HomeMy WebLinkAbout630001_Routine Inspection_20210803Facility Number
L3
Division of Water Resources
0 Division of Soil and Water Conservation
0 Other Agency
'no .1'
Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: -Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time:/0 � li/)Departure Time:
Farm Name:
ti3z &4,PY'
Owner Name: y , p.),6,24)16,
Mailing Address:
Physical Address:
Facility Contact:
3Ojt
Owner Email:
Phone:
County: 022 Region: r 1e V
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
01 orii, Title: Phone:
,(
Latitude:
Integrator:
Certification Number:
Certification Number:
Longitude:
Swine
Design Current
Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
arrow to Wean
33 7z
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Wet Poultry
Design Current
Capacity Pop.
Layer
Non -Layer
Dry Poultry
Design Current
Capacity Pop.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Cattle
Design Current
Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field El Other:
a. Was the conveyance man-made?
❑ Yes ,-No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes .No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes J2'No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3
5/12/2020 Continued
Facility Number: (j)) -
Date of Inspection: V3/77
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
a. If yes, is waste level into the structural freeboard?
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
Structure 1 Structure 2
Structure 3 Structure 4
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes
❑ Yes
Structure 5
�No ❑NA ❑NE
❑No ❑NA ❑NE
Structure 6
❑ Yes �No ❑ NA ❑ NE
❑ Yes .INo ❑ NA E NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
8. Do any of the structures lack adequate markers as required by the permit?
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
,Yes ❑ No ❑ NA ❑ NE
❑ Yes ONo ❑ NA ❑ NE
0 Yes
❑ Yes /'No
❑ Yes JZ1 No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑NE
❑ Excessive Ponding E Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN Q PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): C2,e,%y ;.1)
13. Soil Type(s):
14. Do the receiving crops differ frm those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes..--ErNo
❑ Yes ,a)No
❑ Yes griNo
❑ Yes ._12-No
❑ Yes „❑iNo
❑ Yes !:2'l7o
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check 0 Yes o
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Waste Application
❑ Rainfall ❑ StockinCrop Yield 1220 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
Page 2 of 3
❑ NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑ NA ❑ NE
.._e'es ❑ No
❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Yes ❑ No
❑ Yes ,2'f10
El NA ❑NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑NA ❑NE
5/12/2020 Continued
Facility Number: (p,T -
o
Date of Inspection: q/-3 igt
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
the appropriate box(es) below.
❑ Failure to complete annual sludge survey E Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
❑ Yes a'No ❑ NA ❑ NE
❑ Yes . 'No ❑ NA ❑ NE
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes . No ❑ NA ❑ NE
❑ Yes ,_12-No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes J - o ❑ NA ❑ NE
❑ Yes �No ❑ NA ❑ NE
❑Yes 12410 ❑NA ❑NE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes o ❑ NA ❑ NE
❑ Yes 10 ❑ NA ❑ NE
❑ Yes o ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
wmit 3 (v1-e cedze/p4
/teed' (tteze -te,,e_i7,/,2-d
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
.efa-;
i;Sc)It)
Phone:
Date:
l� '35 --
>/3 bi
5/12/2020
FACILITY #: ��� ` FARM NAME: ‘. -C-`�`��
FREEBOARD ACTUAL LAGOON LEVEL
PERMIT (#19)
- DUE EVERY 5 YEARS
- EXPERIATION DATE
- OIC CARD YES OR NO
NUMBER OF ANIMALS
WASTE UTILIZATION PLAN (WUP) (#20)
SOIL TYPES
CROP TYPES
- THE UTLIZATION PLAN SHOULD HAVE A (-) NEGATIVE NUMBER
- ODOR CONTROL CHECK LIST YES OR NO
- Irrigation Plan Maps
WASTE REPORT (#21)
-GOOD FOR 60 DAYS BEFORE OR AFTER
DATE 7%NITROGEN LEVEL
EVERY 3 YEARS:
SOIL REP/15-
ORT(#21)
DATE ‹ /c)--Cct)
P-I (NO MORE THEN 400) PH (Note if 4 or Tess)
Cu/ZN (NO MORE THEN 3000) CU ZN
(IF PEANUTS NO MORE THEN 300)
- MENTAL CHECK OF CROP AND FIELD NUMBERS
IRR2 (#21)
ZONE ACRES PAN CROP TYPE
FLOW RATES %� NITROGEN (N)
120 Min inspection initialed %' Weather Codes
Commercial Fertilizer Chicken Litter
CALBRIATION (#24)
EACH REEL SHOULD BE CALIBRATED
DATE DUE EVERY TWO YEARS 2 / l ,
FLOW RATES --
F
1r6'
RAIN FALL (#21)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED
-LOOK FOR BIG NUMBER DIFFERENCES SEE THAT THEY MATCH THE IRR2
FORM
SLUDGE (#21 & 25)
-DUE EVERY YEAR: DATE it / /)- //
O: P: c) % RATIO OF SLUDGE
RAIN BREAKER FORM
OTHER FORMS (#22 AND #21)
CROP YEILDS MORTALITY
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON
SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO
BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) ALIVE CROP HARVESTED
FIELDS GOOD HEALTHY CORPS CORRECT
CROPS NO PONDING REELS FEED
BINS LAGOON GARBAGE