Loading...
HomeMy WebLinkAbout20130576 Ver 1_Stormwater Info_20130627June 24, 2013 Green Engineering, PLLC 303 Goldsboro Street E Wilson, NC 27893 Attention: Mr. Leo Green, III; P.E., P.L.S. 13 - t5 I L., JUN 2 7 2013 Reference: Report for Soil Evaluation / Seasonal High Water Table (SHWT) Estimation for Stormwater BMP Klausner Lumber Two Project Enfield, Halifax County, North Carolina S &ME Proposal No. 1054 -12 -325 P2 Dear Mr. Green: S &ME, Inc. (S &ME) has conducted a soil evaluation including Seasonal High Water Table (SHWT) estimation in general accordance with S &ME Proposal 1054 -12 -325 (CO- 2), dated May 30, 2013. Our evaluation was conducted to provide information for the design of an appropriate stormwater Best Management Practice (BMP) device and a Stormwater Management Permit Application to the North Carolina Department of Environment and Natural Resources (NCDENR) — Division of Water Quality (DWQ). A soil scientist evaluated the soil conditions within the proposed stormwater BMP areas. PROJECT BACKGROUND The project involves the construction of a complete lumber processing facility (production sawmill) with railway, log truck, and vehicular access ingress and egress, and associated site grading. The project area currently consists primarily of existing agricultural farmland and is bordered on the west by Marsh Swamp and the CSX Railway, bordered on the north by Dog Pond Branch, bordered on the east by U.S Hwy 301 and bordered on the south by an unnamed tributary of Marsh Swamp. The project location is shown on the Enfield N.C. USGS Topographic Map (Figure 1), the Halifax County Soil Survey Map (Figure 2), and a color aerial photograph (Figure 3) As a result of the proposed construction and associated impervious surface, a stormwater BMP is required to treat stormwater generated from the site to comply with State stormwater management requirements. Use of stormwater BMP's are subject to the suitability of site soils and regulatory approval. Regulatory guidance on requirements for permitting of stormwater BMP's are provided in the North Carolina Division of Water Quality — Stormwater Best Management Practices Manual (NCDENR -SW -BMP), dated SWE, INC. / 3201 Spring Forest Road/ Raleigh, NC27616/p9l9.872.226Of919.790.8909/www.smeinc.com Soil Evaluation for Stormwater BMP S &ME Project No. 1054 -12 -325 P2 Klausner Lumber Two Facility, Enfield, Halifax Co., NC June 24, 2013 July 2007 (Revised September, 2009). There are two proposed Wet Detention Basin areas (Pond B and Pond C) as depicted on the attached Soil Evaluation Map (Figure 4). FINDINGS The soil evaluation was performed with hand auger borings at six locations (B -1 through B -6) within the two proposed Wet Detention Basin areas as shown on the attached Figure 4. Our evaluation consisted of identifying and recording the soil morphological conditions at these locations in order to develop soil profile descriptions, which are also shown on the attached Figure 4. Permeability /Hydraulic Conductivity Estimation Under current North Carolina Division of Water Quality (NCDWQ) requirements for various stormwater devices, the in -situ soil permeability /conductivity is an important design factor. Therefore, the soil profile descriptions on the attached Figure 4 show the soil morphological conditions including texture, estimated United States Department of Agriculture (USDA) permeability and estimated USDA hydraulic conductivity (KSAT) for the different soil horizons found on -site. In the area of Boring Location B -1 and B -2 within the proposed Wet Detention Basin area, the soil surface layer consisted of sandy loam material which has an estimated USDA permeability range of 2 to 6 inches/hour and USDA estimated Ksat range of 1.4 to 14 inches per hour. The underlying soil material consisted of clay loam material which has an estimated USDA permeability range of 0.6 to 2 inches/hour and USDA estimated Ksat range of 0.14 to 1.4 inches per hour. In the area of Boring Location B -3 within the proposed Wet Detention Basin area, the soil surface layer consisted of sandy loam material which has an estimated USDA permeability range of 2 to 6 inches/hour and USDA estimated Ksat range of 1.4 to 14 inches per hour. The underlying soil material consisted of clay loam material which has an estimated USDA permeability range of 0.6 to 2 inches/hour and USDA estimated Ksat range of 0.14 to 1.4 inches per hour and sandy clay loam — sandy clay which has an estimated USDA permeability range of 0.06 to 0.2 inches/hour and USDA estimated Ksat range of 0.014 to 0.14 inches per hour In the area of Boring Locations B -4, B -5, and B -6 within the proposed stormwater BMP area, the soil surface layer and underlying soil consisted of sandy loam material which has an estimated USDA permeability range of 2 to 6 inches/hour and USDA estimated Ksat range of 1.4 to 14 inches per hour. Please refer to the enclosed map and soil profile descriptions, for more information. These estimates were obtained from one or more of the following: Halifax County Soil Survey "Physical & Chemical Properties of the Soil - Permeability "; and/or USDA - NRCS (United States Department of Agriculture - Natural Resource Conservation Service) official series description, and/or "NRCS Field Book for Describing & Sampling K Soil Evaluation for Stormwater BMP S &ME Project No. 1054 -12 -325 P2 Klausner Lumber Two Facility, Enfield, Halifax Co., NC June 24, 2013 Soils" the permeability estimates were converted to conductivity on the profile description tables. SHWT & Observed Water Table (OWT) Estimation Under current NCDWQ regulations, the depth of various stormwater BMP devices from the SHWT is an important design consideration. For example, current regulations for Wet Detention Basins require that the permanent pool elevation (PPE) shall be no more than six inches above or below the SHWT in order to maintain a permanent pool of water and to avoid doing a hydrogeologic analysis. Therefore, S &ME evaluated the SHWT by advancing hand auger borings and evaluating the soil for evidence of SHWT influence. This evaluation involved looking at the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate processes that are driven by SHWT fluctuations, such as iron reduction and oxidation and organic matter staining. See Table 1 below and the soil profile descriptions on Figure 4 for the estimated SHWT depths based on soil color. S &ME also recorded the OWT level below the existing ground level (EGL) at each indicated hand auger boring location if applicable. Please keep in mind that groundwater levels fluctuate for numerous reasons and these findings do not indicate that groundwater levels have not or will not rise above the evaluated depths. See Table 1 below and the soil profile descriptions on Figure 4 for the estimated OWT depths based on the depth to groundwater within the hand auger borings. Table 1: SHWT & OWT Information Boring Location SHWT inches below EGL OWT I (inches below EGL) B -1 38 25 B -2 24 10 B -3 21 >21 B-4 30 36 B -5 42 42 B -6 30 32 CONCLUSION Table 2 below contains the SHWT and PPE information as it relates to the elevations onsite. The PPE at both Pond B and Pond C is +/- 6 inches from the most limiting SHWT encountered during our evaluation. 3 Soil Evaluation for Stormwater BMP Klausner Lumber Two Facility, Enfield, Halifax Co., NC Table 2: SHWT & PPE Information S &ME Project No. 1054 -12 -325 P2 June 24, 2013 BORING LOCATION NUMBER APPROXIMATE EXISTING ELEV. AT BORING (FT) PROPOSED BMP PPE FROM NGL ELEVATION (FT) SHWr DEPTH FROM NGL AT BMP BORING LOCATION ELEVATION (FT) PPE SEPARATION DISTANCE FROM MOST LIMITING SHWr DEPTH (IN) B-1 94 88 90.8 N/A B-2 92 88 90 NtA B-3 89 88 87.4 6 B-4 97 91 94.5 N/A B-5 95 91 91.5 5 B-6 94 91 91.5 5 LIMITATIONS • Data only from hand auger borings, where performed, and conditions may vary in other areas of the basin. CLOSING S &ME appreciates the opportunity to provide these services to you. If you have any questions, please contact us. Sincerely, S &ME, Inc. Walter Cole, L.S.S. Environmental Scientist (919) 801 -3798 wcole @smeinc.com -13 �� k rbok Rob Willcox, L.S.S. Natural Resources Team Leader Attachments: Figure 1: USGS Topographic Map Figure 2: Halifax County Soil Survey Map Figure 3: Color Aerial Photograph Map Figure 4: Soil Evaluation Map SAProjects \1054- 12- 325Project GWP\Reports\ Stormwater Soil Evaluation.doc 4 Klausner ' oV`e � 1 Lumber S --� 4 �- Two Site A;pe7�41-v' . A& - _ _ �' - Wet Detention V.(Basin .wo „ � 1 � � �, Wet • �.y. �- � � I}' M f • Detention .� • ��� Basin `` _=-' '• .