Loading...
HomeMy WebLinkAbout20210992 Ver 1_Transylvania 63_100 Percent Partial Plan Set_Permit Drawings_20210812VICINITY MAP N.T.S. TRANSYLVANIA COUNTY 17BP.14.R.183 25 5050 25 5050 5 10 2010 100 100 See Sheet 1B for Conventional Symbols PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINASee Sheet 1A For Index of Sheets 23-APR-2021 10:47R:\Roadway\Proj\870063_Rdy_tsh.dgn$$$$USERNAME$$$$CONTRACT:WBS:17BP.14.R.183ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NA0 0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 00 0 0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 00 JENNIFER FARINO, PE PROJECT ENGINEER PROJECT DESIGN ENGINEER NCDOT CONTACT LOCATION PROJECT 1304 1313 1319 1309 1135 1304 1318 1315 1320 1322 1316 1143 F R E NC H B R OAD RI VE RWES T F ORK OF T HE BRIDGE NO. 870063 OVER WEST FORK OF FRENCH BROAD RIVERLOCATION: ON SR 1309 (SILVERSTEIN ROAD) TYPE OF WORK:GRADING, DRAINAGE, PAVING AND STRUCTURE (BRIDGE) DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED = = = 0.091 MILES 0.024 MILES 0.067 MILES T V = = =MPH ADT FUNC CLASS = 2011 790 6 20 SUBREGIONAL TIER % LOCAL .DR NIETSREVLIS 9031 RSREVIR DAORB HCNERF EHT FO KROF TSEW REVIR DAORB HCNERF EHT FO KROF TSEW-L- -L- STA. 14+02.86 END BRIDGE TO US 64TO SR 1322-DW2--1W D--L- STA. 10+50.00 BEGIN CONSTRUCTION -L- STA. 16+30.00 END CONSTRUCTION -DW2- STA. 10+95.00 END CONSTRUCTION -L- STA. 12+74.98 BEGIN BRIDGE -DW1- STA. 11+47.00 END CONSTRUCTION TBDDN00502 ROW, UTL. PEN/A N/A PROFESSIONA LE NG INEERNORTH CARO LINA SEAL 030952 ONIRAF .D REFINNEJ 17BP.14.R.183 N/A CONST. 2018 STANDARD SPECIFICATIONS TOTAL LENGTH WBS 17BP.14.R.183 LENGTH STRUCTURE WBS 17BP.14.R.183 LENGTH ROADWAY WBS 17BP.14.R.183 JUNE 22, 2021 GARRETT HIGDON FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NC FIRM LICENSE No: F-0493 CHARLOTTE, NC 28203 1520 SOUTH BOULEVARD, SUITE 200 PREPARED IN THE OFFICE OF: 17BP.14.PE.R.183 17BP.14.ROW.R.183 ALLISON DRAKE, PE -L- STA. 11+00.00 BEGIN PROJECT WBS 17BP.14.R.183 -L- STA. 15+80.00 END PROJECT WBS 17BP.14.R.183100% PLANSPROFESSIONA LE NG INEERNORTH CARO LINA SEAL 048313 NIMAJNEB .M ELO C 64 NA 2011NAD 83/ DocuSign Envelope ID: E6F29A06-9F66-49B0-B11C-49E36E6B5C21 4/27/2021 4/27/2021 INV=2533.75' INV=2531.82' 30.00' RT. -L- +53.00 30.00' RT. -L- +65.00 65.00' RT. -L- +97.00 55.00' RT. -L- +55.00 88.00' RT. -L- +18.00 83.00' RT. -L- +15.00 30.00' RT. -L- +20.00 70.00' LT. -L- +47.00 97.00' LT. -L- +94.00 50.00' LT. 30.00' LT. -L- +87.00 118.00' LT. -L- +25.00 116.00' LT. -L- +49.00 104.00' LT. -L- +60.00 EXIST. 20.00' LT. -L- +80.00 EXIST. 30.00' RT. -L- +80.00 EXIST. 30.00' RT. -L- +90.00 EXIST. 