Loading...
HomeMy WebLinkAboutWQ0041047_Regional Office Historical File Pre 2018Dlvlslon o e ourtes APPLIC.i NT IINFORMATION: ,Ap,pticsnt's name: j` desx Applicant type. [7 h,dividual 0 Federal Signature authority's name: fir tin iwtirrogino per a 4. Apralicant's nsaifsna address.: P913r,.v 6 City: Troutman State: NC Zip: 28166- Rpplicant's contra Phone number (7041 i?8-76()0 Emaif , ddress!iiLimittiii of North Carolina nt of „n ironmental Quality Divisions of Wader Resources 5A NC.aC 02 .0.300 — FAST TRACK SE' 'FFR SYSTEM 'EXTENSION APPLiC.^ATION ETA 04-I6 SUPPORTING DOCUMENTATION U. PROJIECT la''vFORMA`TION: i, Project name. falls C`ytvr a Lit '. Application'Project status: Ira modification, provide the exi: ed I New. Perm Dep © Privately -Owned Public I °ti © Other Ewistir i'ernzit'Prt ber wQtOO and issued date: tf new construction but part o1`a master plan, provide the ex isrin permit number: V Q00 3, County where project is located; Grede1t Approximate Coordinates (Decimal Degrees). Latitude::35.(7✓9 Longitude. -80, _ 5, Parcel IDtif:applicable): 4740157538 for Parcel ID to closest downstream sewer) III_ CONSULTANT INFORMATION; 1, Professional Engineer M. Devin Staley Liaerrse Nunther. O dt Firm: I ftte Rtd f ni;inecrirw address. 924 \fain Suns a 200 City: Ncrr1h 1«'4eshyerp, State: NC Zip: 28059-_. Phone number: t330 8 8-2500 Email ,Address deliin sc,:rl k re:hrePdl .ex;,+rr IV, WASTEWATER TREATh1EN f FACILITY (WWTF) INFORMATION: 1. Facility Name: Rocky. River Permit Number: NC 0046728 Owner Name: Town of Aloor tivi 1. V. RECEIVING VING DOWNSTREAM SEWER INFORMATION (if different than A% WTF): l Permit Number( sr WQ0030370 Owner Natnets): 1 wr of Troutman Downstream I Receiving) Sewer Size: 12 inch r Ab QC'S0024$ FORM: FTA 04-16 GENERAL REQUIREMENTS If the Applicam is a Privately -Owned Public Utility, has a Certificate; of Public Convenience uidNecessity been attached? ' DV) 0NIA If the Applicant is a Developer of lots to be sold, has ..ttikti cittper qatftltwtit0 't.gttowtetli 0 Yes UNn !ZNIA 3. It the Applicant is a t ttytt: f'rt tt,ttr,t tttot.,3,4thtut. Is tin t TttttrtotItottti LvLoncitt t ) been attached? 0 Yes [JNO ist://\ 4 Origin of wasievater: Icheck afl apply t: 2 Residential Owned 0 Rthui sores, centers, malts 0 Residential Leased Li Retail with food preparation/service 0 School/ preschool / day care ' Medical / dental "" veterinary facilities 0 Food and drink facilities J Church 0 Businesses 'offices / facto e D Nursing Home Nature of wastewater LQO DomesticlConmtercial 't:), Commercial 0 Car Wash Hotel and or klotels 0 swimming Pool /clubhouse 0 Swimming Pool/Filier Backwash Other (Explain in Attachment) Industrial L -*is there 3 Pretreatment Program tit Clleo? 0 Yes Has a flow reduction been approved under !""' N,N4 yes "Att• If 'res., provide a ,coot of flow- reduction approval letter 7. Summarize wastewater generated by project „ .„. Establishment 'Fype (see 1021%0)14 ) 1 Daily Design Flow " I Reside - 413R t 480 al day ti 128 ' 61:440 GPD Rcsidentail . 3BR I 360 galeday I 128 t 46,080 GPD 0 No o. of Units „t GPD I I gal/ t I 1 ' i GPD l' ! t ! at 1 GPD......; it ( tf_ gal ,• gar Twat t! 107,520 GPD it See I 4. A \ 1 lhy, 4 1and (00) for caveats to waSteltialtr design floss rates i,e minimum flow per dwelling: proposed unknown non-residential deveiopment uses: public access facilities located near high public uw areas, and residential property located south or east °fine Atlantic Intracoastal \Valensay to he used Ai' vacAtiort re:mak as delincel ), h Per 5A NCAC 02T .0114(c)„ design flow rates for establishments not identified [in table N,C.At 02'1 ,i) I IA shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.. 8. Wastewater generated by project. 107,520 GPO (per ) Do not include future flows or previously permitted allocations If permitted flow, is zero. indicate why 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permitsthat connect to this line 0 Flow has already been allocated in Permit Number 0 R.ehabilitation or replacement of existing sewer with no new flow expected 0 Other (Explain): FORM: FUAO4l6 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA il( Applicable 1. Summarize grlsi.ily ie'er u bc permitted: size (inches) Length (fe NIENLICIriCk 1.(1 tEj Nlaterial 8" 14.800 PVC 8- 280 DIP 12" 2,370 PVC t2" DlP 15" 100 1,700 PVC 14" 86 DIP Section 11 & 111 of the ktDC for Permitting olGravity Sewers contains n1urmiowi rcIaed so design r- Section ill contains information related to minimum slopesfor gravity sewertst Oversizing lines to meet minimum slope requirement is not allowed and a violation of thc MDC VIII. PUMP STA1FION DESIGN CRITERIA (If Applicable) -- Orr & Jjnw SiAtiomiForct Atlitinsji COMPIVIE, MP STATION INCLUDED /N. TIDS PROJECI Pump station number or name: 7 „Approximate Coordinates (Decimal Degrees): Latitude: Longitude, Design flow oldie pump station: millions gallons per day (Firm capacity') 4„ Operational politics) of the porno's): gallons per intrude atfeet total dynamic head t 5 Summarize the force main to be permitted t for this Pomp Station): 1 Size (inches) t Length (feet) t Material 6, Power reliability in accordance with 5 \ 1t 0 CI Standby power source or pump with automatic activation and telemetry— 15A NCAC 07T ,0305(h tu Bct Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day lllust be permanent to facility, Or if the pump station has an average daily flow less than 15,000 gallons per day: Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02 ,030511 C 1 Or Portable pumping unit with plugged emergency pump connection and telemetry' - 5A NCA( 02T ..03.05(h.8 I I(CI. It shall be demonstrated to the Division that the portable source is. owned or contracted by the applicant (draft agreement) and is compatible with the station., R- lithe portable power source or pump is dedicated to multiple pump stations,, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including traveltimelrarnes, shall be provided in the case or a multiple station power outage, FORM; ETA 04-16 Page 3 of 5 SETBACKS & Sr ..P RAT1ONS QI B -f92 NCAC d2.F Does the project comply with all separations found in 1; ) 5A N(.°.AC 0.2T.o305i 1'1 contains minimum separations that sha Setback Parameter' Reclaimed ovate clat ncd water iinc t hor rJ below !vertical) includtnt itned over scwcrr claittti ever seov `Any private or public water supply source, including any impetnrdcd reservoirs ua �aa �t ounce of drrnku t. rtrr ossified WS (except WS-I or WS-VD. R. SA, ORW. HQ\ . or SR from normal ide elawatarrnD and wetlands (see item I X.2) Any other stream, lake. impoundment, or ground water Iovveron,S and surface drainage ditches Any buildine foundation , Aaty basement l"`cep slope of ernbankmc Drainage„yysterns a snv swirnming pniols Finat earth grade t vertical( t ! N contains alternatives where separations in :`,` "Stream c9assific 'ions can be identlfed using the Division's, vS St..104 If noncornp[iance wttrr ;' ,,. 5 r , seeSection k ofthis application e .'`t='rs eaters ofClass I or Does the project comply with separation requirements for svetJands,, 50 feet of separation) See the Division's draft separation requirements for situations where separation cannot No variance is required if the alternative design criteria specified is utilized in design andconstrue As built documents should reference the location of areas effected :arcs, .. 24inches 18 inches f1 reef inches 2 feet 10 feet 5 feet 0 feet 10 feet. 5feet .wm�t 10 feet inches chieved, Does the project comply with P. This would include Trou nd in the river basin rules per I earns per w'..._ :'r _1t 4. Does the project require coverragelauthorization under a 404 Nationwid individual pertn'its or 401, Wale -Quality Certifications" Information can be obtained from the at,(& i3utkr pertiintiril, 5 Does ply with t Per Fist rr fit. r g;s4 a rxt}=, directly been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans. etc.1. Yes No ®N Yes a !o N'A © Yes Nu (additional permit s"cerktfications)? 