Loading...
HomeMy WebLinkAboutNC0020427_Inspection_20001221L NORTH CARDLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FAYE7TEVILLE, REGIONAL OFFICE December 21, 2000 Mr. Monty.R. Crump, City Manager City of Rockingham POBox520 Rockingham, NC 28379 SUBJECT: Compliance Evaluation Inspection City of Rockingham WWTP NPDES Permit No. NC0020427 Richmond County Dear Mr. Crump: Enclosed is a copy of the Compliance Evaluation Inspection conducted December 6.2000. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations and recommendations are in Part D. Summary of Findings/Comments of this inspection report. The objective we should all be striving for is NPDES permit compliance which in turn will provide preservation of our receiving stream for generations to come. Please review the attached report. If you or your staff have any questions do not hesitate to contact me at 910-486-1541. Sincerely, Belinda S. Henson Environmental Chemist /bsh Enclosures 225 GREEN STREET, SUITE 714 / SYSTEL BLD. FAYETTEVILLE, NORTH CAROLINA 28301-5043 PHONE 910-436-1541 FAX 9I O-48S-0707 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLED/10% POST -CONSUMER PAPER NPDES COMPLIANCE INSPECTION REPORT North Carolina Division of Water Quality Fayetteville Regional Office Section A. National Data System Coding Transaction Code: N NPDES NO. NC0020427 Date: 001206 Inspection Type: C Inspector: S Facility Type: 1 Reserved: Facility Evaluation Rating: 4 BI: N QA: N Reserved: Section B: Facility Data Name and Location of Facility Inspected: City of Rockingham WWTP Entry Time: 10:15am _ Permit Effective Date: 990601 Exit Time/Date: 1:45pm/001206 Permit Expiration Date: 040229 Name(s), Title(s) of On -Site Representative(s): Larry Cobler (Certified Grade IV Operator) - "ORC" Phone Number(s): (910) 895-9434 Name, Title and Address of Responsible Official Mr. Monty R. Crump, City Manager PO Box 520 Rockingham, NC 28379 Contacted: no Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable) aci cevi .. Measiareriiea .oa`ato uen eceivrn u 5posal Cn pl ance S:cti a fule „ , (B[rerarr:r Martenacu_ Section D: Summary of Findings/Comments: 1. As of December 1, 2000 the Yadkin Pee Dee Association completes all NPDES permit required stream monitoring. 2. A backup generator is on site to operate the entire plant during power failure with the exception of the biosolids composting system. 3. An alarm system monitors pump failures, inoperable clarifiers, power failure and etc. If any of these occur the operator on call will be phoned to supply the assistance needed to repair the. item. 4. The City has 24 pump stations which are monitored each day as per Mr. Cobler. All main pump stations have telemetry. - 5. The incoming wastewater is made up of 85% - 90% of industrial. 6. The influent and effluent flow meter were calibrated December 8, 1999 by Nix, Purser and Associates. The influent flow meter readings are recorded on the Discharge Monitoring Reports (DMRs). The influent flow meter was installed within the last year. Documentation was; noted on the calibration records of the % error before and after calibration as suggested in a previous report. 7. The automatic bar screen and the grit removal system appeared to be operational. These areas appeared to have paint worn from the surfaces. Maintaining these areas in the near future could eliminate major costs in the future. All screenings and grit are loaded in containers on a daily basis and lime is added and disposal occurs through the Uwharrie Environmental Landfill located in Montgomery County. The area located around the bar screen appeared to have some paper products on the ground. As per Mr. Cobler this area is raked on Friday of each week. A recommendation is to clean this area more frequently to assist with maintaining facility grounds. 8. The primary clarifiers and trickling filter appeared to be operating adequately. 