Loading...
HomeMy WebLinkAboutNC0020427_CEI NOV_20011218vleAu ATA NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor December 18, 2001 Mr. Monty R. Crump, City Manager City of Rockingham PO Box 520 Rockingham, NC 28379 SUBJECT: Notice of Violation/ Compliance Evaluation Inspection City of Rockingham WWTP NPDES Permit No. NC0020427 Richmond County ijaIo * `�� William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality Dear Mr. Crump: Enclosed is a copy of the Compliance Evaluation Inspection conducted December 11, 2001. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations and recommendationsare in Part D. Summary of Findings/Comments of this inspection report. The cooperation of Mr. Larry. Cobler, Grade IV ORC wasgreatlyappreciated. During the inspection a copy of the NPDES Compliance Reminders were reviewed and left with facility staff. The following item is addressed in this report as violation of administrative Code 15A NCAC 2B .0503-Surface Water Monitoring: Reporting: The City was given until March 15, 2001 to complete effluent flow proportional sampling as outlined in a letter dated March 21, 2000 and an inspection report dated December 21, 2000. You are asked to immediately take steps to comply with the requirement stated above. Please respond within ten (10) days of receiving this report. The response should include why implementing the effluent flow proportional sampling has not taken place as required as well as the plans the City has to implement flow proportional sampling. As a reminder preservation of the Waters of the State can only be acquired through consistent NPDES permit compliance. Fayetteville Regional Office' 225 Green Street.- Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-15411 FAX: 910-486-07071 Internet: www.enr.state.nc.us/ENR An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Crump Page 2 December 18, 2001 If you or your staff have any questions do not hesitate to contact me at 910-486-1541. Sincerely, Paul Rawls Water Quality Regional Supervisor /bsh Enclosures cc: Larry Cobler, ORC City of Rockingham, WWTP Maurice Horsey, USEPA, Reg. IV DWQ NPDES Compliance Unit Shannon Langley, Compliance Unit NPDES COMPLIANCE INSPECTION REPORT North Carolina Division of Water Quality Fayetteville Regional Office Section A. National Data System Coding Transaction Code: N NPDES NO. NC0020427 Date: 011211 Inspection Type: C Inspector: S Facility Type: 1 Reserved: Facility Evaluation Rating: 3 BI: N QA: N Reserved: Section B: Facility Data Name and Location of Facility Inspected: City of Rockingham WWTP Entry Time/Date: 10:10am/011211 Permit Effective Date: 990601 Exit Time/Date: 1:45pm/011211 Permit Expiration Date: 040229 Name(s), Title(s) of On -Site Representative(s): Larry Cobler (Certified Grade IV Operator) - "ORC" Phone Number(s): (910) 895-9434 Name, Title and Address of Responsible Official Mr. Monty R. Crump, City Manager PO Box 520 Rockingham, NC 28379 Contacted: no Section C: Areas Evaluated Duringlnspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable) xermt aGxtxty Slte xev ew ratio > K tor ttsft. epoir: ... .. e.attne. ::onxtori:ng.'iro :'Mudge wisp o sat::; Co ri'pixance.Scttedute: Crump Page 4 December 18, 2001 Section D: Summary of Findings/Comments: 1. The incoming wastewater is made up of 85% 90% industrial. The municipality has a pretreatment program with ten (10) Significant Industrial Users (SIUs). 2. A backup generator is on site to operate the entire plant during power failure with the exception of the biosolids composting system. 3. An alarm system monitors pump failures, inoperable clarifiers, power failure and etc. The facility has an efficient telemetry system which has allowed a waiver from the requirement that a certified operator be on site 24 hours per day. 4. The City has 24 pump stations which are monitored each day as per Mr. Cobler. All main pump stations have telemetry also. 5. Two (2) new effluent flow meters were installed September 2001 by Nix, Purser and Associates. The meters are Milltronics OCM III. 6. The automatic bar screen and the grit removal system appeared to be operational. The grounds around the bar screen were cleaned more efficiently as recommended in the last inspection report dated December 21, 2000. The grit removal system has two (2) different areas which can be utilized. One side was down for repairs and the other was operational. All screenings and grit are loaded in containers on a daily basis and lime is added and disposal occurs through the Uwharrie Environmental Landfill located in Montgomery County. 7 The primary clarifiers appeared to be operating adequately. Wooden flights had been installed on the primary clarifiers since the last inspection. The trickling filter and secondary clarifiers appeared to be operating adequately. 