Loading...
HomeMy WebLinkAbout20061894 Ver 1_More Info Received_20070523ENGNGER~ING ~' ~ ~ r~ ~~~; ~ ~'` ~ ~ ~~ ~~ a~0'7.d ~ h i~~~ ~.~ MAY ~ ~ 2007 ~~~~v!~ - :~~ar~~ ~ t~~L:l,titt;' a,1~1? 7Q?.:, r 4JF1l.iTY e ter o ransmittal ~~_ ~ 8 q ~, 2013';Van Buren Avenue Indian Trail, NC 28079 704) 882-4222 www.eagleonline.net L t fT ' Attention: Annette Lucas DWQ-401 Oversight Express Permitting Unit 2321 Crabtree Boulevard Suite 250 Date: 5/22/2007 EEI Job Number: 3151 Re: Long Creek Club Apartment Raleigh, NC 27804 We are transmitting the following items: " ihe. G.1-u..b ail' ~ o~r-~,..l.a..l~e_ ~"' Prints (~ Plans r` Specifications ~'"' Application ~" Report ~" Copy of Letter r Shop Drawings r Calculations ("" Check ~"" Other Copies Date No. Items to be Transmitted 3 sets Plans 3 sets Calculations These are transmitted as checked below: ~ For Approval I"` For Your Use r As Requested Remarks: r'" For Review r' Corrected Prints ~` Copies for Distribution r'° Approved as Submitted j- Approved as Noted ~"" Copies for Approval Note: Unless the revision block states "Released for Construction ", all plans enclosed are to be considered 'Preliminary" and "Not for Construction ", and are provided for permitting, information or bidding use only. Cc: Signed: Beverly Carson 1 1 1 1 1 1 1 1 1 1 1 1 1 o~ -Igq~{ S'TORMWATER MANAGEMENT & EROSION CONTROL CALCULATIONS' L ~n~ ~ CJr~e~e~1=~~ C~1 ~!~!,b A pia rtr~J ~ e~~~tr_s.~ for Charter Properties ENGIN~ER~ING John D. Barnard, P.E. EAGLE ENGINEERING, INC. 2013 Van Buren Avenue Indian Trail, NC 28079 Phone: (704) 882-4222 Toll free: (866) EAGLENC EEI PROJECT NO. 3151 February 7, 2007 Initials .. Da e ' 5 Is ~~- _ _ _~ R..~ ~° r^° gay ~ 3p a•.~1a Vk i~~ ~.~ ~, ~ ~ 1~ i t . k. ¢~p ~~,y~. _.. ~:~ h~1r,Y ~ ~ ~Z~JC l 1 ' TABLE OF CONTENTS I. Erosion Control Calculations a. Time Of Concentration Calculations 1. Phase 1 1 2. Phase 2 b. Sediment Basin Calculations 1. Basin 1 Outlet Structure 2. Basin 2 Outlet Structure ' c. Sediment Basin Stage-Storage d. Sediment Basin Summary e. Sediment Trap Weir Calculations II. Storm Water System Calculations ' a. Inlet C - ' apacity Calculations Onsite ' b. Mannings Pipe Calculations - Onsite c. Time Of Concentration -Bypass ' d. Mannings Pipe Calculations -Bypass e. Storm Profiles f. Rip Rap Apron Calculations g. Interceptor Ditch Calculations h. B ass Yard Inlet Calculations yP i. On Site Yard Inlet Calculations I C III. IV. Wet Detention Pond Calculations a. Wet Pond Worksheet b. SCS 1 yr 24 Hr Storm Volume c. Wet Pond Drawdown Calcs d. Pond Sizing Calculations e. Misc. Wet Pond Calcs f. Detention Worksheet g. Basin Stage Storage h. Pre-Developed Time of Concentration i. Soil Type Summary j. 1 yr 24 Hour Routing k. Detention Routing Calcs 1. Level Spreader Worksheet Additional S. W.I.M. Buffer Calculations Time of Concentration Long Creek Clulb Apartments For Sediment Basin 1 -Phase 1 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.240 Grass 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 300 ELEV UP (NGVD FT) 795.0 ELEV DOWN (NGVD FT) 785.0 LAND SLOPE (FT/FT) 0.033 0.000 TIME OF CONCENTRATION (HRS) 0.473 0.000 0.473 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 1626 1 ELEV UP (NGVD FT) 785.0 0.0 ELEV DOWN (NGVD FT) 718.