HomeMy WebLinkAboutNCC214711_ESC Approval Submitted_20210818Iredell County Planning & Development
Erosion Control Section
349 North Center Street
P.O. Box 788
Statesville, NC 28687
Date: July 12`h 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Andrew McDonald
Hidden Lakes Holdings LLC
2649 Brekonridge Centre Dr.
Monroe, NC 28110
RE: Project Name: Beaver Creek Single Family Subdivision
Acres Approved with Modifications: 66
Project ID: STVLE-2021-091
Project Location: PIN 4733156364
Submitted By: Bloc Design, PLLC
Date Received: June 22" d 2021
Plan Type: New
Dear Mr. McDonald:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and herby issue this Letter of Approval with Modifications.
Modifications must be received in this office no later than two weeks prior to the project start
date. Failure to submit modified plans can result in a violation and fine under the Iredell County
Land Development Code. The Modifications required for Approval are listed on the attached
page. The Certificate of Approval issued by Iredell County must be posted at the job site. This
plan approval shall expire three (3) years following the date of this approval as is required by
Title 15A NCAC 413.0129 and Appendix H of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code
requires that a copy of the approved erosion control plan be on file at the job site. Any
amendments and/or revisions to the approved plan must be reviewed and approved prior to
implementation in order for the site to remain in compliance. Failure to submit plans for approval
may result in administrative actions and/or penalties as indicated in the Iredell County Land
Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix
H of the Iredell County Land Development Code, of our right of periodic inspection to insure
compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
Letter of Approval with Modifications
Beaver Creek Single Family Subdivision
July 121h 2021
Page 2 of 3
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Iredell County Land Development Code and the
Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through
66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval. It is the responsibility of the applicant to obtain all other required permits or
approvals.
As of May 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or
after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it is required that this
office to be notified of the proposed starting date for this project. Failure to notify this office of
the starting date may result in a Notice of Violation and civil penalty. Please notify us when you
plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
1 �Z"14 4
Jonathan Williams
Erosion Control Inspector I1
Enclosures: Modifications
Fact Sheet on the New NCGO1 Permit
Permit
Letter of Approval with Modifications
Beaver Creek Single Family Subdivision
July 12'h 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Beaver Creek Single Family Subdivision
Project ID: STVLE-2021-091
County: Iredell
Reviewed by: Jonathan Williams
Required changes are designated as "RC" under legal authority from NC
General Statutes Chapter 113A Article 4 and the Iredell County Land
Development Code.
Suggested changes are designated as "SC" for improvement of the plan.
1. Provide a copy of the City of Statesville Floodplain Development Permit prior to land
disturbance. —RC
2. Provide a copy of permits from NCDOT and City of Statesville for disturbances related
to road right-of-way and utility work as applicable prior to land disturbance. —RC
3. Close gaps in the silt fencing along the northern property boundary that do not drain to
the basins in Phase 1 until Phase 2 berms are in place on the northern property boundary.
—RC
4. Include diversion 1-5 installation on page CE-101 in the limits of disturbance. —RC
5. Mark basins 3 & 4 spillway locations on the Phase 2 plans. —RC
6. Basin 3 outfall should discharge into a stabilized path to feed the treated water to the
slope drain inlet to leave the site. —RC
7. Provide inlet and outlet -protection for construction drive culverts. —RC
8. Adjust Basin 4 skimmer orifice size to 2 inches to dewater the required volume of 13,266
ft3 in as close to 3 days' time (2.87 days) possible. —RC
9. For Basin 1 extend the slope drain for the middle diversion so that the discharge enters
the basin behind the 3"1 baffle furthest from the skimmer. -SC