HomeMy WebLinkAboutNC0024872_Correspondence_20210730ROY COOPER
Governor
ELIZABETH S. BESER
Secretary
S. DANIEL SMITH
Director Environmental Quality
Johnny Lambert
Davie County
261 Chaffin St
Mocksville, NC 27028
NORTH CAROLINA
July 30, 2021
SUBJECT: Compliance Inspection Report
Cooleemee WWTP
NPDES WW Permit No. NC0024872
Davie County
Dear Mr. Lambert:
On Tuesday, July 27, 2021, Alex Lowe of the WSRO conducted a routine Pretreatment Compliance
Inspection of the Davie County - Cooleemee pretreatment program. Acting Pretreatment Coordinator John
Grey, Water Resources Superintendent Michael Weir, ORC Tim Smith, and Administrative Coordinator
Joy Howard were present for the inspection. This inspection was conducted to verify that the facility is
operating in compliance with the conditions and limitations specified in NPDES WW Permit No.
NC0024872. The full findings and comments noted during this inspection are provided in the enclosed
copy of the inspection report entitled "Pretreatment Compliance Inspection (PCI) Report."
Pretreatment Program Elements
All Pretreatment Program elements are up-to-date. Note that the next HWA is due September 30, 2021.
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Next
Due, If
Applicable
Headwaters Analysis (HWA)
10/3/2016
(revision 1/2/2017)
Yes ❑
No
3/3/2017
Yes ❑
No
9/30/2021
Industrial Waste Survey (IWS)
5/29/2020
Yes ❑
No
8/25/2020
Yes ❑
No
4/30/2025
Sewer Use Ordinance (SUO)
*Updated 11/6/2017, but no changes
were related to pretreatment*
10/23/2013
/1
Yes ❑
No
12/30/2013
A
Yes ❑
No
Enforcement Response Plan (ERP)
6/2/2020
Yes ❑
No
9/2/2020
I
Yes ❑
No
Short Term Monitoring Plan
(STMP)
3/12/2018
(revision 3/27/2018)
0
Yes ❑
No
3/28/2018
0
Yes ❑
No
Program Background
The program has only one SIU, Ingersoll Rand. The IUP was renewed on January 1, 2021, and an
inspection was conducted within the past 12 months (due to COVID-19 restrictions, the inspection was
conducted virtually, via telephone, with pictures of the facility provided by the SIUs representative).
North Carolina 0epartment of Fn ironmental Qualify I Division of Water Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road,5uite 3001 Wen%ton-Salem, North Carolina 27105
336.776.9800
Action Items
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required. The pretreatment program was found to be well -run and compliant upon this
inspection. If you should have any questions, please do not hesitate to contact Alex Lowe with the Water Quality
Regional Operations Section in the Winston-Salem Regional Office at 336-776-9800 or via email at
alex.lowe@ncdenr.gov.
Sincerely,
, DocuSiiggned by: <
AAjte
"-145B49E225C94EA...
Lon T. Snider, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Enclosed: Pretreatment Compliance Inspection Report
Cc: Winston-Salem Regional Office — Digital File
Laserfiche — Digital File
John Grey, PE — Digital Copy
North Carolina 0epartment of Fn ironmtntal Qualify I Division of Water Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road,5uite 3001 Wen%ton-Salem, North Carolina 27105
336.776.9800