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.041 0.000 AVERAGE VELOCITY (FT/SEC) 3.275 0.000 TIME OF CONCENTRATION (HRS) 0.138 0.000 0.138 RECTANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SFr; #s cFr_ ed BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TRIANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.611 36.646 (MIN) 0.366 USE 3s MIN TRAPEZOIDAL CHANNEL SFr; $1 CFf_ 87 cFf_ it4 CC!_ xA 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo o.oo o.oo o.oo 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 CIRCULAR CHANNEL (Gravity Flow) SEG #1 RF(: #9 cFf, eFZ cGr_ iew 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 o.ooo o.ooo o.ooo o.ooo o.ooo 0.000 0.000 0.000 0.000 0.000 Time of Concentration Long Creek Club Apartments For Sediment Basin 2 -Phase 1 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.240 Grass 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 300 ELEV UP (NGVD FT) 812.0 ELEV DOWN (NGVD FT) 808.0 LAND SLOPE (FT/FT) 0.013 0.000 TIME OF CONCENTRATION (HRS) 0.682 0.000 0.682 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 460 1 ELEV UP (NGVD FT) 808.0 0.0 ELEV DOWN (NGVD FT) 782.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.057 0.000 AVERAGE VELOCITY (FT/SEC) 3.836 0.000 TIME OF CONCENTRATION (HRS) 0.033 0.000 0.033 RECTANGULAR CHANNEL CHANNEL FLOW SFr, ~~ SFr. ~~ cFr. ~a cFr_ ~ BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.ooo o.ooo o.ooo o.ooo o.ooo o.ooo 0.000 0.000 0.000 0.000 0 TRIANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 30.0 4.0 60.00 0.00 0.00 0.00 31.05 0.00 0.00 0.00 1.93 0.00 0.00 0.00 1176.00 782.0 726.0 0.048 O.O~l0 0.000 0.000 0.240 zlos o.ooo o.ooo o.ooo 0.155 0.000 0.000 0.000 0.1550758 TOTAL TIME OF CONCENTRATION (HRS) lAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.871 52.235 (MIN) 0.522 USE 5z MIN TRAPEZOIDAL CHANNEL SFr. ~~ SFr. n~ cFr_ us cFr_ ~n 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 CIRCULAR CHANNEL (Gravity Flow) SEG #1 SFG $2 SFr; it3 RFG i!d 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ~ ~ ~ ~ ~ ~ a~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ Time of Concentration Long Creek Club Apartments For Sediment Basin 3 -Phase 1 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.240 Grass 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 300 ELEV UP (NGVD FT) 760.0 ELEV DOWN (NGVD FT) 742.0 LAND SLOPE (FT/FT) 0.060 0.000 TIME OF CONCENTRATION (HRS) 0.374 0.000 0.374 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 57 1 ELEV UP (NGVD FT) 742.0 0.0 ELEV DOWN (NGVD FT) 726.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.281 0.000 AVERAGE VELOCITY (FT/SEC) 8.548 0.000 TIME OF CONCENTRATION (HRS) 0.002 0.000 0.002 RECTANGULAR~CHANNEL CHANNEL FLOW cFr: ~~ ccr_ a~ cFr_ ez c~r_ ~e BOTTOM WIDTH (FT) DEPTH (FT) AREA(SO.FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 O.ODO 0.000 0.000 0.000 O.ODO 0.000 0.000 0 TRIANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.0 0.0 0.00 0.00 0.00 0.00 0.00 O.DO 0.00 0.00 0.00 0. DO 0.00 0.00 0.00 0.0 0.0 o.ooo D.ooo o.ooo o.ooo 0.000 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.oo0 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1 V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.376 22.538 (MIN) 0.225 USE zz MIN TRAPEZOIDAL CHANNEL SEG #1 SEG #2 SEG !L9 RFG #d 0.0 0.0 0.0 0.0 o.o o.o