HomeMy WebLinkAboutNCC214559_Site Plan or Location Map_20210816Roads & Drainage Notes: 1. The streets to be constructed for this project are subject to the Department of Transportation Certification Program and Quality Management System Maintenance Version Requirements. The Contractor, at his expense, shall provide test results on 1) Subgrade, 2) Base and 3) Pavement. The Contractor shall insure that all construction and testing is performed in accordance with the N.C. Department of Transportation "Standard Specifications for Roads and Structures", latest edition, 2006 Hot Mix Asphalt Specifications and Manual, and "Quality Management System Maintenance Version", and shall report the testing and /or core locations, test method, results and D.O.T. allowable range or tolerance, as applicable. Subgrade shall be tested for density and shall be proofrolled by the testing Engineer or the Engineer or Surveyor who will issue the Final Certification. Base and pavement shall both be tested for density and thickness. If Parker & Associates is administering the construction they must also proof roll the stone. Twenty-four (24) hour advance scheduling before proof roll. Testing for pavement shall be certified by either a professional Engineer or properly certified QMS technician and shall be in accordance with QMS criteria. €tequired thickness for this project is as shown on the plans. Note that thickness for widening or turn lanes is greater than that for internal streets. 2. Minimum Densities: Subgrade 100% Stone Base 100% S 9.58 90q 119.00 92 % B 25.00 92 % 3. Notify the Engineer or Surveyor, who will issue the overall Final Certification, of all phases of Roadway Construction. 4. All metal used for any type of catch basin or inlet shall be produced in the USA. 5. A minimum sight distance of 10'X70' shall be maintained along the right-of-way of all internal intersections. 6.20 foot radii at right-of-way intersections, 30 foot radii at edge of pavement intersections. 7. All culverts under streets shall be reinforced concrete per North Carolina Department of Transportation Specifications, unless otherwise specified and/or approved by the Engineer and/or Department of Transportation. 8. All roads shall be public and built to NCOOT Standards. 9. There shall be no encumbrances within the NCDOT Right-of-way. 10. All materials and practices shall meet North Carolina Department of Transportation Standards. 11. For other detailed construction notes, see plan and profiles. Existing Onslow Bay Drive existing J 11" water �- _ _ `14�J 10' ur J�� a Utility Easement r- Note: Swale Calculations Chart Drainage Pipe Chart Area Q10 Q2 Side- Channel V10 V10 V2 OUTLET Section (acres) (cfs) (if) Slope Slope(ft/ft) (bare)(fps) (grassed)(fps) (bare)(fps) AREA Q10 DIAMETER GRADE LENGTH VELOCITY 1 - 1 1.52 4.7 2.7 5:1 0.008 2.9 1.4 2.5 ASL PIPE (acres) (cfs) (inches) (ft / ft) (if) (fps) 2 - 2 1.93 6.0 3.4 5:1 0.006 2.7 1.4 2.4 ASL A 0.70 2.5 18" RCP 0.005 40 3.8 3 - 3 2.11 6.1 3.7 5:1 0.004 2.4 1.2 2.1 ASL B 0.92 3.3 18" RCP 0.005 40 4.1 C 0.28 1.0 18" RCP 0.004 72 2.7 Q=ciA Friction Factors D 1.37 4.1 18" RCP 0.005 40 4.3 C=varies, Use C=0.3 for Q2 n=0.02 Bare Earth i10=7.17 in/hr., i2=5.88 in/hr. n=0.05 Grass v=1.49 R 2/3 s 1/2 Q�CiA Note: n c=Varies RCP = Reinforced Concrete Pipe 1. See site plan for section locations. 2. Line bottom of swales with American Excelsior tc=5 min. CFS = Cubic Feet per Second Curlex Blanket as indicated by ASL - Apply Swale i25=$.1 in/hr. LF = Linear feet Liner. See Plan for location of ASL. FPS = Feet per Second Skimmer Sediment Basin Chart NOTE: Sediment Disturbed Q10 Volume Surface General Top Dimension (ft) Skimmer Orifice Td 1. Contractor shall use invert elevations shown on plans for construction. Grades shown above are rounded. Basin Area (Acres) (CFS) (Cubic Yards) Area(sf) (Length x Width x Depth Sate (in) Dia. (in) (Days) #1 1.35 2.9 194 943 84'L x 25'W x 2.5'D 2 1.4 3 #2 0.9 1.9 60 618 451L x 151W x 2.5'D 2 0.8 3 Sediment Trap Chart Sediment Disturbed Volume Size Trap Area (Acres) (Cubic Yards) (Length x Width x Depth) 1 0.74 99 671L x 101W x 4'D 2 0.16 24 17'L x 101W x 4'D 3 0.25 34 231L x 101W x 4'D 4 0.43 58 391L x 10'W x 4'D 5 0.24 32 221L x 101W x 4'D 6 0.43 58 401L x 101W x 4'D 7 0.13 18 12'L x 101W x 4'D Design Standard - 133.3 CY Sediment Trap Volume per Disturbed Acre. I -- Existing Jackson Pointe I �18i \:17r ume i owne