HomeMy WebLinkAbout20210256 Ver 1_FINAL Update_20210813Strickland, Bev
From: Heath Caldwell <heath.caldwell@wetlands-epg.com>
Sent: Friday, August 13, 2021 10:26 AM
To: Fuemmeler, Amanda J CIV (USA); Johnson, Alan
Cc: Amber Lipsky
Subject: [External] Re: Meritage Homes of the Carolinas / Stanley Lucia / NWP #29 On Hold /
AID 2020-01916
Attachments: 2021-0813 - Harper Landing Wetlands Stream Impact Exhibit.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amanda/Alan-
Geez this took longer than expected, but Alan, we've got your baffles. And that's the only change as impacts and
all are as proposed in the application. Alan, can you swap in this plan set and we're good to go? Amanda, do we
need to get you anything else here outside of Alan's approval? Let me know and I'll try and get it - thanks!
Heath
On Wed, Jul 28, 2021 at 3:59 PM Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil> wrote:
North Carolina Division of Water Resources (NCDWR): After review of the submitted PCN for The Meritage
Homes of the Carolinas / Stanley Lucia site for NWP #29, dated June 28, 2021, and a review of the
Nationwide Permit #29 Water Quality General Certification (GC) No. 4256, dated December 18, 2020, it
appears that an individual 401 water quality certification (WQC) is required from the NCDWR for the
proposed activities. The ePCN received by our office on June 28, 2021, provided the 9 required elements for
an individual WQC. This permit application/ePCN constitutes the Corps initial receipt of the 401 WQC
application.
Mr. Caldwell: This email is notification that the 404 permit is on hold until a 401 WQC is issued or waived by
the DWR. If there is additional information that we need to process your application, I will contact you in a
separate email but in general your proposed work shall not commence until after the 401 WQC has been issued
or waived AND until a final general permit verification has been provided to you.
Please contact me with any questions, thanks.
Amanda Jones
i
Regulatory Specialist
U.S. Army Corps of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
828-271-7980 ext. 4225
Heath Caldwell
Wetlands & Environmental Planning Group
Leonard S. Rindner, PLLC
www.wetlands-epg.com
704.999.5279
2
al"n
/ � H12fON
I
WETLAND F
-269 SF (ONSITE)
WETLAND I
11 SF
6, 95 S� g� I BIW TTFNT S EAM KS
\ H P6ZtIG ST N EY EC" o /
B
" E REAM °
)$f// 511 � 24 S
i
b PLiTgO PAGNf MOy -----i
WETLAND K
o
421 SF
WETLANDBW
2,260 SF
INTERMITTENT STREAM C r—\, ° o
263LF9� o
I I I I METROPOLITANAVE, SUITE250 DATE: 6/15/2021
CHARLOTTE, NC28204 OVERALL EXISTING CONDITIONS
www.bgeinc.com 0 250' 500,
NC LICENSE #C 4397 SCALE: 1" = 500'
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN
10RIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
•1 11 `
eOMRF a \
Pll
"All a
UR
g.
AIR
•' '" I�lll� 1 _
. • _�_,_� J�,�.,, III' / •
I'
'I'I / DATE: 6/15/2021
CHARLOTTE,
•• • OVERALL 1 1 11
11
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN
10RIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
PROP. PUMP LINE
W
a
711 SF/0.016AC/74LF
PERMANENT SOUTH PRONG STANLEY CREEK CULVERT
IMPACT FROM RETAINING WALL TO RETAINING WALL
La
CL OF SOUTH PRONG STANLEY CREEK
I
PROP. PUMP INLET LOCATION Ja
PROP. COFFER DAM 74.51 LF
"N (OR OTHER APPROVED EQUIVALENT) , 60" RCP @ 1.34%
—3SS
159SF/0.004AC/15LFJ
TEMPORARY SOUTH PRONG STANLEY CREEK
IMPACT FROM PUMP INLET TO HEADWALL
•3SS 3SS 3SS
GE
FMAI 56 34
gIM
1111 METROPOLITAN AVE, SUITE 250
v . = CHARLOTTE, NC 28204
www.bgeinc.com
NC LICENSE #C-4397
3
THIS C)n(:I IMFNT TC)r FTHFR WITH THE C.n NC;FPTS ANCI nFSI(; NS PRFSFNTFCI HFRF
OHWL
74.51 LF
60" RCP @ 1.34%
-- v
PROPOSED HEADWALL (TYP.)