o.oo o.oo o.oo o.oo 0.00 0.00 0.00 0.00 0.00 O.OD 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.aoo 0 CIRCULAR CHANNEL (Gravity Flow) cFr_ its cFr_ ~~ ccr_ ~a cGr_ ien 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 a.ooo o.oo0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Time of Concentration Long Creek Club Apartments For Sediment Basin 4 -Phase 1 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.240 Grass 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 300 ELEV UP (NGVD FT) 802.0 ELEV DOWN (NGVD FT) 782.0 LAND SLOPE (FT/FT) 0.067 0.000 TIME OF CONCENTRATION (HRS) 0.358 0.000 0.358 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 431 1 ELEV UP (NGVD FT) 782.0 0.0 ELEV DOWN (NGVD FT) 738.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.102 0.000 AVERAGE VELOCITY (FT/SEC) 5.155 0.000 TIME OF CONCENTRATION (HRS) 0.023 0.000 0.023 RECTANGULAR CHANNEL CHANNEL FLOW SFr, u~ SF(; S2 SFr, !!3 cFr, !ed BOTTOM WIDTH (FT) DEPTH (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 OAO 0.00 0.00 0.00 OJ)0 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TRIANGULAR (:HANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.0 0.0 o.oo o.oo o.oo o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 o.ooo o.ooo o.ooo o.ooo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:iV) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.382 22.895 (MIN) 0.229 USE zz MIN TRAPEZOIDAL CHANNEL SFr, 81 SF(: 89 SFr: ita SFC: !!d 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 CIRCULAR CHANNEL (Gravity Flow) cFr. e~ cFr. e~ cFr_ yes cFr_ ed 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 o.oooo o.oooo o.oooo o.oooo 0.000 0.000 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.ooo o.ooo Time of concentration Long Creek Clulb Apartments For Sediment Basin 1 -Phase 2 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.011 Soil 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 100 ELEV UP (NGVD FT) 753.0 ELEV DOWN (NGVD FT) 752.0 LAND SLOPE (FT/FT) 0.010 0.000 TIME OF CONCENTRATION (HRS) 0.027 0.000 0.027 SHALLOW CONCENTRATED FLOW SEG #t SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 513 1 ELEV UP (NGVD FT) 752.0 0.0 ELEV DOWN (NGVD FT) 718.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.066 0.000 AVERAGE VELOCITY (FT/SEC) 4.154 0.000 TIME OF CONCENTRATION (HRS) 0.034 0.000 0.034 RECTANGULAR CHANNEL CHANNEL FLOW SFr, it1 SFr. s~ SFr, i!A cFr. ire BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0:00 0.00 0.00 0.00 0: DO 0.00 0.00 0.00 0: DO 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.oo0 0 TRIANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) 0.061 3.878 (MIN) 0.037 ,/ USE ,{ MIN /~ TRAPE201DAL CHANNEL SEC #7 SFr, r!T CFC: !f:{ CF(: i!d 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 o.ooo o.ooo o.ooo o.ooo 0.030 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 CIRCULAR CHANNEL (Gravity Flow) SFQ iF1 CFr~ !!9 SFr: 8R CFr: ird 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 J w ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ Time of concentration Long Creek Club Apartments For Sediment Bslsin 2 -Phase 2 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.011 Soil 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 100 ELEV UP (NGVD FT) 776.0 ELEV DOWN (NGVD FT) 770.0 LAND SLOPE (FTlFT) 0.060 0.000 TIME OF CONCENTRATION (HRS) 0.013 0.000 0.013 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 683 1 ELEV UP (NGVD FT) 770.0 0.0 ELEV DOWN (NGVD FT) 726.