HomeMy WebLinkAbout20190229_Other Documents_20110208STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTAT[ON .,4,* �"� �
BEVERLY EAVES PERDUE EUGENE A. TI, JR.
GOVERNOR SECRETARY
February 4, 2011
MEMORANDUM TO: Mr. David Wainwright
Division of Water Quality /Wetlands
Central Office
FROM: Gregory J. Thorpe, Ph.D., Manager ,
Project Development and Environmental Anal s' rant
SUBJECT: NC 42, from US 421 (Horner Blvd.) in Sanford to SR 579 (North Main
Street) in Broadway, and along SR 1579, NC 42 (Avents Ferry Road) to
SR 1538 (Buckhorn Avenue) in Broadway, Widen to three with turn -
lanes at SR 1523 (Rice Road), SR 1529 (Cox Mill Road) and SR 1579
(Broadway Road), Lee County, Federal -Aid Project STP -0042(49),
WBS 38887, R -3830
The Project Development and Environmental Analysis Branch is starting the project .
development, environmental and engineering studies for the proposed R -3830 project. The project is
included in the 2011 -2017 North Carolina Transportation Improvement Program and is scheduled for
right of way in fiscal year 2016 and construction in fiscal year 2018.
Attached for your review and comments are the scoping information sheets for the proposed project.
We would appreciate any information you might have that would be helpful in evaluating potential
environmental impacts of the project. If applicable, please identify any permits or approvals that may be
required by your agency. A scoping meeting will be scheduled with NCDOT staff to discuss the proposed
project in more detail. In order to include your comments in our materials for this meeting, we would
appreciate your response by May 1, 2011. If you would like to attend the scoping meeting, please notify the
project engineer.
It is anticipated that a federally funded Categorical Exclusion will be prepared for this project.
This document will be prepared in accordance with the National Environmental Policy Act.
If you have any questions concerning the project, please contact Karen Reynolds, Project
Planning Engineer, of this Branch at (919) 733 -7844, Ext. 327. Please include the TIP Project Number in
all correspondence and comments.
GJT /plr
Attachment
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699 -1548
TELEPHONE: 919 -733- 3141.
FAX: 919 -733 -9794
WEBSITE: WWWNCD0T.0RG
LOCATION:
TRANSPORTATION BUILDING
1 SOUTH WILMINGTON STREET
RALEIGH NC
PDEA Scoping Scoping Information Sheets
Rev 3119/08
Project Development and Environmental Analysis Branch
Scoping Information Sheets
TIP No.: R -3830 Sent Date: 02 -11 -2011
WBS No.: 38887
Federal Aid No: STP -0042 (49)
Division: 8
County: Lee
Project Description:
General Project Need:
Revision Date: N/A
Meeting Date: 08 -02 -2011
NC 42, from US 421 (Horner Blvd) in Sanford to SR 1579 (North Main St)
In Broadway, and along SR 1579, NC 42 (Avents Ferry Road) to SR 1538
(Buckhorn Ave) in Broadway. Widen to three lanes, with turn -lanes at SR
1523 (Rice Rd), SR 1529 (Cox Mill Rd) and SR 1579 (Broadway Rd)
Widen to three lanes to Improve the traffic carrying capacity and to
reduce the accident potential (rear -end and angle crashes) along
Broadway- Road
Metropolitan 1 Rural Planning Organization: Triangle Area RPO
NEPA / 404 Merger Candidate ?: ❑ Yes ® No
Feasibility Study Completed ?:
Proiect Schedule:
® Yes ❑ No
Environmental Document(s)
Right of Way Authorization Date:
Cost Estimate:
TIP Estimate:
Current Estimate:
Let Date:
® To Be Determined
Date of Study: 02/26/1998
Construction: Right of Way:
Dates:
09 -11 -2013
11 -10 -2014
05 -03 -2016
05 -15 -2018
Total Cost:
9,200,000 5,500,000 14,700,000
PDEA Scoping Scoping Information Sheets
Rev 3/19/08
Design Criteria:
Length of Project: 5.4 miles !
Right of Way: Existing: 60 feet along NC 42 & SR 1579 - 30 feet
on either side of roadway centerline
Proposed: 80 -100 feet
Type of Access Control: Existing: None
Proposed: None
Functional Classification: C 42 - Functional Class 4: Minor Arterial
[::S�F 1 579 - Functional Class 5: Ma'or Collector
Strategic Highway Corridor N/A
Information:
CTP/Thoroughfare Plan Maior Thoroughfare: Sanford TF Plan - needs
Designation (Facility Type): improvement. Minor Arterial -- NC Statewide
Functional Classification System
Air Quality Status: ❑ Non - attainment - E] Maintenance ® Attainment -
Ozone CO2
Horizon Completion Year (Long Range Trans. Plan): 2035 :D
Typical Section in Compliance with
Conformity Determination? ® Yes - Exempt F1 No
Traffic_(AADT): Year Range of Traffic % TTST:
Current Year: (2009) 6,100 - 14,000 % Dual:
Design Year: (2040) 1 % DHV:
Design Standards Applicable: ® AASHTO ❑ 3R
PDEA Scoping Scoping Information Sheets
Rev 3/19/08
Railroad Involvement:
One crossing between SR 1519 (Nash Street) and SR 1520
(Rosser Road) — Atlantic & Western Railway industrial
s ur line
Utility Involvement: Moderate
Natural/ Human Environmental Features include comments from environmental
agencies):
No major stream crossings exist. Several tributaries are piped under the roadway.
No threatened or endangered species or wetland encounters are expected.
A large cemetery is located 0.1 mile west of SR 1523 (Rice Road). The relocation of a
number of graves will be required.
The R -3830 Feasibility Study (1998), states that the City of Sanford had requested
proposed sidewalks on both sides of Broadway Road, from East Lee Middle School to
Horner Boulevard. Highway Division 9 staff will verify the status of this request and
inquire about as to any sidewalk requests from the Town of Broadway.
Print Send Link
"
� y
M'10' "gill
fake rall��
gg+� ;+ s
4
e l
Rd
N lho fir'
GIV
j
w 1
iy,
p
� 4�1
t t q
•A
021 o Goo e -ia data c o1 o Go le -
15 �y
hap;llmaps,google,comlmaps?f s &utm_campaign --en &utm source= en- ha.na- us- bk- gm &utm_ medium= ha &utm_term= google %20maps ONE