74.51 LF _ — —
6'x8' RCB @ 0.50% 160 SF / 0.004 AC / 20 LF
I PERMANENT SOUTH PRONG STANLEY
CREEK RIPRAP IMPACT FROM
I RETAINING WALL TO END OF RIPRAP
lmmuaq-
NEVA I $•-
mon
20'CLASS A RIPRAP APRON
AU TO
BE
INSTALLED AT
• •
-''�►�►���i��ri`A�_ELEVATION
CPROP. PUMP• •
3SS \W
CL
SOUTH PRONG STANLEY CREEK AND WETLAND
BW IMPACT - PLAN VIEW
WETLAND 'SW" /
2260t SF OF/MPACT
0 10, 20'
SCALE: 1" = 20'
JTHORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
HARPER LANDING BLVD
770
765
760
755
750
745 30+00
STA: 30+00.00 TO STA:32+00.00
------------------------------
- - -
- - - - -
- - - - -
- - - - - -
PROP. GRADE AT R
- - - - - -
- - - - - -
AD C.L.
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
-�---
-- --
- - - - - -
- - - - - -
i
- - - - -
- - - -
----
--/--
t J
74.51 LF
60"RCP @1.34% —
----- 74.51LF—
6'X8' RCB @ 0.50%
1'TALLBAFFLES
6'X8' BOX TO BE EMBEDDED 1' �/
EX.
--74.51LF
60" RCP
----
GRADEATROADC.L.
----
@ 1.34%
-----
770
765
760
755
750
0 20' 40' 80'
30+50 31+00 31+50 32+00 745 SCALE: 1" = 4'
VERT: 1" = 4
="" METROPOLITAN SUITE 250 SOUTH PRONG STANLEY CREEK CULVERT DATE:B/12/2021
CHARLOTTE,NC28204
www.bgeinc.com CROSSING IMPACT - CROSS SECTION
NC LICENSE #C-4397
AUTHORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
Stream CL
STA:-0+50.00 TO STA:2+00.00
770 770
ROP. GRADE
765 ==I- 765
__ _ __ _ _ _ _ _ _STA.0+75.25
PROP. RETAINING WALL (BY OTHERS) F—OR 640SSING
PROP. RETAINING WALL (BY OTHERS)
760 760
SEWER C OSSING 1 88'
— — — — -760:20— ---
--
6'X8' RCB @ 0.50% 74.51 LF
— — — — — — (2) 60" RCP @ 1.34%- —
PROP. COFFER DAM
(OR APPROVED EQUIVALENT) - - - - - - - PROP. PUMP DISCHARGE LOCATION
755 755
PROP. PUMP INLET LOCATION
— _ — — — — — — EX. GRADEALONGPIPE C.L.
EX GRADEALONGP/PEC.L.
750 750
20' CLASS RIPRAP APRON
6'X8' BOX TO BE EMBEDDED l'-/
- - - - - -
- - - - - - - - 1 TALL BAFFLES--- -----
0
20' 40' 80'
745
745
SCALE: 1" = 40'
v _0+50 0+00
0+50 1+00 1+50 2+00
VERT: 1" = 4'
v 1 I I I I METROPOLITAN AVE, SUITE250
SOUTH PRONG STANLEY CREEK CULVERT
DATE: 8/12/2021
CHARLOTTE, NC28204
wwwbgeinc.com
CROSSING IMPACT- PROFILE VIEW
NC LICENSE #C-4397
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN
UTHORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
I �
S
I All
STREAM BANKS TO BE RESTORED
AS SHOWN ON STREAM BANK
STABILIZATION DETAIL
939 LF / 0.022 AC / 51 LF
v TEMPORARY SOUTH PRONG STANLEY CREEK
IMPACT FROM PUMP INLET TO PUMP DISCHARGE `
PROP. PUMP INLET LOCATION
ITOP OF BANK
� 01
■
■
PROPOSED 40 LF 18" STEEL CASING
PIPE INSTALLED BY OPEN CUT
\ TEMP. CLASS A RIPRAP APRON
\\ \ (TO BE REMOVED) _ — — ■_
\ r \ PROP. PUMP DISCHARGE LOCATION ■
— — CL OF SOUTH PRONG
— — STANLEY CREEK
C /
PROPOSED 25' SANITARY SEWER EASEMENT
PROP. COFFER DAM
(OR OTHER APPROVED EQUIVALENT) i
ass M—
/ 3Ss i 'S