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.064 0.000 AVERAGE VELOCITY (FT/SEC) 4.095 0.000 TIME OF CONCENTRATION (HRS) 0.046 0.000 0.046 RECTANGULAR CHANNEL CHANNEL FLOW SEC ut SEG #2 sec it3 Ser, tta BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) o.oo o.oo o.oo o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TRIANGULAR I:HANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.060 3.570 (MIN) 0.036 USE ~ MIN U TRAPEZOIDAL CHANNEL cFr. ~~ cFr. a~ cFr. ~~ cFr_ ad 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.oo0 0 CIRCULAR CHANNEL (Gravity Flow) ccr. n~ cFr. a~ cFr. ~z cFr_ as 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ .. Time of Concentration Long Creek Club Apartments For Sediment Bflsin 3 -Phase 2 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.011 Soil 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 100 ELEV UP (NGVD FT) 748.0 ELEV DOWN (NGVD FT) 747.5 LAND SLOPE (FT/FT) 0.005 0.000 TIME OF CONCENTRATION (HRS) 0.036 0.000 0.036 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 176 1 ELEV UP (NGVD FT) 747.5 0.0 ELEV DOWN (NGVD FT) 726.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.122 0.000 AVERAGE VELOCITY (FT/SEC) 5.639 0.000 TIME OF CONCENTRATION (HRS) 0.009 0.000 0.009 RECTANGULAR CHANNEL CHANNEL FLOW cFr #~ cFr. #~ cFr. #z cFr. ~ BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 O.DO 0.00 0.00 o.oo O.DO 0.00 0.00 o.oo o.DO o.oo o.oo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 O.ODO 0.000 0.000 0 TRIANGULAR <:HANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0. DO 0.00 0.00 0.00 0: DO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 O.OJO 0.000 0.000 0.000 O.ODO 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.044 2.657 (MINj 0.027 / USE y MIN 5 TRAPEZOIDAL CHANNEL SFr, #1 SF(: #7 SFr: #3 SFr: #d 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 CIRCULAR CHANNEL (Gravity Flow) SEC #1 SF(; #2 SFr; #.Z SF(; itd 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo o.oo o.oo o.oo o.oo 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Time of concentration Long Creek Club Apartments For Sediment BilSln 4 -Phase 2 SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.011 Soil 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 100 ELEV UP (NGVD FT) 750.0 ELEV DOWN (NGVD FT) 744.0 LAND SLOPE (FT/FT) 0.060 0.000 TIME OF CONCENTRATION (HRS) 0.013 0.000 0.013 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 159 1 ELEV UP (NGVD FT) 744.0 0.0 ELEV DOWN (NGVD FT) 738.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.038 0.000 AVERAGE VELOCITY (FT/SEC) 3.134 0.000 TIME OF CONCENTRATION (HRS) 0.014 0.000 0.014 RECTANGULAR CHANNEL CHANNEL FLOW SFr; s~ SFr. ~~ cFr_ yea cGr_ ttd BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) o.oo o.oo a.oo o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 o.ooo o.ooo o.ooo o.oao 0.000 0.000 0.000 0.000 0 TRIANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.'00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA(SO.FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.027 1.636 (MIN) 0.016 USE ~ MIN TRAPEZOIDAL CHANNEL SFr ~N CFf. its Cc(. i!a ccr^_ xe 0.0 0.0 0.0 0.0 0.0 0.0 o.oo o.oo o.oo o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 o.ooo o.ooo o.ooo o.ooo o.ooo a.ooo o.ooo o.oo0 0 CIRCULAR CHANNEL (Gravity Flow) SEC !t1 SFC: !t7 CFC: !!i cFn Std 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Long Creek Clu b Apartments Sediment Basin Wo rksheet Phase 7 Basins Structure Structure Total Disturbed Required Provided Type Area Area Storage Storage (AC) (AC) CF 1 Basin 14.6 12.11 26,280 115,418 2 Basin 22.93 5.33 41,274 252,658 3 Trap 2.23 2.23 4,014 9,715 4 Trap 4.89 3.49 8,802 26,209 1 5 Trap 0.66 0.66 1,188 9,825 Flow Calculations -Phase 1 Disturbed 2 yr 10 yr Total Area Composite Tc Intensity Flow Intensity Flow ' Area A (AC) (AC) C(dist) C(undist) C (in/hr) Q (cfs) (in/hr) Q (cfs) 1 14.6 12.11 0.65 0.3 0.59 36 2.28 20 3.05 26 2 22.93 5.33 0.65 0.3 0.38 52 1.64 14 2.66 23 3 2.23 2.23 0.65 0.3 0.65 22 2.73 4 4.23 6 4 4.89 3.49 0.65 0.3 0.55 22 2.73 7 4.23 11 5 0.66 0.66 0.65 0.3 0.65 5 5.03 2.16 7.03 3.02 Phase 2 Basins Structure Structure Total Disturbed Required Provided Type Area Area Storage Storage (AC) (AC) CF 1 Basin 5.03 5.03 9,054 20,524 2 Basin 13.57 13.57 24,426 252,658 3 Trap 1.47 1.47 2,646 9,715 4 Trap 2.85 2.85 5,130 26,209 ' Flow Calculations -Phase 2 Disturbed 2 yr 10 yr Total Area Composite Tc Intensity Flow Intensity Flow Area A (AC) (AC) C(dist) C(undist) C (in/hr) Q (cfs) (in/hr) Q (cfs) ' 1 5.03 5.03 0.65 0.3 0.65 5 5.03 16 7.03 23 2 13.57 13.57 0.65 0.3 0.65 5 5.03 44 7.03 62 3 1.47 1.47 0.65 0.3 0.65 5 5.03 5 7.03 7 4 2.85 2.85 0.65 0.3 0.65 5 5.03 9 7.03 13 t t 1 1 Phase 3 Basins Structure Structure Total Disturbed Required Provided Type Area Area Storage Storage (AC) (AC) CF 1 Basin 2.15 2.15 3,870 20,524 2 Basin 19.5 19.5 35,100 252,658 3 Trap 0 0 0 0 4 Trap 0.7 0.7 1,260 26,209 Flow Calculations -Phase 3 -SEE DETENTION CALCULATIONS ALSO. 1 Disturbed 2 yr 10 yr Total Area Composite Tc Intensity Flow Intensity Flow Area A (AC) (AC) C(dist) C(undist) C (in/hr) Q (cfs) (in/hr) Q (cfs) 1 2.15 2.15 0.65 0.3 0.65 5 5.03 7 7.03 10 2 19.5 19.5 0.7 0.3 0.70 5 5.03 69 7.03 96 ' 3 0 0 0.65 0.3 0.00 5 0 4.23 0 4 0.7 0.7 0.65 0.3 0.65 5 5.03 2 7.03 3 Phase 4 Basins Structure Structure Total Disturbed Required Provided Type Area Area Storage Storage (AC) (AC) CF ' 1 Basin 0 0 0 0 2 Basin 20.19 20.19 36,342 252,658 3 Trap 0 0 0 0 4 Trap 0 0 0 0 Flow Calculations -Phase 4 -SEE DETENTION CALCULATIONS ALSO. Disturbed 2 yr 10 yr 1 Area Total A (AC) Area (AC) C(dist) C(undist) Composite C Tc Intensity (in/hr) Flow Q (cfs) Intensity (in/hr) Flow Q (cfs) 1 0 0 0.65 0.3 0.00 36 2.28 0 3.05 0 2 20.19 20.19 0.7 0.3 0.70 5 5.03 71 7.03 99 3 0 0 0.65 0.3 0.00 22 2.73 0 4.23 0 4 0 0 0.65 0.3 0.00 22 2.73 0 4.23 0 n 1 1 1 1 1 1 1 1 1 1 1 1 1 Basin 1 Riser -Wier Length Analysis Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet Basin 1 Riser -Weir Lenc Type Sharp Crested Rectangul Solve For Crest Length Input Data Headwater Elevatir243~5-ft ~ ~ .Z.S ~~ -~- Crest Elevation '23.50 ft `~'Z~j ti ~'~ ,~.~- Tailwater Elevation'20.00 ft .-~.~ ~~ fr}- Discharge CoefficiE 3.33 US Number of Contrac 0 Results Crest Length 9.71 ft Headwater Height Abo~ 0.75 ft Tailwater Height Above -3.50 ft Flow Area 7.3 ft2 Velocity 2.88 ff/s Wetted Perimeter 11.21 ft Top Width 9.71 ft ~@A.w ~ASA.1 ~u.rt-~wC2-'~' ~~ 2 ~. = 2~c,~g ~ fit. °~ ~~1 ` ~ L, ~ ~~ 4L" ~~yG~ ~d.aa.~ Project Engineer: DROSS x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14!07 10:43:27 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 Project Description Worksheet Basin 1 Riser - Orifi Type Generic Orifice Solve For Opening Area Input Data Discharge 21.00 cfs Headwater Elevat'24.25 ft Centroid Elevatior'23.50 ft Tailwater Elevatioi'20.00 ft Discharge Coeffic 0.60 Opening Area 5.0 ftz Results Headwater Height Above ~ 0.75 ft Tailwater Height Above C~ -3.50 ft Velocity 4.17 ft/s Basin 1 Riser -Orifice Analysis Worksheet for Generic Orifice 1C,f1~ ~~li d~-~i~C~ ~~~' ~ ~ , ~ ~ ~Z ~~2- ~ , o ~'--z i~.G, ~ 1 ~j 5"vt,~ C.1''e~~ f~ ,~„~^ Project Engineer: JROSS x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05!14/07 10:43:42 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 t 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 Basin 1 Barrel -Mannings Analysis Worksheet for Circular Channel Project Description Worksheet Basin 1 Barrel Dian' Flow Element Circular Channel Method Mannings Formula Solve For Channel Depth Input Data Mannings Coeffic 0.024 ~ ~ M P Slope 005000 ft/ft Diameter 36 in Discharge 21.00 cfs Results Depth 2.07 ft Flow Area 5.2 ft2 Wetted Perime 5.88 ft Top Width 2.77 ft Critical Depth 1.47 ft Percent Full 69.0 Critical Slope 0.014400 ft/ft Velocity 4.03 ft/s Velocity Head 0.25 ft Specific Energy 2.32 ft Froude Numbe 0.52 Maximum Disc 27.48 cfs Discharge Full 25.55 cfs Slope Full 0.003379 ft/ft Flow Type Subcritical ~~~~ Ca~-~~a~. 3i~s~ I ~~~~ ~~~ M (.~iV nl 2,Ti'f1 r7 Z~ G~5 2 Title: Long Creek Club Apartments Project Engineer. J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 10:54:02 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 t 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Basin 1 Barrel -Orifice Analysis Worksheet for Generic Orifice Project Description Worksheet Basin 1 Barrel Orifi Type Generic Orifice Solve For Opening Area Input Data Discharge 21.00 cfs Headwater Elevat'20.40 ft "'1 Z,O. (.,~ o Centroid Elevatior'19.50 ft ~ tg ,~ Tailwater Elevatioi'20.00 ft ~ ~ Discharge Coeftic 0.60 ~~ " Opening Area 6.9 ft2 Resu Its Headwater Height Above ~ 0.90 ft Tailwater Height Above G 0.50 ft Velocity 3.04 ft/s E ~.O 5"tbr.1 l~ ~-- °i72 a®V gases I C ~ o~ ~J~rr ~Qnq~Z' ~ ~ ~, ~~- ~ ~- ~x~ ~ Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 10:54:19 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 i 1 1 1 1 1 i 1 1 Project Description Worksheet Type Solve For Input Data Basin 1 Emergency Spillway Length Worksheet for Sharp Crested Rectangular Weir ~ ~ a S~v~O Ga~~a ~ ~A~ ~ Basin 1 E.S. Wier ~~~~~~ Sharp Crested Rectangul ~~l+l ~ZCr ~~G y Crest Length Discharge 10.00 cfs Headwater Elevatic'25.00 ft '~'Z$,p~ Crest Elevation '24.50 ft .-1~d ~ S~7 Tailwater Elevation'22.00 ft --~~-L~D l~ Discharge Coefficic 3.33 US Number of Contrac 0 Results Crest Length 8.49 ft Headwater Height Abo~ 0.50 ft Tailwater Height Above -2.50 ft Flow Area 4.2 ftZ Velocity 2.35 ft/s Wetted Perimeter 9.49 ft Top Width 8.49 ft is G~~ ~- - ~ ~~ ~ I.LS~ 1~~ Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 10:54:35 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 ' ~~t/ C~ C,e~rc Ctu ~ ++ ~A'~~ ~o~ No 3151 1 ~ iJ C..iZ.