HomeMy WebLinkAboutNC0085928_Remission (Request)_20210805 AMERICAN TRUTZSCHLER
5 . I N N I N G NONW OII N3 CAPLL CLOTHING
TRUETZSCHLER �/ //�/`
American Truetzschler, Inc. • P.O. BOX 669228 • CHARLOTTE, N.C. 28266
ECT m3
Water Sciences Section AUG Q 9 2021
Division of Water Resources
1621 Mail Service Center Waiar.-I1`c)ctiori
Raleigh NC 27699-1621
RE¢U"EST FOR REMISSION
August 5, 2021
Re : Case No.TX 2021-0006, American Truetzschler Assessment of
Civil Penalty for Violations of NC General Statute 143-
215. 1 (a) (6 . NPDES Permit no.NC85928
To Whom It May Concern:
Enclosed is our Justification For Remission Request of Civil of
Penalties Assessed, Wavier of Right to an Administrative Hearing
and Activities Summary regarding the subject case.
Yours truly,
John Guglielmetti, Risk Manager
12300 MOORES CHAPEL ROAD•CHARLOTTE,NC 28214•TELEPHONE(704)399-4521 •FAX(704)399-4525
WEBSITE:W WW.TRUETZSCHLER.COM•E-MAIL:SALES@AM-TRUETZSCHLER.COM•ISO 9001:2008 CERTIFIED
JUSTIFICATION FOR REMISSION REQUEST
Case Number:, TX-2021-0006 County: Mecklenburg
Assessed Party: American Truetzschler Inc.
Permit No.(if applicable): NC0085928 Amount Assessed: 3 073.88
Please use this form when requesting remission of this civil penalty. You must also complete-the
"Reauest For Remission Waiver of Right to an Administrative Hearing and Stipulation ofFacts"
form to request remission of this civil penalty. You should attach any documents that you believe
support your request and are necessary for the Director to consider in evaluating your request for
remission. Please be aware that a request for remission is limited to consideration of the five
factors listed below as they may relate to the reasonableness of the amount of the civil penalty
assessed. Requesting remission is not the proper procedure for contesting whether the violation(s)
occurred or the accuracy of any of the factual statements contained in the civil penalty assessment
document. Pursuant to N.C.G.S. § 14313-282.1(c); remission of a civil penalty may be granted
only when one or more of the following five factors applies. Please check each factor that you
believe applies to your case and provide a detailed explanation, including copies of supporting
documents,as:to why the factor applies(attach additional pages as needed).
(a) one or more of the civil penalty assessment factors in N C G S 14313-282 10)were
wrongfully applied to the detriment of the petitioner(the assessment factors are listed in the civil
penalty assessment document);
(b) the violator Promptly abated continuing environmental damage resulting from the
violation (i.e., explain the steps that you took to correct the violation and prevent,future
occurrences);
_ (c) the violation was inadvertent or a result of an accident (i.e., explain why the
violation was unavoidable or something you could not prevent or prepare for),,
(d) the violator had not been assessed civil penalties for any previous violations,
_ (e) payment of the civil penalty will prevent payment for the remaining necessary
remedial actions (i.e., explain how payment of the civil penalty-will prevent you from performing
the activities necessary to achieve compliance).
EXPLANATION:: C
5CE Cd-+4L c\APo( A \g iv J% P5 Sv �4LG11 y
STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL
QUALITY
COUNTY OF MECKLENBURG
IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN
OF CIVIL PENALTIES AGAINST ) ADMINISTRATIVE HEARING AND
} STIPULATION OF FACTS
American Truetzschler Inc. }
American Traetzschler RS )
NPDES PERMIT NO. NCO085928 ) CASE NO. TX-2021-0006
Having been assessed civil penalties totaling$3,073.89 for violation(s) as set forth in the assessment document
of the Director of the Division of Water Resources dated July 7.2021,the undersigned,desiring to seek
remission of the civil penalties,does hereby waive the right to an administrative hearing in the above-stated
matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further
understands that all evidence presented in support of remission of this civil penalty must be submitted to the
Director of the Division of Water Resources within 30 days of receipt of the notice of assessment. No new
evidence in support of a remission request will be allowed after 30 days from the receipt of the notice of
assessment.
This the IN day of Av c o s +- 20 Z �
SIG14ATURE
ADDRESS
�cx G(oC1ZYi
/JG -2 e2-6& 2--LP
TELEPHONE
?UPI Rgi 45Zi
Activities Summary
American Truetzschler currently operates an existing 0.050 MGD groundwater remediation
system consisting of an equalization tank, particulate filter, a sodium cation-exchange
system, a crushed limestone filtration unit and an air stripper located at American
Truetzschler, Inc., 12300 Moores Chapel Road, Charlotte, Mecklenburg County, North
Carolina.
The system discharges approximately 2 million per year or 160,000 gallons per month. The system has
failed the quarterly chronic toxicity test approximately one quarter every year since Excel has been
monitoring the system starting in 2011. In 2016 the Chronic Toxicity test failed three months
consecutively (Nov CT pass/fail, Dec for CT multi concentration and Jan 2017 CT multi concentration).
Below is the summary of the most recent system sampling for which the fine was imposed:
Under the permit, chronic toxicity Pass/Fail testing must be conducted quarterly in February, May,
August and November. The chronic toxicity testing failed the regular quarterly pass/fail testing
conducted on February 16, 2021.The required follow-up ChV Multi-Concentration tests were conducted
in March (3/30&4/1) and April (4/13 &4/15)which failed.
American Truetzschler personnel had been working through various issues with the system operation in
coordination with Kellie Hedrick (ORC) in an effort to determine why the system kept shutting down. In
addition, ECEA personnel completed a compost change-out on 2/22/21 and a carbon change-out on
3/29/21. Additional maintenance on the carbon tank was completed 4/16/21; media in the carbon
column was causing a blockage.The blockage was cleared and the system was running at departure.
The regular quarterly pass/fail testing was completed on May 11& 13 which passed.
Although it took time to work through the remediation system's various issues,American Truetzschler
personnel along with Excel Civil&Environmental and the ORC,worked diligently to identify and abate
the issues and ensure the system functions as designed to prevent any potential environmental
impact.
EXCEL CIVIL&ENVIRONMENTAL ASSOCIATES,PLLC
www.excelengr.com