0. No d environmental permits or certification applications are being prepared, have Does this project include any sewer collection lines that are deemed "high -priority, Per `u:t 'sr, . t: 11 "high -priority sewer" means `.any aerial sewer. sewer contacting surface waters, siphon, or sewer positioned parallel to streamtanks that is Subject to erosion that undermines or deteriorates the sewer. © Yes [0 No DNA r I f yes, include an attachment with details for each line. including type (aerial line, size, material, and locationb. High priority lines stroll be inspected by the permittee or its representative at least once ever documented per I5A l' CAC 02T.041O3(a)(5) or the permitee's individual System -Wide Collection permit. onths and inspections FORIXt FIA 04.16 Page 4 of 5 X. CERTIFICATIONSe Does the submitted system comply with surd the If (vo, cerraapteta: and submit the ' aria Professional Engineer's C eat igii Request dpplic ictun t v A 0( .10-14) and supporting documents for tanfitofthe 1- r�v c name hot n rypplicatie lid is accurate, complete. and consistent with the i ions. and all other supporting documentation to the hest of my of my 1 nowrIedt e the proposed design has been prepared in accordance with \ tinirpurta Design C ymt tat firr Cit"avity Sewers (latest version), and the *siittin of Pump Stations and Force Mains !latest versiann i Although other submittal package, inclusion of these materials under my signature and have judged it to he consistent with the proposed design, is tirmtt sand vtiettorting, ducat mien ts supplied in the plans. specifications. wledge. I further attest that to the best plicablc regulations, Gravity Sewer iteti°a for the Fast -`mock Permitting .e developed certain portions of this hal 1 have reviewed this material and NOTE, In accordance with Cicm rug Setttttes 14:3-215,6:1 and 14 3.2I 5,GB, any person who Ivnowingly makes any false coat rnent, re,prcsentatomon, or cellar `'ratsamn in any application package shalt be guilty of a Class 2 misdemeanor, which may anelude a fine not to e_,seeed SI+),t)(aU, as v«etl as civil ,penalties up to S25,000 per violation, North Carolina Professional Engineer's seal, signature, and date. AppIicant°s C'errtifcalion per 15A NC ,S.0 02T .0106tbl CIA �ki_ rCtit4C Ibtfi4 AIWA (Signature Authority's name & tit from Appi attest that this application for has been reviewed by me and is accurate and complete to the he of my knowledge,. I understand that if all required. parts of this application are not completed and that if all required supporting docurnen'tatuon and attachments are not included, this application package is subject to being returned as incomplete. i understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, inpunctive relief, andror criminal prosecution, I will make no claim against the Division of Water Resources should a condition of this permit be violated, I also understand that if all required pans of this application package. arc not completed and that if all required supporting, information and attachments are not included_ this application package will be returned to me as incomplete. NOTE ._ In accordance with General Statutes 1 t i w a,;s and € 't l, ° ,any person who, knowingly makes any faise statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S10,000 as well as civil penalties up to $25.000 per violation. Date, FORM, `TA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Troutman Project Name for which flow is being requested: Falls Cove at Lake Norman Phases 5,6,7 More than one FTSE may be required for a single project ?I -the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewaterflow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: _ All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request 0.107520 g. Total actual and obligated flows to the facility h. Percent of permitted flow used Ii. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A D) Design Obligated, Average Daily Approx. Not Yet Total Current Pump Station Firm Flow** Current Tributary Flow Plus (Name or Capacity, * (Firm 1 pf), Avg. Daily Daily Flow, Obligated Available Number) MGD MGD Flow, MGD MGD Flow Capacity*** Streamwood 1.022 0.409 0.020 0.243 0.263 0.146 Westmoreland 1.080 0.432 0.050 0.366 0.416 0.016 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Mooresville Collection System Downstream Permit Number: Page I of 6 FTSE 04-16 III. Certification Statement; I Justin Longino certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en. route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signingure gate Page 2 of 6 FTSE 04-16 Obligated Not Yet Tributary Daily Flow Subdivision I Remaining Obligated Flow (GPD) 1 Permit Reference Notes Sutlers Milt j 21,600 _ WQ0036983 approx. 60 lots remaining Sanders Ridge 1 42,120 WQ0034676 Falls Cove, Phase 2 135,420 W00039395 neglecting few homes already built Falls Cove, Phases 5.71I 107,520 this specific request (Line f.) Sutters Mill 11 I 53,968 WQ0040770 Total 365,628 1 F1�tF.io11 r E..tr!.i f r•.ourte. State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04- 1 6) Entity Requesting Allocation: Town of Troutman Project Name for which flow is being requested: Falls Cove at Lake Norman Phases 5,6,7 More than one FTSE may be required for a single project if the owner of the WWTP is no! responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Rocky River WWTP b. WWTP Facility Permit #: NC0046728 All flows are in !IGD c. WWTP facility's permitted flow 7.5 d. Estimated obligated flow not yet tributary to the WWTP 1.470121 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 4.752625 0.093 184 6.31593 84% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the Pump Station (Name or Number) S. Iredell Reeds Cr. Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm / pf), MGD Approx. Current Avg. Daily Flow, MGD (B) (C) Obligated, Not Yet Tributary Daily Flow, MGD 2.33 0.93 0.40 .2252 7.93 3.17 WWTP: (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow Available Capacity*** .6252 .3048 2.54 .5906 3.13 0.04 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: • Page 1 of 6 if3e,ation Statement: 1 a SE certto the best of my knowledge that the addition of the voluble of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment fa'and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections 1 and 11 plus all attached planning assessment addendums for which l am the responsible pasty.. Signature of this form indicates acceptance of this wastewater flow. Signing Q',ffiei Signature Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality February 14, 2008 John Vest Public Services Director 4I3 North Main Street P.O. Box 878 Mooresville, NC 28115 Subject: Rocky River WWTP, NC0046728 Residential Flow Reduction Approval Iredell County Dear Mr. Vest: On January 25, 2008 the Division of Water Quality received a flow reduction request for residences in the Town of Mooresville served by the Rocky River WWTP (Permit No. NC0046728). The request presented two methods for calculating the wastewater reduction. The first method presented is the preferred method. The DMR data between. December 2006 and November 2007 was analyzed by central office staff. The highest monthly average was observed in January 2007. Based upon this data the Division hereby approves your request for the reduction in flow to 104 gallons per day per bedroom (minimum of 208 gpd for 1 and 2 bedroom residences) for sewer extension permits issued tributary to the Town of Mooresville Rocky River wastewater treatment plant. Regardless of the adjusted design daily wastewater flow rate, at no time shall the wastewater flows exceed the effluent limits defined in the NPDES permit for the treatment facility or exceed the capacity of the sewers downstream of any new sewer extension or service connection(s). If you have any questions or comments regarding this matter, please contact Deborah Gore at (919) 733-5083 ext. 593, email [Deborah.Gore@ncmail.net]. Sincerely, Coleen H. Sullins cc: Rob Krebs, Mooresville Regional Office Dee Browder, Mooresville Regional Office Central Files NC0046728 • NPDES permit file NC0046728 PERCS Flow Reduction File • NOne 7' Pretreatment, Emergency Response and Collection Systems Unit Internet httpl/h2a.enr nc.state.uslndpu OrthCarOlina 1617 Mail Service Center, Raleigh, NC27699-1617 An Equal Opportunity Action Employer at/Iya/1y Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post-consumerpaper e *nee P C N (1-) I..x:i.) `liu resv lle Region:1 (.` �tfn: Britt: Selzer Center ,.venue oor ° �°ille, NC 28113 Ref: Falls Cave at Lake Normal. — Troutman, NC Phases 5,6, and 7 Fast Track Sewer Submittal Dear Brit. Please find the following satl.aataittals tear tlac ahc> e rcterenced project. The pr()jcc Cove subdivision ira Troutta'twtn, NC. The proposed project includes extending tl sewer to serve an sadditiean;.tl 128 4-hcdroc tra h.catnes and 128 3-bedroom homes, • • • aue rions. w1" (.2) letter to Ioore For the Eirctt, Blue Ridge Engineering PLLC