HomeMy WebLinkAbout20120887 Ver 2_Emails_20130625Burdette, Jennifer a
From: Greer, Emily C SAW [Emily.C.Greer @usace.army.mil]
Sent: Tuesday, June 25, 2013 4:53 PM
To: Burdette, Jennifer a
Subject: FW: Epiphany School (UNCLASSIFIED)
Attachments: image001.jpg; Epiphany sewer inset.pdf; Epiphany Preferred Site Plan with dimensions.pdf;
school site topo.pdf; school site grading.pdf
Classification: UNCLASSIFIED
Caveats: NONE
Keeping ya in the loop!
- - - -- Original Message---- -
From: Kim Williams [mailto:kwilliams(@lmgroup.net]
Sent: Tuesday, Tune 25, 2013 4:27 PM
To: Greer, Emily C SAW
Cc: 'Scheller, Roberto'; Bud Stilley; Rynas, Stephen; 'Bud Stilley'
Subject: RE: Epiphany School (UNCLASSIFIED)
Hi Emily
Attached are the following maps for Epiphany:
A close up of the existing sewer pump and utility lines
Preferred site plan showing tennis courts and dimensions of proposed parking lots,
structures, and fields
Topo of school site prior to its construction
Grading plan for school site
We look forward to seeing you on Friday.
Thanks,
Kim
Kim Williams I Environmental Scientist
Land Management Group, Inc I Environmental Consultants
Direct: 452 -0001 x 1908 1 Cell: 910.471.5035 1 Fax: 910.452.0060
Email: kwilliams(@lmgroup.net website:www.lmgroup.net <http: / /www.lmgroup.net />
1
3805 Wrightsville Ave., Suite 15 1 Wilmington, NC 28403
From: Greer, Emily C SAW
Sent: Wednesday, May 29,
To: Kim Williams
Cc: 'Scheller, Roberto';
Subject: Epiphany School
Classification: UNCLASSI
Caveats: NONE
Kim-
[ mailto :Emily.C.Greer (@usace.army.mil]
2013 11:13 AM
Bud Stilley; Rynas, Stephen
(UNCLASSIFIED)
IED
We need to have a conference call between the three of us, your client, and 7ennifer, the
permit manager in the Raleigh DWQ office, to discuss this project, specifically project
alternatives. We would like to schedule the meeting at the Washington DWQ office on Tune 7 at
10 or 10:30 AM. Your client is required to attend so if they are not able to meet at this
time please let me know so that I can reschedule.
If you'd like to get a head start and pull together some additional information for us, we
will be asking for updated drawings including insets where necessary and showing the sewer
lift station and lines, tennis courts, labeled dugouts, etc., all dimensions (not just the
baseball in /out field), all newly constructed and old drainage ways, etc.; a water budget;
and the drainage plan you reference in the rebuttal letter. Although helpful, these are not
necessary for our meeting, but you will be required to submit this information later.
Anyone with any questions can feel free to contact me.
Emily Greer
Program Specialist
U.S. Army Corps of Engineers
Wilmington District - Washington Field Office
2407 West 5th Street
Washington, NC 27889
910.251.4567 (o)
252.975.1399 (f)
Classification: UNCLASSIFIED
Caveats: NONE
Classification: UNCLASSIFIED
Caveats: NONE
2