HomeMy WebLinkAboutNCC214544_NOI Application_20210818Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 8/9/2021 2:48:03 PM (NCG01 NOI Submission)
Approve by Broussard, Brooklyn C 8/9/2021 2:57:19 PM (Review- Construction NOI 61727)
• The task was assigned to Broussard, Brooklyn C by round robin distribution 8/9/2021 2:49 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 11, 2021 5:00
PM 8/9/2021 2:49 PM
Submit by Selkane, Aziza 8/18/2021 10:33:40 AM (Payment Verification for NCC214544)
* 5 Star Holding CO., LLC
• Selkane, Aziza assigned the task to Selkane, Aziza 8/18/2021 10:32 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 20, 2021 5:00
PM 8/9/2021 2:58 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting r No
an NOI that was r Yes
rejected before?
Previous Rejected 61664
NOI No.
Prior Reviewer Brooklyn Broussard
Name
1a. Project Name * Five Star Carwash Gate City
1 b. Specific Lot This field may be used to list specffc lot numbers.
Numbers
1 c. Parcel ID List all R% associated w ith this project.
Number(s) (PIN) 7843-73-1821, 7843-73-1649
2. County* Guilford
3. Highway or Street 3803 wgate city blvd
Address* Street name only is acceptable if no address number assigned yet
4. City or Township* greensboro
5. State * NC
6. Zip Code* 27407
7. Latitude* Enter the latitude in decimal degrees
36.0380
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-79.8550
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 08/10/2021
Estimated Construction Project Start Date
10. Date to End * 08/08/2022
Estinated Construction Project End Date
11. SIC (Primary)* Commercial (1542)
Standard Industrial Classification for Development
12. Acres to be 1.15
disturbed* (including off -site borrow and waste areas)
13. Total site area 1.18
(acres) *
14. Post- 0.70
construction (Estimated)
impervious area
(acres) *
Project Tracking ID NCC-GUILF-2021-Five Star Carwash Gate City
Assigned automatically (not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving south buffalo creek
Waterbody* Narreof waterbody into which stormwater runoff will discharge
15b. Waterbody 16-11-14-2
Index No. * NCWaterbody Index Nurrber
Stormwater F No
discharges will flow 17 Yes
to additional
wate rs *
15c. Additional buffalo creek
Receiving Waterbody narre
Waterbody
15d. Waterbody 16-11-14
Index No. NCWaterbody Index Number
15e. Additional reedy fork
Receiving Waterbody narre
Waterbody
15f. Waterbody 16-11-(9)
Index No. NCWaterbody Index Number
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * 5 star gate city blvd Ilc
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Mark
If Corporation, enter Faegistered Agent First Wre
3. Last Name* Reynolds
It Corporation, enter F;bgistered Agent Last %rre
3b. Title manager
4. Permitee E-mail markreynolds@wash5star.com
Address*
5. Permittee 336-580-3368
Telephone No.*
6. Permittee Mailing Street Address
Address* PO Box 10428
Address Line 2
City
State / Frovince / Fbgion
greensboro
nc
Fbstal / Zip Code
Country
27404
usa
Check box if the F Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 6 Granville Oaks Court Greensboro, NC 27408
Address Line 2
City
State / Frovince / Faegion
greensboro
nc
Fbstal / Zip Code
Country
27408
usa
8. Type of ONnership is only individual if an individual is naned in B.1. above.
Ownership* Non -Government
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Gray
Contact - First
Name *
2. Primary Site
Coble
Contact - Last
Name *
3. Title
4. Site Contact E-
graycoble4@gmail.com
mail Address*
5. Site Contact
336-401-5757
Telephone No.
6. Organization
Bill Norman Construction
Name
7. Site Contact
Street Address
Mailing Address*
234 Storm Haven Ln
Address Line 2
city
mt airy
Fbstal / Zip Code
27030
8. Consultant Name
(Optional)
jarrett senkbeil
First and Last nacre
9. Consultant E-mail
jarrett@onsitecivil.com
This person will be copied on all correspondence.
10. Consultant
4040-822-9147
Telephone No.
11. Billing E-mail
(For Annual Fee correspondence)
markreynolds@vvash5star.com
Default is legally responsible person e-rrail
12. Billing
(For Annual Fee correspondence)
Telephone
336-580-3368
Default is legally responsible person telephone
State / Rovince / Region
nc
Country
usa
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 08/09/2021
Approved *
2. E&SC Plan Project 3054
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* City of Greensboro
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan COG Erosion Approval Letter.pdf 377.59KB
Approval letter or Mast beRDFformat
Grading Permit
6. Site Location Map Mist be RDFforrret (lint 20 NB)
vicinity map.pdf 59.17KB
Rease do not upload entire set of E&SC plans.
7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies if necessary.
8. NOI Certification NOI form signed.pdf 82.33KB
Form Wst be RDFforrret
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Legally Responsible Person named on this Notice of Intent
f Authorized Responsible Person' (signing on behalf of Legally Responsible
Person named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* mark p. reynolds
Title manager
Organization Legally Pesponsible Entity
5 star gate city blvd Ilc
Date * 08/09/2021
F. Tracking and COC Info
NOI Tracking No. 61727
NC Reference No.
NCG01-2021-4544
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC214544
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 4544
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2021
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC214544-2021
Invoice Due Date 9/8/2021
Initial Fee $ 100.00
Invoice Status OPEN