 Y 8 Y 9 N 10 Y 11 Y 12 Y 13 Y 14 N 15 Y 16 Y 17 Y F2 Table 3b. Planted Herbaceous Cover (Bog Cells) Vile Creek Mitigation Site DMS Project No. 96582 Monitoring Year 3 - 2019 Plot ID Base MY1 Percent MY2 Cover MY3 % MY4 MY5 MY6 MY7 1 <5 30 65 100 2 10 75 100 100 3 <5 75 95 95 4 <5 90 100 100 5 <5 80 90 100 6 <5 85 95 100 7 <5 100 100 100 8 50 95 100 100 V 7 f0 T r r r r r r l0 l0 m Ot rn m m to N to N O `~ N N ^ `� to N to N ' NO V 'o M IN I, N INO I, N W O M O Y V/ V1 -zrN W l0 l0 .-I >. 00 00 to w � Y to to N l0 c-I N In l0 N l0 N c-I O c-I N N Lri to .4 l0 N to N N ' e-I M N N ^ m O c4 V c4 r I� r O IN IN Ol M N O Ol Ol O M M O O O 0 N 0 N r NO c-I N -li n Do N �0 Do N nw N ' `~ V M . HV/ IN N IN N m� rI O tOo c-I V m ^u? ti O u0i V/ V1 ^ O m m N 0 n ccW ci c-I n c4 m N N N cM y ,j V C m m N N z Ol c VV c-I c-I r4 r r r r r r 0 0 V/ I� M r nt r W W 6 O lD r N N .--I Y N N N o0 V l0 IN N� Ot V V O O O N N 00 N O N N O c-I N M c-I to c-I N N m O c-I l0 } .N-I N N W W } O O V m l0 c-I W W O m y Ol Ol lD r In ^ In .-I Y lD to o0 I, Ol N N V M o0 V/ O N `~ m O N O N O e-I M M eN-I r `� N N e�-I Omi `� N M eN-I V c4 . r N IN r N lIN 0 O O C N^ N N W o O c-I I� O • r O O O' N^ 6 O N N r NO c-I N N rml e`~-I `� lm0 N lm0 N �� e-I N N f"i ^ IN r N IN r N m O O V N N rN O r4 l6 N^ vOi O O p N c-I N ^ M c-I I.0 W 00 o0 00 N � O V/ M LD 00 m N e O vOi u) N u) N tt/ m V c-I N N N O O 1p w M w V ^ O m N N N .--I N `""� N m m N N c4 N N c-I m m N N .--I c-I ^ m m c-I N c-I N m O c-I r r L r r m oo Oti O O In W m m cn W O N O N LI) 4 N N N o) N I, m c4 N NO U! r N r N m Lrioo NO IT n^ N N V/ O NC 0 0 O ill e-I e-I e-I N ^ l0 O V V On ^ N m m l0 v) V N M M ul I, M G N O N N N N cNC C to N to N 0o N N c^-I `� cN L I, N r N m o .4 N cO n 6 .-4 r 1, N 1, r N .--I i O c-I l0 ~ O O q e-I w� `~ e-1 rl O N M In r O `~ M M c-I � N N V O W O M M� I, o0 O N N N`� N N to N to N e�-I W .--I N N T e-I . I, N ^ N m .--I N Ol I� n c~ N N yOj 0 O 0� O V) N O N N ti m ti^ m W O W N rl O N Lq-1 0 O O IOj m V M V l0 O m r c-I m N m 0 M M m 01 o m m N N N c-I m CT N m m N N `� N N c-I c-I r4 m m N N W 1p O r4 V/ IZ c-I M. m N N ^ O' O ^ O' O ^ O' O ^ O' O C C L L L L m C C L L L L v m C C L L L L m C C L L L L v m O .m O '> -O 'O O_ O_ `! L O O O O > > ro 0 m 0 a n N- m > > 0 0 a a N- m ;� > ;� > m m O a a c N- m > m > 0 0 a a v m v W v— W J ai C c m x m m C pm \ E L= m ar W ar W — J ar C c m x m m C\ pm L= w W J C c m x m m C pm \ E L v = m w v— W J ar C c m x m m C m L= ar N� O O N� O N� O L U Y — Y 'S. O N O L l) Y J C C O_ 'i ;5 C cc tiY J C C O_ �— �i � C N ~Y J C C O_ �— �i � C C ~y J c c O_ C m m O —_ J y N to v m ly6 y C m m m m -p O — J J y N N v m y C m m m m -p O —_ J y N N i� m fi Y c m m m m V O —_ J J y N N m ` +' f6 m w— +' m C— i f6 m 3 w— m C— a O W c m O O— y O W c m O O — o O W c m O O— Y o O w c m 0 0— It,o m m U �e C Y c m y�yl m co i S c m m m U i C Y c m m m i c _ J o m c m m —_ 3 m m c m m —_ J m m c m m —_ 3 m m c m m c m c O .O C m co m c m c O .O C m �p m c m c O .