8. Two (2) aeration basins are operational but only.one (1) is necessary for proper treatment of wastewater. Four (4) aerators and two (2) floating mixers are operational in the basin. The Mixed Liquor Suspended Solids (MLSS) results were 4400 mg/L. The Dissolved Oxygen (DO) analysis is done daily in the aeration basin. Polymer is added to the MLSS at the end of the aeration basin before it enters the clarifiers. It is added to assist with the settling of solids in the clarifiers. A 6000 gallon polymer storage tank is located on site. 9. The sludge depths in the final clarifiers are as follows: Clarifier #1 - 5 feet with a tank depth of 10 feet Clarifier #2 - 4 feet with a tank depth of 10 feet Clarifier #3 - 5 feet with a tank depth of 12 feet. Crump Page 5. • December 18, 2001 10. The chlorine contact tanks were cleaned two (2) weeks ago as per Mr. Cobler..The effluent appeared to be free of solids. Chlorine is used to disinfect the effluent. It is added by a flow paced system called Regal Smart Valve which doses the effluent as the flow increases. Sulfur dioxide is used to dechlorinate the effluent . The sulfur dioxide is added in the manhole where both effluents from the two chlorine contact tanks combine. 11. Two (2) variable and two (2) constant speed effluent pumps are located at the effluent pump station. One pump is utilized when normal flow conditions occur. 12. Effluent sample collection is completed at the wet well area located at the effluent pump station. The effluent discharge pipe travels directly to the Pee Dee River. 13. The influent and effluent composite samplers' temperature were 1 degrees C. The acceptable range of samples during storage and for stored sample extracts, is 1.0 - 4.4 degrees C. 14. The biosolids handling facility appeared to be operating adequately. Biosolids travel to the belt press at 2 - 3 % solids and at the completion of the dewateringprocess solids are 19 - 20 % solids. Thirty (30) to forty (40) tons weekly of biosolids are wasted to the digester and then to the filter press Biosolids are composted for a Class A Biosolids and is used by various landscaping companies and etc. The land application permit is WQ0004477. 15. The sand drying beds have been removed with the exception of one which is utilized to dry waste material collected from the collection system by vac trucks. The area where the drying beds were located is now a concrete pad used to store compost while it is curing. 16. The "Backup Operator" for this facility is James Croke, NC certified Grade III Wastewater Treatment Plant Operator. 17. The certified laboratory on site analyzes all NPDES permit required parameter with the exception of the following: Metals, Total Nitrogen, Total Phosphorus and Chronic Toxicity which is completed by the commercial laboratory "Similabs". The on site laboratory has implemented an approved method to analyze ultra low chlorine residual. The facility has a NPDES permit limit for residual chlorine. 18. Laboratory bench sheets were reviewed for the months January and March 2001 and compared to Discharge Monitoring Reports. All records reviewed appeared to be accurate and well organized. 19. A compliance evaluation analysis report for the period October 2000 through September 2001 did not reveal any monthly violations. There were not any Notice of Violations (NOVs) sent to the facility during this period. Name and Signature of Inspector Agency/Office/Telephone Date Belinda S. Henson Name and Signature of Reviewer Paul E. Rawls Action Taken DENR/Fayetteville/(910)486-1541%- iS-0 Agency/Office/Telephone Date DENR/F ayetteville/(9 10)4 8 6 - 15 4 1 Regulatory Office Use Only Compliance Status Noncompliance _Compliance Date Section D: Summary of Findings/Comments Brief Facility Description: A 6.0 MGD WWTP consisting of influent pumps, mechanical bar screen, grit removal, magnetic flow meter, primary clarifiers, trickling filter, secondary clarifier. dual extended aeration basins, three final clarifiers, two chlorine contact tanks, sulfur dioxide dechlorination, aerobic sludge digester, belt filter press, and effluent pump station. FACILITY SITE REVIEW es No N/A 1. Treatment units properly operated and maintained. Yes No N/A 2. Standby power or other equivalent provision provided. es No N/A 3. Adequate alarm system for power or equipment failure available. 4. Sludge disposal procedures appropriate: No N/A a. Disposal of sludge according to regulations TI`es No N/A b. State approval for sludge disposal received. Y-e_§ No N/A 5. Sufficient sludge disposed of to maintain treatment process equilibrium. es No N/A 6. The ORC and Backup Operator are officially designated with NCDENR/DWQ Training and Certification Unit. Yes No N/A 7. Adequate. spare parts and supplies inventory maintained. Yes No N/A 8. Plant has general safety structures such as rails around or covers over tanks, pits, or wells. es No N/A 9. Plant is generally clean, free from open trash areas. 