Loading...
HomeMy WebLinkAboutNCC190203_NOT Signed Certification_20210809 NC ®1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete,scan and upload to the electronic NOT(Rescission) form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: j i Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6's Floor 1612 Mail Service Center Raleigh, NC 27699-1612 i DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE.FORM YOU.MAIL MUST BE COMPL TED (ITIi J.N.ORIGIN AL SIGNATURE NOT D GITAL) f4TUIR 122.221 General Permit Certificate of Coverage (COC) No.: Name of Project: /-en4e 4,-7 — Per NC General Statute 143-215.0(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief, such information is true,complete, and accurate. /r� Legally Responsible Organizational Entity: IV6 bU.//A! Aee sakrea �e�.+�•"ts'�oh *Legally Responsible Person: .S IC WA r`• T-rCt:lee Title of Legally Responsible Person: s1r'*C- 0A 6^1 t09•er *Signature: Date: 9/-R-740al Print Name and Title of Signed (only if authorized individual signing differs from legally Responsible Person): * IMPORTANT NOTE. This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part iV,Section B, Item (6)of the NCGO10000 permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCGO10000 permit. E f E F I