•_3 �' jo r rin �,- MAP SOURCE: W TOPO TERRAIN NAVIGATOR; USGS TOPOGRAPHIC QUADRANGLE MAPS; MAP EDITION 4.0 SCALE: 1” = 12,000 USGS TOPOGRAPHIC MAP FIGURE NO. DATE: 2012 S&ME ENFIELD QUADRANGLE DRAWN BY: Y: w WC WWW.SMEINC.COM PROJECT GWP SITE PROJECT NO: NC ENGINEER LICENSE #F -0176 1054 -12 -325 3201 SPRING FOREST RD, RALEIGH, NC 27616 HWY 301, ENFIELD, HALIFAX COUNTY, NC MAP SOURCE: USDA -NRCS HALIFAX COUNTY SOIL S,,RVEY MAP; 2006 SCALE: 1 ° = 24,000, FIGURE NO DATE: S&ME USDA -NRCS SOIL SURVEY MAP OCT 2012 HALIFAX CO; SHEET 15 DRAWN BY: WC 2 WWW.SMEINC.COM eROJECT GWP SITE PROJECT NO: NC ENGINEER LICENSE #F -0176 HWY 301, ENFIELD, HALIFAX COUNTY, NC 1054 -12 -325 3201 SPRING FOREST RD, RALEIGH, NC 27616 i P V U - etention Basin 111112: 1 :12,000 DATE: OCT DRAWN N BY: wc 2012 S &M E WWVV.SMEINC.COM PROJECT NO: NC ENGINEER LICENSE #F -0176 .= 1054-12-325 13201 SPRING FOREST RD, RALEIGH, NC 27616 Wk O rr aa 4 Wk O rr aa POND C 1301C3: 4 -7_1 LEGEND B-# APPROXIMATE SOIL AUGER BORING LOCATION WITH ASSOCIATED PROFILE DESCRIPTION ABOVE • THIS MAP IS ONLY A PORTION OF A REPORT FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT • BACKGROUND AUTOCAD MAP FROM FILE SUPPLIED BY GREEN ENGINEERING AND ASSOCIATES NAMED POND- TEMP.DWG Klausner Lumber Two Project SBME Project No. 1034.12 -325 P2 Boring 1 Seasonal High Water Table from existing ground surface: 38 Inches (3.2 feet) Observed Water Table from existing ground surface: 25 Inches (21 feet) Boring 2 Dep Horizon (In) P Color Grade Structure Moist Consistency moist USDA Estimated Permeability (Inlhr) USDA Estimated USDA Estimated Horizon (in) Texture Grade Structure Consistency Notes Permeability (In /hr) Conductivity (In/hr) poatrtxjltmotdoe 1.4-14 At 0.8 2.5Y 93 sandy clay loam sandy week granular wry bade 0.6 -2 0.14.1.4 8t2 24+ 2.5Y 514 2.5Y 8N 17.$YR 5/8 1sandy clay • loam weak cem stable granular 0.6.2 0.14 -1.4 2.6 1.4-14 A2 8.12 2.5Y 5/8 2.5Y 518 sandy weak granular wary *lade vary *table 2 -6 1.4 -14 Bt2 3038 10YR 518 10YR 518 loam s°anm blocky wry Mable 2 -6 1.4.14 BN 12.38 2.SY S!6 2 S 5/4 sandy clay week subangular Mable veryMable 2-6 1.4 -14 8t2 20* 2.5Y 514 7.S R 516 loam weak blocky }lade 0.6 -2 0.14.1.4 Bt2 38.48 2.5Y 516 10YR 7/1 sandy clay week subanguler Meble saturated 0.06 -0.2 0.014 -0.14 1.4 -14 8t3 1 2.5Y 318 loam sandy Iced blocky granular wry liable 1 0. .2 0.14.1.4 Seasonal High Water Table from existing ground surface: 38 Inches (3.2 feet) Observed Water Table from existing ground surface: 25 Inches (21 feet) Boring 2 Dep Horizon (In) Color Texture Grade Structure Moist Consistency Notes USDA Estimated Permeability (Inlhr) USDA Estimated ConductlNty (Inlhr) Matrix owes A 0.10 2.5Y 413 Grade sandy loam weak granular wry liable Conductivity (In/hr) 2.6 1.4-14 all 10.24 2.5Y 5/4 2.5Y 518 sandy clay loam week subanguiar blocky liable wry Cable 0.6 -2 0.14.1.4 8t2 24+ 2.5Y 514 2.5Y 8N 17.$YR 5/8 1sandy clay • loam weak subanguier blocky stable granular 0.6.2 0.14 -1.4 Seasonal High Water Table from existing ground surface: 24 Inches (2.0 foot) Observed Water Table from existing ground surface: 10 Inches (0.8 feet) Boring 3 Seasonal High Water Table from existing ground surface: 21 Inches (1.8 fast) Observed Water Table from existing ground surface: s21 Inches ( ".a foot) Boring 4 Depth Color to M N to moist Moist USDA Estimated USDA Estimated Horizon In Texture Grade Structure Consistency Notes Permeability (INhr) Conductivity (In/hr) Matrix Mottle A 0-8 2.5Y 413 10YR413 sandy weak granular wry Cable very lhable 2 -6 1.4 -14 E 6-16 10YR 416 loam sand granular vary *table 2-6 1.4 - 14 BN 8.20 2.5Y 5/4 2.5Y 518 sandy clay week subenguier „able vary *table 2 -6 1.4 -14 Bt2 3038 10YR 518 10YR 518 loam s°anm blocky wry Mable 0.6.2 0.14.1.4 all 18.30 2.5Y 5/4 2 S 5/4 sandy clay week sub wry liable veryMable 2-6 1.4 -14 8t2 20* 2.5Y 514 7.S R 516 loam - weak kular }lade 2-6 1.4 -14 8t2 1 30.38 2.5Y 6/2 10YR 5/6 sandy clay weak y wry Noble saturated 0.06 -0.2 0.014 -0.14 Seasonal High Water Table from existing ground surface: 21 Inches (1.8 fast) Observed Water Table from existing ground surface: s21 Inches ( ".a foot) Boring 4 Seasonal High Water Table from existing ground surface: 30 Inches 12.5 bet) Observed Water Table from existing ground surface: 36 Inches (3.0 feet) Boring 5 Depth Color to M N to Moist Moist USDA Estimated USDA Estimated Horizon In Texture Grade Structure Consistent Notes Permeability (In /hr) Conductivity (In/hr) Matrix Momee Ap 0-6 10YR413 10YR413 loam weak granular wry liable very lhable 2 -6 1.4 -14 E 6-16 10YR 416 seem sand granular vary *table 2 -6 1.4.14 E 6-18 10YR4 /6 10YR416 sandy week granular %ery liable vary *table 2 -6 1.4 -14 Bt2 3038 10YR 518 10YR 518 ooamm s°anm granular wry Mable 2.6 1.4.14 all 18.30 2.5Y 5/4 2 S 5/4 sandy week granular wry liable veryMable 2-6 1.4 -14 Bt3 36+ 10YR516 10YR S/1 loam sand granular myMeble 2-6 1.4 -14 8t2 1 30.38 2.5Y 6/2 10YR 5/6 a weak granular wry Noble saturated 2-6 2 -6 1.4 -14 8t3 1 10YR 516 -m sandy Iced weak granular wry liable 2.6 1.4 -14 Bt3 3848+ 70YR S/6 tOYR 7/1 sandy weak granular very *lade heavy 7.SYR 416 loam 2.8 1.4.14 Seasonal High Water Table from existing ground surface: 30 Inches 12.5 bet) Observed Water Table from existing ground surface: 36 Inches (3.0 feet) Boring 5 Seasonal High Water Table from existing ground surface: 42 Inches (3.5 feet) Observed Water Table from existing ground surface: 42 Inches (3.5 feet) Boring 0 M LU0 N m 0 Z U Z U � Q w O O U Depth Color to M N to W Moist Z USDAEodmatsd USDA Estimated Horizon (In) Texture Grade Structure Consistency Notes Permeability (INhr) Conductivity (Irdhr) Matdz Mome Ap 08 10YR413 loam week granular very lhable 2 -6 1.4 -14 E 6-16 10YR 416 sandy loam sand granular vary *table 2-6 2 -6 1.4 -14 E 8-16 10YR416 loam - week granular vary *table 2 -6 1.4 -14 Bt2 3038 10YR 518 10YR 518 s°anm granular wry Mable 2 -6 1.4 -14 Btl 1630 2 S 5/4 I0.m weak granular veryMable 2-6 1.4 -14 Bt3 36+ 10YR516 10YR S/1 I sandy sand granular myMeble 2 -6 1.4 -14 St2 3038 10YR 5/6 10YR 5/8 sandy week granular wry table 2-6 2 -6 1.4 -14 8t3 38+ 10YR 516 10YR 8/1 10YR 5/8 sandy Iced weak granular wry liable 2-6 1.4 -14 Seasonal High Water Table from existing ground surface: 42 Inches (3.5 feet) Observed Water Table from existing ground surface: 42 Inches (3.5 feet) Boring 0 M LU0 N m 0 Z U Z U � Q w O O U Seasonal High Water Table from existing ground surface: 30 Inches (2.5169t) Observed Water Table from existing ground surface: 32 Inches (27 Act ) _m LLI- Z � > UZ) v� LL Z Z� FIGURE NO. 4 Q Z J H 0 U W W U 02 of F- d � O 0 Z W m =) 0 � U J X W U Q J `1 J W LL Z W w N W to M N to W Z e- Z Z w 0 LLI O CD Texture r Structure Consistency K � Seasonal High Water Table from existing ground surface: 30 Inches (2.5169t) Observed Water Table from existing ground surface: 32 Inches (27 Act ) _m LLI- Z � > UZ) v� LL Z Z� FIGURE NO. 4 Q Z J H 0 U W W U 02 of F- d � O 0 Z W m =) 0 � U J X W U Q J `1 J W LL Z W Depth Color Moist USDAEstimatod USDA Estimated Horizon (In) Texture Grade Structure Consistency Notes Permeability (INhr) Conductivity (Whr) -(m--atd­x-)r(-motdqsl Ap 0.8 10YR414 loam granular very Mebie 2 -6 1.4 -14 E 6-16 10YR 416 sandy loam weak granular vary *table 2-6 1.4 -14 Sit 1630 2 S 6/4 loam - granular very Mebie 2 -6 1.4 -14 Bt2 3038 10YR 518 10YR 518 week granular wry Mable I0.m 2-6 1.4 -14 Bt3 36+ 10YR516 10YR S/1 I sandy week granular myMeble 10YR 518 loam 2-6 1.4 -14 Seasonal High Water Table from existing ground surface: 30 Inches (2.5169t) Observed Water Table from existing ground surface: 32 Inches (27 Act ) _m LLI- Z � > UZ) v� LL Z Z� FIGURE NO. 4 Q Z J H 0 U W W U 02 of F- d � O 0 Z W m =) 0 � U J X W U Q J `1 J W LL Z W KLAUSNER LUMBER TWO HALIFAX COUNTY POND DESIGN JUNE 512013 ,.F eeD PREPARED BY: GREEN ENGINEERING 303 GOLDSBORO ST E WILSON, NC 27893 252- 237 -5365 Pond "A" {Recycle Pond - Future) Determine initial volume of pond for storm water retention of a 25 year storm (4% Annual Chance) and provide outlet for 100 year storm event (1 % Annual Chance). Site area — 66.5 Acres Impervious Area = 53 Acres SCS CN = 87 25 Year 1 day precipitation = 6.46 (p) 25 year peak discharge = 291 cfs Estimate depth of runoff from 25 year storm: S — (1000/CN) -10 = (1000/87) -10 = 1.49 Q* = (p -0.2(s)) ^2] I (p +0.8(s)) — [(6.46 - 0.2(1.49) 12] I (6.46 +0.8(1.49) = 37.97 / 7.65 = 4.96 in V = (Q *)(A) — (4.96in)(66.5 ac) = 1,197,319 of (Estimated Storage Volume) Pond A Dimensions: Stage (ft) Area (ft) Storage (cf) 88 (Bottom) 133,559 89 137,580 135,551 90 141,657 275,151 91 145,791 418,855 92 149,981 566,722 93 154,228 718,806 94 158,532 875,165 95 162,892 1,035,856 96 25 Yr Storage 167,308 1,200,935 97 Weir (50') 171,782 1,370,458 98 176,311 1,544,482 99 Top of Pond 180,899 1,723,064 Max 25 year Q = 291 cfs Max 25 Year Elevation = 95.98' Pond Will Contain. The 25 Year Storm Event a (0) Hyd. No. 2 -- 26 Year 0 (cfs) 320.00 32Q.00 280,00 280.00 240.00 240.00 200.00 240.00 160.00 _ 180.00 120.00 120.00 80.00 80.00 40.00 _ .. 40.00 0.00 - - - — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 . _ Hyd No. 2 — Hyd No.1 ® Total storage used= 1,196.971 auftTime (hrs) Q 100 = 421 cfs Max 100 Year Elevation = 97.22' Provide 50' Weir at Elevation 97.0 for emergency storm events larger than 100Year (1% Annual Chance) Hydraflow Table of Contents POND-A- RECYCLE. gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2012 by Autodesk, Inc, A Wednesday, 06 1 5 12013 Hydrograph Return Period Recap ......................................... ............................... 1 25 - Year SummaryReport .................................................................................... ............................... 2 HydrographReports ............................................................................................................. 3 Hydrograph No. 2, Reservoir, POND A ............................................... ............................... 3 PondReport - POND A ................................................................... ............................... 4 100 -Year SummaryReport .................................................................................... ............................... 5 HydrographReports .............................................................................. ............................... 6 Hydrograph No. 2, Reservoir, POND A ........................ ........... 6 OFReport ................................................................................ ............................... 7 Hydrograph Return Period F�cP, l ydra o ydrographs Extension for AutoCAD& Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 2 5C5 Runoff Reservoir - - - - -- 1 30.42 0.000 121.28 0.000 - - - - - -- - - - - - -- - - - - - -- - - - - - -- 219.77 0.000 290.53 0.000 - - - - - -- - - - - - -- 420.98 16.97 Pond A POND A Proj. file: POND- A- RECYCLE.gpw Wednesday, 06 1 5 1 2013 Hydrograph Summary Repo liydraflow Hydrographs Extension for AutoCAD® Civil 3D(3 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total Hydrograph strge used Description (cult) 1 SCS Runoff 290.53 6 726 1,196,971 - - - - -- - - - - -- - - - - -- Pond A 2 Reservoir 0.000 6 nla 0 1 95.98 1,196,971 POND POND- A- RECYCLE.gpw Return Period: 25 Year Wednesday, 06 15 / 2013 Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 2 POND A Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs. Time to peak Time interval = 6 min Hyd. volume Inflow hyd. No. = 1 -Pond A Max. Elevation Reservoir name = POND A Max. Storage Storage Indication method used. Q (cfs) 320.00 280.00 240.00 200.00 160.00 W1)[1I81 :0 1t 40.00 POND A Hyd. No. 2 -- 25 Year 3 Wednesday, 06 1 5 1 2013 = 0.000 cfs = n/a = 0 cuft = 95.98 ft = 1,196,971 cuft Q (cfs) 320.00 r:1 9I 240.00 200.00 160.00 120.00 :ME 40.00 0.00 --L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 2 Hyd No. 1 = =] Total storage used = 1,196,971 cuft Pond Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. v9 Wednesday, 0615 / 2013 Pond No. I - POND A Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 88.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 88.00 133,559 0 0 1.00 89.00 137,580 135,551 135,551 2.00 90.00 141,657 139,600 275,151 3.00 91.00 145,791 143,705 418,855 4.00 92.00 149,981 147,866 566,722 5.00 93.00 154,228 152,084 718,806 6,00 94.00 158,532 156,359 875,165 7.00 95.00 162,892 160,691 1,035,856 8.00 96.00 167,308 165,079 1,200,935 9.00 97.00 171,782 169,523 1,370,458 10.00 98.00 176,311 174,024 1,544,482 11.00 99.00 180,899 178,582 1,723,064 Culvert 1 Orifice Structures [A] [B] [C] [PrFRsr] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope ( %) = 0.00 0.00 0.00 nla N -Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = nla No No No Weir Structures [A] [D] [C] [D] Crest Len (ft) = 50.00 0.00 0.00 0.00 Crest El. (ft) = 97.00 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = Rect - -- - -- - -- Multi -Stage = No No No No Exfi1.(infhr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: CulverUOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) . Stage (ft) Stage 1 Discharge 12.00 10.00 8.00 6.00 4.00 2.00 0.00 Elev (ft) 100.00 98.00 96.00 94.00 92.00 90.00 on o0 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 - ---- -- Total Q Discharge (cfs) Hydrograph Summary Repolydraflow Hydrographs Extension for AutoCAD® Civil 3D®20i2 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total Hydrograph strge used Description (tuft) 1 SCS Runoff 420.98 6 726 1,761,873 - - - - -- - - - - -- - - - - -- Pond A 2 Reservoir 16.97 6 924 391,411 1 97.22 1,408,162 POND A POND- A- RECYCLE.gpw Return Period: 100 Year Wednesday, 06 1 5 1 201 3 Hydrograph Report 11 Hydraf low Hydrographs Extension for AutoCAD@Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 061512013 Hyd. No. 2 POND A Hydrograph type = Reservoir Peak discharge = 16.97 cfs Storm frequency = 100 yrs Time to peak = 924 min Time interval = 6 min Hyd. volume = 391,411 tuft Inflow hyd. No. = 1 - Pond A Max. Elevation = 97.22 ft Reservoir name = POND A Max. Storage = 1,408,162 tuft Storage Indication method used. Q (cfs 480.00 420.00 360.00 300.00 240.00 180.00 fih1119Z1l Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0 1 1 0.0 IIF� J � LL lUJ - - 0,00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 2 Hyd No. 1 [LT=j Total storage used = 1,408,162 tuft Hydraflow Rainfall Report FA Hydraflow Hydrographs Extension for AutoCAD® Civil MO 2012 by Autodesk, Inc. v9 Wednesday, 06 1512013 Return Period Intensity - Duration - Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 - - - - - -- 2 4627.2861 4.2000 1.9134 -- - - - - -- 3 0.0000 0.0000 0.0000 -- - - - - -- 5 3209.4641 3.2000 1.7771 -- - - - - -- 10 2876.6289 2.8000 1.7209 -- - - - - -- 25 2703.0281 2.4000 1.6685 - - - ---- 50 2674.6011 2.2000 1.6401 -- - - - - -- 100 2660.0020 2.0000 1.6157 -- - - - - -- File name: ENFIELD.IDF Intensity = B 1(Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 66.26 28.88 16.21 10.41 7.27 5.37 4.14 3.29 2.68 2.23 1.88 1.61 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 76.29 32.74 18.50 12.02 8.50 6.36 4.95 3.98 3.28 2.75 2.34 2.02 10 83.88 35.77 20.28 13.24 9.42 7.08 5.55 4.48 3.70 3.12 2.67 2.32 25 95.84 40.50 23.02 15.10 10.79 8.16 6.42 5.21 4.32 3.66 3.14 2.73 50 105.00 44.22 25.17 16.56 11.87 9.00 7.10 5.78 4.81 4.08 3.51 3.06 100 114.67 48.00 27.34 18.03 12.95 9.84 7,78 6.34 5.29 4.49 3.87 3.38 Tc = time in minutes. Values may exceed 60. Precip. file name: W:IHALCO1 12108 1EnoineerinalPONDSIENFIELD.DCD Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24 -hour 1.50 3.34 4.32 4.32 5.16 6.46 7.59 8.87 SCS 6 -Hr 1.00 2.39 0.00 2.90 3.52 4.27 5.00 5.73 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pond "B" Wet Pond (North) Determine initial volume of pond for storm water retention and for storm water treatment to reduce Total Suspended Solids, Nitrogen, and Phosphorus. For a 10 year Storm Event (10% Annual Chance) and provide outlet for 100 year storm event (1% Annual Chance). Utilize a pond with a permanent pool (wet pond) to achieve: 85% reduction Total Suspended Solids 25% reduction Nitrogen 40% reduction Phosphorus Storage for a 10% Annual Chance (10 Year) Storm Site area = 3 9.4 Acres SCS Pre CN =74 SCS Post CN = 85 10 Year 1 day precipitation = 5.16 (p) 10 year peak pre discharge = 61.33 cfs 10 year peak post discharge = 88.62 cfs Estimate depth of runoff from 10 year storm: S = (1000 /CN) -10 = (1000185) -10 = 1.76 Q* = (p- 0.2(s)) ^21 / (p +0.8(s)) _ [(5.16- 0.2(1.76)) ^2] / (5.16 +0.8(1.76) = 23.12 / 6.57 = 3.52in V = (Q *)(A) = (3.52in)(39.4 ac) = 503,096 of (Storage Volume) Impervious area = 31.5 acres Percent impervious = 80 % Permanent Pool Depth = 3.0' SD /SA Factor = 3.36 Min Pond Surface Required: A = [(3.361100)(39.4)](43,560) = 57,666 sf Storage Volume for 1.5" Flush for 2 -5 day drawdown Rv = Runoff Coefficient I = Impervious Percentage Rv= 0.05 +0.009(I) =0.56 Required Volume = (Design Rainfall) (Rv) (Drainage Area) = (1.5 ") (0.56) (39.4 Ac) = 2.76 Ac /ft ^2 = 107,158 cf (Wet pond Volume) Calculate draw down orifice for 2 day drawdown — 172,800 secs. Provide Orifice for 1.5 cfs Provide 4" Orifice or equivalent Pond B" Total Storage Required — 610,254 cf Surface area= 57,666 sf Storage Depth = 2.5' Pond B Dimensions: Stage (ft) Area (ft) Storage (cf) = 160 cfs (Permanent 93.70' 91 (Pool 12" Weir) 58,189 91.5 (Shelf) 65,428 30,883 92 91,238 38,984 92.1 (Riser 4'x4') 93.0 (50' Spillway) 94,865 93,036 94 98,548 96,691 95 102,287 100,402 Max 10 year Q inflow = 90 cfs Max 10 Year Elevation = 93.14' Max 10 year Q outflow = 59 cfs Pre Development 10 year Q = 61 efs Max 100 Year Q inflow = 175 cfs Max 100 Year Q outflow = 160 cfs Max 100 Year Elevation = 93.70' Q (cfs) POND B Hyd. No. 2 - -18 Year Q (cfs) 0 2 4 6 -- Hyd fro. 2 8 13 12 14 16 18 20 22 24 26 28 30 32 34 v VV — Hyd No. 1 Total storage used = '� ��,829 cult rime (hrs) Provide 36" Riser Outlet Pipe at invert 88.5 Riser Height Top 92.1 Bottom 88.5' Provide 36" RCP Outlet, Provide Outlet Dissipater for 36" RCP Velocity= 21 fps Provide Velocity Dissipater Pad 21' x 11' x 36" With Class 2 Stone. Provide 50' Emergency Weir at Elevation 93.00. MENNEN� IINN ■IIMI�NIN ■ENNEN IMMEMME No , IINI■® ®®®®■®®MINI ®®■®E®®®®® ■®ES ®®f NINN ®N NIIINNNNNN ■ENNEN� gIINNNNa■®MMI■ 0 2 4 6 -- Hyd fro. 2 8 13 12 14 16 18 20 22 24 26 28 30 32 34 v VV — Hyd No. 1 Total storage used = '� ��,829 cult rime (hrs) Provide 36" Riser Outlet Pipe at invert 88.5 Riser Height Top 92.1 Bottom 88.5' Provide 36" RCP Outlet, Provide Outlet Dissipater for 36" RCP Velocity= 21 fps Provide Velocity Dissipater Pad 21' x 11' x 36" With Class 2 Stone. Provide 50' Emergency Weir at Elevation 93.00. Hydraflow Table of Contents POND- C- WET.gpw Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Ino. v9 Wednesday, 06/5/2013 Hydrograph Return Period Recap ......................................... ............................... 1 - Year SummaryReport .................................................................................... ............................... 2 HydrographReports .............................................................................. ............................... 3 Hydrograph No. 1, SCS Runoff, POND B - POST .............................. ............................... 3 Hydrograph No. 2, Reservoir, POND B ............................................... ............................... 4 PondReport - POND B ................................................................... ............................... 5 10 - Year SummaryReport .................................................................................... ............................... 6 HydrographReports ............................................................................................................. 7 Hydrograph No. 1, SCS Runoff, POND B - POST .............................. ............................... 7 Hydrograph No. 2, Reservoir, POND B ............................................... ............................... 8 25 - Year SummaryReport .................................................................................... ............................... 9 HydrographReports ............................................................................ ............................... 10 Hydrograph No. 1, SCS Runoff, POND B - POST ............................ ............................... 10 Hydrograph No. 2, Reservoir, POND B ............................................. ............................... 11 100 - Year SummaryReport .................................................................................. ............................... 12 HydrographReports ............................................................................ ............................... 13 Hydrograph No. 1, SCS Runoff, POND B - POST ............................ ............................... 13 Hydrograph No. 2, Reservoir, POND B ............................................. ............................... 14 1DFReport .............................................................................. ............................... 15 Hydrograph Return Period Rp ydra o ydrographs Extension for AutoCADT) Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 2 SCS Runoff Reservoir - - - - -- 1 10.43 1.259 - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- 88.62 58.87 118.78 96.01 - - - - - -- - - - - - -- 174.66 158.98 POND B - POST POND B Proj. file: POND- B- rev.gpw Wednesday, 06 / 5 / 2013 Hydrograph Summary Re po Oydraflow Hydrographs Extension for AutoCADO Civil 3D02012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 10.43 6 744 63,971 - - - - -- - - - - -- - - - - -- POND B - POST 2 Reservoir 1.259 6 870 63,888 1 91.52 32,650 POND B POND -B- rev.gpw Return Period: 1 Year Wednesday, 06 1 5 1 2013 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 1 5 1 2013 Hyd. No. 1 POND B - POST Hydrograph type = SCS Runoff Peak discharge = 10.43 cfs Storm frequency = 1 yrs Time to peak = 744 min Time interval = 6 min Hyd. volume = 63,971 cuft Drainage area = 40.000 ac Curve number = 85* Basin Slope = 0.4% Hydraulic length = 4300 ft Tc method = KIRPICH Time of conc. (Tc) = 42.73 min Total precip. = 1.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area /CN) _ [(36.500 x 79) + (48.500 x 90)] 140.000 POND B - POST Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 000 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. A Wednesday, 06 1 5 1 201 3 Hyd, No. 2 POND B Hydrograph type = Reservoir Peak discharge = 1.259 cfs Storm frequency = 1 yrs Time to peak = 870 min Time interval = 6 min Hyd. volume = 63,888 cult Inflow hyd. No. = 1 - POND B - POST Max. Elevation = 91.52 ft Reservoir name = POND B Max. Storage = 32,650 cuft Storage Indication method used POND B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 4320 4680 Time (min) - Hyd No. 2 Hyd No. 1 U=11 Total storage used = 32,650 cuft Pond Report Hydraflow Hydrographs Extension for AutOCAD® Civil 3D& 2012 by Autodesk, Inc. v9 Wednesday, 06 1 5 1 2013 Pond No. 1 - POND B Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 91.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 91.00 58,189 0 0 0.50 91.50 65,428 30,883 30,883 1.00 92.00 91,238 38,984 69,868 2.00 93.00 94,865 93,036 162,904 3.00 94.00 98,548 96,691 259,595 4.00 95.00 102,287 100,402 359,997 Culvert ! Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 0.00 0.00 0.00 Crest Len (ft) = 1.00 16.00 50.00 0.00 Span (in) = 36.00 0.00 0.00 0.00 Crest El. (ft) = 91.00 92.10 93.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 88.50 0.00 0.00 0.00 Weir Type = Rect Rect Rect - -- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope ( %) = 0.50 0.00 0.00 n1a N -Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inthr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 NoW CulverflOrifice outflows are analyzed under inlet (ic) and outlet (oc) cortrol, Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) 4.00 3.00 2.00 1.00 000 Stage 1 Discharge Elev (ft) 95.00 94.00 93.00 92.00 91 00 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 Total Q Discharge (cfs) Hydrograph Summary Re po 0ydraflow Hydrographs Extension for AutoCADO Civil 3DO 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 88.62 6 738 497,792 - - - - -- - - - - -- - - - - -- POND B - POST 2 Reservoir 58.87 6 762 497,709 1 93.14 175,829 POND B POND- B- rev.gpw Return Period: 10 Year Wednesday, 06 15 1 2013 Hydrograph Report 7 Hydrafiow Hydrographs Extension for AMCAD® Civil 3DO2012 by Autodesk, Inc. v9 Wednesday, 06 15 1 2013 Hyd. No. 1 POND B - POST Hydrograph type = SCS Runoff Peak discharge 88.62 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 6 min Hyd. volume = 497,792 cuft Drainage area = 40.000 ac Curve number = 85* Basin Slope = 0.4% Hydraulic length = 4300 ft Tc method = KIRPICH Time of conc. (Tc) = 42.73 min Total precip. = 5.16 in Distribution = Type it Storm duration = 24 hrs Shape factor = 484 * Composite (Area1CN) = [(36.500 x 79) + (48.500 x 90)] 140.000 POND B - POST Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D02012 by Autodesk, Inc. A Wednesday, 06 1512013 Hyd. No. 2 POND B Hydrograph type = Reservoir Peak discharge = 58.87 cfs Storm frequency = 10 yrs Time to peak = 762 min Time interval = 6 min Hyd. volume = 497,709 cuft Inflow hyd. No. = 1 - POND B - POST Max. Elevation = 93.14 ft Reservoir name = POND B Max. Storage = 175,829 cuft Storage Indication method used. POND B Q {cfs} Hyd. No. 2 -- 10 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 .i 40.00 40.00 30.00 _ 30.00 20.00 . , 20.00 10.00 i 10.00 0.00 - - — _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 1920 2040 Time {min} Hyd No. 2 Hyd No. 1 [1=- ] Total storage used = 175,829 cuft Hydrograph Summary Repo l iydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (thin) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuff) Hydrograph Description 1 SCS Runoff 118.78 6 738 670,753 - - - - -- - - - - -- - POND B - POST 2 Reservoir 96.01 6 756 670,669 1 93.39 199,937 POND B POND- B- rev.gpw Return Period: 25 Year Wednesday, 06 / 5 1 2013 Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 1 5 1 2013 Hyd. No. 1 POND B - POST Hydrograph type = S Runoff Peak discharge = 118.78 cfs Storm frequency = 25 yrs Time to peak = 738 min Time interval = 6 min Hyd. volume = 670,753 cuft Drainage area = 40.000 ac Curve number = 85* Basin Slope = 0.4% Hydraulic length = 4300 ft Tc method = KIRPICH Time of conc. (Tc) = 42.73 min Total precip. = 6.46 in Distribution = Type Il Storm duration = 24 hrs Shape factor = 484 Composite (Area /CN) = 1(36.500 x 79) + (48.500 x 90)] 140.000 Q (cfs) 120.00 100.00 40.00 20.00 M POND B - POST Hyd. No. 1 -- 25 Year Q (cfs) 120.00 100.00 40.00 20.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2092 by Autodesk, Inc. v9 Hyd. No. 2 POND B Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 6 min Hyd. volume Inflow hyd. No. = 1 - POND B - POST Max. Elevation Reservoir name = POND B Max. Storage Storage Indication method used. Q (cfs; 120.00 100.00 40.00 20.00 11 Wednesday, 06 1 5 12013 = 96.01 cfs = 756 min = 670,669 tuft 93.39 ft = 199,937 tuft Q (cfs) 120.00 `01 T94, 40.00 K810191 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 1920 Time (min) Hyd No. 2 Hyd No. 1 fLLI1 Total storage used = 199,937 tuft 12 Hydrograph Summary Repo Oydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuff) 1 SCS Runoff 174.66 6 738 998,810 - - - - -- - - - - -- - - - - -- POND B - POST 2 Reservoir 158.98 6 750 998,727 1 93.70 230,189 POND B POND- B- rev.gpw Return Period: 100 Year Wednesday, 06 15 12013 Hydrograph Report 13 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 1512013 Hyd. No. 1 POND B - POST Hydrograph type = SCS Runoff Peak discharge = 174.66 cfs Storm frequency = 100 yrs Time to peak = 738 min Time interval = 6 min Hyd. volume = 998,810 cuft Drainage area = 40.000 ac Curve number = 85* Basin Slope = 0.4% Hydraulic length = 4300 ft Tc method = KIRPICH Time of conc. (Tc) = 42.73 min Total precip. = 8.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area /CN) _ [(3 6.500 x 79) + (48.500 x 90)] 140.000 POND B - POST Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 1 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 0615 1 2013 Hyd. No. 2 POND B Hydrograph type = Reservoir Peak discharge = 158.98 cfs Storm frequency = 100 yrs Time to peak = 750 min Time interval = 6 min Hyd. volume = 998,727 cuft Inflow hyd. No. = 1 - POND B - POST Max. Elevation = 93.70 ft Reservoir name = POND B Max. Storage = 230,189 tuft Storage Indication method used POND B Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 _.. 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 Time (min) °- - Hyd No. 2 Hyd No. 1 L- Total storage used = 230,189 tuft Hydraflow Rainfall Report 15 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 1 5 1 2013 Return Period Intensity - Duration - Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -- - - - - -- 2 4627.2861 4.2000 1.9134 -- - - - - -- 3 0.0000 0.0000 0.0000 - -- -- 5 3209.4641 3.2000 1.7771 -- - - - - -- 10 2876.6289 2.8000 1.7209 -- - - - - -- 25 2703.0281 2.4000 1.6685 -- - - - - -- 50 2674.6011 2.2000 1.6401 -- - - - - -- 100 2660.0020 2.0000 1.6157 -- - - - - -- File name: ENFIELD.IDF Intensity = B 1(Tc + D) ^E Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 s0 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 OM 0.00 0.00 0.00 2 66.26 28.88 16.21 10.41 7.27 5.37 4.14 3.29 2.68 2.23 1.88 1.61 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 76.29 32.74 18.50 12.02 8.50 6.36 4.95 3.98 3.28 2.75 2.34 2.02 10 83.88 35.77 20.28 13.24 9.42 7.08 5.55 4.48 3.70 3.12 2.67 2.32 25 95.84 40.50 23.02 15.10 10.79 8.16 6.42 5.21 4.32 3.66 3.14 2.73 50 105.00 44.22 25.17 16.56 11.87 9.00 7.10 5.78 4.81 4.08 3.51 3.06 100 114.67 48.00 27.34 18.03 12.95 9.84 7.78 6.34 5.29 4.49 3.87 3.38 Tc = time in minutes. Values may exceed 60. Preci . file name: WAHALCO1121081En ineerin TONDSIENFIELD. c Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24 -hour 1.50 3.34 4.32 4.32 5.16 6.46 7.59 8.87 SCS 6 -Hr 1.00 2.39 0.00 2.90 3.52 4.27 5.00 5.73 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pond "C" Wet Pond (West) Determine initial volume of pond for storm water retention and for storm water treatment to reduce Total Suspended Solids, Nitrogen, and Phosphorus. For a 10 year Storm Event (10% Annual Chance) and provide outlet for 100 year storm event (1% Annual Chance). Utilize a pond with a permanent pool (wet pond) to achieve: 85% reduction Total Suspended Solids 25% reduction Nitrogen 40% reduction Phosphorus Storage for a 10% Annual Chance (10 Year) Storm Site area = 66.5 Acres SCS Pre CN = 74 SCS Post CN = 87 10 Year 1 day precipitation = 5.16 (p) 10 year peak pre discharge = 103 cfs 10 year peak post discharge= 91.61 efs Estimate depth of runoff from 10 year storm.: S = (10001CN) -10 = (1000/87) -10 = 1.49 Q* = (p- 0.2(s)) ^2] / (p +0.8(s)) = [(5.16 - 0.2(1.49)) ^2] 1(5.16 +0.8(1.49) = 23.6416.35 = 3.72in V — (Q *)(A) = (3.72in)(66.5 ac) — 897,989 cif (Storage Volume) Impervious area = 53.2 acres Percent impervious = 80 % Permanent Pool Depth = 3.0' SD /SA Factor = 3.36 Min Pond Surface Required: A = [(3.361100)(66.5)](43,560) = 97,330 sf Storage Volume for 1.5" Flush for 2 -5 day drawdown Rv = Runoff Coefficient I = Impervious Percentage Rv = 0.05 + 0.009(I) = 0.56 Required Volume = (Design Rainfall) (Rv) (Drainage Area) = (1.5 ") (0.56) (66.5 Ac) = 4.66 Ac/ft ^2 = 202,772 of (Wet pond Volume) Calculate draw down orifice for 2 day drawdown — 172,800 secs. Provide Orifice for 1.17 cfs Provide 4" Orifice or equivalent Pond "C" Total Storage Required — 610,254 cf Surface area = 57,666 sf Storage Depth = 2.5' Pond C Dimensions: Stage (ft) Area (ft) Storage (cf) = 275 cfs (Permanent 91.55' 88 (Pool 12" Weir) 101,452 88.5 (Shelf) 120,415 55,394 88.7 (Riser 5'x 5') 89 161,641 125,648 90 166,435 289,664 90.5 Spillway (50') 91 171,286 458,502 92 176,193 632,218 93 Top of Pond 181,157 810,869 Max 10 year Q inflow = 220.00 cfs Max 10 Year Elevation = 90.35' Max 10 year Q outflow = 92 cfs Pre Development 10 year Q = 103 cfs Max 100 Year Q inflow = 420 cfs Max 100 Year Q outflow = 275 cfs Max 100 Year Elevation = 91.55' "fM F " Q (cfs) Q (cfs) Hyd. No. 2 - -10 Year 240.00 240.00 210.00 210.00 180.00 6 100.00 180.00 - 1 fi0.00 120.00 120.010 90.00 q 30.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 16 20 22 24 26 28 30 32 34 -° Hyd No. 2 Hyd No.1 Total storage used = 347,602 tuft Time (hrs) Provide 42" Riser Outlet Pipe at invert 84.5 Riser Height Top 88.7 Bottom 84.5' Provide 42" RCP Outlet. Provide Outlet Dissipater for 42" RCP Velocity = 8 fps Provide Velocity Dissipater Pad 21' x 11' x 36" With Class 2 Stone. Provide 50' Emergency Weir at Elevation 90.5. Hydraflow Table of Contents POND- C- VVET.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. v9 Wednesday, 06 15 1 2013 Hydrograph Return Period Recap ......................................... ............................... 1 1 -Year SummaryReport .................................................................................... ............................... 2 HydrographReports .............................................................................. ............................... 3 Hydrograph No. 1, SCS Runoff, Pond C ............ ............................... Hydrograph No. 2, Reservoir, POND C ......................... ....................... 4 .............................. PondReport - POND C ................................................................... ............................... 5 10 -Year SummaryReport .................................................................................... ............................... 6 HydrographReports .............................................................................. ............................... 7 Hydrograph No. 1, SCS Runoff, Pond C ............................................. ............................... 7 Hydrograph No. 2, Reservoir, POND C ............................... ............................... ....... 8 25 - Year SummaryReport .................................................................................... ............................... 9 HydrographReports ............................................................................ ............................... 10 Hydrograph No. 1, SCS Runoff, Pond C ........................................... ............................... 10 Hydrograph No. 2, Reservoir, POND C ............................................. ............................... 11 100 - Year SummaryReport .................................................................................. ............................... 12 HydrographReports ............................................................................ ............................... 13 Hydrograph No. 1, SCS Runoff, Pond C ........................................... ............................... 13 Hydrograph No. 2, Reservoir, POND C . ............................... ..... 14 OFReport .............................................................................. ............................... 15 Hydrograph Return Period Rp ydra o ydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 2 SCS Runoff Reservoir - - - - -- 1 30.42 1.744 121.28 59.17 - - - - - -- - - - - - -- - - - - - -- - - - - - -- 219.77 91.61 290.53 941.89 - - - - - -- - - - - - -- 420.98 275.43 Pond C POND C Proj, file: POND- C- WET.gpw Wednesday, 06 1 5 1 2013 Hydrograph Summary Repot ydraflow Hydrographs Extension for AutoCADO Civil 3D02012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 30.42 6 732 129,211 - - - - -- - - - - -- - - - - -- Pond C 2 Reservoir 1.744 6 942 129,062 1 88.65 76,423 POND C POND- C- WET.gpw Return Period: 1 Year Wednesday, 06 1 5 1 2013 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pond C Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 6 min Hyd. volume Drainage area = 66.500 ac Curve number Basin Slope = 0.5% Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 1.50 in Distribution Storm duration = 24 hrs Shape factor Composite (Area /CN) = [(50.000 x 90) + (15.000 x 79)] 166.500 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Pond C Hyd. No. 1 -- 1 Year 3 Wednesday, 06 15 1 2013 = 30.42 cfs = 732 min = 129,211 cuft = 87* = 2000 fit = 20.88 min = Type II = 484 M Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 O.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 1512013 Hyd. No. 2 POND C Hydrograph type = Reservoir Peak discharge = 1.744 cfs Storm frequency = 1 yrs Time to peak = 942 min Time interval = 6 min Hyd. volume = 129,062 tuft Inflow hyd. No. = 1 -Pond C Max. Elevation = 88.65 ft Reservoir name = POND C Max. Storage = 76,423 cult Storage Indication method used. POND C Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 000 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 nn 0 720 1440 2160 2880 3600 4320 5040 5760 6480 7200 Time (min) Hyd No. 2 Hyd No. 1 fiTJ= Total storage used = 76,423 tuft Pond Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 15 ! 2013 Pond No. 1 - POND C Weir Structures Pond Data [A] [B] Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 88.00 ft Stage I Storage Table [A] [g] Stage (ft) Elevation (ft) Contour area (sgft) Ill Storage (cuft) Total storage (cuft) 0.00 88.00 101,452 0 0 0.50 88.50 120,415 55,394 55,394 1.00 89.00 161,641 70,255 125,648 2.00 90.00 166,435 164,016 289,664 3.00 91.00 171,286 168,838 458,502 4.00 92.00 176,193 173,716 632,218 5.00 93.00 181,157 178,651 810,869 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [g] [C] [D] Rise (in) = 42.00 0.00 0.00 0.00 Crest Len (ft) = 1.00 25.00 50.00 0.00 Span (in) = 42.00 0.00 0.00 0.00 Crest EI. (ft) = 88.00 88.70 90.50 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 84.50 0.00 0.00 0.00 Weir Type = Rect Rect Rect - -- Length (ft) = 100.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope ( %) = 1.00 0.00 0.00 1 N -Value = .013 ,013 .013 n!a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Wet area) Multi -Stage = nla No No No TW Elev. (ft) = 0.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 - jWFAN ,A Note: Culvertl0riflce outflows are analyzed under inlet (to) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s Stage I Discharge Elev (ft) 93.00 92.00 91.00 90.00 89.00 88 00 0.0 80.0 160.0 240,0 320.0 400.0 480.0 560.0 640.0 720.0 800.0 • Total Q Discharge (cfs) Hydrograph Summary Re po l iydraflow Hydrographs Extension for AutoCADe Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (Cfs) Time interval (min) Time to Peak (min) Hyd. volume (Cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description I SCS Runoff 219.77 6 726 897,558 - - - - - -- - - - - -- Pond C 2 Reservoir 91.61 6 750 897,410 1 90.35 347,602 POND C POND- C-WET.gpw Return Period: 10 Year Wednesday, 06 1 5 1 2013 Hydrograph Report 7 Hydraflow Hydrographs Extension for AutoCADV Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 / 5 1 2013 Hyd. No. 1 Pond C Hydrograph type = SCS Runoff Peak discharge = 219.77 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 6 min Hyd. volume = 897,558 cuft Drainage area = 66.500 ac Curve number = 87* Basin Slope = 0.5% Hydraulic length = 2000 ft Tc method = KIRPICH Time of cone. (Tc) = 20.88 min Total precip. = 5.16 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area1CN) = [(50.000 x 90) + (15.000 x 79)]166.500 Q (cfs; 240.00 210.00 180.00 150.00 120.00 a� �f 30.00 Q (cfs) 240.00 ff- M R 180.00 150.00 120.00 30.00 0.00 - -- - I i_ I I I 1 1 - -7%- 0.00 0 420 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - y Hyd No. 1 Time (min) Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 06 1 5 1 2013 Hyd. No. 2 POND C Hydrograph type = Reservoir Peak discharge = 91.61 cfs Storm frequency = 10 yrs Time to peak = 750 min Time interval = 6 min Hyd. volume = 897,410 tuft Inflow hyd. No. = 1 - Pond C Max. Elevation = 90.35 ft Reservoir name = POND C Max. Storage = 347,602 tuft Storage Indication method used. f, I J Q (cfs) Q (cfs) Hyd- No. 2 -- 10 Year 240.00 240.00 210.00 _ 210.00 180.00 180.00 150.00 150.x0 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 1920 2040 Time (rein) Hyd No. 2 Hyd No. 1 [- -- J Total storage used = 347,602 cuff Hydrograph Summary Repo Odraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuff) Hydrograph Description 1 SCS Runoff 290.53 6 726 1,196,971 - - - - -- - - - - -- - - - - -- Pond C 2 Reservoir 141.89 6 750 1,196,822 1 90.93 442,491 POND C POND- C- WET.gpw Return Period: 25 Year Wednesday, 06/5/2013 Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc, v9 Wednesday, 06/5/2013 Hyd. No. 1 Pond C Hydrograph type = S Runoff Peak discharge = 290.53 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 6 min Hyd. volume = 1,196,971 cult Drainage area = 66.500 ac Curve number = 87* Basin Slope = 0.5 % Hydraulic length = 2000 ft Tc method = KIRPICH Time of conc. (Tc) = 20.88 min Total precip. = 6.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area /CN) = 1(50.000 x 90) + (15.000 x 79)] 166.500 Pond C Q (cfs) Q (cfs) Hyd. No. 1 -- 25 Year 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Repor# 11 Hydraflow Hydrographs Extension for AutoCADO Civil 3DD 2012 by Autodesk, Inc. v9 Wednesday, 06/5/2013 Hyd. No. 2 POND C Hydrograph type = Reservoir Peak discharge = 141.89 cfs Storm frequency = 25 yrs Time to peak = 750 min Time interval = 6 min Hyd. volume = 1,196,822 cuft Inflow hyd. No. = 1 - Pond C Max. Elevation = 90.93 ft Reservoir name = POND C Max. Storage = 442,491 cuft Storage Indication method used. Q (cfs 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 -1 1 1 - 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 Time (min) Hyd No. 2 Hyd No. 1 1 -- __ 1 Total storage used = 442,491 tuft 12 Hydrograph Summary Repo0draflow Hydrographs Extension for AutoCAD& Civil 31D® 2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total Hydrograph strge used Description (cuft) 1 SCS Runoff 420.98 6 726 1,761,873 - - - - -- - - - - -- - - - - -- fond C 2 Reservoir 275.43 6 744 1,761,725 1 91.55 547,588 POND C POND- C- WET.gpw Return Period: 100 Year Wednesday, 0615 / 2013 Hydrograph Report 13 Hydraflow Hydrographs Extension forAutoCAD® Civil 3DO2012 byAutodesk, Inc. v9 Wednesday, 06 1 5 1 2013 Hyd. No. 1 Pond C Hydrograph type = SCS Runoff Peak discharge = 420.98 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 6 min Hyd. volume = 1,761,873 tuft Drainage area = 66.500 ac Curve number = 87* Basin Slope = 0.5% Hydraulic length = 2000 ft Tc method = KIRPICH Time of conc. (Tc) = 20.88 min Total precip. = 8.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area1CN) = [(50.000 x 90) + (15.000 x 79)] 166.500 Pond C Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 000 480.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Storage Indication method used. Q {cfs; 480.00 420.00 360.00 [ 8iffiiilm 240.00 180.00 120.00 Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' 1 .... - ] - -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 Hyd No. 1 [ALL: -tTLI Total storage used = 547,588 tuft 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCA6p Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 061512013 Hyd. No. 2 POND C Hydrograph type = Reservoir Peak discharge = 275.43 cfs Storm frequency = 100 yrs Time to peak = 744 min Time interval = 6 min Hyd. volume = 1,761,725 cult Inflow hyd. No. = 1 - Pond C Max. Elevation = 91.55 ft Reservoir name = POND C Max. Storage = 547,588 cuft Storage Indication method used. Q {cfs; 480.00 420.00 360.00 [ 8iffiiilm 240.00 180.00 120.00 Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' 1 .... - ] - -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 Hyd No. 1 [ALL: -tTLI Total storage used = 547,588 tuft Hydraflow Rainfall Report 15 Hydraflow Hydrographs Extension for AUtoCADQ Civil 3DS 2012 by Autodesk, Inc. v9 Wednesday, 06 / 5 1 2013 Return Period Intensity - Duration - Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -- - - - - -- 2 4627.2861 4.2000 1.9134 -- - - - - -- 3 0.0000 0.0000 0.0000 -- - - - - -- 5 3209.4641 3.2000 1.7771 -- - - - - -- 10 2876.6289 2.8000 1.7209 -- - - - - -- 25 2703.0281 2.4000 1.6685 -- - - - - -- 50 2674.6011 2.2000 1.6401 -- - - - - -- 100 2660.0020 2.0000 1.6157 -- - - - - -- File name: ENFIELD.IDF Intensity = B 1(Tc + D)"E Return Period Intensity Values (inlhr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 66.26 28.88 16.21 10.41 7.27 5.37 4.14 3.29 2.68 2.23 1.88 1.61 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 76.29 32.74 18.50 12.02 8.50 6.36 4.95 3.98 3.28 2.75 2.34 2.02 10 83.88 35.77 20.28 13.24 9.42 7.08 5.55 4.48 3.70 3.12 2.67 2.32 25 95.84 40.50 23.02 15.10 10.79 8.16 6.42 5.21 4.32 3.66 3.14 2.73 50 105.00 44.22 25.17 16.56 11.87 9.00 7.10 5.78 4.81 4.08 3.51 3.06 100 114.67 48.00 27.34 18.03 12.95 9.84 7.78 6.34 5.29 4.49 3.87 3.38 Tc = time in minutes. Values may exceed 60. Preci . file name: W:IHALC01121081En ineerin IPQNDSIENFIELD. c Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24 -hour 1.50 3.34 4.32 432 5.16 6.46 7.59 8.87 SCS 6 -Hr 1.00 2.39 0.00 2.90 3.52 4.27 5.00 5.73 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 , Location name: Enfield, North Carolina, W '` Coordinates: 36.1686, - 77.6750 1) Elevation:104ft" `source: Google Maps �T"Ov f POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)' Average recurrence interval(years) 0.402 J� 0.463 0.522 0.599 0.673 0.738 0.797 200 0.852 50D 0.915 1000 0.977 5 -mm (0.361 - 0.451) (0.416 - 0.515) (0.469 - 0.580) (0.538 - 0.666) (0.601 - 0.747) ((0.657 - 0.820) (0.704- 0.883)1(0.750-0.946)1(0.799-1,02)1(0.846-1.09) 0.643 0040 0.836 0.958 1.07 1.18 7.27 1.35 10 -mm (0.576- 0.720) (0.668 - 0.823) (0.752 - 0.930) (0.860 -1.07) (0.958 -1.19) (1.05 -1.31) (1.12 -1.40) 11 (1,19 -1.50) 145 (1.26 -1.61} 1.54 (1.33 -1.71) F-0.8-0-3-]F--0931 1.08 1.21 1.36 1.49 1.60 793 15 -min 1(0.720-0.900)1[(0.840-1.04) . (0.951 -1.18) 1 (1.09 -1.35) 1 (1.21 -1.51) 1 (1.33 -1.65) (1.42 -1.77) 110 1 (1.50 -1.89) 1.82 (1.59 - -2.03) (1.67 -2.15) 30 -min 1.10 1 1.29 1 1.50 .7B -1.76--]F- 2.01 2.24 2.45 2.85 2.90 3.13 (0.987 -1.23) {1.16 -1.43) {1.35 -1.67) 1 (1.58 -1.95) 11 (1.80-2.24) (2.00 -2.49) 1 (2.17 -2.72) 1 (2.33 -2.95) (2.53 -3.22) (2.71 -3.49) 60 -mm 1.37 (1.23 -1.54) 1.67 11 (1.46 -1.79) 1.93 (1.73 -2.14) 2.29 (2.05 -2.54) 2.68 1 (2.40 -2.98) 3.04 (2,70 -3.37) 3.38 L (2.99 -3.74) 3.72 (3.27 -4.13) 4.16 4.57 1.60 1.89 2.28 2.75 F-3.2-9-1 3.60 4.29 4.82 {3.63 -4.63} (3.95 -5.09) 2 -hr (1.43 -1.80) 11 (1.69 -2.11) 1 (2,04 -2.55) (2.45 -3.07) 1 (2.91 -3.66) (3.35 -422) 1 (3.76 -4.77) (4.20 -5.36) 5.52 (4.77 -6.14) 6.19 (5.29 -6.90) 1'70 F--2.-01-7 2.44 F 2.95-71 3.56 4.15 4.73 3 -hr (1.51 -1.93) (1.79 -2.26) (2.17 4.74) (2.62 -3.32) 11 (3.14 -3.99) (3.64 -4.65) 11 (4.13 -5.30) 5.36 {4.64 -5.99) 1 6.22 (5.33 -6.96} 7.06 (5.98 -7.91) 2.03 2.39 2.90 3.52 4.27 5.00 5.73 6 -hr (1.81 -2.29} (2.14 -2.69) (2.59 -3.25) 1 (3.14 -3.94) (3.78 -4.76) (4.39 -5.56) 1 (4.99 -6.37) 6.52 1 (5.64 -7,24) 7.62 (6.50 -8.45) 8.70 (7.32 -9.66) 12 -hr 2.38 (2,14 -2.66) 2.81 (2,64 -3.13) 3.43 1 (3.08 -3.81) 4,78 1 (3.75 -4.64) 5.10 (4.55 -5.64) 6--02-7F-65-5--11 (5.32 -6,63) 1 (6.08 -7.64) 7.97 (6.90 -8.7fi} 1 9.41 (8.02 -10.3) 10.8 (9.11 -11.9) 76 F-2-7-6-]F- 3.34 4.32 5.16 6.46 7.59 8.87 10.3 24hr (2.55 -3.01) (3.09 -3.65) 1 (3.98 -4.71) 1 (4.74 -5.64) (5.87 -7.05) 1 (6.84 -8.28) (7.90 -9.69] (9.08 -11.3) 12.5 (10.8 -13.9) 14.5 (12.3 -16.1) 3.20 3.87 4.95 5.89 -730--]F--8 30 5- 8.53 9.91 F 2 -da y (2.95 -3.61) 11 (3.57 -4.24) (4.56 -5.42) (5.39 -6.44) (6.63 -8.00) 1 (7.67 -9.35) 1 (8.82 -10.9) 11.5 1 (10.1 -12.6) 13.6 {11.9 -15.3} 15.8 (13.4 -17.7) 3.42 4.13 F--5--25-7F-6--2j-7F--7-65---]1 8.89 70.3 11.8 3 -da y (3.16 -3.72) (3.82 -4.50) (4.85 -5.71) (5.72 -6.75) (6.98 -8,32) {8.04 -9.68) {9.19 -11.2) (10.4 -12.9) 14.7 (12.2 -15.6) 16.1 (13.7 -17.9) 4 -day 3•fi4 (3.38 -3.94) 4.39 (4.07 -4.75) 5.55 (5.14 -6.00) 6.54 1 (6.04 -7.07) 8.00 (7.33 -8.64) 9.26 (8.41 -10.0) 10.6 (9.56 -11.5) 11 12.1 14A 16.3 4.26 5.12 6.43 7.52 9.70 10.4 11.6 (10.8 -13.2) (12.6 -15.8) (14.0 -18.0) 7 -day (3.97 -4.59) (4.78 -5.52) (5.99 -6.93) 1 (6.97 -8.09) (8.38 -9.78) (9.53 -11,2) (10.7 -12.8) 1 73.4 (12.0 -14.5) 15.6 (13,8 -17.1) 17.5 (15.3 -19.3) 4.87 5.83 7.21 8.36 7 0.0 11.4 F-1-2,9---T-1-4-4 IF 10 -da y (4.55 -5.22) (5.46 -6.26) {6.74 -7.73} (7.79 -8.95) (9.28 -10.7) (10.5 -12.2) (11.7 -13.8) 1 (13.1 -15.6) 16.7 (14.9 -18.2) 18.fi (16.4 -20.4) 6.60 7.87 9.57 11.D 13.4 74.6 16.3 20 -da y 1 (6.20 -7.07) (7.39 -8.42) (8.97 -10.2) 1 (10.3 -11.7) (12.1 -13.9) (13.5 -15.7) (15.0 -17.5) 18.1 (16.5 -19.5) 24.7 (16.6 -22.5) 22.7 (20.2 -24.9) 8.17 9.70 11.6 13.2 75.3 17.0 18.8 30 -day (7.71 -8.69) (9.15 -10.3} (11.0 -12.4) 1 (12.4 -14.0) (14.3 -16.3) (15.9 -18.1) (17.4 -20.0) 1 20- 06 (18.9 -22.0) 23.0 (21.0 -24.8) 25.0 (22.6 -27.1) 70.3 72.1 14.3 16.1 18.6 20,5 F-2-2.-5-] 24.5 45 -day (9.73 -10.9} (11.5 -12.8) (116 -15.2) 1 (15.2 -17.1) 1 (17.5 -19.7) (19.2 -21.8) 1 (20.9 -23.9) (22.7 -26.1} 27.2 (25.0 -29.2) 29A (262-31.7) 12.4 14.6 17.0 18.9 21.5 23.5 25.5 6D -day (11.8 -13.1) (13.8 -15.4) (16.1 -17.9) (17.9 -20.0} (20.3 -22.7) (22.2 -24.9) (23.9 -27.0) 27.5 (25.6 -29.2) 34.1 (27.9 -32.2) 32.1 (29.5 -34.5) estimates in this table are based on frequency analysis of partial duration series (PDS). Precipitation frequency (PF) Numbers in parenthesis are given duration and average PF estimates at lower and upper recurrence interval) will be greater bounds of the than the upper 90% confidence bound (or less interval. The probability that precipitation frequency estimates (for a than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PM values. Please refer to NOAH Atlas 14 document for more information. Back to Top http:ll hdse. nws. noaa. govl hdsc /pfdslpfds _printpage.httnl ?lat =3 6.1686 &Ion =- 77.6750 &data... 2/25/2013 Precipitation Frequency Data Server PF graphical PDS -based depth - duration - frequency (DDF) curves Coordinates. 36.1686,-77-6750 jj 30 c 25 r a 20 c 0 15 s7. 10 CL g 0 E •� r r G s t m m m m m +tl m m m pis 6 A o r i n5 � � � � � � � © 'pa o * 8 .•r r•r ro „-i ry ro Duration 35 30 c 25 J-_ , Y 20 C O v 15 2- U L 10 Q. 5 -. .. 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAA NWSJOHDIHDSC Created (GMT): Mon Feb 25 15,44.34 2013 Back to Top - -- Mans & aerials Page 2 of 4 Average recurrence interval (years) z — 5 -� 10 — 25 50 100 — 200 — Soo 1000 Duration --°- 54Nn -- 2.04 15-mon --- 4-d - — 30-mm — 7-6 -- 604n)n — 10.4 -- 2 -hr ---- 20-t 3-11r --- 30-< -- 6-hr --- 45-4 --- 12-hr 24-hr http:// hdsc. nws. noaa. gov/ hdsc /pfds /pfds_printpage,htmI ?Iat= 36.1686 &ion=- 77.6750&data— 2/25/2013 Precipitation Frequency Data Server Page 2 of 4 NOAA Atlas 14, Volume 2, Version 3 Location name: Enfield, North Carolina, US* Coordinates: 36.1666, - 77.6750 $ Elevation: 104ft* # Source; Gcogle Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and P. Riley NOAH, National Weather Service, Silver Spring, Marylard PF tabular I PF graRhical I Maps & aerials PF tabular P,S-based point precipitation frequency estimates with 90% confidence intervals (in inches /hour' Average recurrence interval(years) duration r ----- ��r --- -� 1D i 25 50 100 200 504 1000 5 -min 4.82 5.56 626 7.18 (4.33 -5,41) (5.02 -6.18) 8.08 8.66 9.56 10.2 11.0 11,7 (5.63 -6.96) (6.46 -7,99) (7.21 -8.96) (7.68 -9.84) (8.45 -10.6} (9.00 -11.4) (9.59 -12.2) (10.2 -13.1 } 10 -min 3.86 4.44 5.02 5.75 (3.46 -4.32) (4.01 -4.94) (4.51 -5.58) (5.16 -6.40) r,-.4--3-71 (5.75 -7.15) 7.06 7.60 8.10 8.fi8 (6.28 -7.83) (6.71 -8.42) 9.23 {7.13 -8.99) (7.58 -9.66) 7.99 -10.3) 15 -min 3.21 3.72 4.23 4.85 (2.88 -3.60) (3.36 -4.14) {3.80 -4.70) (4.35 -5.39) 5.44 (4.86 -6.04) 5.96 F-6-.40--j .81 7.28 (5.30 -6.61) 1 (5.66 -7,10) (6.04 -7.57) 7.72 30 -min 2.20 2.57 3.01F-3-51-F--4-03--F--4.4-9- 351 (1.97-2.47) (2.32 -2.86) (2.70-3.34) 1 (3.15 -3.91) 4.03 11 (3.60 -4.47) 4.49 4.90 5.30 F- -580 1 (3.99 -4.98) (4.33 -5.43) (4.67 -5.89) 1 (5.06 -6.45) (5.41 -6.97) 60 -min 1.37 1.61 1.93 2.29 (1.23 -1.54) (1.46 -1.79) (1.73 -2.14) (2.05 -2.54) 2.68 1 (2.40 -2.98) 3.04 3.38 3.72 4.16 1 (2.70 -3.37) (2.99 -3.74) {3.27 -4.13) (3.63 -4.63) 4.57 1 (3.95 -5.09 2 -hr 0.802 0.944 1.14 1.38 1(0.714-0.902)1(0.845-1.05) 1 1.64 1.90 2.15 2.41 F-2.-76---]F--3-.O ) 9 (1.02 -1.27) (1.23 -1.53) 1 (1.46 -1.83) (1.67 -2.11) 1 (1.88 -2.38) (2.10 -2.fi8J (2.38 -3.07) (2.65 -3.45) 3 -hr 0.567 0.669 0.811 0.984 1(0.503-0.642)1(0.597-0.753)1(0.723-0.913) 0.874 1.19 1.38 1.58 1.79 2.07 2.35 ( -1.11) 1 (1.05 -1.33) 1 (1.21 -1.55) 1 (1.37 -1.76) 1 (1.55 -2.00) (1.78 -2.32) (1.99 -2.64 ) 0.339 0.400 0.485 0.589 0.712 0.835 0.957 1.09 6 -hr (0.302 - 0.383) (0,358 -0.449) (0.432 - 0.543) (0.524 - 0.659) (0.631 - 0.795) 1,27 (0.734 - 0.929) 1 (0.834 -1.06} (0.941 -1.21) 1.45 1 (1.22 -1.61) 0.198 0.233 0.284 0.347 0.423 F--o-.60-0--] 0.577 0.662 12 -hr (0.178- 0.221) (0.211 - 0.260) (0256 -0.316 0.311- 0.385) ) ( (0,377 - 0.488) ) ( 0.781 (0.442- 0.550) (0.505 -0.634 0.573 -0.727 0.666 - 0.857) ) ( 0.899 ) (0.756 -0.988 24 -hr 0.115 0.139 0--1-8-0-) 1 0.215 0.269 - -0. 5-22 0.316 0.370 0.430 0.603 (0.106- 0.125) (0.129 - 0.152) (0.166 -0.196 0.197 - 0.235) ( (0.245 - 0.294) (0285 -0.345 {0.329 - 0.404) (0.378 -0.471 0.450 - 0.577) ) ) ( (0.512 -0.671 ) 2 -day 0.067 0.081 0.103 0.123 (0.061 -- 0.073) (0.074 - 0.088) 0.113) 0.152 0.178 0.206 0.239 0.287 0.330 (0.095 - (0.112- 0.134) (0.138- 0.167) (0.160 - 0.195) (0.184- 0.227) (0.209- 0.263) (0.247 - 0.320) (0.279- 0.369) 3 -da y 0.047 0.057 0.073 0.086 0.106 0.124 0.143 0.164 0.196 0.223 1(0.044-0.052)11(0.053-0,062) (0.067 - 0.079) (0.079 - 0.094) (0.097- 0,118) (0.112 - 0.434) (0.128 - 0.156) (0.145 - 0.180} (0.170 - 0.216) (0.190 - 0.248) 0.038 0.046 0.058 F--60-687170-108-3 0.096 0.111 4 -da y (0.035 - 0.041) (0.042 - 0.050) (0.054- 0.062) (0.063- 0.074) (0.076- 0.090) .126 0.150 I0.1-26--F--0- 15- (0.088- 0.104) (0.100-0.12J(0,112-0.138)1(0,131-0.165)1(0.146-0.1 0.170 88) 0.025 0.030 0.038 0.045 0.054 O.D62 0.070 01080 7 -da y 1(0.024-0.027)11(0.028-0.033) {0.036 - 0.041) (0.042 -- 0.048) (0.050 - 0.058) 0.093 (0.057 - 0.067) (0.064 - 0.076) {0.072 - 0.086) (0.0820.102) 0.104 (0.091 - 0.115} 20 0.0 0.024 0.030 0.035 0.042 0.047 0.054 0.060 10 -da y 1(0.019-0.022)1[(0.023-0,026) (0.028- 0.032) (0.032- 0.037) (0.039 - 0.045) 0.070 (0.044 - 0.051) (0.049 - 0.058) (0.054 - 0.065) (0.062 - 0.076) 0.077 (0.068- 0.085) 0.020 0.023 0.027 0.030 0.034 0.038 20 -da y 13-0. 15-0. (0.013 - 0.015) (0.015 -0.018 (0.019- 0.021) (0.021- 0.024) (0.025- 0.029) 0.043 (0.028- 0.033} (0.031- 0.037) 0.034- 0.041) (0.039 - 0.047) 0.047 (0.042- 0.052) 3D -da y 0.011 (0.011 - 0.012) 0.013 (0.013 - 0.014) 0.016 (0.015- 0.017) 4.018 (D.017- 0.019) O.D21 (0.020- 0.023) 0.024 (0.022 - 0.025) 0.026 (0.024 - 0.028) 0.029 (0.026- 0.031} 45032 0.035 0.034) 0.010 0.011 0.013 0.015 0.017 0.019 0.021 0.023 (0.029 - (0.031- 0.038) 45 -da y (0.009- O.O1D) (0.011 - 0.012) (0-013-0,014)1(0,014-0-016) 1(0.016-0.018)1(0.0113-0.020) {0.019 - 0.022} (0.021- 0.024) 0.025 0.027 (0.023- 0.027) (0.026 - 0.029) 60 -day 0.049 0.010 0.012 0013 0.015 0.016 0.018 0.019 OA21 0.022 (0.008- 0.009) (0.010 -0.011 ) ( 0.011 - 0.012 ) ( 0,012 - 0.014) (0.014 - 0.016} (0.015- 0.017) (0.017 -0.019 ) ( 0.018 - 0.020) (0.019 - 0.022) (0.020 -0.024 ) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the tower bound) is 5 %. ESGmates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAH Atlas 14 document for more information. Back to Top http.l lhdsc. nws. noaa. govl hdsc /pfdslpfds _printpage.html ?lat= 36.1686 &lon = - 77.6750 &data... 2/25/2013 Precipitation Frequency Data Server 100.0 Iz s 10.000 G ZI 51 1.0D0 r 0.100 0. 0.010 0 001 T PF graphical PDS -based intensity - duration - frequency (IDF) curves Coordinates_ 36-1686,-77-6750 C C C C •ff C IE L L �. 4 t r L L T T 7. T T 7< — 10-OE --- 2-hr — 2"a --- 3 fir -- 34"a rV A us — 45-& b '7 'C 'ti 'a m `b 'p i Duration 100.0 14.ODD e 1.b00 c e 0.100 U 0.010 0-001 -- 2 5 10 25 50 100 200 500 10( 0 Average recurrence interval iyears) NnAA/NWS(OHD /HDSC Created (GMT): Mon Feb 25 15-27:13 2013 Back t0 Tor) -, Maps & aerials Page 2 of 4 Average recurrence interval (years) 1 2 — 10 -- 25 — .50 100 — 200 °--- 500 -- 1000 Duration - a-m" — ;c-aay -°- 'IO -m!n -- 3-day 15-min — 4-day — 30-min — 7-day -- 50 -grin — 10-OE --- 2-hr — 2"a --- 3 fir -- 34"a "r — 45-& — 12-IN -- 60-dr --- 24-hr http: / /hdsc.nws.noaa. gov/hdsc /pfds /pfds _printpage.html ?lat =3 6.1686 &lon -- 77.6750 &data... 2/25/2013 2 « � 66 s N L6 0 a a a) C 0 C Q) W C 0 0 a 0 d Q F- w W CD 0 A 4 En 0 AE . � g"' 1 40 r9'I 9Q 88 90 f 1 89 90 8g _ _ _ - 95 94 92 2= 85 ' r r f I I I /1 1\ 1 \ 1 1 1 t \ 1 I I i i -- _ - - - -- 111124 = 11 11111=1115101 I =1 I I; III =! 10: - I II1 =1II- 1= 1II -I -1 Fr--- -, , , __ I! l I -I L EI 11- 1 I I -1 I I - -III - � �_? -1 I ! -I 1 -� FRAME MAY BE CAST DIRECTLY INTO BOX (OPTIONAL) PRECAST OVERSIZE FOR 36 "0 RCP INSTALLATION (NO KNOCKOUTS) 10 :1 SUBMERGED VEGETATED PERIMETER SHELF ..0......■ ...........:... NORM. POOL EL. • ii - -- 88. i POND SECTION_ No Scale —4' x 4' "GABLE" TRASH RACK (WELDED REBAR 4" SPACING AND FRAME PRECAST INTO BOX) ELEV. 92.10 8" MODEL 101 —C 12" WIDE WEIR ELEV. 91.00 SLIDE GATE WITH ------,— 4' x 4' PRECAST RISER INVERT AT RISER 88.50 96%96" ANTI—SEEP COLLARS 11' l EXIST. GRADE -1 11 - -1 I II I EI -_ - -11 I I I- 8„ MODEL 101 —C SLIDE GATE WITH HANDWHEEL OR EQUAL POND PERIMETER SHELF — BELOW PERMANENT POOL _:_ _ 6:1 SUBMERGED VEGETATED PERIMETER SHELF: f. �L£ `x t l 1. ;. r. ILA ANDROPOGON VIRGINICUS) INVERT CULVERT AT OUTLET: iV F7- SOFT RUSH f 1. __. , � c L SMARTWEED SPP.) SOFT —STEM BULRUSH �POLYGONNUM SCIRPUS VALIDUS) , ABOVE PERMANENT POOL BARREL DIA.: 36 "0 RCP EMERGENCY SPILLWAY ELEV.: 93.50 TOP OF DIKE ELEV.: 95.50 -- _ - - - -- 111124 = 11 11111=1115101 I =1 I I; III =! 10: - I II1 =1II- 1= 1II -I -1 Fr--- -, , , __ I! l I -I L EI 11- 1 I I -1 I I - -III - � �_? -1 I ! -I 1 -� FRAME MAY BE CAST DIRECTLY INTO BOX (OPTIONAL) PRECAST OVERSIZE FOR 36 "0 RCP INSTALLATION (NO KNOCKOUTS) 10 :1 SUBMERGED VEGETATED PERIMETER SHELF ..0......■ ...........:... NORM. POOL EL. • ii - -- 88. i POND SECTION_ No Scale —4' x 4' "GABLE" TRASH RACK (WELDED REBAR 4" SPACING AND FRAME PRECAST INTO BOX) ELEV. 92.10 8" MODEL 101 —C 12" WIDE WEIR ELEV. 91.00 SLIDE GATE WITH ------,— 4' x 4' PRECAST RISER INVERT AT RISER 88.50 96%96" ANTI—SEEP COLLARS 11' l EXIST. GRADE -1 11 - -1 I II I EI -_ - -11 I I I- 8„ MODEL 101 —C SLIDE GATE WITH HANDWHEEL OR EQUAL POND PERIMETER SHELF — BELOW PERMANENT POOL ACCEPTABLE WETLAND SPECIES TO BE PLANTED ON 6:1 SUBMERGED VEGETATED PERIMETER SHELF: BROOMSEDGE ANDROPOGON VIRGINICUS) INVERT CULVERT AT OUTLET: TYPHA SPP,) SOFT RUSH JUNCUS EFFESUS) SMARTWEED SPP.) SOFT —STEM BULRUSH �POLYGONNUM SCIRPUS VALIDUS) POND SIDE SLOPES — ABOVE PERMANENT POOL TALL FESCUE PENSACOLA BAHIAGRASS SERICEA LESPEDEZA KOBE LESPEDEZA a� DRAINAGE AREA: 85.00 AC. POND INVERT: 88.00 RISER /BARREL INVERT: 88.50 INVERT CULVERT AT OUTLET: 87.50 PERMANENT POOL: 91.00 4 "0 ORIFICE ELEV,: 91,00 TOP OF RISER ELEV.: 92.50 RISER BOX GEOMETRY.: 2.5° x 2.5' (GRATE /FRAME) BARREL DIA.: 36 "0 RCP EMERGENCY SPILLWAY ELEV.: 93.50 TOP OF DIKE ELEV.: 95.50 _` r- �=C� i, a Ex. 1' CONTOURS Ex, 5' CONTOURS---- 119 WETLANDS w w! VV EXISTING TREE LINE - EXISTING TREES TO BE REMOVED ZONE AE FEMA DESIGNATED 1% ANNUAL CHANCE FLOOD LIMITS 2011 BORE LOCATION -°- 2012 BORE LOCATION 2012 CPT LOCATION HOG WIRE FENCE CHAIN LINK FENCE — x x 30' ZONE 1 BUFFER 20' ZONE 2 BUFFER Ux CLEAR AND GRUB OUTLET STRUCTURE SITE. CONSTR UCT RI SER B AR REL STRUCTURE AS SHOWN ON THE CONSTRUCTION DRAWINGS AND SPECIFIED IN THE CONTRACT SPECIFICATIONS. CLEAR AND GRUB ENTIRE POND SITE, REMOVING ALL TREES, STUMPS, AND DECAYED MATERIAL. INSTALL ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES SURROUNDING POND SITE AS SHOWN ON THE PLANS, AFTER EACH RAINFALL EVENT, CHECK ALL TEMPORARY SEDIMENT CONTROL MEASURES AND CORRECT AS NECESSARY (POND TO BE USED AS TEMPORARY SEDIMENT TRAP AND SHOULD BE CLEANED OUT BEFORE POND IS PLACED INTO OPERATION). REMOVE TOPSOIL FROM POND SITE AND PLACE IN DESIGNATED BERM AREAS. PROOF ROLL DIKE FOUNDATION SOILS, UNDERCUTTING ALL UNSUITABLE MATERIAL AND REPLACING WITH SUITABLE BACK FILL, EXCAVATE POND AREA, CONSTRUCT AND BACK FILL STORM DRAIN OUTFALL AS SHOWN ON THE CONSTRUCTION DRAWINGS. PROPERLY STABILIZE POND AREA TO PREVENT EROSION OF DIKE SLOPES. UPON COMPLETION OF PROJECT CONSTRUCTION REMOVE ALL SEDIMENT FROM POND. LINE TOP AND SIDE OF POND AND DIKE SLOPES WITH EXCELSIOR CURLED —WOOD MATTING. ONCE POND AREA IS PROPERLY STABILIZED AND APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCING, SEDIMENT BASINS, ETC. AND SEED PER SPECIFICATIONS. NO EXISTING WETLANDS WILL BE DISTURBED BY POND CONSTRUCTION. 1, pt 90 91 (92 LEGEND 47 99 i ~ - 111111 \ 10:1 SUBMERGED VEGETATED E NG R"g" IREMENTS PERIMETER SHELF POND OmE ul cuu SEDIMENT CONTROL MEASURES AND CORRECT AS NECESSARY (POND TO BE USED AS TEMPORARY I- -ii POND PERIMETER SHELF - BELOW PERMANENT POOL -J I SEDIMENT TRAP AND SHOULD BE CLEANED OUT .. H l- I do 0 N Ln c D _0 to Lij c Q) O CC (Y LLI m 0 ry 5� -0 '0 2 0 n c. cn O Cp z 0 00 0 C) to 00 0 0 C) I S MITAMMIM