10. Screening: Yes No %' a. Manual No N/A b. Mechanical Yes Ni N/A c. Buildup of debris Yea No N/A d. Screenings properly disposed of. 11. Grit Removal: Yes 6) N/A a. Excessive organic content in the grit chamber Yes � ' N/A b. Excessive odors Yes No N/A c. Grit properly disposed of. Page 2 12. Primary clarifier: Yes N/A a. Excessive gas bubbles Yes GO N/A b. Black and odorous wastewater Yes i'10 N/A c. Poor suspended solids removed Yes o N/A d. Excessive buildup of solids in center well of circular clarifier Yes Now N/A e. Weirs level Yes N/A f Weir blockage Yes ' N/A g. Evidence of short circuiting Yes N/A h. Lack of adequate scum removal Yes) N/A i. Excessive floating sludge Yes N/A j. Broken sludge scraper. 13. Trickling Filter: Yes N/A a. Trickling filter ponding(indicating clogged media) Yes j) N/A b. Leak at center column of trickling filter's distribution arms Yes N/A c. Uneven distribution of flow on trickling filter surface Yes OM N/A d. Uneven or discolored growth Yeses N/A e. Excessive sloughing of growth Yes N/A f. Odor Yes _9) N/A g. Clogging of trickling filter's distribution arm orifices Yes N/A h. Filter flies, worms, or snails. 14. Activated Sludge Basins/Oxidation Ditches: Yes NS, N/A a. Dead spots Yes No N/A b. Failure of surface aerators Yes CO N/A c.. Air rising in clumps Yes O N/A d. Dark foam or bad color Yes C' N/A e. Thick billows of white, sudsy foam Yes (I "o) N/A f. Air rising unevenly Yes No &A g. Excessive air leaks in compressed air piping. Na15. Stabilization'Ponds/Lagoons' Yes No / a. Excessive weeds including duckweed in stabilization ponds Yes No N/A b. Dead fish or aquatic organisms Yes No N/A c. Buildup of solids around influent pipe Yes No N/A d. Excessive scum on surface. Page 3 16. Secondary Clarifier: - Yes CM N/A a. Excessive gas bubbles on surface Yes No N/A b. Level overflow weirs Yes Teo N/A c. Weir blockage Yes N/A d. Evidence of short circuiting Yes N/A e. Excessive buildup of solids in center well of circular clarifier Yes N/A f Pin floc in overflow Y s s No N/A g. Effective scum rake Yes Q N/A h. Floating sludge on surface Yes C N/A i. Excessive high sludge blanket Yes 0 N/A j. Clogged sludge withdrawal ports on secondary clarifier. 17. Filtration: Yes NoNfrw a. Filter surface clogging Yes No N/A b. Short filter run Yes No N/A c. Gravel .displacement of filter media. Yes No N/A d. Loss of filter media during backwashing Yes No N/A e. Recycled filter backwash water in excess of 5 percent Yes No N/A f: Formation of mudballs in filter media. Yes N/A Yes N/A Yes e N/A Yes N/A Yes No N/A Yes No N/A C.) No N/A (YES) No NIA Yes No 18. Chlorination Unit: a. Sludge buildup in contact chamber b. Gas bubbles c. Floating scum and/or solids d. Adequate ventilation of chlorine feeding room and storage area e. NIOSH-approved 30 minute air pack f. All standing chlorine cylinders chained in place g. All personnel trained in the use of chlorine h. Proper chlorine feed, storage, and reserve supply. 19. Ultraviolet radiation disinfection present and in use. 20. ` Dechlorination: es No N/A a. Proper storage of sulfur dioxide cylinders C No N/A b. Adequate ventilation of sulfur dioxide feeding room he`s No N/A c. Automatic sulfur dioxide feed or feedback control operating properly. Yes No N/A Yes No N/A _ Yes No _ N/A Yes No N/A 21. Aerobic Digester: a. Excessive foaming in tank b. Noxious odor c. Mechanical aeration failure d. Clogging of diffusers. Page 4 Yes No Yes No N/A 22. Anaerobic Digester: a. Floating cover tilting b. Gas burner operative 23. Sludge Drying and/or disposal: Yes No I a. Poor sludge distribution on drying beds Yes No N./ b. Vegetation in drying beds Yes No /A c. Dry sludge remaining in drying beds Yes No (RA d. Dry sludge stored on site Yes No iA e. Filtrate from sludge drying beds returned to front of plant ( Yes Nof Sludge disposal through county landfill. Yes No N/A g. Sludge land applied. 24. Filter Press: Yes C N/A a. High level of solids in filtrate from filter presses or vacuum filters Yes N/A b. Thin filter cake caused by poor dewatering Yes ( o N/A c. Sludge buildup on belts and/or rollers of filter press Yes �Id N/A d. Excessive moisture in belt filter press sludge cake. Yes N Yes No N/A Yes No N/A Yes N/A Yes O N/A Yes No N/A CYe No N/A Yes No N/A Yes CRO N/A Yes A Yes No Yes N/A Yes No N/A 25. Polishing Ponds or Tanks: a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface b. Solids or scum accumulations in tank or at side of pond c. Evidence of bypassed polishing ponds or tanks because of low capacity. 26. Plant Effluent: a. Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present b. Potential toxicity (dead fish, dead plant at discharge) c. Outfall discharge line easily accessible. 3 Vg. (11Ata� 27. Flow Measurement: a. Proper placement of flow measurement device b. Flow meter calibrated c. Buildup of solids in flume or weir d. Broken or cracked flume or weir e. Clogged or broken stilling wells f. Weir plate edge corroded or damaged g. Flow measurement error less than 10%. t Page 5 es No N/A No N/A e Na N/A Yes N/A 28. Sampling: a. Sampling and analysis completed on parameters specified by permit b. Composite sample temperatures maintained at 4 degrees Celsius or less (but above freezing) during sampling c. Contract laboratory used for sample analysis d. Effluent composite samples obtained are flow proportional. Ye No N/A es No N/A No N/A No N/A Ea No N/A No N/A No . N/A No N/A No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A No NIA • Yes No N/A RECORDKEEPITG AND REPORTENG 1. Records and reports maintained as required by permit. 2. All required information available, complete, and current. 3. Records maintained for 3 years and all sludge records maintained for 5 years. 4.. Analytical results consistent with data reported on DMRs. 5 Sampling and analyses data adequate and include:. a. Dates, times, and location of sampling b. Name of individual performing sampling c. Results of analyses and calibration d. Dates of analyses e. Name of person performing analyses. 6. Monitoring records adequate and include: a. Monitoring charts kept for 3 years b. Flowmeter calibration records kept for 3 years. 7 The pH meter is calibrated daily with two buffers and checked with a third buffer and properly documented. Expiration dates of pH buffers adequate. 9. All thermometers used in NPDES permit reporting is calibrated annually with an NIST certified thermometer or a traceable thermometer annually and documented. 10. The following NPDES permit required parameters are analyzed on site: pH, Temperature, Dissolved Oxygen and Chlorine Residual. Page 6 j) No N/A 11. The NPDES permit required parameter Total Chlorine Residual is analyzed by approved method. s No N/A 12. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for every day of operation. Ye r' No N/A 13. Fecal coliform incubator maintained at 44.5 +/-. 0.2 Degree Celsius and the temperature maintained in a log for every day of operation. No N/A •Ce3 No N/A ( No N/A es) No N/A 14. Plant records adequate and include: a. 0 & M Manual b. "As -built" engineering drawings c. Schedules and dates of equipment maintenance repairs d. Equipment data cards. Yes No OA 15. Peimittee is meeting compliance schedule. es No N/A 16. DMRs complete and include all NPDES permit required parameters. Yes No N/A 17. The facility has a permitted flow greater than 5 MOD and is required to operate seven days per week 24 hours a day. No N/A 18. ORC visitation logs available and current. Yes No N/A 19. ORC certified at a level equal to or greater than the classification of the wastewater facility. s) No NIA 20. Backup Operator certified at one level less than the classification of the wastewater facility or greater. No N/A 21. - Current copy of the complete NPDES permit on site. ye -,-)No N/A 22. Facility description verified as contained in NPDES permit. 'e No N/A 23. Facility analyzes process control parameters for example: MT SS, MCRT, Settleable Solids and others that are applicable. No N/A 24. Industrial Waste Surveys (IWS) sent to all possible Significant Industrial Users (SIUs) within the last five years (especially new industries). Revised 7/16/01 by Belinda Henson City of Rockingham Wastewater Treatment Plant and Composting Facility 311 East Franklin Street Rockingham, North Carolina 28379 January 4, 2002 Mr. Paul Rawls, WQ Regional Supervisor N.C. Department of ENR Fayetteville Regional Office 225 Green Street -Suite 714 Fayetteville, North Carolina 28301-5043 JEAN - .8 2002 BBC4: oAcl c, B l7/6 e,cr Dear Paul, I received your letter dated December 18, 2001 yesterday concerning the Notice of Violation for failing to implement flow proportional sampling. I apologize for not having this in place before now. To be honest I completely forgot about it. We purchased the attachment from ISCO for the sampler to connect to the flow meter over a year ago, put it on a shelf and haven't thought about it since. We were going to hook it up this week but the snow has slowed us a bit. It will however, be in place and operating by January 11, 2002. Again, I apologize for this deficiency and.assure you that the City of Rockingham is committed to the preservation of the Waters of the State of North Carolina. Si erely, C a obler PI. t OprationsDirector City of Rockingham, WWTP