HomeMy WebLinkAboutNCC202453_NOT Closeout Documents_20210811 Charlolte-Mecklenburg
STORM MR
ATER2145 Suttle Avenue
Services
EC Inspection Report Charlotte, NC 2 8 2 0 8
Project Name: PLEASANT VALLEY
Location: 7960 SILVER MAPLE LN -Mint Hill
Owner:
EC- Final Inspection#: 61,536 -Date/Time: 8/3/21 12:00-8/3/21 13:00-Inspector: Chanell Hatch
Weather conditions: Sunny
Soil conditions: Workable
Contact made: N/A
Erosion and sediment control measures removed: YES
Site permanently stabilized: YES
BMP's installed per approved plans: N/A
Summary: Final inspection for Lot 13, 7819 Silver Maple Ln in Mint Hill (#409094). The Lot has been permanently
stabilized and all erosion control measures have been removed.
•
To report pollution or drainage problems call: 311
CIIARLOTTE_ http://stormwate r. c h a rmeck. o r g s
8/5/2021 3:19:42PM Page 1 of 1