HomeMy WebLinkAboutWQ0003661_Compliance Evaluation Inspection_20210719DocuSign Envelope ID: 26473E1 13-8131 F-44C3-133DC-8AD271C8E27F
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
Jimmy F Tyndall
Town of Faison
PO Box 365
Faison, NC 28341-0365
rcSTATE r
NORTH CAROLINA
Environmental Quality
July 22, 2021
SUBJECT: Compliance Inspection Report
Town of Faison WWTF
Non -discharge Permit No. WQ0003661
Duplin County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Town of Faison WWTF
on 7/19/2021. This inspection was conducted to verify that the facility is operating in compliance with
the conditions and limitations specified in Non -discharge Permit No. WQ0003661. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report". There were no significant issues or findings noted during the
inspection and therefore, a response to this inspection report is not required.
If you should have any questions, please do not hesitate to contact Helen Perez with the Water
Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at
helen.perez@ncdenr.gov.
ATTACHMENTS
Cc: Billy Mello — electronic copy
Uploaded to Laserfiche
Sincerely,
EHDocuSigned by -
, ullk "c� 94-9
E3ABA14A=C434...
Morella Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
D_E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
DocuSign Envelope ID: 26473E1 B-8131 F-44C3-B3DC-8AD271C8E27F
Compliance Inspection Report
Permit: WQ0003661 Effective: 04/26/17 Expiration: 03/31/22 Owner: Town of Faison
SOC: Effective: Expiration: Facility: Town of Faison WWTF
County: Duplin 188 Water Treatment Rd
Region: Wilmington
Faison NC 283410365
Contact Person: Jimmy F Tyndall Title: Phone: 910-267-2721
Directions to Facility:
From the WiRO, take 1-40 North approx. 85 miles to US Route 17 East. Proceed east 0.5 mi. to right turn onto NC 403 Hwy (east).
Proceed 4.5 miles to Water Treatment Plant Rd. (on left).
System Classifications: SI,
Primary ORC: William Owen Mello Certification: 999877 Phone: 910-922-4513
Secondary ORC(s):
On -Site Representative(s):
On -site representative Jimmy F Tyndall
Related Permits:
Inspection Date: 07/19/2021 Entry Time 09:40AM
Primary Inspector: Helen I Perez DocuSignetd�by:
Secondary Inspector(s):E n
39694BE_
910-267-2721
Exit Time: 10:50AM
Phone: 910-796-7387
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Wastewater Irrigation
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Treatment Flow Measurement -Effluent Treatment Flow Measurement -Influent Miscellaneous Questions
Treatment Flow Measurement -Water Treatment Treatment Barscreen
Use Records
Record Keeping End Use -Irrigation Treatment Disinfection
Treatment Flow Measurement Standby Power
(See attachment summary)
Page 1 of 6
DocuSign Envelope ID: 26473E1 13-8131 F-44C3-B3DC-8AD271C8E27F
Permit: WQ0003661 Owner - Facility: Town of Faison
Inspection Date: 07/19/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
A routine compliance inspection of the Town of Faison WWTF was conducted on July 19, 2021. The purpose of the
evaluation was to verify that the facility is operating in compliance with the conditions and limitations specified in Permit
WQ0003661. Jimmy Tyndall, Public Works Director, and the ORC, Billy Mello, were present during the inspection.
This is a facultative lagoon biological treatment system and spray irrigation facility. The two-2.4 MG facultative/storage
lagoons, Lagoon #1 and #2, are connected and each contain a baffle curtain. The 5.4 MG facultative/storage lagoon, Lagoon
#3, is being used only during heavy rain events. The fence surrounding Lagoon #3 is located close to the lagoon berm and
appears to be difficult for operators to maintain the lagoon. Freeboard in all three lagoons was in compliance. The Town has
not had to remove solids from the lagoons to date.
A review of NDMR/NDARs and GW59s indicate no violations have been issued for effluent or groundwater monitoring.
Documentation was organized and complete. A Field Lab Certification application needs to be submitted as soon as
possible. The Town can find information on the State website under the Laboratory Certification Branch section.
The Town currently has four operators to operate the wastewater plant, the collection system and the drinking water system.
It appears to be challenging to keep up with the required operation and maintenance of these permitted facilities. The
wastewater permit expires on March 31, 2021. A renewal application will need to be submitted by October 1, 2021. The
facility is compliant with Non -Discharge Permit W00003661. Please review the comment sections of the inspection report
for more details.
Page 2 of 6
DocuSign Envelope ID: 26473E1 B-8131 F-44C3-B3DC-8AD271C8E27F
Permit: WQ0003661 Owner - Facility: Town of Faison
Inspection Date: 07/19/2021 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Type
Yes No NA NE
Reuse (Quality)
❑
Infiltration System
❑
Single Family Spray, LR
❑
Activated Sludge Spray, LR
❑
Activated Sludge Spray, HR
❑
Activated Sludge Drip, LR
❑
Recycle/Reuse
❑
Single Family Drip
❑
Lagoon Spray, LR
Treatment Yes No NA NE
Are Treatment facilities consistent with those outlined in the current permit? 0 ❑ ❑ ❑
Do all treatment units appear to be operational? (if no, note below.) 0 ❑ ❑ ❑
Comment: Lagoon #3 is currently only being utilized for large rain events if needed. The rotating bar
sceen is not operational.
Treatment Flow Measurement -Influent
Is flowmeter calibrated annually?
Is flowmeter operating properly?
Does flowmeter monitor continuously?
Does flowmeter record flow?
Does flowmeter appear to monitor accurately?
Comment: The 3 influent flowmeters were calibrated by Custom Control Unlimited on 7-22-20.
Treatment Flow Measurement -Water Use Records
Is water use metered?
Are the daily average values properly calculated?
Comment:
Treatment Flow Measurement -Effluent
Is flowmeter calibrated annually?
Is flowmeter operating properly?
Does flowmeter monitor continuously?
Does flowmeter record flow?
Does flowmeter appear to monitor accurately?
Comment: The effluent flowmeter was calibrated by Custom Control Unlimited on 7-22-20.
Yes No NA NE
■❑❑❑
❑❑❑■
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
❑❑■❑
❑❑■❑
Yes No NA NE
■❑❑❑
❑❑❑■
■❑❑❑
■❑❑❑
■❑❑❑
Standby Power Yes No NA NE
Page 3 of 6
DocuSign Envelope ID: 26473E1 B-8131 F-44C3-B3DC-8AD271C8E27F
Permit: WQ0003661 Owner - Facility: Town of Faison
Inspection Date: 07/19/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Is automatically activated standby power available? 0 ❑ ❑ ❑
Is generator tested weekly by interrupting primary power source? ❑ ❑ ❑
Is generator operable? ❑ ❑ ❑
Does generator have adequate fuel? ❑ ❑ ❑
Comment: A generator is on site as a back-up power source.
Treatment Barscreen Yes No NA NE
Is it free of excessive debris? ❑ ❑ ❑
Is disposal of screenings in compliance? ❑ ❑ ❑
Are the bars spaced properly? ❑ ❑ ❑
Is the unit in good condition? 0 ❑ ❑ ❑
Comment: The rotating bar screen is not in operation. The facility uses the manual barscreens and
screened cages around the 2 irrigation pumps for addtional screening. During the inspection,
the cages were in the process of being cleaned.
Treatment Disinfection
Yes No NA NE
Is the system working?
❑ ❑ ❑
Do the fecal coliform results indicate proper disinfection?
❑
❑ ❑
Is there adequate detention time (>=30 minutes)?
❑ ❑ ❑
Is the system properly maintained?
❑ ❑ ❑
If gas, does the cylinder storage appear safe?
❑ ❑ ❑
Is the fan in the chlorine feed room and storage area operable?
❑ ❑ ❑
Is the chlorinator accessible?
❑ ❑ ❑
If tablets, are tablets present?
❑
❑ 0 ❑
Are the tablets the proper size and type?
❑
❑ ❑
Is contact chamber free of sludge, solids, and growth?
❑ ❑ ❑
If UV, are extra UV bulbs available?
❑
❑ ❑
If UV, is the UV intensity adequate?
❑
❑ ❑
# Is it a dual feed system?
❑
❑ ❑
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)?
❑
❑ ❑
If yes, then is there a Risk Management Plan on site?
❑
❑ ❑
If yes, then what is the EPA twelve digit ID Number? (1000-
If yes, then when was the RMP last updated?
Comment: No comment.
Record Keeping Yes No NA NE
Is a copy of current permit available? ❑ ❑ ❑
Are monitoring reports present: NDMR? ❑ ❑ ❑
NDAR? ❑ ❑ ❑
Page 4 of 6
DocuSign Envelope ID: 26473E1 B-8131 F-44C3-B3DC-8AD271C8E27F
Permit: WQ0003661 Owner - Facility: Town of Faison
Inspection Date: 07/19/2021 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Are flow rates less than of permitted flow?
0
❑ ❑ ❑
Are flow rates less than of permitted flow?
0
❑ ❑ ❑
Are application rates adhered to?
0
❑ ❑ ❑
Is GW monitoring being conducted, if required (GW-59s submitted)?
0
❑ ❑ ❑
Are all samples analyzed for all required parameters?
0
❑ ❑ ❑
Are there any 2L GW quality violations?
❑
0 ❑ ❑
Is GW-59A certification form completed for facility?
❑
❑ ❑
Is effluent sampled for same parameters as GW?
0
❑ ❑ ❑
Do effluent concentrations exceed GW standards?
❑
❑ ❑
Are annual soil reports available?
❑
❑ ❑
# Are PAN records required?
❑
0 ❑ ❑
# Did last soil report indicate a need for lime?
❑
❑ ❑
If so, has it been applied?
❑
❑ ❑
Are operational logs present?
0
❑ ❑ ❑
Are lab sheets available for review?
0
❑ ❑ ❑
Do lab sheets support data reported on NDMR?
❑
❑ ❑
Do lab sheets support data reported on GW-59s?
❑
❑ ❑
Are Operational and Maintenance records present?
0
❑ ❑ ❑
Were Operational and Maintenance records complete?
0
❑ ❑ ❑
Has permittee been free of public complaints in last 12 months?
0
❑ ❑ ❑
Is a copy of the SOC readily available?
❑
❑ 0 ❑
No treatment units bypassed since last inspection?
0
❑ ❑ ❑
Comment: Soil samples were taken earlier in the month and results are pending. Please submit the results
to Helen Perez, Wilmington Regional Office. The facility monitors 5 monitoring wells quarterly
and there have been no violations reported on the GW59s. Daily operation and maintenance
records were present and complete. Bench sheets and calibration records were organized and
complete. An application for a Field Lab Certification for pH and chlorine needs to be
submitted. All other reported parameters are analyzed by Envirochem, Certification #94.
End Use -Irrigation
Yes No NA NE
Are buffers adequate?
❑
❑ ❑
Is the cover crop type specified in permit?
❑
❑ ❑
Is the crop cover acceptable?
❑ ❑ ❑
Is the site condition adequate?
❑ ❑ ❑
Is the site free of runoff / ponding?
❑ ❑ ❑
Is the acreage specified in the permit being utilized?
❑ ❑ ❑
Is the application equipment present?
❑ ❑ ❑
Is the application equipment operational?
❑
❑ ❑
Is the disposal field free of limiting slopes?
0
❑ ❑ ❑
Page 5 of 6
DocuSign Envelope ID: 26473E1 B-8131 F-44C3-B3DC-8AD271C8E27F
Permit: WQ0003661 Owner - Facility: Town of Faison
Inspection Date: 07/19/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Is access restricted and/or signs posted during active site use? 0 ❑ ❑ ❑
Are any supply wells within the CB? ❑ ❑ ❑
Are any supply wells within 250' of the CB? ❑ ❑ ❑
How close is the closest water supply well? ❑ ❑ ❑
Is municipal water available in the area? 0 ❑ ❑ ❑
# Info only: Does the permit call for monitoring wells? 0 ❑ ❑ ❑
Are GW monitoring wells located properly w/ respect to RB and CB? 0 ❑ ❑ ❑
Are GW monitoring wells properly constructed, including screened interval? ❑ ❑ ❑
Are monitoring wells damaged? ❑ ❑ ❑
Comment: The crop cover needs to be cut and removed. Staff stated that the Town is in negotiations for a
new farmer to cut and remove the crop on a regular basis. Field #8 is not utilize due to poor
performance of the field. Spray heads are maintained and replaced as needed.
Page 6 of 6