STREAM BUFFER
PROP. PUMP LINE S
PROPOSED RETAINING WALL _
-
/ / / ssE — —
v MCHARPOTTE, NC28204ITE250 SOUTH PRONG STANLEY CREEK SEWER DATE: 6/15/2021
wwwbgeinc.com CROSSING 1 IMPACT - PLAN VIEW o 10' 20'
NC LICENSE #C-4397 SCALE: 1 " = 20'
THIS I7777 IMFNT TnrFTHFR WITH THE C:C)N(:FPTS AND F)FSIC�NR PRFSFNTFF) HFRFIN AS AN INSTRI IMFNT C)F RFR\/IC:F IS INTFNn Fn C)NI Y FOR THE SPF(:IFIC: PI IRPC)RF ANF) 71 IFNT FnR WHICH IT WAR PRFPARFF) RFI ISF C)F ANF) IMPROPFR RFI IAN(:F nN THIS F)C)C:I IMFNT WITHO I IT WRITTFN
JTHORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
770
765
PROPOSE[
760
alPROP. 40 LF 18" STEEL CASING PIPE
755
a
a
U
750
1
SWR-K
STA: 4+75.00 TO STA:6+50.00
GRADE
- —
—
—
— — — —
— — — —
— — — — —
— — — — —
EXISTING
— — —
— —
GRADE
— — -
— —
— —
—
— — —
�— — — — — —
— —
— —
110.26
LF
DI @ 0.60%
8"
2.0'
`L
d
W
U)
N �
�`�Tzo--
--
-------�F�zz
-- _ ------
-------ocAEE==—
745 4+75 5+00 5+50 6+00
I I I I METROPOLITANAVE, SUITE250
CHARvL07 e', NC2 204 SOUTH PRONG STANLEY CREEK SEWER
g CROSSING 1 IMPACT - PROFILE
NC LICENSE #C 4397
THIR nnn1IMFNT Tn(.FTHFR WITH THE nnNnFPTR ANN nFRI(:NR PRFRFNTFn HFRFIN AR AN INRTRI IMFNT nF RFRVInF IR INTFNDFD nNI Y FOR THE RPFnIFIn PI IRPnRF ANTI nI IFNT FOR WHICH IT WAS PRFPAI
770
765
760
755
750
6+50 745
0 20' 40'
SCALE: 1 " = 40'
1THORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
/\ \-SDE SDE SIDE SDE SIDE • d1
Z
17
C �
/ STREAM BUFFER ` ` I SIDE SIDE
-� PROPOSED 20 LF 18" STEEL CASING
PROP. COFFER DAM �� - PIPE INSTALLED BY OPEN CUT
(OR OTHER APPROVED EQUIVALENT) 767 SF 10.018 AC 167 LF
TEMPORARY SOUTH PRONG STANLEY CREEK
PROP. PUMP INLET LOCATION IMPACT FROM PUMP INLET TO PUMP DISCHARGE
. -------------
-SSE `
_ PROP. PUMP LINE :ZJ4
STREAM BANKS TO BE RESTORED
AS SHOWN ON STREAM BANK
STABILIZATION DETAIL
�IIII METROPOLITAN A VE, SUITE250
v . = CHARLOTTE, NC28204
www.bgeinc.com
NC LICENSE #C-4397
\ TOP 71fP\\
PROP. PUMP DISCHARGE LOCATION \ /
I V
I TEMP. CLASS A RIPRAP APRON
TO BE REMOVED
� � I
%00 \ CL OF SOUTH PRONG STANLEY CREEK
SOUTH PRONG STANLEY CREEK SEWER
CROSSING 2 IMPACT - PLAN VIEW
"""""r" '
25SANITARY SEWER EASEMENT
Fl
0 10' 20'
SCALE: 1" = 20'
AUTHORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
11
11
765
760
755
750
PROP. 20 LF 18" STEEL CASING PIPE —,
745
740
SWR-M
STA: 0+50.00 TO STA:1 +75.00
----
-------Z
EXISTING GRADE
----
-- '
— —
—1.9'oF
—
1.10°
—
I —
w�
—
----__
USN
W
M
Q O
V
Nr�—
--- _�
2 o�?p
�F�jj—
--- 10
-O
-
+0 (h
Z Z
735 0+50
1+UU 1+bU
765
760
755
750
745
740
1+75 735
9191 METROPOLITAN A VE, SUITE250 DATE: 6/15/2021
CHARLOTTE, NC28204 SOUTH PRONG STANLEY CREEK SEWER
wwwbgeinc.com CROSSING 2 IMPACT - PROFILE 0 25' 50'
NC LICENSE #C-4397 SCALE: 1" = 50'
AUTHORIZATION AND ADAPTATION BY BGE INC. SHALL BE WITHOUT LIABILITY TO BGE INC.
1. UPON COMPLETION OF STREAM CROSSING WORK, CONTRACTOR SHALL BACKFILL
AND MECHANICALLY TAMP (NO SPECIFIC DENSITY) SOILS INTO PLACE AND DRESS
DISTURBED SURFACES
2. BEGINNING AT A POINT 2' ABOVE WATER SURFACE ELEVATION, GRASS DISTURBED
AREAS (SEED, FERTILIZER & STRAW MULCH) STREAM BANK, TOP OF BANK AND
DISTURBED AREAS UPLAND OF STREAM
3. INSTALL 001R FIBER NET/MAT STARTING MINIMUM 12' BELOW WATER SURFACE
ELEVATION AND EXTENDING A MINIMUM 5 BEYOND TOP OF BANK. MINIMUM
SPECIFICATIONS FOR COIR FIBER NET/MAT AS FOLLOWS:
- MIN. THICKNESS OF 0.30 INCHES
- 100% COCONUT FIBER AND WOVEN INTO TWINE
- AVG. WEIGHT OF 20 ❑UNCES/S0. YO.
4. COIR FIBER NET/MAT SHALL BE SECURELY HELD IN PLACE WITH USE OF WOODEN
STAKED AND WIRE STAPLES (AS NEEDED)
5, INSTALL LIVE STAKES BEGINNING AT WATER SURFACE ELEVATION AND EXTENDING
2 VERTICAL FEET UP THE STREAM BANK. SEE LIVE STAKE DETAIL FOR
ADDITIONAL REQUIREMENTS,
6. INSTALL SILT FENCE "RE REINFORCEMENT ALONG TOP OF BANK (ADJACENT TO
END OF COIR FIBER NET/MAT) FOR WIDTH OF DISTURBED SOILS,
WATER SURFACE ELEVATION
COIR FIBER NET/MAT
GRASS (SED, MULCH & FERTILIZE) -
REMAINING DISTURBED STREAM BANK
AREAS 1NCLUDING TOPS OF BANK
(UNDER COR NET/MAT)
LIVE STAKE (WALLOWS OR -
SPECIES APPROVED BY
COW/OHEC) FOR FIRST 24'
ABOVE NORMAL WATER
SURFACE ELEVATION
24'±
12't
LIVE STAKES SHALL BE APPROXIMATELY 24'IN LENGTH
2. LIVE STAKES SHALL BE 0.5'-1.5' IN DIAMETER AT THE TIME
OF PLANTING
3. LIVE STAKES SHALL BE BLACK WILLOW OR SPECIES
SPECIFIED BY COE/DH£C OR CONSULTANT
I1.
4. SPECIES SkiALi. BE DpiMANT AT THE TIME OF ACQUISITIONAND
PLANTING AND LOCALLY GROWN/HARVESTED5.
LIVE STASES SHALL BE SPACED 3' D.C.
6. LIVE STAKES SHALL BE PLANTED A MINIMUM OF 18' IN N
DEPTH WITH NO MORE THAN 4'-8' OF STAKE EXPOSED
1..1yA�I.I1C;�
EXTEND COIR FIBER MAT
W BEYOND TOP OF BANK
ra�
II,II--I I I�-' '
Il,ia� �
1-I i i
EXTEND COIR FIBER NET/IMAT
I 1 k l 12' BELOW WATER SURFACE
ELEVATION
STREAM BANK STABILIZATION - LIVE STAKE
TYPICAL DETAIL - N.T.B.
5 ❑ 2.5 5 10
VERTICAL GRAPHIC SCALE
( IN FEET )
20 ❑ 10 20 40
HORIZONTAL GRAPHIC SCALE
( IN FEET )
INSTALL SILT FENCE
REINFORCED WITH HOG
WIRE AT TOP OF BANK
(EDGE OF ODIR FIBER
NET/MAT)
LARGE ROCK (SHOT OR IMPORT)
MAY BE USED TO REFORM
STREAM BANK (STACKEO), 19' OF
SOIL SHALL COVER STREAM
SIDE FACE OF ROCK STACK.
(USE OF ROCK TO ANCHOR BANK
i5 OPTIONAL)