HomeMy WebLinkAboutNC0020427_Pretreatment Inspection_20010920AlTA
NCDENR
- North Carolina Department of Environment and Natural Resources
Michael F. Easley, Governor •
September 20, 2001
Mr. Larry Cobbler
Director. of Plant Operations
City of Rockingham
P.O. Box 250
Rockingham, NC 28379
SUBJECT: Pretreatment Compliance Inspection (PCI)
City of Rockingham
Wastewater Treatment Plant
NPDES Permit No. NC0020427
Richmond County
William G. Ross Jr., Secretary
Gregory J.:Thorpe, Ph.D.
Acting Director
Division of Water Quality
Dear Mr. Cobbler:
Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection
conducted on August 2, 2001 at the City of Rockingham Wastewater Treatment Plant. The report indicates
that the Rockingham WWTP meets the, pretreatment requirements as outlined in 15A NCAC 2H .0900 for
Local. Pretreatment .Programs. A file review was performed on the records of Perdue Farms, .Perkins Papers,
and Trinity Manufacturing, Inc. You are again commended for your continued success in maintaining your
program in such a manner that has ensured the best water quality possible to the stream as well as
maintaining the NPDES permit limits. The report is self-explanatory and contains observations and
recommendations.
If you. or your staff have any questions, please do not hesitate to contact me at (910) 486-154.1.
\Sincerely,
Dale Lopez
Environmental Specialist
/dl
Enclosure: Pretreatment Compliance Inspection (PCI) Report
cc: Dana Folley, DWQ Pretreatment Unit
Fayetteville Regional Office
225 Green Street — Suite 714, Fayetteville; North Carolina 28301-5043
Phone: 910-486-1541 1 FAX: 910-486-07071 Internet: www.enr.stare.nc.us/ENR
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper.
NORTH CAROLINA DIVISION OF WATER QUALITY
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
FAYETTEVILLE REGIONAL OFFICE
1. Control Authority (POTW) Name: City of Rockingham WWTP
2. Control Authority Representative: Larry Cobler
3. Title(s): Pretreatment Coordinator/ ORC/Plant Operations Director
4. Last Inspection Date: September 7, 2000 Inspection Type (Circle One): PnI Audit
5. Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)?
6. Is POTW under an Order That Includes Pretreatment Conditions?
Order Type And Number: Are Milestone Dates Being Met? Yes / No
PCS CODING
Trans.Code Program NPDES Number MM/DD/YY Inspec.Type
J N I 1 NI CIO 10 12 10 14 12 17 1 08 /02 /O1 L_P_l
(DTIA) (TYPI)
7. Current Number of Significant Industrial Users (SIUs)?
8. Current Number of Categorical Industrial Users (CIUs)?
9. Number of SIUs Not Inspected by POTW in the Last Calendar Year?
10. Number of SIUs Not Sampled by POTW in the Last Calendar Year?
11. Enter the Higher Number of 9 or 10.
12. Number of SIUS With No IUP or With an Expired IUP?
13. Number of SIUS In SNC for Either Reporting or Limits Violations During Either of the Last 2
Semi -Annual Periods (Total Number of SIUs in SNC).
14. Number of SIUs in SNC for Reporting During Either of the Last 2 Semi -Annual Periods.
15. Number of SIUs in SNC for Limits Violations During Either of the Last 2 Semi -Annual Periods?
16. Number of SIUS in SNC for Both Reporting and Limits Violations During Either of the Last 2
Semi -Annual Periods?
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the parameters and how are these problems being addressed?
18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge
(Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production,
Etc.)?
If Yes, How Are These Problems Being Addressed?
Inspector
1 51
(INSPI
Yes
/ No
Yes /
No�
Fac.Type
J1L
(FACCI
10
1
0
0
0
0
0
2
1
0
SIUS
CIUS
NOIN
NOCM
PSNC
MSNC
SNPS
YES
NO
YES
kNO
19. Which Industries have been in SNC during either of the Last 2 Semi -
Annual Periods? Have any Industries in SNC (During Either of the Last
2 Semi -Annual Periods) not been Published for Public Notice?
(May refer to PAR if Excessive SIUs in SNC)
SNC for Limits:
For year 2000, Perkins Papers, TSS
SNC for Reporting:
Not Published:
Santony & Sara Lee
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a
Signed copy of the Order been sent to the Division?
21. Are any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones?
0
YES
INO
PRETREATMENT PROGRAM ELEMENTS REVIEW — Please review POTW files and complete• the
following:
Program Element
Date of Last Approval
Date Next Due, If Applicable
7/26/00
Headwork Analysis (HWA)
Industrial Waste Survey (IWS)
7/17/97
Sewer Use Ordinance (SUO)
11/13/94
Enforcement Response. Plan (ERP)
8/31/94
Long Term Monitoring Plan (LTMP
9/11/00
22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies?