9. Two (2) aeration basins are operational but only one (1) is necessary for proper treatment of wastewater. Four (4) aerators and two (2) floating mixers are operational in the basin. The Mixed Liquor Suspended Solids (MLSS) results were 3000 mg/L. The Dissolved Oxygen analysis is done twice a day and documented. The most recent result was 1.7 mg/L. Polymer is added to .the MLSS at the end of the aeration basin before it enters the clarifiers. It is added to assist with the settling of solids in the clarifiers. A 6000 gallon polymer storage tank is located on site. Approximately 2000 gallons are utilized monthly. 10. The sludge depths of Clarifier #1, #2, and #3 appeared to be 2'/2 feet with tank depths of ten (10) feet in # 1 and #2 and twelve (12) feet in #3. As per Mr. Cobler repairs of weirs and internal mechanical components are to be completed in next year's budget for Clarifier #2. Wasting from the clarifiers occurs twice a week with approximately 350,000 gallons wasted. 11. Two (2) variable and two (2) constant speed effluent pumps are located at the effluent pump station. Under normal flow conditions one pump is utilized. -continued- 12. The chlorine contact tanks are cleaned every 2-3 weeks as per Mr. Cobler. The effluent appeared to be free of solids. Chlorine is used to disinfect the effluent. It is added by a flow paced system called Regal Smart Valve which doses the effluent as the flow increases. Sulfur dioxide is used to dechlorinate the effluent before it is discharged. 13. Effluent sample collection is completed at the. wet well area located at the effluent pump station. The effluent discharge pipe was relocated at the end of April 2000. It travels directly to the Pee Dee River. 14. The influent and effluent composite samplers' temperature was within 0 - 4 degrees C required for proper preservation. As a reminder all major facilities should incorporate flow proportional sampling for the effluent composite sampler by March 15, 2001. 15. The biosolids handling facility appeared to be operating adequately. Biosolids travel to the belt press at 2 - 3 % solids and at the completion of the dewatering process solids are 19 - 20 % solids. The belt press is utilized twice weekly. Biosolids are composted for a Class A Biosolids and is used by various landscaping companies and etc. The land application permit is WQ0004477. 16. Sand drying beds are no longer used to dry biosolids. Plans are to remove all drying beds with the exception of one which will be used to dry waste material collected from the collection system by vac trucks. When the drying beds are removed an expanded concrete pad will be constructed to store biosolids during the composting process. 17. The `Backup Operator" for this facility is Tommy Campbell. He is a NC certified Grade II Wastewater Treatment Operator. 18. The certified laboratory on site analyzes all NPDES permit required parameter with the exception of the following: Metals, Total Nitrogen, Total Phosphorus and Chronic Toxicity which is completed by "Burlington Research". 19. Laboratory records were reviewed for the months February and March 2000 and compared to Discharge Monitoring Reports (DMRs). On the date March 7, 2000 a Total Nitrogen was reported as 2.5 mg/L on the DMR but laboratory records revealed the result was 5.0 mg/L. The following procedure should be followed in submitting a corrected copy for the month of March 2000: A. All corrected data should be written in red ink or hi -lighted. B. At the top to the Effluent Page, the words "Corrected Report" or "Amended Report" should be written in red ink on all copies. This will differentiate between originally submitted report and corrected report. C. Two (2) copies of the corrected report should be submitted to this Division and one (1) copy must be retained by the pern ittee. Submit corrected DMR for the month of March 2000 by January 31, 2001 to our Division. D. A brief explanation for the correction should be written either on the back side of the Effluent page or in a cover letter accompanying the reports. -continued- 20. A compliance evaluation analysis report for the period November 1999 through September 2000 did not reveal any monthly violations. There were not any Notice of Violations (NOVs) sent to the facility during this period. 21. As a reminder according to our Administrative Code Section: 15A NCAC 2B .0506(b)(3)(F)(i)-the date on which collection of composite samples is commenced or data shall be entered onto the monitoring report form on the date that has the greater number of hours in it. The following examples will assist you in understanding the reporting date: A. If the composite sample is started on Tuesday, November 7, 2000 at 9:OOAM and the sample is withdrawn from the composite sampler on Wednesday, November 8, 2000 at 9:OOAM; the day with the greater number of hours in it is Tuesday, November 7, 2000. B. If the composite sample is started on Tuesday, November 7, 2000 at 6:OOPM and the sample is withdrawn from the composite sampler on Wednesday, November 8, 2000 at 6:OOPM; the day with the greater number of hours in it is Wednesday, November 8, 2000. Name and Signature of Inspector Agency/Office/Telephone Date Belinda S. Henson �DENR/Fayetteville/(910)486-1541 Name and Signature of Reviewer Agency/Office/Telephone Action Taken DENR/Fayetteville/(910)486-1541 Regulatory Office Use Only Compliance Status Noncompliance _Compliance Date Date Section D: Summary of Findings/Cbmments Brief Facility Description: A 6.0 MGD WWTP consisting of influent pumps, mechanical bar screen, grit removal, magnetic flow meter. primary clarifiers_ trickling_filter. secondary clarifier, dual extended aeration basins, three final clarifiers. three chlorine contact chambers, sulfur dioxide dechlorination, aerobic sludge digester, sludge drying beds, belt filter press, composting system effluent pump station, and a post aeration cascade aerator. FACILITY SITE REVIEW No N/A 1. Treatment units properly operated and maintained. Yes No N/A 2. Standby power or other equivalent provision provided. es No N/A 3. Adequate alarm system for power or equipment failure available. 4. Sludge disposal procedures appropriate: es )No N/A a. Disposal of sludge according to regulations Yes No N/A b. State approval for sludge disposal received. es No N/A 5. All treatment units other than backup units in service. Yes No N/A 6. Sufficient sludge disposed of to maintain treatment process equilibrium. No N/A 7. Adequate number of qualified operators on staff. Gres j No N/A 8. Established procedures available for training new employees. e ' No N/A 9. Adequate spare parts and supplies inventory maintained. Yes No N/A 10. a. Hydraulic overflows and/or organic overloads experienced Yes (go) N/A b. Untreated bypass discharge occurs during power failure Yes S N/A c. Untreated overflows occurred since last inspection. No N/A 11. Plant has general safety structures such as rails around or covers over tanks, pits, or wells. es' No N/A 12. Plant is generally clean, free from open trash areas. Tes>No N/A �Yes� No N/A Yes 1CVo; N/A 3Yej No N/A Yes ()N/A Yes (No )N/A Yes -)No • N/A Yes a N/A Yes gii:NN/A Yes ( N/A Yes N/A Yes log N/A Yes Vo> N/A Yes moo' N/A. Yes N/A Yes N/A Yes N/A Yes 07 N/A Yes No .N/A Yes al. N/A Yes N/A Yes (NO) N/A Yes CI\Ta N/A Yes ffo N/A Yes CND N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Page 2 13. Screening: a. Manual b. Mechanical c. Buildup of debris d. Screenings properly disposed of. 14. Grit Removal: a. Excessive organic content in the grit chamber b. Excessive odors c. Grit properly disposed of. 15. Primary clarifier: a. Excessive gas bubbles b. Black and odorous wastewater c. Poor suspended solids removed d. Excessive buildup of solids in center well of circular clarifier e. Weirs level f. Weir blockage g. Evidence of short circuiting h. Lack of adequate scum removal i. Excessive floating sludge j. Broken sludge scraper. 16. Trickling Filter: a. Trickling filter ponding(indicating clogged media) b. Leak at center column of trickling filter's distribution arms c. Uneven distribution of flow on trickling filter surface d. Uneven or discolored growth e. Excessive sloughing of growth f. Odor g. Clogging of trickling filter's distribution arm orifices h. Filter flies, worms, or snails. 17. Rotating Biological Contactors (RBC): a. Development ofwhite biomass on rotating biological contactor media b. Excessive sloughing of growth c. Excessive breakage of rotating disks or shafts in RBC units d. Excessive breakage of paddles on brush aerators e. Shaft, bearing, drive gear, or motor failure on disk or brush aerators. Yes No ; N/A Yes l ) N/A Yes N/A Yes NO N/A Yes C i N/A Yes No Yes No t /A) 18. Activated Sludge Basins/Oxidation Ditches: a. Dead spots b. Failure of surface aerators c. Air rising in clumps d. Dark foam or bad color e. Thick billows of white, sudsy foam f. Air rising unevenly g. Excessive air leaks in compressed air piping. Page 3 19. Stabilization Ponds/Lagoons: Yes No 04.) a. Excessive weeds including duckweed in stabilization ponds Yes No N/A b. Dead fish or aquatic organisms Yes No N/A c. Buildup of solids around influent pipe Yes No N/A d. Excessive scum on surface. Yes N/A Yes (So N/A Yes LNg; N/A Yes (RIO) N/A Yes joy N/A Yes Eo: N/A Yes (Nd N/A Yes No N/A Yes go) N/A Yes ( N/A Yes Yes Yes Yes Yes Yes 20. Secondary Clarifier: a. Excessive gas bubbles on surface b. Unlevel overflow weirs c. Weir blockage d. Evidence of short circuiting e. Excessive buildup of solids in center well of circular clarifier f. Pin floc in overflow g. Ineffective scum rake h: Floating sludge on surface 5c : n z cal 4( # i. Excessive high sludge blanket j. Clogged sludge withdrawal ports on secondary clarifier. 21. No(N[ .) No N/A No N/A No N/A No N/A No N/A Yes Icio, N/A Yes N/A Yes No N/A CY:a No N/A Yes)No N/A Yes No C�NIA) No N/A CYe-s) No N/A Filtration: a. Filter surface clogging b. Short filter run c. Gravel displacement of filter media d. Loss of filter media during backwashing e. Recycled filter backwash water in excess of 5 percent f Formation of mudballs in filter media. 22. Chlorination Unit: a. Sludge buildup in contact chamber b. Gas bubbles c. Floating scum and/or solids d. Adequate ventilation of chlorine feeding room and storage area e. NIOSH-approved 30 minute air pack f. All standing chlorine cylinders chained in place l ac° i to cAl 1; A (& (' ) g. All personnel trained in the use of chlorine 564°tY h. Proper chlorine feed, storage, and reserve supply. Yes No N/A...) 23. Ultraviolet radiation disinfection present and in use. Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 24. No (WA—) No N/A No N/A No No No No N/A N/A N/A N/A No N/ No N/A No N/A Yes No N/ Yes No (N/A.-) Yes No (WAD Yes No _/A) Yes No N/A) ryes ) No N/A (Yes No N/A Yes Yes Yes Yes No No No No N/A N/A N/A N/A r� Yes No (N/A' Yes No N/A Yes No N/A Page 4 Dechlorination: a. Proper storage of sulfur dioxide cylinders b. Adequate ventilation of sulfur dioxide feeding room c. Automatic sulfur dioxide feed or feedback control not operating properly. 25. Aerobic Digester: a. Excessive foaming in tank b. Noxious odor c. Mechanical aeration failure d. Clogging of diffusers. 