� Y C m �p m c m c O C m m m E E E O cl E s N GJ °t! m V c 'n N N O " a -Z a1 M tm on o v N Q +.+ Z } C a+ u w C V Y ar C V W ar p N N d 0 cu U VI N aj N C v� o v g o 0 u > o 2 c� 0 a o M m 0 0 x m LL Y O N O) O V � M Gl I o o � a to v tr+i o > � O o N o 0, 0, 0 O ^ 0 m O } O ^ N O 00 N O ^ N O ^ N (11) Ol Lo N uollena13 Ol Lo _ s on c v = o a, a, aj D 0 on m aJ � m Q t v Q N oO ar Q Q ,U N -IF -6 O -O aJ -6 7 u c Y m t O— C aJ -6 a] x -6 -6 x •3 E E 3 t •3 0 v 3 w m as `n �o ^ m `n f0 ar v m Ln r, o c-I c-I N _6 m i N Il N s V GJ GJ N N V o p p_ c M 7 ,mw O N N p z } C +, u ao c V Y N C V d N N N o Y N V V N C v� p v g p p u > 0 2 V 0 m I o 1 N 1 1 O O 1 } I I I I I I � O ti i I � I v C, a o w i c o a a 00 } o o � c G LL W I Y � I s M I V C � I AA O > w � I I � � ci a I X I (r m I } � I I I I I W I � I I 1 � o 1 ON O I m m , O I LL I o � m I I I 0 O O O Ol n Lo Ol Lo N N N N N (41) uolIena13 bA I I I 00 I I F I � O I � I I O I 0 } I I I I I I I I O m v a I � � O I V o o_ a I > °o � I I W I � I N p s Ln v t I c O cn I N I — I I � � O X � Y O m a } � I I I I I I I I I I I I I O � p I iz ti I � O I m x O m I p LL m O N O O1 01 m m N N N N N (41) uolIena13 O txo O N O N in m f0 c O m O L _67 O ,pp bOA o N aJ w Q a Q Q E cc O v -O aJ -O 7 O C a] o O 'in u O x zclj O N p a] N -O N -O -O 3 E x3 E E 3 t3 aai o � v 3 w N N O O�o Q Ou m aJ — m ,w N N V GJ IV °t! m O 'n N N O " '-Z Ol M bA O N Z } u w C V 0J C V d N O N O LL Y cu N VI c v 0 0 u > o 2 c� m 0 0 m � o C w C, Q o O a o a ° c> G LL W Y N ci O ci > O) w o w m ^ Q N O X \ LL � Y O m .ti O I I O I Ol O n N a -I � O O N O J O LL } � m O 0 N O 00 C) N m N m N N N (11) uOlIena13 N m v GJ y L N 00 V O 'n N N O " a '-Z Ol M � on o v z } u to 0 V 0J C V d 0J O N O LL 0 cu U VI N v c o 0 u > o c� I I I I I I I � I O I � I O � I 00 m I I I ITy I I I I O I ^ I � W Q o � o a } O 0 � I � � 00 O t � � I O ci I fp I � I w I N I I n Q � I X LL I AO O m p Y I } } I I I I I I I I I I O 7 I I � O N I N � I � O I � O co I O LL m I I I o m N O 00 lD Lo Lo Lo N N N N (11) uO!Ienal3 00 0 o O m 0 0 x m LL Y ci O Ol o0 m O O } �l I o o � o_ Ln 00 o Ln i O N o 0 N } o ^ 0 M 0 } 0 N N N N O 00 Lo N lD Lo N (11) UO!Ienal3 Lo N V Lo N _ s on c v = O in — a ai c aJ 7 f0 'b0 a] Y a Q t v Q N �^ c .