Loading...
HomeMy WebLinkAbout20050638 Ver 2_Certification of Completion_20070629Q.T F Certificate of Completion DWQ Project No: ~ S ~~ ®(0 3 • Applicant: ~ (Z - t~ ~a ~ w~T County: a.oa~~e.d ' 0 5 ~ B 2 2. ~! T -4 -,~ 4 l~ mP/~N ~ ~', LL Project Name: ~Th c- ~~~~ ~ /a-`t' ~ t« ~o~mc(n ~~uS~ 1.! Date of Issuance of 401 Water Quality Certification: ~ j ~ I S' C~ (o Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh NC 27699-1621. The applicant, the applicant's authorized agent, or the project engineer may return this form to DWQ. It is not necessary to send certificates from all of these. ~[~ r~ ~ ~~'~ --~ Applicant's Certification • • „i~.;N ~ ~ 200 ~~vR ~ b`vt:`i ~;~t , iM~"flAr~~.s a~ip STn~{~:yATrR ~,tt:a~!(:H I, S ~FF~~- ~~2-w ~iZ7 ,hereby state that, to the best of my abilities, due care and diligence was used i the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specif 'ons, and other supporting materials. gR~~v~ w C~ . S, L~ ~- I Signature: b '• Date: ~ ~ l V ~ Z V n a c~,e ,~- Agent's Certification the approved plans and specifications, and other supporting materials. I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, Signature: If this project was designed by a Certified Professional Date: I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature: Registration No: Date: