Loading...
HomeMy WebLinkAboutNCC214479_ESC Approval Submitted_20210812 1 01 Z4 I I�ei is qll o 19 ��$ 4 �R i i5 d� b � � O T i � •5 6 3 �a}�eeR•�`E o E�2g��la z E€dt �i� �.GG'SI'Lr-------- 67-- --__ �k J i6 J 1 ♦ I s � k g6 �, rl ,pppay / 1l1$ � / 1 1 -905— ! / I 59l ' f 1� R P 1 :66 \lye ' �qtl 4 \ x � r �P @ 8 98➢� I ��=a �� � z 888g o I IR� �d �° •111r`1 GRACE CHURCH of SOUTHERN PINES s rm _ KQONTZo0ty' SDsi.�o.r< ,u„,•m SOUTHERN PINES,NORTH CAROLINA t.rxu.. a ;,+1 Ewa�"nr�iec,'�x�i♦� �— C— EXISTING CONDITIONS 1887�_ Town of ` Public Works Department outhern 140 Memorial Park Court • Southern Pines, NC 28387 North orth Carolina - •y The Abil South Resort March 1$ 2019 Inlernationally Recoanized for I iudram Excellence Grace Church of Southern Pines, Inc. 1519 Luther Way Southern Pines, NC 28387 Re: Approval with Modifications: ZP-17-18—Grace Church of Southern Pines Aberdeen Creek— Lumber River Basin Plans Received: 3-4-19 HOW: No Project Location: Financially Responsible Owner/Developer: 1519 Luther Way Grace Church of Southern Pines, Inc. Southern Pines, NC 28387 1519 Luther Way Lat: 35.16670 Southern Pines, NC. 28387 Long: -79.43330 910-692-6711 Dear Grace Church of Southern Pines, Inc.: Our review of the above referenced erosion control plan has been completed_ The plan submitted has been found acceptable and subject to the following stipulations: 1. "In accordance with guidance from the United States Fish and Wildlife Service (USFWS) it is recommended that a cavity tree survey be conducted prior to removal of any pine tree greater than or equal to 8 inches in diameter at breast height. For additional information refer to USFWS website at littps://www.f'ws.gov/iicsatidiiills/iiine tree removal.lit niL" 2. In order to ensure the early coordination and implementation of the erosion control for this project, it is requested that a pre-construction conference be held. Representatives of the owner, engineer, contractor, and this office should attend. Please notify Mr. Jay Hough at 910.692.1983 when scheduling this conference. 3. At the conference, the representative of this office will deliver a set of plans clearly marked as approved for erosion control by the Town. After the installation of temporary erosion control measures and devices the representative of this office will issue the Town of Southern Pines Grading Permit. The Grading Permit must be posted on the job site. During all phases of construction, the contractor must work only from a set of approved plans. The marked set of plans and a copy of this letter must be on the site at the time of any construction activity. 4. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land-disturbing activity. This could include the Division of Energy, Mineral and Land Resources under storm water regulations, the US Army Corps of Engineers under Article 404 jurisdiction, local county or town agencies under their local ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All other lands must still be in compliance with the Sedimentation Pollution Control Act. Phone: 910-692-1983 Fax: 910-692-1085 5. If any area on site falls under the jurisdiction of Section 404 of the Clean Water Act., the developer is responsible to the orders of the US Army Corps of Engineers. Any erosion measures that fall within jurisdictional wetland areas must be relocated to the transition point between the wetlands and the highlands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of the Corps of Engineers, it is the responsibility of the developer to inform the Erosion Control Inspector so that an adequate contingency plan can be made to assure sufficient erosion control on-site. Failure to do so will be considered a violation of the approval. 6. This project is subject to the National Pollutant Discharge Elimination System (NPDES) and covered by the "enclosed stormwater discharge general permit NCGO10000 (Construction Activities)". Should you have questions concerning this permit, contact Mr. Timothy LaBounty, Division of Energy, Mineral and Land Resources, at 910.433.3300. 7. Any borrow material brought onto this site must be from a legally permitted mine site or other approved source. A single use borrow or waste area site is only permissible if it is operated under control of the financially responsible person or firm that is developing this site. An approved erosion and sediment control plan is required for all single use borrow and waste sites. 8. Following the installation of all initial erosion control measures, you should notify this office to request an inspection prior to proceeding with any grading. 9. Following completion of the project, you should notify this office to schedule a final inspection. The purpose of this inspection is to ensure that all erosion control requirements have been met. 10. This permit is valid only for the land owner(s) and financially responsible person(s) as listed on the plans and Financial Responsibility/Ownership Form. Any changes must be reported to this office on an amended Financial Responsibility/Ownership form. 11. With this approval the construction inspector for the Town of Southern Pines or his agent has the right to enter the permitted property to provide for periodic inspection of the land-disturbing activity in accordance with North Carolina general statue 113a-61.1. 14. The approval of this plan, by the Town of Southern Pines, in no way is meant to relieve the design professional of his or her responsibility for the project design. This approval is subject to the satisfactory performance of the erosion control measures under field conditions. Should it be determined that the requirements of the Sedimentation Pollution Control Act of 1973 (G.S. 113A, 51-66)and the Soil Erosion and Sedimentation Control Ordinance of the Town of Southern Pines are not being met, revisions to the plan and its implementation will be required. This permit allows for a land disturbance, as called for on the application plan, not to exceed 2.52 acres and/or the construction limits as shown on the plans. Exceeding these limits will be a violation of this permit and would require a revised plan and additional application fee. Amendments to the plan should be submitted to this office under the same procedure as followed for the original plan. Phone: 910-692-1983 Fax: 910-692-1085 PLEASE NOTE THE NEW SELF INSPECTION PROGRAM REQUIREMENTS AS DETAILED IN THE ATTACHED INFORMATION. A REPORTING FORM IS ATTACHED AND SHOULD BE FILLED OUT AND KEPT ON-SITE AND AVAILABLE FOR REVIEW BY TOWN INSPECTORS. We look forward to working with you on this project. Sincerely, Town of Southern Pines Ae�: Chris Kennedy, AICP, CZO Assistant Town Manager Community Development Director Phone: 910-692-1983 Fax: 910-692-1085