Pointe Boulevard 601 R/ W Contractor shall insure that he and all his workers (contractors, subcontractors and other site personnel) do not damage construction stakes or other measures used in laying out the project whether by the Engineer or another entity including those under the employ of the contractor. Contractor shall cause his workers to observe and verify to the fullest extent practicable that stakes, other measures and grades are, or appear to be, accurate and correct, and immediately, but prior to any associated work, notify the staking entity of any potential conflict, error or question regarding the work, The Engineer shall not be responsible if all of the above measures are not strictly adhered to. The Engineer shall not be responsible where due to damage, his staking can not be verified. For critical or costly components of the work, where the contractor believes that staking may not be preserved, the contractor shall request the staking entity to place staking in an area where its preservation can be insured. Rev. 07/28/20215J5 - Add Fire Hydrant, 6" Tap, Add Disturbance Limit Notes per ONWASA and LQ5 Rev. 07/01/2021 SJS - Input Additional Notes TAT A 911UT? JP QUTATT7D XTt--% MC - 1. Potable water, supply and wastewater treatment to be by ONWASA_ 2. Contractor shall verify location of existing water & sewer mains & report any deviations to Engineer prior to construction_ 3. As of October 1, 2014, anyone digging with mechanized equipment in highway right-of-way, private utility easements, or public spaces will be required by North Carolina law to give notice of the proposed excavation to all existing area utilities at least three to twelve business days before starting to dig. The utility owner is to locate its facilities in the area of the proposed excavation. Utility members of North Carolina 811 can be contacted at 1-800-632-4949, 4. Contractor is responsible for contacting any utility company that is not a member of N.C. One Call. 5. Contractor shall verify location of all underground utilities prior to commencement of work. 6. Contractor is responsible for any damages to any existing utilities. 7. All proposed sewer mains shall be SDR PVC 35, PVC C900 or Ductile Iron as shown on plans. Services to be 4-inch Sch. 40 PVC or Ductile Iron. Place 3" to 6" minimum #57 stone bedding under all gravity mains. Place #57 stone hounching to V above (min) above top of pvc pipe and to spring line (min.) for ductile iron. Place 12" compacted select fill above stone to 12" minimum above pipe, then suitable fill compacted in 6" lifts above that. 8. All manholes located outside of street right-of-ways shall have watertight rings & covers_ 9. All water mains 6" through 12" shall be AWWA C-900, Class 150.2" water mains shall be ASTM D-2241, PVC 1120, SDR 21, 200 PSI pressure rating. 10. Fire hydrants shall be Mueller Centurion Model A421 or American Flow Control Mark 73. 11. Water mains shall be buried with a minimum of 36 inches cover, unless otherwise noted. 12. Water mains & sewage mains shall have proper separations. At water & sewer crossings , the water main shall have 18 inches separation above the sewer main or they both shall be constructed of ferrous material for a minimum of 9 feet each side of the crossing. See specifications for further details. 13, Contractor to lay water mains at extra depth to avoid conflicts with storm drainage and other facilities. 14, Contractor shall notify The Certifying Engineer and ONWASA at least 48 hours prior to commencing any work, inspections, sampling, & pressure tests. 15. Chlorination & pressure tests are required in the presence of The Certifying Engineer and ONWASA. 16. Contractor shall furnish negative bacterial analysis results A 24 hour chlorine residual results to The Certifying Engineer and ONWASA. 17. Contractor shall maintain comprehensive (depth & horizontal locations) field "As guilts" for all installations & submit them to the Certifying Engineer & ONWASA_ 18. All units shall have individual water & sewer services installed by the contractor. 19. For other detailed construction notes, see plan & prof les, other plan sheets and specifications. 20. All water A sewer system installation materials & practices shall meet ONWASA specifications_ 21. No construction of either water or sewer mains is to begin prior to receipt of permits to construct from NCDENR in accordance with 15A NCAC18C.03'05 (a) and 15A NCACO2H.02'04.15A NCAC18C.03'05 (a) and 15A NCACO2H.02'04. 22. All lots are less than 5 miles from the Piney Green Fire Station. Q10-CiA C=0.3 tc=5 min .i10=7.17 in/hr. Orifice Dia. (in)= Qd/(2310* H) Qd=dewatering rate=V/td (Cf/Day) V=Volume (Cf) td=Draw Down Time (Days=3) H=0.167 ft For 2" Skimmer Design Notes: 1. Side slopes from top of bank down to inside bottom of basin are to be 2:1 2. Side slopes from top of bank to ex ground are to be no steeper than 3:1 3. Skimmers shall be Faircloth Skimmers or approved equal 4. Volume and Surface Area calculated with 1' free board to the top of the basin and 0.5' to spill way. 5. 325 sf minimum surface area per cfs of Q10 peak inflow 6. 66.7 cy minimum volume per acre of disturbed area 7. Upon complete restabilization of all disturbed areas, and approval by Engineer and NCDENR-LQS, remove sediment basin and regrade swale, fertilize, seed and mulch. rCl ence atbo a Bore Pit ,..,� 12" PVC Water I L___ Masonry Enc" at Both Ends M.1s, bU, rg. Lai M.B. 67, Pg.186 (Tract 3) RA Zone Undeveloped Existing 8" Water Main Note: 1.) Far 12" Main, use 24" Min. Diameter Steel Casing - 0.250" Min. Wall Thickness 2.) Install Restrained Joint Ductile Iron from tap through casing. 3.) See Plan and Prof lie and Detail Sheet for more information. Typical Reverse Tap Boring Detail Notes: Not to Scale 1. Contractor to field verify location and depths of existing water mains and any other utilities prior to beginning bore. 2. Casing thickness shall be per DOT requirements. Steel encasement pipe shall conform to ASTM A-139 with wall thickness and grade as defined in the specifications. minimum allowable yield strength is 35,000 psi. 3. Bore and Receiver Pit shall be a minimum of f H per V V depth away from the cop. 4. Carrier Pipe shall be adequately supported the entire length within the casing by using "spider" steel supports at a maximum of 9 foot centers (one at each joint and one intermediate). Other methods must meet approval of the Engineer. 5. Materials and installation shall meet ONWA5A and NCDOT specifications. 2- 12. W Bends to be Properly Restrained and Blocked Ir �oS d46 ?p�`yiS Site Benchmark Bolt Nearest The "H" in Hydrant on Fire Hydrant at Intersection of Olde Towne so SO - Blow off Pointe Boulevard and Pine Thicket Lane (E- Centerline Elev. 34.16 GCB - Catch Basin Datum NAVD 88 Oemh - Existing Manhole N=366,813.084 p epp - Existing Power Pole E-2,508,779.515 ex - Existing I -- Onslow 22, LLC - I vwiy� VY[14G 7 -fir �} all 2 ties �f % - Onslow 22, LLC I Project Design Summary - For ONWASA Purvoses Only: IQIFH - Fire Hydrant ® GV - Gate Valve Inv. - Invert MH - Manhole j�L j[ RCO - Rock Check Dam R/W - Right-of-way SSB - Skimmer Sediment Basin ST - Sediment Trap ` 5 j - Adjoining Lot Number /-+-- - Flow Arrow Pipe Label Existing Design Information - Proposed Information •• ••• - Existing Ditch ohpl - Overhead Power Line E E - Proposed Electrical Conduit - Water Line �.._.._..�.._..�..�.._.._ - Wetlands Line - Woods Line sf - Silt Fence Number of Lots to be served by ONWASA Water ... 0 Number of Lots to be served by ONWA5A Sewer ... 0 12" Water Distribution Main ................................................ 2,200 L.F. 6" Water Distribution Main..................................................105 L.F. FireHydrants............................................................................. 2 8" Sanitary Sewer......................................................................130 L.F. Number of Manholes............................................................... 2 existing ONWASA B" water o /a r ro � a Erosion and Sedimentation Control Notes: 1. Construction Sequence: A. Notify Engineer, Owner, and NCDEQ prior to beginning construction. R. Clear only the area necessary to install the construction entrances and perimeter silt fences, sediment traps and sediment basins. The remainder and bulk of clearing is not to be done until installation of these items has been completed- C. Sediment control measures are required to be installed at the earliest practicable date after start of work Grading operations shall begin at tow points, points of outfall release or at other locations of where sediment control measures are shown on plan, and the sediment control devices (silt fences, sediment traps, sediment basins, etc.) shall be installed before or simultaneously with the grading of any area draining to the device. D. Install stabilized construction entrance prior to beginning construction. E_ Clear and grub entire project area. F. Install silt fence, sediment traps and sediment basins. G. Rough grade and temporary seed areas not to be disturbed during street and utility construction. H. Install Swales I. Install storm drain pipes and outlet protection. J_ Rough grade roads and roadside swales. K Install water mains. L Fine grade streets. Place CABC over compacted subgrade. Contractor must conduct and pass a proof roll test, on the subgrade prior to installing stone, and on the stone prior to installing asphalt. The proof roll tests shall be conducted in the presence of The Soil Engineer. Density and thickness tests on subgr ode, stone and asphalt by The Soil Engineer shall be conducted and approved and tests results submitted to Engineer. For additional info, See Roads and Drainage notes. M. Maintain erosion control measures as needed to assure full functionability. N. Install asphalt surface course. Soil Engineer to witness laydown and test for thickness and density and submit results to Engineer. O. Temporary or permanent seed, fertilize, and mulch ail disturbed areas after completing any phase of the grading work within the fallowing time schedule. Apply temporary seeding and mulch if area is to be disturbed again and permanent seeding and mulch if areas have been final graded and accepted by Engineer and owner. 1.) Slopes steeper than 3:1 and perimeter dikes, swales, ditches and slopes, and area new HQW waters - within 7 days. 2.) Slopes 3.1 or flatter, and all other areas with slopes flatter than 4:1 - within 14 days. If temporary seeding is used to temporary stabilize an area upon final grading of the job the permanent seed, fertilizer and mulch shall be completed. See detail for seeding specifications. 2. Seeding Specifications: Apply lime and fertilizer and work into 4 - 6 inches of soil. Seed mixture shall be distributed uniformly and covered with a clean straw mulch. All mulch shall be crimped or asphalt tacked to hold in place. Material and application rates as follows, and are generally considered minimums. "Mulch rate to be doubled if crimped*: Material Application Rate Lime 3000 lbs./ac. Fertilizer (10-10-10) 750 lbs./ac. Mulch 2 tons/ac. Asphalt Tack 435 gal./ac. (Max) Permanent Seeding Common Bermuda (Unhulled Sept. l - April 1) 100 lbs./ac. (Hulled April 1 - Sept. 1) 75 lbs./ac. "Rebel" Fescue 50 lbs./ac. Rye Grain (Sept. 1 - April 1 only) 50 lbs./ac. German Millet (April 1 - Sept. 1 only) 50 lbs./ac. Temporary Seeding Dec. 1 - April 15 Kobe Lespedeza 50 lbs./ac. Rye Grain 120 l.bs./ac. April 15 - Aug. 15 German Millet 40 lbs./ac. Aug. 15 - Dec. 30 Rye Grain 120 lbs./ac. 3. Contractor is responsible for complying with erasion control permit conditions and NPDES general permit conditions. See permits for additional information. 4. Contractor shall clean out, amend, and maintain all measures as required to prevent accelerated erosion from taking place on this site, until site is restabilized and accepted by, Engineer and NCDEQ. 5. Upon restabilization of all disturbed areas and swales, contractor shall remove all temporary erosion control facilities and grade, gross, mulch, and restabilize the areas. 6. Once contractor has completed job and site is restabilized, the developer shall be responsible to maintain the restabilized areas until time when the lots are sold or developed. 7. For additional information, see specifications and other plan sheets. ,,,BSI 111C1+3 t, to, %011A � St1�OO�'�! l �i SEAL _ 14575 ����rrrrrls►II'� GRADING, DRAINAGE, EROSION AND SEDIMENTATION CONTROL AND WATER AND SEWER PLAN ONSLOW BAY DRIVE EXTENSION TO ROCKY RUN ROAD White Oak TWp., Onslow Co., North Carolina Owner: Developer: OnslowHu LLC Clearly Development Inc. 1000 Hunters s Trail Ir Midway Park, NC 28544 100 Carolina Plantations Boulevard Jacksonville, North Carolina 2SS46 (910) 455-6956 DATE: 06/10/2021 GRAPHIC SCALE: 1"=100' 0 50 100 200 300 SCALE: I"=100' FEET PARKER & ASSOCIATES, INC. Engineers - Surveyors - Planners Field Book: Onslow say, Pg. 1-12; Onslow say #2, Pg. 16,19 Jacksonrrille, North Carolina Disk Name: Acad 24" P.O. Box 976 - 306 New Bridge Street - 28640 Filename: Onslow Bay Second Aommdwg KHW Sheet 1 of 5 Phone (910) 455-2414 - www.ParkerJacksonville.com Job No.: S201123-7573 N.C. Firm License Number: F-0108