� ar Q Q_ ar -o o O 0 ar Z •vi u c Y m t O— C aJ -6 -6_ OJ x •3 E E 3 t •3 0 � v 3 M N O O N � m a, — m •° � w N s V w v N � 14 c O N tLn o O H p m M 'm O N n p c z } C C U 2 V Y aJ .V N O O N � LL Y N Ncu aj n C v� —aj 2 O O V > 0 2 V O I I I I I I I � I p I � I a0 I I I O } I I I Tl I I I I N I o" � Q I 0 N C O V O N 6 °o I r � L L11 -O o I o N I — I > I w I � N I NO X I � Y I rl O I I I r r I I I I I I O m I I � I e-I O I � I p V I \ o I � J I � m I O N co D C N O N n n N N N N N N N (11) uOizena13 on s V N v O N O 00 O ~ O Ol M a' p on o v o0 : p 'c' z } c C U 2 V Y OJ .V N N O N aj cu d Y N N O —aj 2 O O V > 0 2 V O co ti 0 N V O 2 m LL m O O O M o o a � 00 L p rq O rq � r 0 0) 0 ti ti O co C N v V n N O o0 r N r (4) UOizenal3 D n N _ on _ c U, o v v v v D 0 on m N Q O_ ,U N � -6 ° -6 7 O -o a; ca t 0 f0 U O -O N li N N O x3 E E 33 0 O O 7 VJ N 00 7 c-I r, N U cli v co.E i N O I I I rn I I 1 I � I I O N I v I o I m r I 1 I O 1 I 1 I co I I I I @ v a O v o o a N O I > p 1 N Ln O L ^ O I } O I 3 p cti I - N is I O/ w I � I I N Q � I X � LL O m c-I O I I O 1 1 I I I m rl O N r V O O M m O LL � m O Ln m N N N N N N (1j) OOl;eA@13 bA _ O_ C O- O O i O Ut ` N cli N w +0+ N � O OJ E t O N N W O Q N O_ Q 0 c C Y N Q O_ ,U N L c -6 C O -6 OJ — -O -O U C c-I O U L C OJ i L O 5� O f0 c N -o v- v -o -o -- cli 3 -o x •3 E E 3 t •3 ali ° o 7 lD M I� O N lD Ol N Ol O v m mO .--i lD O I� W O >, U c 10 > N m � LL N i O m ti 0 N a 0 x m Y m O O Ln O N V O ` 1 °o o_ ti N v Lr) O + L O > ti N � m r 0 0 ti ti 0 m 0 l0 .-I r N O N O r N V rl n N (1j) N ei rl r N OO!ILA@13 s on w v O cli a, n a 0 c m on c �+ ,U Q O_cij -6 c c O -o -O -O cp C o U � � o Y � m t 0 f0 O -O xm N cij N x3 aJ E E 33 0 o v 3 m N 7 c0 lD m CO M I- -1 U c 7 In O c-I I, O n v m i N Il N N m a m u N N N W p N H O p � i p) cma � bA O N rl p :c z } c C U 2 V Y .aJ V N aj p N aj cu LL Y N N aj n C v� o v g o 0 u > 0 2 c� O rn 0 0 m 0 ono Q 0 o a N ° ° cr C LL 4- � m O L v v Ln ti 3 0 - ry @ v w m N Q O X N X � LL O m .-I O O m I I I O N O 0 V O In 2 O m J O LL } CO ID O N O V N N N (14) UO!Iena13 N N bA APPENDIX 3 Approved Planting Plan from Vile Creek Mitigation Plan Riparian Planting Zone Plant List Species Common Name Spacing Min. Caliper Percentage Alnus serrulata Tag Alder 12ft x 6ft 0.25" 10% Carpinus caroliniana American Hornbeam 12ft x 6ft 0.25" 10% Liriodendron tulipifera Tulip Poplar 12ft x 6ft 0.25" 15% Platanus occidentalis Sycamore 12ft x 6ft 0.25" 15% Betula nigra River Birch 12ft x 6ft 0.25" 15% Quercus pagoda Cherrybark Oak 12ft x 6ft 0.25" 15% Fraxinus pennsylvanica Green Ash 12ft x 6ft 0.25" 10% Diospyros virginiana Persimmon 12ft x 6ft 0.25" 10% Understory Planting Zone Plant List Species Common Name Spacing Min. Caliper Percentage Carpinus caroliniana American Hornbeam 12ft x 12ft 0.25" 25% Aronia arbutifolia Red Chokeberry 12ft x 12ft 0.25" 25% Ilex verticillata Winter Berry 12ft x 12ft 0.25" 25% Lindera benzoin Spicebush 12ft x 12ft 0.25" 25% Wetland Shrub Planting Zone Plant List Species Common Name Spacing Min. Caliper Percentage Aronia arbutifolia Red Chokeberry 12ft x 12ft 0.25" 15% Cornus amomum Silky Dogwood 12ft x 12ft 0.25" 15% Ilex verticillata Winter Berry 12ft x 12ft 0.25" 15% Lindera benzoin Spicebush 12ft x 12ft 0.25" 15% Sambucus nigra Elderberry 12ft x 12ft 0.25" 10% Vaccinium corymbosum Highbush Blueberry 12ft x 12ft 0.25" 15% Cephalanthus occidentalis L. Common Buttonbush 12ft x 12ft 0.25" 15% Herbaceous Planting Zone Plant List Species Common Name Spacing Percentage Juncus effusus Common Rush 8 ft 15% Carex alata Broadwing Sedge 8 ft 15% Carex lurida Shallow Sedge 8 ft 15% Carex crinita Fringed Sedge 8 ft 15% Scirpus cyperinus Woolgrass 8 ft 20% Sagittaria latifolia Broadleaf Arrowhead 8 ft 20% Table 14e. Streambank Planting Zone Livestakes Plant List Species Common Name Spacing Min. Caliper Percentage Cornus amomum flivestake) Silky Dogwood 3-5 ft 0.5" 20% Cephalanthus occidentalis L. Common Buttonbush 3-5 ft 0.5" 20% Salixsericea (livestake) Silky Willow 3-5 ft 0.5" 20% Physocarpos opulifolius Ninebark 3-5 ft 0.5" 20% Alnus serrulata Tag Alder 3-5 ft 0.5" 20% Streambank Planting Zone Herbaceous Plugs Plant List Species Common Name Spacing Percentage Juncus effusus Common Rush 4 ft 40% Carex alata Broadwing Sedge 4 ft 40% Panicum virgatum Switchgrass 4 ft 20% Permanent Seed Mix Approved Date Species Name Common Name Stratum Density (lbs/acre) All Year Schizachyrium scoparium Little Bluestem Herb 3.0 All Year Panicum virgatum Swithgrass Herb 3.0 All Year Rudbeckia hirta Blackeyed Susan Herb 3.0 All Year Carex vulpinoidea Fox Sedge Herb 3.0 All Year Panicum clandestinum Deertongue Herb 3.0 All Year Elymus virginicus Virginia Wild Rye Herb 3.0 All Year Asclepias syrica Common Milkweed Herb 0.8 All Year Lobelia cardinalis L. Cardinal Flower Herb 0.2 All Year Eupatorium perfoliatum Boneset Herb 1.0 ID#* 20140869 Version* 1 Select Reviewer:* Erin Davis Initial Review Completed Date 08/18/2021 Mitigation Project Submittal - 8/18/2021 Is this a Prospectus, Technical Proposal or a New Site?* O Yes a No Type of Mitigation Project:* rJ Stream rJ Wetlands [Buffer ❑ Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Paul Wiesner Project Information .................................................................................................................................................................. ID#:* 20140869 Existing IDI Project Type: F DMS r Mitigation Bank Project Name: Vile Creek Mitigation Site County: Alleghany Document Information Email Address:* paul.Wesner@ncdenr.gov Version: * 1 Existing Version Mitigation Document Type:* Mitigation Remediation Plans File Upload: Vile Creek _96582_AMP August 18, 2021.pdf 4.5MB Rease upload only one PDF of the complete file that needs to be subrritted... Signature Print Name:* Paul Wiesner Signature:* C5vaell / c�c 't•