Loading...
HomeMy WebLinkAboutNC0021253_NC0021253 Inspection_20210812ROY COOPER Governor ELIZABETH S. BISER Serrerory S. DANIEL SMITH Director Will Lewis City of Havelock 1 Governmental Ave Havelock, NC 28532 NORTH CAROLINA Environmental Quality August 12, 2021 SUBJECT: Compliance Inspection Report Havelock WWTP NPDES WW Permit No. NC0021253 Craven County Dear Mr. Lewis: The North Carolina Division of Water Resources conducted an inspection of the Havelock WWTP on 8/11/2021.This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0021253. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact Paul Mays with the Water Quality Regional Operations Section in the Washington Regional Office at 252-948-3940 or via email at paul.mays@ncdenr.gov. ATTACHMENTS Cc: Laserfiche Sincerely, Pad, kas Paul Mays, Environmental Specialist I Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 IN I 2 15 I 3 I NC0021253 111 121 21/08/11 I17 Type 18Lin I I I I I Inspector Fac Type 191 c I 201 I 21I I I I I I I I I I II I I I I I I I I I I I I I I I I I I II 111 11166 l Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67I I 70I I 711I 72 I N I 731 I I74 71 I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Havelock W WTP 304 N Jackson Dr Havelock NC 28532 Entry Time/Date 1 O:OOAM 21/08/11 Permit Effective Date 20/O5/01 Exit Time/Date 12:OOPM 21/08/11 Permit Expiration Date 24/06/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Jeffrey A Jarman/ORC/910-330-8167/ Other Facility Data Name, Address of Responsible OffcialTtle/Phone and Fax Number Contacted Will Lewis,1 Governmental Ave Havelock NC 28532/Mayor/252-444-6400/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement • Operations & Maintenar Records/Reports Sludge Handling Dispo: Facility Site Review • Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Paul M Mays DWRM/ARO WQ/252-948-3940/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 NPDES yr/mo/day Inspection Type N00021253 111 121 21/08/11 117 18 r, I (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On 08/12/2021 Paul Mays with the Division of Water Resources from the Washington Regional Office conducted a compliance evaluation of Havelock WWTP which operates under NPDES Permit #NC0021253. The facility was found to be compliant with NPDES Permit #NC0021253. Bellow are the findings and observations made during the inspection. Effluent meter was last calibrated on 05/20/2020 and needs to be calibrated annually. Staff onsite said that the meter will be calibrated next month. The effluent composite sampler was 0.8 degrees Celsius inside the unit. However, the doors inside the unit were dirty with algae growing on outside portion of the door seal with a frog and slug also being present. The facility needs to clean this portion of the effluent sampler. It is also important to note that the effluent sampler is flow proportional. Records were overall well -kept and easy to review. The 02/2021 eDMR and 04/2021 eDMR was spot checked with corresponding lab data and no issues were found. The 2020-2021 and 2019-2020 Annual Compliance Report for the facility were present for review with no issues. Sludge haul records were emailed at the request of the inspector end of the day (08/11/2021) for the month of 06/2021 for review and no issues were noted. Finally, it should be noted that the staff onsite were very helpful during the record review process. The last thing that was discussed were the violations originating from the 04/2021 eDMR, 05/2021 eDMR and 06/2021 eDMR reports. The major thing was the parameters Total Flow mgal/month and/or Total Nitrogen (monthly quantity) lbs./month were missing in these reports. The facility has the data to input these parameters into a revised eDMR report. These violations were discussed with staff, and it was settled that revised eDMRs with these missing parameters would be submitted for these months. The generator is tested by interrupting the primary power source one a month. The generator itself appeared to be in good condition and was operational at the time of inspection. The fuel tank for the generator was % full at the time of inspection and the facility has an emergency fuel agreement with Coastal Diesel. Overall, all the primary and secondary aeration basins looked good. Staff onsite said MLSS for the plant is 4500mg/I for the plant on average. The first two 840,000-gallon primary aeration basins run a DO at 3.0mg/I, the two 150,000-gallon secondary aeration basins run DO at 1.0mg/I and the last 190,000-gallon aeration basin runs DO at 3.0mg/I according to staff. No major issues were noted with either of the secondary clarifiers and both units appeared to be in good working condition. Clarifier #1 had a sludge blanket of 2.5ft and Clarifier #2 had a sludge blanket of 2.5ft as well. This data was obtained via sludge judge. The effluent coming out of the tertiary filters looked good The UV system was operational and well maintained. The facility has plenty of spare UV bulbs should they need to be replaced. The was approximately 12.7' of solids in the aerobic digestor. There was some vegetation growing on top of the unit. However, it was noted that it was dangerous for the staff onsite to remove the vegetation and they remove it once a year plus pressure wash where they possible to remove the vegetation. Page# 2 Permit: NC0021253 Owner - Facility: Havelock W WTP Inspection Date: 08/11/2021 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ■ ❑ application? Is the facility as described in the permit? ■ ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? M000 Comment Permit expires on 06/30/2021 Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? •❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable • ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? • ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ■ ❑ ❑ ❑ Dates, times and location of sampling ■ Name of individual performing the sampling ■ Results of analysis and calibration ■ Dates of analysis ■ Name of person performing analyses ■ Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? •❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑•❑ operator on each shift? Is the ORC visitation log available and current? •❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? •❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility � ❑ ❑ ❑ classification? Page# 3 Permit: NC0021253 Inspection Date: 08/11/2021 Owner - Facility: Havelock wwTP Inspection Type: Compliance Evaluation Record Keeping Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑•❑ L1❑ • ❑ Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b.Mechanical Are the bars adequately screening debris? ■ ❑ ❑ ❑ Is the screen free of excessive debris? •❑ ❑ ❑ Is disposal of screening in compliance? MOOD Is the unit in good condition? •❑ ❑ ❑ Comment: .Screeninqs are disposed of at least once a week and the facility is contracted with GFL for disposal. Grit Removal Type of grit removal a.Manual b.Mechanical Is the grit free of excessive organic matter? Is the grit free of excessive odor? # Is disposal of grit in compliance? Yes No NA NE • • ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment .Grit is disposed of at least once a week and the facility is contracted with GFL for disposal. Page# 4 Permit: NC0021253 Inspection Date: 08/11/2021 Owner - Facility: Havelock WN TP Inspection Type: Compliance Evaluation Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Yes No NA NE ■ ❑ ❑ ❑ ▪ ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: The generator is tested by interrupting the primary power source one a month. The generator itself appeared to be in good condition and was operational at the time of inspection. The fuel tank for the generator was % full at the time of inspection and the facility has an emergency fuel agreement with Coastal Diesel. Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Yes No NA NE • ❑ ❑ ❑ ❑■❑❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ Comment: Effluent meter was last calibrated on 05/20/2020 and needs to be calibrated annually. Staff onsite said that the meter will be calibrated next month. The effluent composite sampler was 0.8 degrees Celsius inside the unit. However, the doors inside the unit were dirty with algae growing on outside portion of the door seal with a frog and slug also being present. The facility needs to clean this portion of the effluent sampler. It is also important to note that the effluent sampler is flow proportional. Aeration Basins Yes No NA NE Mode of operation Type of aeration system Diffused Is the basin free of dead spots? • ❑ ❑ ❑ Are surface aerators and mixers operational? ■ ❑ ❑ ❑ Are the diffusers operational? ■ ❑ ❑ ❑ Is the foam the proper color for the treatment process? • 0 ❑ ❑ Does the foam cover less than 25% of the basin's surface? • ❑ ❑ ❑ Is the DO level acceptable? • ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/I) ■ ❑ ❑ ❑ Page# 5 Permit: NC0021253 Inspection Date: 08/11/2021 Owner - Facility: Havelock WWTP Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Comment: Overall, all the primary and secondary aeration basins looked good. Staff onsite said MLSS for the plant is 4500mq/I for the plant on average. The first two 840,000-gallon primary aeration basins run a DO at 3.0mq/I, the two 150,000-gallon secondary aeration basins run DO at 1.0mq/I and the last 190,000-gallon aeration basin runs DO at 3.Omq/I according to staff. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) Yes No NA NE ▪ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ M ❑ ❑ ❑ MOOD ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: No malor issues were noted with either of the secondary clarifiers and both units appeared to be in good working condition. Clarifier #1 had a sludge blanket of 2.5ft and Clarifier #2 had a sludge blanket of 2.5ft as well. This data was obtained via sludge iudge. Filtration (High Rate Tertiary) Type of operation: Is the filter media present? Is the filter surface free of clogging? Is the filter free of growth? Is the air scour operational? Is the scouring acceptable? Is the clear well free of excessive solids and filter media? Comment The effluent coming out of the filters looked good. Chemical Feed Is containment adequate? Is storage adequate? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ 11000 ❑ ❑ ❑• ❑ ❑ ❑• • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 6 Permit: NC0021253 Inspection Date: 08/11/2021 Owner - Facility: Havelock WWTP Inspection Type: Compliance Evaluation Chemical Feed Are backup pumps available? Is the site free of excessive leaking? Comment: Polyaluminum chloride is used for phosphorous removal Methanol is still used for nitrogen removal by the facility. Pumps-RAS-WAS Are pumps in place? Are pumps operational? Are there adequate spare parts and supplies on site? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE MOOD • ❑ ❑ ❑ • ❑ ❑ ❑ Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? •❑ ❑ ❑ Are UV bulbs clean? MEDD Is UV intensity adequate? � ❑ ❑ ❑ Is transmittance at or above designed level? •❑ ❑ ❑ Is there a backup system on site? • ❑ ❑ ❑ Is effluent clear and free of solids? • ❑ ❑ ❑ Comment: The UV system was operational and well maintained. The facility has plenty of spare UV bulbs should they need to be replaced. Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge? Yes No NA NE • ❑ ❑ ❑ • ■ ❑ ❑ ❑ ❑ ❑ ❑ ▪ ❑ ❑ ❑ MOOD Comment: The was approximately 12.7' of solids in the aerobic digestor. There was some vegetation growing on top of the unit. However, it was noted that it was dangerous for the staff onsite to remove the vegetation and they remove it once a year plus pressure wash where they possible to remove the vegetation. Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? Yes No NA NE MODE ❑ ❑ ❑• Page# 7 Permit: NC0021253 Inspection Date: 08/11/2021 Owner - Facility: Havelock WWTP Inspection Type: Compliance Evaluation Effluent Pipe If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE ❑ ❑ ❑ • Page# 8