'Yes
Just modified. Had to add primary clarifier effluent and add waste sludge (WAS) to the belt presses
23. Should any Pollutants of Concern be Eliminated From or Added to the LTMP?
If Yes, which ones? Eliminated: Added:
24. Are Correct Detection Levels being used for all LTMP Monitoring?
25. Is the LTMP Data Maintained in a Table or Equivalent? Yes / No Is the Table Adequate?
No
Yes
Yes
INDUSTRIAL USER PERMIT (UP) FILE REVIEW
26. User Name
1. Perdue Farms
2. Trinity Manufacturing, Inc.
3.Perkins Papers (formerly Cascad
27. IUP Number
0003
0009
00041
28. Does File Contain Current Permit?
Yes
/ No
'Yes/No
M o
29. Permit Expiration Date?
06/30/06
06/30/06
06/30/06
30. Categorical Standard Applied (I.E. 40 CFR 413, Etc.) or N/A
N/AI
JYes
N/A
455.20
31. Does the File Contain Permit Application Completed Within One Year
Prior to Permit Issue Date?
'Yes
/ No
El
2111
10/29/00
11/30/00
32. Does the File Contain an Inspection Completed Within Last Calendar
Year?
'Yes
/ No
Yes/No
E ro
12/12/00
12/31/00
12/11/00
33. a. Does File Contain A Slug Control Plan?
b. If No, is One Needed? (See Inspection Form from POTW)
a.
Yes
/ No
a oNM
12/91
08/07/98
12/15/98
b. Yes
/ No
Yes/No
b. Yes/No
34. For 40 CFR 413 And 433 TTO Certifiers, Does The File Contain A
Toxic Organic Management Plan (TOMP)?
Yes
/ No
N/A
N/A
Yes/No/N/A
35. a. Does the File Contain Original Permit Review Letter from the
Division?
b. All Issues Resolved?
a.Yes
b.Yes
/
/
No
No
Yes/No
Yes/No
Yes/No
Yes/No
36. During the Most Recent Semi -Annual Period, Did the POTW
Complete its Sampling as Required by IUP?
Yes
/ No
BM"o
R o
37. Does File Contain POTW Sampling Chain -Of -Custody's?
'Yes
/ No
Ellt To
12i 0
38. During the Most Recent Serni-Annual Period, Did the SIU Complete
its Sampling as Required By IUP?
El i "o
EM t o
I I
No N/A
39. Does Sampling Indicate Flow or Production?
Yes
/ No N/A
B o
NM t o
40. During the Most Recent Semi -Annual Period, Did the POTW Identify
All Non -Compliance from Both POTW and SIU Sampling?
Yes
/ No
N o
R i o
41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
Monitoring Violations
b. Did Industry Resample Within 30 Days?
a.'Yes
/ No/ N/A
NM o/ N/A
Em o
Ell o
EMt o
b.J/ No/ N/A
42. Was the SIU Promptly Notified of any Violations (Per ERP)?
E o
Yes
es No N/A
43. During the Most Recent Semi -Annual Period, Was the SIU in SNC?
Yes / No
.Yes4
ir
44. During the Most Recent Semi -Annual Period, Was Enforcement Taken
as Specified in the POTWs ERP?
Yes /No/
N/A1
Yes/No 1NUA
N/A]
45. Does the File Contain Penalty Assessment Notices?
Yes / No N/AI
Yes/No/ N/A
N/A
(None since 1998
46. Does the File Contain Proof of Penalty Collection?
Yes / No N/A]
Yes/No N/A
N/A
47. a. Does the File Contain any Current Enforcement orders?
b. Is SIU in Compliance with Order?
a.Yes / No
b.Yes / No
Yes/No / N/Aj
N/A,
Yes/No/ IN/Al
N/A
N/A
48. Did the POTW Representative Have Difficulty in Obtaining any of this
Requested Information for You?
Yes / No _
Yes/No]
No
FILE REVIEW COMMENTS
Santtony Wear (formerly Wundies)---IUP#0007--- quite all dyeing approximately eight or nine months ago. They
are now shipping the dyeing process to Mexico.
Perdue Farms---IUP#0003---.In 1998, Perdue installed an EQ tank ahead of the DAF. Since the change they have
been doing a good job of reducing their BOD levels. Now the average BOD is approximately 160 mg/L. Before
the changes, the BOD was 700 to 800 mg/L. They have now gone two years without any surcharges at all. They
use to have $17,000 to $19,000 per month in surcharges.
PCI SUMMARY AND COMMENTS
PCI Comments:
This facility has a well -organized pretreatment program. Files are neat and organized.
Requirements:
Recommendations:
NOD: YES
NOV: YES
QNCR: YES
POTW Rating:
Satisfactory X Marginal Unsatisfactory
NO
NO
NO
PCI COMPLETED BY: Dale Lopez, Environmental Specialist Date: 9/20/01
INDUSTRY INSPECTION CODING:
Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type
NJ J I 1 I t -// I J l l J.2.1
(DTIA) (TYPI) (INSP) (FACC) .
1. Industry Inspected:
2. Industry Address:
3. Type of Industry/Product:
4. Industry Contact:
5. Phone: Fax:
6. Does the POTW use The Division Model Inspection Form or Equivalent? Yes / No
7. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview
B. Plant Tour
C. Pretreatment Tour
D. Sampling Review
E. Exit Interview
Industrial Inspection Comments: