HomeMy WebLinkAbout660034_Inspection_20210615, ,. ivislon of Water Resources
Facility Number - 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: QJCo�Outln:
e Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: Complaint Follow-up Referral 0 Emergency Other Denied Access
z �y:Date of Visit: t 1 Arrival Time: eparture Time: ou Region:
Farm Name: Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
.5F
1 3Z7
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feede
Farrow to Finish
Gilts
Boars
Other
Integrator:
Certification Number:
Certification Number:
Latitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer I I Ed
Non -La er
Non-L;
Pullets
Other
Pou
Design Current
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non-Dai
Beef Stocker
Beef Feeder
Beef Brood Cow
' Discharses and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
/No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
[:]Yes
[]No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
[]No
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
;34No
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
00�o
❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3 511212020 Continued
Facili Number: - 5 jDate of Inspection: t
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZNo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure I Structure``2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: c[ o"gj
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
l'1
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes No ❑ NA ❑ NE
❑ Yes P<
o ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks) T
9. Does any part of the waste management system other than the waste structures require ❑ Yes ZNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �fo ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Applic14-t-
13.
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Yes X No
❑ Yes P"No
❑ Yes 0No
❑ Yes �No
❑Other:
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes XT,
o ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and 1" Rainfall Inspections [:]Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes Z�No ❑ NA ❑ NE
❑ Yes �!rNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - Date of Inspection: t r
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �o ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ;ErNo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating noncompliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on. site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes XNo ❑ NA ❑ NE
❑ Yes ;? No ❑ NA ❑ NE
❑ Yes ZNo ❑ NA ❑ NE
❑ Yes VNo ❑ NA ❑ NE
❑ Yes 4E No
❑ Yes No
❑ Yes .0No
❑NA ONE
❑NA ❑NE
❑NA ❑NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Zo T> 0 c Z-°Z3
4�s3 DOS
s r Z-4Lk
CP> -J-4
Zo �.
14
5rP
5-V� ,2.I
X'oA-e T&A,
Reviewer, Inspector Name:
Reviewer! Inspector Signature:
Page 3 of 3
Phone: �'�! Iq 1�
Date: l r S '
O
511212020