26. Anaerobic Digester: a. Floating cover tilting b. Gas burner operative c. Supernatant has a sour odor. 27. Sludge Drying and/or disposal: Poor sludge distribution on drying beds Vegetation in drying beds Dry sludge remaining in drying beds Dry sludge stored on site Filtrate from sludge drying beds returned to front of plant Approved disposal site forthe sludge Sludge land applied. a. b. c. d. e. f. g• 28. Filter Press: no t` o (' -�' n �� z z s e to , t ; L , a. High level of solids in filtrate from filter presses or vacuum filters b. Thin filter cake caused by poor dewatering c. Sludge buildup on belts and/or rollers of filter press d. Excessive moisture in belt filter press sludge cake. 29. Polishing Ponds or Tanks: a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface Solids or scum accumulations in tank or at side of pond Evidence of bypassed polishing ponds or tanks because of low capacity. b. c. Yes N/A Yes ( N/A Yes No N/A es) No N/A Ye No N/A Yes id) N/A Yes Noy N/A Yes No N/A Yes No Yes (Na) N/A . es No N/A (Yes) No N/A Yes No N/A CYes) No N/A es No N/A Yes -::No N/A Yes No N/A 30. Plant Effluent: Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present Potential toxicity (dead fish, dead plant at discharge) Outfall discharge line easily accessible. a. b. c. Page 5 31. Flow Measurement: Proper placement of flow measurement device Flow meter calibrated Buildup of solids in flume or weir Broken or cracked flume or weir Properly functioning magnetic flowmeter Clogged or broken stilling wells Weir plate edge corroded or damaged System capable of measuring maximum flow Flow measurement error less than 10%. a. b. c. d. e. f. g• h. 32. Sampling: a. Sampling and analysis completed on parameters specified by permit b. Samples refrigerated during compositing c. Composite sample temperatures maintained at 0 to 4 degrees Celsius during sampling Contract laboratory used for sample analysis Composite samples obtained are flow proportional. d. e. • es) No LXe No Yes) No N/A 1. N/A 2. N/A 3. (Yes) No N/A Cam% No N/A 1Ye�Js No N/A / No N/A• ems. No N/A Yes; No N/A RECORDKEEPING AND REPORTING Records and reports maintained as required by permit. All required information available, complete, and current. Records maintained for 3 years and all sludge records maintained for 5 years. 4. Analytical results consistent with data reported on DMRs. 5. Sampling and analyses data adequate and include:. a. Dates, times, and location of sampling b. Name of individual performing sampling c. Results of analyses and calibration d. Dates of analyses e. Name of person performing analyses. No N/A Yes No N/A ()No N/A —es ;No N/A Yes No N/A Page 6 6. Monitoring records adequate and include: a. Monitoring charts kept for 3 years b. Flowmeter calibration records kept for 3 years. 7. Laboratory equipment calibration and maintenance records adequate. 8. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for every day of operation. 9. Fecal coliform incubator maintained at 44.5 +/- 0.2 Degrees Celsius and the temperature maintained in a log for every day of operation. 10. Plant records adequate and include: Yes No N/A . a. 0 & M Manual es) No N/A b. "As -built" engineering drawings s�No N/A c. Schedules and dates of equipment maintenance repairs &s_)No N/A d. Equipment data cards. Yes No OK) 11. Permittee is meeting compliance schedule. (Y,s> No N/A 12. DMRs complete and include all NPDES permit required parameters. 7No N/A 13. ORC visitation logs available and current. '. K f t m e ,ski r - f u Ye-s--)No N/A 14. ORC certified at a level equal to or greater than the classification of the wastewater facility. es) No N/A 15. _ Backup Operator certified at one level less than the classification of the wastewater facility or greater. Ye No N/A 16. Current copy of the complete NPDES permit on site. N/A 17. Facility description verified as contained in NPDES permit. Revised 7/11/00 by Belinda Henson INSPECTION REPORT UPDATE OPTION: TRX: 5IF KEY: NC0020427INSCEI 001206 SYSMSG: ADFE191 *** NO MODIFICATIONS MADE TO SCREEN *** PERMIT--- NC0020427 REG/COUNTY-- 06 RICHMOND FACILITY-- ROCKINGHAM, CITY -•WWTP LOC-- ROCKINGHAM ). INS TYPE CEI NEXT PLANNED INSPECTION INSPECTED BY: DATE: 001206 HSB REPORT INSPECTION DMR RESPONSE RECEIVED DATE STATUS STATUS DUE DATE DATE 001221 C C COMMENTS: