Loading...
HomeMy WebLinkAbout20211076 Ver 1_More Info Received_20210810Strickland, Bev From: wyatt brown <brownenvgrp@gmail.com> Sent: Tuesday, August 10, 2021 12:37 PM To: Hopper, Christopher D CIV (USA) Cc: Cohn, Colleen M; Goss, Stephanie Subject: [External] Re: SAW-2021-00833 (Air Flow Site / Oak Tree Drive / Selma NC / Johnston County) - REQUEST FOR ADDITIONAL INFORMATION Attachments: 8-10-21 WETLAND IMPACT -OVERALL (4).pdf; Revised Submitted Pre -Construction Notification (PCN) Form (46).pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Chris, Colleen I'm attaching the revised drawings and revised PCN for the SAW-2021-00833 Air Flow Site additional information email of August 2, 2021. I could not submit through Additional Information on Laserfiche because I don't have a WQ project number and Version number. I revised the front page of the previously submitted PCN reflecting the addition of NW 18 permit number and revised the impacts table breaking out the parking lot impact for NW 39 and the BMP impact for NW 18. All revisions were made in red and I added today's date to the signature page of the PCN. I also request an email from Colleen that we don't need a 401 on this one. Thanks for your time. Wyatt On Mon, Aug 2, 2021 at 3:26 PM Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil> wrote: Good Afternoon, Wyatt: Thank you for your application to construct the Airflow facility in Selma, North Carolina. I have a couple questions before verifying your use of Nationwide Permit 39. Please see below and let me know if you have questions. 1. Nationwide Permit 39 Regional Condition a. prohibits discharges to streams and wetlands for stormwater management facilities. If the applicant wishes to stack this application with another permit request (e.g. NWP 18), please provide a breakdown of areas required for each impact (i.e. parking/building and stormwater). Please provide an updated impact exhibit and impact table. 2. Little information was provided on the BMP. Would a discharge to downslope wetland / stream areas be included in the design? Please provide additional detail. I. 3. It appears this project may not require an Individual Water Quality Certification from the State of North Carolina. Please provide written verification from the NC Division of Water Resources for our records. Thank you, Christopher D. Hopper I Regulatory Specialist I U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 35 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Wednesday, July 7, 2021 8:14 AM To: brownenvgrp@gmail.com Cc: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil>; Thames, Joyce A CIV USARMY CESAW (USA) <Joyce.A.Thames@usace.army.mil> Subject: SAW-2021-00833 (Air Flow Site / Oak Tree Drive / Selma NC / Johnston County) Good Morning, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Mr. Christopher Hopper for further processing. 2 Thank you, Josephine Schaffer Regulatory Division Wilmington District, USACE (919) 554 4884 ext. 28 Wyatt Brown, LSS, CPESC Brown's Environmental Group, Inc 919-524-5956 3 Oak Tree Drive60' Public R/W16216216116016116116216116116216115915915915915915915915915916016016016016016016016016416316016216116116116216116116216116015915915915915915915915915916016016016016016016016016316416315815615715916116016216215615815615715916116015943SOURCES OF INFORMATION: 1.EXISTING SURVEY OF SITE PROVIDED BY HALL LAND SURVEYING, INC., 1899 STEVEN'S CHAPEL ROAD, SMITHFIELD, NC 27577, DATED APRIL 29, 2021 2.EXISTING TOPO OF SITE PROVIDED BY HALL LAND SURVEYING, INC., 1899 STEVEN'S CHAPEL ROAD, SMITHFIELD, NC 27577, DATED APRIL 29, 2021 3.EXISTING WATER MAIN INFORMATION FROM TOWN OF SELMA WATER PLANT SUPERINTENDENT, EMAILED MARCH 30, 2021. 4.PARCEL INFORMATION FROM JOHNSTON COUNTY GIS DATED 2018 5.EXISTING WETLANDS FLAGGED BY BROWN'S ENVIRONMENTAL GROUP, INC., 242 BATTEN FARM ROAD, SELMA, NC 27576 AND SURVEYED BY HALL LAND SURVEYING, INC., 1899 STEVEN'S CHAPEL ROAD, SMITHFIELD, NC 27577, DATED APRIL 29, 2021 SOURCES OF INFORMATION NAD83314 East Main StreetClayton, NC 27520donnie@adamsandhodge.com919-243-1332FIRM # C-4187ADAMS & HODGEENGINEERING, PCGRAPHIC SCALE: 1"=40'4020040SHEET 1 OF 1WETLAND IMPACT MAPAIRFLOW INDUSTRIAL SITESELMA, JOHNSTON COUNTY, NORTH CAROLINA0PROJECT BOUNDARY AIRFLOW INDUSTRIAL SITE 8/10/2021 6:25 AM REVISED WETLANDS WETLAND IMPACT WETLAND TO BE IMPACTED 0.035 AC WETLAND TO REMAIN 0.018 AC VICINITY MAP NTS SITE WEST STNAD 83 PROPOSED BUILDING Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1, 2021 Ver 4.1 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf County (or Countie s) where the proje ct is locate d:* Is this a NCDM S Proje ct * Is this project a public transportation project?* 1a. Type (s) of approv al sought from the Corps:* Has this PCN pre v iously be e n submitte d?* 1b. What type (s) of pe rmit(s) do you wish to se e k authorization?* 1c. Has the NWP or GP numbe r be e n v e rifie d by the Corps?* Nationwide Pe rmit (NWP) Numbe r: NWP Numbe rs (for multiple NWPS): 1d. Type (s) of approv al sought from the DWR:* Pre-Filing Meeting Information A. Processing Information Johnston Yes No Click Yes, only if NCDMS is the applicant or co-applicant. Yes No This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project. Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Yes No Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) Yes No 39 - Commercial/Institutional Developments List all NW numbers you are applying for not on the drop dow n list. check all that apply 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification Before submitting this form please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) “At least 30 days prior to submitting a certification request, the project proponent shall request a pre-filing meeting with the certifying agency” and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click he re to read more information on when this form is needed prior to application submission or he re to view the form. Is this a courte sy copy notification?* ID#Ve rsion Pre -fling M e e ting or Re que st Date * Yes No 1e . Is this notification sole ly for the re cord be cause writte n approv al is not re quire d? * For the re cord only for DWR 401 Ce rtification: For the re cord only for Corps Pe rmit: 1f. Is this an afte r-the -fact pe rmit application?* 1g. Is payme nt into a mitigation bank or in-lie u fe e program propose d for mitigation of impacts? Acce ptance Le tte r Attachme nt 1h. Is the proje ct locate d in any of NC's twe nty coastal countie s?* 1j. Is the proje ct locate d in a de signate d trout wate rshe d?* Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx 1a. Who is the Primary Contact?* 1b. Primary Contact Email:* 1c. Primary Contact Phone :* 1d. Who is applying for the pe rmit?* 1e . Is the re an Age nt/Consultant for this proje ct?* 2. Owner Information Attach docume ntation of Pre -Filing M e e ting Re que st he re :* 6/10/2021 Click the upload button or drag and drop files here to attach document DWR Pre-Filing Meeting Request Form (28).pdf 53.18KB File type must be PDF Yes No Yes No Yes No If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No Click the upload button or drag and drop files here to attach document FILE TYPE MUST BE PDF Yes No Yes No B. Applicant Information Wyatt Brown brownenvgrp@gmail.com (xxx)xxx-xxxx (919)524-5956 Owner Applicant (other than owner) (Check all that apply) Yes No 2a. Name (s) on re corde d de e d:* 2b. De e d book and page no.: 2c. Contact Pe rson: 2d. Addre ss * 2e . Te le phone Numbe r:* 2f. Fax Numbe r: 2g. Email Addre ss:* TOBACCO ROAD PROPERTIES, LLC 05343, 0185 (for Corporations) Jeff Holt City Selma State / Province / Region NC Postal / Zip Code 27576 Country US Street Address 100 OAK TREE DR Address Line 2 (xxx)xxx-xxxx (919)625-9115 (xxx)xxx-xxxx 4. Agent/Consultant (if applicable) 1a. Name of proje ct:* 1b. Subdivision name : 1c. Ne are st municipality / town:* 2a. Prope rty Identification Numbe r: 2b. Prope rty size : 2c. Proje ct Addre ss 2d. Site coordinate s in de cimal de gre e s Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude :*Longitude :* 3. Surface Waters 3a. Name of the ne are st body of wate r to propose d proje ct:* 3b. Wate r Re source s Classification of ne are st re ce iv ing wate r:* Surface Water Lookup jeff@airflowproducts.net 4a. Name :* 4b. Business Name : 4c. Addre ss * 4d. Te le phone Numbe r:* 4e . Fax Numbe r: 4f. Email Addre ss:* Wyatt Brown (if applicable) Brown's Environmental Group, Inc City Selma State / Province / Region NC Postal / Zip Code 27576 Country US Street Address 242 Batten Farm Road Address Line 2 (919)524-5956 (xxx)xxx-xxxx (xxx)xxx-xxxx brownenvgrp@gmail.com C. Project I nformation and Prior Project History 1. Project Information Air Flow Site (if appropriate) Selma 2. Project Identification (tax PIN or parcel ID) 260520-81-5652 (in acres) City Selma State / Province / Region NC Postal / Zip Code 27576 Country US Street Address not assigned Address Line 2 Oak Tree Drive 35.53869 ex: 34.208504 -78.29867 -77.796371 Mill Creek WS-IV, NSW 3c. What riv e r basin(s) is your proje ct locate d in?* 3d. Ple ase prov ide the 12-digit HUC in which the proje ct is locate d.* River Basin Lookup 4. Project Description and History 4a. De scribe the e xisting conditions on the site and the ge ne ral land use in the v icinity of the proje ct at the time of this application:* 4b. Hav e Corps pe rmits or DWR ce rtifications be e n obtained for this project (including all prior phase s) in the past?* 4f. List the total e stimate d acre age of all e xisting we tlands on the prope rty: 4g. List the total e stimate d line ar fe e t of all e xisting stre ams on the prope rty: 4h. Explain the purpose of the propose d proje ct:* 4i. De scribe the ov e rall proje ct in de tail, including indirect impacts and the type of e quipme nt to be use d:* 5. Jurisdictional Determinations 5a. Hav e the we tlands or streams be e n de line ate d on the prope rty or propose d impact are as?* Comme nts: 5b. If the Corps made a jurisdictional de te rmination, what type of de te rmination was made ?* Corps AID Numbe r: 5c. If 5a is ye s, who de line ate d the jurisdictional are as? Name (if known): Age ncy/Consultant Company: Othe r: 6. Future Project Plans 6a. Is this a phase d proje ct?* Are any othe r NWP(s), re gional ge ne ral pe rmit(s), or indiv idual pe rmits(s) use d, or intende d to be use d, to authorize any part of the propose d project or re lated activ ity? This include s othe r se parate and distant crossing for line ar proje cts that re quire De partme nt of the Army authorization but don’t re quire pre -construction notification. 1. Impacts Summary 1a. Whe re are the impacts associate d with your proje ct? (che ck all that apply): 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be use d in the table be low to re pre se nt the word "wetland". Neuse 030202011105 The site is an existing 5 acre tract located on Oak Tree Drive in an industrial park. The site is routinely mowed grass. The general land use in the vicinity is industrial with some existing homes to the west of the industrial park. Yes No Unknown 0.053 (intermittent and perennial) 0 The purpose of the project is to construct a manufacturing building for Airflow filters. The site plan includes the building, parking and stormwater bmp. The project will be to construct a manufacturing building, parking lot and bmp. The site is mostly mowed lawn with a few trees on the north side and the back of the property. The runoff from the building and asphalt will be diverted to a BMP in the back of the property. The sewage will be carried by sanitary sewer going out the front of the property to Oak Street. Motor Graders will be used to grade the property and a trackhoe will be used to construct the bmp. The parking lot will be asphalt. There should be no indirect impacts from this project. Yes No Unknown Preliminary Approved Not Verified Unknown N/A Example: SAW-2017-99999 SAW-2021-00833 Wyatt Brown Brown's Environmental Group, Inc Yes No Not to my knowledge D. Proposed Impacts Inventory Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2a. Site #*(?)2a1 Reason *(?)2b. Impact type *(?)2c. Type of W.*2d. W. name *2e . Fore ste d *2f. Type of Jurisdicition *(?) 2g. Impact are a * 2g. Total Te mporary We tland Impact 2g. Total Pe rmane nt We tland Impact 2g. Total We tland Impact 2i. Comme nts: 1. Avoidance and Minimization 1a. Spe cifically de scribe me asure s take n to av oid or minimize the propose d impacts in de signing the proje ct:* 1b. Spe cifically de scribe me asure s take n to av oid or minimize the propose d impacts through construction te chnique s:* 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Doe s the proje ct re quire Compe nsatory M itigation for impacts to Wate rs of the U.S. or Wate rs of the State ? 2b. If this proje ct DOES NOT re quire Compe nsatory M itigation, e xplain why: NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website. *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Doe s the proje ct include or is it adjace nt to prote cte d riparian buffers ide ntifie d within one of the NC Riparian Buffe r Prote ction Rule s? For a list of options to meet the diffuse flow requirements, click here. If no, e xplain why: 2. Stormw ater Management Plan 2a. Is this a NCDOT proje ct subje ct to compliance with NCDOT’s Indiv idual NPDES pe rmit NCS000250?* 2b. Doe s this proje ct me e t the re quire me nts for low de nsity proje cts as de fine d in 15A NCAC 02H .1003(2)?* To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Doe s this proje ct hav e a stormwate r manage me nt plan (SM P) re v ie we d and approv e d unde r a state stormwate r program or state-approv e d local gov e rnme nt stormwate r program?* 2d. Which of the following stormwate r manage me nt program(s) apply (che ck all that apply):* Local Gov e rnme nt Stormwate r Programs * Wetland A parking lot, bmp P Small-Basin Wetland Wetland A Yes Both 0.053 (acres) 0.000 0.053 0.053 E. Impact Justification and Mitigation In designing the project, 0.018 acres of wetland were left to show minimization the impact. Through construction the existing wetland will be marked in the field and protected with silt fence. Since the wetland is in the very back there should be no construction activities in that area. Yes No The impact is 0.053 acres, much less than the 0.10 acre threshold. F. Stormwater M anagement and Diffuse Flow Plan (required by DWR) Yes No No buffered streams in or adjacent to the property. Yes No Yes No Yes No N/A - project disturbs < 1 acre Hint: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormw ater programs or projects that satisfy state or locally-implemented stormw ater programs through use of community in-lieu programs should answ er no to this question. Local Government State If you have a local government approval please include the SMP on their overall impact map. Phase II NSW USMP Water Supply Ple ase ide ntify which local gov e rnme nt stormwate r program you are using.* Comme nts: 1. Environmental Documentation 1a. Doe s the proje ct inv olv e an e xpe nditure of public (fe de ral/state /local) funds or the use of public (fe de ral/state ) land?* 2. Violations (DWR Requirement) 2a. Is the site in v iolation of DWR Wate r Quality Ce rtification Rule s (15A NCAC 2H .0500), Isolate d We tland Rule s (15A NCAC 2H .1300), or DWR Surface Wate r or We tland Standards or Riparian Buffe r Rule s (15A NCAC 2B .0200)?* 3. Cumulative Impacts (DWR Requirement) 3a. Will this proje ct (base d on past and re asonably anticipate d future impacts) re sult in additional de v e lopme nt, which could impact ne arby downstre am wate r quality?* 3b. If you answe re d “no,” prov ide a short narrativ e de scription. 4. Sewage Disposal (DWR Requirement) 4a. Is se wage disposal re quire d by DWR for this proje ct?* 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this proje ct occur in or ne ar an are a with fe de rally prote cte d spe cie s or habitat?* 5b. Hav e you che cke d with the USFWS conce rning Endange re d Spe cie s Act impacts?* 5c. If ye s, indicate the USFWS Fie ld Office you hav e contacte d. 5d. Is anothe r Fe de ral age ncy inv olv e d?* 5e . Is this a DOT proje ct locate d within Div ision's 1-8?* 5f. Will you cut any tre e s in orde r to conduct the work in wate rs of the U.S.?* 5g. Doe s this proje ct inv olv e bridge mainte nance or re mov al?* Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Doe s this proje ct inv olv e the construction/installation of a wind turbine (s)?** 5i. Doe s this proje ct inv olv e (1) blasting, and/or (2) othe r pe rcussiv e activitie s that will be conducte d by machine s, such as jackhamme rs, me chanize d pile driv e rs, e tc.?* 5j. What data source s did you use to de te rmine whe the r your site would impact Endange re d Spe cie s or De signate d Critical Habitat?* 6. Essential Fish Habitat (Corps Requirement) 6a. Will this proje ct occur in or ne ar an are a de signate d as an Esse ntial Fish Habitat?* 6b. What data source s did you use to de te rmine whe the r your site would impact an Esse ntial Fish Habitat?* Town of Selma G. Supplementary Information Yes No Yes No Yes No This is a small manufacturing project located in an existing industrial park. I don't foresee any additional development caused by this project. Yes No N/A Yes No Yes No Raleigh Yes No Unknown Yes No Yes No Yes No Yes No Yes No Natural Heritage-List attached at bottom, Our site is basically a mowed lawn with no streams, no habitat on property and no impact. IpaC- 1) Red-cockaded Woodpecker-No habitat on this property for the woodpecker. 2) Neuse River Waterdog- 3) Carolina Madtom-No stream on or near out tract, no habitat no effect. Yes No 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this proje ct occur in or ne ar an are a that the state , fe de ral or tribal gov e rnme nts hav e de signate d as hav ing historic or cultural pre se rv ation status (e .g., National Historic Trust de signation or prope rtie s significant in North Carolina history and archae ology)?* 7b. What data source s did you use to de te rmine whe the r your site would impact historic or arche ological re source s?* 8. Flood Zone Designation (Corps Requirement) Link to the FEM A Floodplain M aps: https://msc.fema.gov/portal/search 8a. Will this proje ct occur in a FEM A-designate d 100-ye ar floodplain?* 8c. What source (s) did you use to make the floodplain de te rmination?* Comme nts Ple ase use the space be low to attach all require d docume ntation or any additional information you fe e l is he lpful for application re v ie w. Documents should be combine d into one file whe n possible , with a Cov e r Le tte r, Table of Conte nts, and a Cov e r She e t for e ach Se ction pre fe rre d. * · The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief’; and · The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. · I have given true, accurate, and complete information on this form; · I agree that submission of this PCN form is a “transaction” subject to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”); · I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”); · I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND · I intend to electronically sign and submit the PCN form. Full Name :* Signature * Date None in Johnston County, no streams on the project. Yes No Website above, the project will occur within 1 mile of the Richard B Harrison School, this project should not cause any effect on the school. Yes No website above M iscellaneous Click the upload button or drag and drop files here to attach document Airflow Package.pdf 8.68MB File must be PDF or KMZ Signature By checking the box and signing below, I certify that: Wyatt Brown 7/6/2021