30.00' LT. -L- +90.00 30.00' RT. -L- +02.40 30.00' RT. -L- +36.13 20.00' LT. -L- +36.13 50.00' LT. -L- +59.78 30.00' LT. -L- +35.37 35.00' RT. -L- +37.50 30.00' RT. -L- +15.22 40.00' RT. -L- +60.00 81.02' LT. -L- +56.00 50.00' LT. -L- +14.00 30.00' RT. -L- +35.37 52.07' LT. 63.00' LT. -L- +45.00 85.55' RT. -L- +69.00 83.90' RT. -L- +34.00 98.00' RT. -L- +63.00 30.00' LT. -L- +00.00 15" CSP EST 11 SY GEOTEXTILE EST 3 TON CL B RIP RAP RETAIN BRIDGE EXISTING REMOVE 24" RCP-III SEE DETAIL E EMBANKMENT RIP RAP AT ELBOW GEOTEXTILE EST 5 SY CL B RIP RAP EST 1 TON Slope Ditch Front SEE DETAIL A SPECIAL CUT DITCH SEE DETAIL B SPECIAL CUT DITCH 18" CMP REMOVE EXISTING SEE DETAIL D DITCH STANDARD BASE SEE DETAIL C BASE DITCH SPECIAL CUT Slope Ditch Front Geotextile Geotextile Ditch Slope Front Geotextile Grade Ditch 1.5' GEOTEXTILE 8:1 TAPER 8:1 TAPER R=25' R=20' R=25' R=12.5' TO BE REMOVED AND BENTS EXISTING BRIDGE W/ GEOTEXTILE (TYP.) CLASS 'II' RIP RAP NORMAL TO END CAP 1.5:1 SLOPE LIMITS EXCAVATION LIMITS EXCAVATIONGRGR T T GR 18" CMP S(2) S(2) S SSGR GR GR S S S WD WD S S NE1 NW 1 D 1 CL 1 D2 SW 1 SE1 D3 CL2 D4 SILVERSTEIN RD.SR 1309 20' BSTSILVERSTEIN RD. SR 1309 20' BST SR 13227100' +/- TO US 6413000' +/- TOWEST FORK OF THE FRENCH BROAD RIVERTO BR IDGE ATTACHED UT IL IT IES 30 .00' 30.00' WOODS INV=2549.29' 18" CMP INV=2544.39' WOODS WOODS Floyd, VA 24091 201 East Main Street, Suite 5 Citizens Telephone Company (Comporium) WOODS WOODS GATE WOODS WOODS WOODS WOODS WOODS UNITED STATES OF AMERICA TRACT 21-D DB 73 PG 566 GATE RR SPIKE IN BASE OF 30" PINE -L- STA. 12+00.11 9.66' RT -BL- STA. 9+55.24 48.73' LT BM #2 ELEV=2540.05' -L- STA. 14+68.93 18.75 RT -BL- STA. 12+15.81 87-0063-GPS 2 -L- STA. 11+32.73 26.82' RT BL STA. 9+28.59 87-0063-GPS 1 DB 73 PG 566 TRACT 21-D UNITED STATES OF AMERICA RR SPIKE IN BASE OF 24" ELM BM #1 ELEV=2551.38' 1 EXIST. 70.00' RT. -L- +77.00 R/W ABANDON CHORD -L- PC Sta. 11+35.37 10'10' 10'10'-L--DW2- POT Sta. 11+00.00 -L- Sta. 12+00.00 -DW1- Sta. 10+00.00= -DW1- PRC Sta. 10+72.01 -DW1- PC Sta. 10+12.40 -DW1- POT Sta. 12+21.76 -DW2- CURVE DATA PI Sta 10+28.75 D L = 34.95' T = 18.75' R = 39.00' SE = N/A DS = 5 PI Sta 10+81.18 D L = 28.62' T = 14.99' R = 39.00' DS = 5 SE = N/A -DW2-ABC12'16' EX IST 07 06060 5 04 0302 0 100 01020203040 5 0 5 4 054 06 0708 085 E XIST 010 09 08070 6 05 04030 2 010001020 5 4 0 5 04 03 022 012 02 02EXI ST01102-1WD-02004 00 0102 02 EXIST 003 00 0102 -L- PC Sta. 15+36.13 -L- PT Sta. 12+59.78 STA. -L- POT 10+50.00 BEGIN CONSTRUCTION -L- CURVE DATA PI Sta 12+09.82 D L = 124.40' T = 74.45' R = 90.00' DS = 20 SE = 06 PI Sta 14+60.37 D L = 87.18' T = 45.15' R = 136.00' DS = 20 SE = 054 PI Sta 15+83.09 D L = 93.87' T = 46.96' R = 1,100.00' SE = EXIST. DS = 20 -L- PT Sta. 15+02.40 -DW2- PT Sta. 10+94.81 -DW2- PC Sta. 10+66.19 -DW2- PT Sta. 10+44.95 -DW2- PC Sta. 10+10.00 BEGIN GRADE -L- Sta. 14+30.00 -DW2- Sta. 10+00.00=1015 POT STA. -L- 10+00.00+50.64+ 7 8.8 7 +06 .62 +19.19+ 89.80 +09 .86 (TYP.)13'+40.94 +90 .58018'+29.00(TYP.)12'+47.00+19.96 -L- PC Sta. 14+15.22-DW2--DW1- CURVE DATA PI Sta 10+49.78 D L = 59.61' T = 37.38' R = 39.00' SE = N/A DS = 5 PI Sta 11+09.87 D L = 74.17' T = 37.86' R = 150.00' DS = 5 SE = N/A (TYP.)13.50' BEGIN PROJECT STA. -L- POT 11+00.00 PT STA. -L- 16+30.00 END CONSTRUCTION POC STA. -L- 15+80.00 END PROJECT RIGHT OF WAY LINE ON -DWI- TO PROPOSED REMOVE AND RESET GATE* *(TYP.)13.50'-L- -DW1- PT Sta. 11+46.18 ** **+59.69-DW1- POT Sta. 10+10.00 BEGIN GRADE -DW2- POT Sta. 10+95.00 END CONSTRUCTION -DW1- POT Sta. 11+47.00 END CONSTRUCTION LEVELS. SEE DETAIL E. BENTS TO NATURAL GROUND SLOPE BACK EXISTING END R/W ABANDON TB2GI 06060 5 04 0302 0 100 0102020304050 5 4 054 06 010 09 0 8070 6 05 04030 2 010001020 5 4 0 5 04 012 02 01102 02004 00 0102 02 EXIST 003 00 0102ELBELB0401 0402 0403 D2:1( Not to Scale) SPECIAL CUT DITCH DETAIL B Ground Natural FROM -L- STA. 12+50 TO STA. 12+64 LT Min. D= 1.0 Ft. Flatter2:1 or TB2GI D d ( Not to Scale) SPECIAL CUT DITCH DETAIL A Ground Natural 1.5:14:1 44 SY GEOTEXTILE Type of Liner= 24 TONS CL B Rip-Rap Min. d= 1.5 Ft. Min. D= 2 Ft. FROM -L- STA. 11+00 TO STA. 11+83 LT FROM -L- STA. 12+91 TO STA. 13+21 LT B= 2 Ft. Max. d= 1.5 Ft. Min. D= 2.3 Ft. 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d DETAIL D Ground Natural Ground Natural *When B is < 6.0' DDE = 26 CY 24 SY GEOTEXTILE Type of Liner= 17 TONS CL I Rip-Rap d 2:1B D ( Not to Scale) SPECIAL CUT BASE DITCH 2:1 DETAIL C Ground Natural 25 SY GEOTEXTILE Type of Liner= 18 TONS CL I Rip-Rap B= 2 Ft. Max. d= 1.5 Ft. Min. D= 2.3 Ft. FROM -L- STA. 12+55 TO STA. 12+91 LT ( Not to Scale) RIP RAP AT EMBANKMENT FROM -L- STA. 13+21 TO STA. 13+30 LT DETAIL E 8 SY GEOTEXTILE Type of Liner= 6 TONS,CL I Rip-Rap 10'min. 1.0'min. BRIDGE NO. 870063 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN 417BP.14.R.183 R/W SHEET NO.8/17/99ENGINEER ENGINEER 27-APR-2021 09:52R:\Roadway\Proj\870063_Rdy_psh.dgn$$$$USERNAME$$$$DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/ NA 2011 10'10'TYPE III BRIDGE SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP N.T.S.-DW2-AT-1 -L- 12'16'GREU, TL-2 AT-1 GREU, TL-2 27'-10"-1WD-10'10'4'4'4' 120° ABC BRIDGE EXCAVATION PAVEMENT REMOVAL BRIDGE APPROACH SLAB FOR -L-, -DW1-, -DW2- PROFILES, SEE SHEET 5 -L- POT Sta. 12+64.28 BEGIN APPROACH SLAB -L- POT Sta. 14+13.56 END APPROACH SLAB CURVED SHOP TYPE III CURVED SHOP TYPE III -L- Sta. 14+36.50 END SBG 3' 11"3' 11"FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-22 PROFILE ALONG EXISTING BRIDGE RIPRAP AT EMBANKMENT PROFESSIONA LE NG INEERNORTH CARO LINA SEAL 030952 ONIRAF .D REFINNEJ -L- POT Sta. 12+74.98 BEGIN BRIDGE -L- POT Sta. 14+02.86 END BRIDGE -L- Sta. 14+21.86 BEGIN CLASS I RIP RAP -L- Sta. 14+20.87 BEGIN CLASS 1V SELECT MATERIAL -L- Sta. 14+21.00 BEGIN SBG -L- Sta. 14+50.00 SELECT MATERIAL END CLASS IV -L- Sta. 14+25.45 BEGIN CLASS I RIP RAP -L- Sta. 14+50.00 RIP RAP END CLASS I SHOP CURVED TYPE III EST 62 SY ROCK PLATING NC FIRM LICENSE No: F-0493PROFESSIONALENGINEERNORTH CARO LINA SEAL 048313 NIMAJNEB .M ELO C F C C F FF F F C F F C F F C C DocuSign Envelope ID: E6F29A06-9F66-49B0-B11C-49E36E6B5C21 4/27/20214/27/2021 SBG EST 11 SY GEOTEXTILE EST 3 TON CL B RIP RAP RETAIN SEE DETAIL E EMBANKMENT RIP RAP AT ELBOW GEOTEXTILE EST 5 SY CL B RIP RAP EST 1 TON Slope Ditch Front SEE DETAIL A SPECIAL CUT DITCH SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL D DITCH STANDARD BASE SEE DETAIL C BASE DITCH SPECIAL CUT Slope Ditch Front Geotextile Geotextile Ditch Slope Front Geotextile Grade Ditch 1.5' GEOTEXTILE 15" CSP BRIDGE EXISTING REMOVE 18" CMP REMOVE EXISTING INV=2533.75' INV=2531.82' 24" RCP-III LIMITS EXCAVATION LIMITS EXCAVATIONGR GR 18" CMP S(2) S(2) S SSGR GR GR S S S S S WEST FORK OF THE FRENCH BROAD RIVER18" CMP WOODS WOODS GATE WOODS UNITED STATES OF AMERICA GATE UNITED STATES OF AMERICA WD WD WOODS INV=2549.29' INV=2544.39' WOODS WOODS WOODS WOODS WOODS WOODS C C C C C C R/W ABANDON CHORD 1015 ELBELBD2:1( Not to Scale) SPECIAL CUT DITCH DETAIL B Ground Natural FROM -L- STA. 12+50 TO STA. 12+64 LT Min. D= 1.0 Ft. Flatter2:1 or TB2GI D d ( Not to Scale) SPECIAL CUT DITCH DETAIL A Ground Natural 1.5:14:1 44 SY GEOTEXTILE Type of Liner= 24 TONS CL B Rip-Rap Min. d= 1.5 Ft. Min. D= 2 Ft. FROM -L- STA. 11+00 TO STA. 11+83 LT FROM -L- STA. 12+91 TO STA. 13+21 LT B= 2 Ft. Max. d= 1.5 Ft. Min. D= 2.3 Ft. 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d DETAIL D Ground Natural Ground Natural *When B is < 6.0' DDE = 26 CY 24 SY GEOTEXTILE Type of Liner= 17 TONS CL I Rip-Rap d 2:1B D ( Not to Scale) SPECIAL CUT BASE DITCH 2:1 DETAIL C Ground Natural 25 SY GEOTEXTILE Type of Liner= 18 TONS CL I Rip-Rap B= 2 Ft. Max. d= 1.5 Ft. Min. D= 2.3 Ft. FROM -L- STA. 12+55 TO STA. 12+91 LT ( Not to Scale) RIP RAP AT EMBANKMENT FROM -L- STA. 13+21 TO STA. 13+30 LT DETAIL E 8 SY GEOTEXTILE Type of Liner= 6 TONS,CL I Rip-Rap 10'min. 1.0'min. B B C ENGINEER. NEED TO BE INSTALLED AS DIRECTED BY THE ADDITIONAL EROSION CONTROL DEVICES MAY REQUIRE PRIOR APPROVAL BY ENGINEER. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL IN PROPOSED DITCH LINE INSTALL 25 SY MATTING IN PROPOSED DITCH LINE INSTALL 60 SY MATTING IN PROPOSED DITCH LINE INSTALL 65 SY MATTING IN PROPOSED DITCH LINE INSTALL 60 SY MATTING FROM -DW2- STA. 10+50 to 10+95 LT FROM -DW1- STA. 10+50 to 11+00 LT FROM -DW1- STA. 10+50 to 11+00 RT NOT ALLOWED IN OR ON STREAM BANKS. NOTE: EXCELSIOR OR OTHER MESH TYPE NETTING IS NOT ALLOWED IN OR ON STREAM BANKS. NOTE: EXCELSIOR OR OTHER MESH TYPE NETTING IS NC FIRM LICENSE No: F-0493 OF RUNOFF IN ROADWAY OPEN TO TRAFFIC. TRAPS, TYPE-C AS DIRECTED TO AVOID IMPOUNDMENT DEVICES IN LIEU OF ROCK INLET SEDIMENT UTILIZE FABRIC INSERT INLET PROTECTION NOTE: FROM -L- STA. 15+00 to 15+50 RT F F FF F F F F F F SHEET NO.PROJECT REFERENCE NO. EC-5/CONST. 4 19-APR-2021 13:57R:\Environmental\Design\Plan Sheets\870063_EC_dsn_psh_EC-5.dgn$$$$USERNAME$$$$8/17/9917BP.14.R.183 EST 62 SY ROCK PLATING NAD 83/ 2011 DocuSign Envelope ID: AFE7DA3E-A7A8-4CD6-A608-2CAA45D10F73 TS TS SITE 1 TS TSTS S