~"f ~ ~ N Ct-l~~ ~A ~- ~/J y~~ ~ ~ y . :TOl3 ~I.IdG~ ~~ ~b T t5rr ~L~~^R.. C~~,4 -by / 3 C~2.9°z ~~3 ~ ~ 3~~~~ /bs /~ r /~ ~sc~c~ `. ~~ ~-K ~ / ~ (~cF - __. _ __. _ ... - tom. ~ s~ ~'~ X s"~x~ ~ 1 1 1 1 1 1 RIP RAP APRON SIZING ~~~:~~~ ~,r, army Corps at t.ngineers Reports 1-f-70-2 PROJECT NAME: Long Creek Club ~-f-rz-:~, <,r,a N.J. st<~naerds for cioil Erosion anti STRUCTURE NUMBER: Erosion Control Basin 1 s.rtir*?ent t;ontrol t1s~9i Input: Pipe Diameter, Do 36 Inches or 3 Feet Peak Flow, Q10 21 CFS (Always use FULL FLOW) Tailwater depth, Tw 1 Feet (If Unknown, use 0.2 x Diameter in Feet ) Design: La = (1.8 x Do/Q) +7Do , Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 28.3 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 37.3 Feet Wide (Only if no well-defined channel downstream ) dso Stone Size = 0,21:. dso in Feet 2_6_ dso in Inches dso = 0.016/TW x (q) RI'P RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP MINIMUM MfDRANGE MAXIMU CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 25 f s Silt Loam, Loam 3'.0' fps Sand Cla Loam 3'.5# s Cla ' Loam 4A f s Cla ,fine Gravel 5.O f s Cobbles 5.5 fps Basin 1 Phase 1 Elev Area '1;8 ,~172,6z: .720 '! 99Q9 722 ~e~`22684 72 3~'S . ~.. '; 4854 ? ~~ ~ r ~.: Basin 2 Phase 1 FIPV Area '726 X279 ;28 ~11'~1858 X730 ;~189^~~ 732 i22217; s~ ~ ,73,4 ~''~~ 22710 ii11736 , ~r2938Q ~~:738 ~,~3319'5 DH DH Long Creek Club Apartments Stage Storage Bsain 1 Phase 2 Inc Vol Cum Vol Flev Area (CF) (CF) 2 37171 37171 2 42593 79764 1.5 35653.5 115417.5 Inc. Vol. Cum. Vol (CF) (CF) 2 21137 21137 2 30785 51922 2 41144 93066 2 44927 137993 2 52090 190083 2 62575 252658 r1 ' ~ 71',8 ~~2198 ' ,s, '720 ~"~x~i"'3230. °,, ~?22 r °:~ 4443 7235 ~~°; 5508' '6"~~7'~ Basin 2 Phase 2 Elev Area .726 ak ' .. 9279 ~' , 728 1;18$8. `'~'"' ;30 X18927 € 732 X2221;7, 734 `~~s,~227;1.0 ,~, `"`7,36 T~,~„29~$0. _p ,73'8 ~°33;195.'. DH Inc. Vol. Cum. Vol (CF) (CF) 2 5408 5408 2 7653 13061 1.5 7463 20524 DH Inc. Vol. Cum. Vol (CF) (CF) 2 21137 21137 2 30785 51922 2 41144 93066 2 44927 137993 2 52090 190083 2 62575 252658 n 1 1 1 1 1 1 1 1 1 1 1 Trap 3 Phase 1 Elev Area . , ~~6 ~ ~~" ; ,m g"5~ wT2$ ~ ~':;~1975 730 . ",_ 31 ~~30'.5 ' ~;-'.3467 Trap 4 Phase 1 Elev Area ;~~~`'73$ 4 .~~~2z~4,.i ~' 7d0 ~+~~~s 5596 .~42 ~~7127 X742:3 ~""''7537 Trap 5 Phase 1 Flev Area "x.1,720 , :_: X140,1 :~a722 ' ; ~; 2419' X72.4 ; ?`; 3586. Long Creek Club Apartments Stage Storage Trap 3 Phase 2 DH Inc Vol Cum Vol Flev Area (CF) (CF) 2 2931 2931 2 5129 8060 0.5 1655.25 9715.25 DH Inc. Vol. Cum. Vol (CF) (CF) 2 9820 9820 2 12723 22543 0.5 3666 26209 DH Inc. Vol. Cum. Vol (CF) (CF) 2 3820 3820 2 6005 9825 726 ~r~` ., ; ; . ~5 ~~728 +t'; ! 1975 ~~730 ~~".: ~ 3.154 _` ~.7~3D1`5 r ;G ;3467 Trap 4 Phase 2 Elev Area i'~~'~'7 €~ '.4224' !!=`~40 ~ x "~ .,~ 559$'' ~s7;42 '~~ s 7127 ~~ 7~~~j~ ~ . 'x.,:7537 DH Inc. Vol. Cum. Vol (CF) (CF) 2 2931 2931 2 5129 8060 0.5 1655.25 9715.25 DH Inc. Vol. Cum. Vol (CF) (CF) 2 9820 9820 2 12723 22543 0.5 3666 26209 n 1 GRAVEL AND RIP RAP SEDIMENT BASIN DATA -PHASE 1 CMLDS 30.02 Basin Drainage Denuded Area Area (AC) (AC) Pond Volume Required Provided (CF) (CF) Cleanout Depth (ft) H/2 H (FT) L T (FT) (FT) W X (FT) (FT) 3 2.23 2.23 4,014 9,715 2.25 4.5 10 1.5 9 7 4 4.89 3.49 8,802 26,209 2.25 4.5 13 1.5 9 7 5 0.66 0.66 1,188 9,825 2.25 4.5 13 1.5 9 7 GRAVEL AND RIP RAP SEDIMENT BASIN DATA -PHASE 2 CMLDS 30.02 Basin Drainage Denuded Pond Volume Cleanout Area Area Required Provided Depth (ft) H L T W X (AC) (AC) (CF) (CF) H/2 (FT) (FT) (FT) (FT) (FT) 3 1.47 1.47 2,646 9,715 2.25 4.5 10 1.5 9 7 4 2.85 2.85 5,130 26,209 2.25 4.5 13 1.5 9 7 ' GRAVEL AND RIP RAP SEDIMENT BASIN DATA -PHASE 3 CMLDS 30.02 r Basin Drainage Denuded Pond Volume Cleanout Area Area Required Provided Depth (ft) H L T W X (AC) (AC) (CF) (CF) H/2 (FFT) (FFT) (FT) (FT) (FT) 4 0.7 0.7 1,260 26,209 2.25 4.5 13 1.5 9 7 C' Trap 3 Weir Worksheet -Phase 1 Worksheet for Broad Crested Weir Project Description Worksheet Trap 3 Weir Type Broad Crested 1,~~,i r Solve For Crest Length Input Data Discharge 7.00 cfs Headwater Elev<'31.00 ft `~ ~~ (-~~ Crest Elevation '30.50 ft `'73ty, rj'U Tailwater Elevati'26.00 ft ~~ e a Crest Surface T~ 3ravel Crest Breadth 9.00 ft Results Crest Length 7.35 ft Headwater Height Above 0.50 ft Tailwater Height Above C-4.50 ft Discharge Coefficient 2.69 US Submergence Factor 1.00 Adjusted Discharge Coef 2.69 US Flow Area 3.7 ft2 Velocity 1.90 ft/s Wetted Perimeter 8.35 ft Top Width 7.35 ft 1i~ ~` Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 02:34:27 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 Project Description Trap 4 Weir Worksheet -Phase 1 Worksheet for Broad Crested Weir Worksheet Trap 4 Weir Type Broad Crested \ Solve For Crest Length Input Data Discharge 12.00 cfs HeadwaterElev<'43.00 ft ~~.~ •~~ ~, to = ~~ ~~ Crest Elevation '42.50 ft "]~}'j.. SD Tailwater Elevati'38.00 ft "?3~ a ~~ Crest Surface T~3ravel Crest Breadth 9.00 ft Results Crest Length 12.60 ft Headwater Height Above 0.50 ft Tailwater Height Above C -4.50 ft Discharge Coefficient 2.69 US Submergence Factor 1.00 Adjusted Discharge Coef 2.69 US Flow Area 6.3 ft2 Velocity 1.90 ft/s Wetted Perimeter 13.60 ft Top Width. _ 12.60 ft I ~ ' Prd~ ~~ Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 01:13:20 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Basin 5 -Phase 1 Weir Length Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet Basin 5 Weir Type Sharp Crested Rectangul Solve For Crest Length Input Data Discharge 3.02 cfs Headwater Elevatic '24.50 ft `j Z1} ,So Crest Elevation '24.00 ft °( ~, _p~ Tailwater Elevation '20.00 ft .~ ~ . ~() Discharge CoefficiE 3.33 US Number of Contrac 0 Results Crest Length 2.57 ft Headwater Height Abo~ 0.50 ft Tailwater Height Above -4.00 ft Flow Area 1.3 ft2 Velocity 2.35 ft/s Wetted Perimeter 3.57 ft Top Width 2.57 ft ~ p` ,~~17~~A ' Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 10:55:30 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 _ Inlet Capacity Chart PROJECT: Long Creek Club Apartments LocanoN: Charlotte _ Date 1/6/2007 JDB Rainfall Intensit : _ for curb inlets 4.00 in/hr for curb inlets (in sump) - no relief 8.21 in/hr -- for and Inlets 7.03 In/hr CURB INLET INTERCEPTION RATE F OR INLETS WITH LONGITUDINAL SLOPES Structure Draina a Area Intenslt Inlet Flow Add'nl Flow _ Total Flow _ Lon It. Slo e, S I Trans. Slo e S t Mannln 's Coeff. De th Inlet Ca acct S read B Flow ass # of Std # T e of Number ac In/hr Cc cfs cfs cfs fUft ft/ft n K d ft cfs T-ft Q-cis Tolnlet# Remarks Inlets Inlet CATCH BASINS ON GRADE ,.. _ CB 1 0.06 4.00 0.6 0.14 0 0.14 0.048 0.031 0.016 29.5 0.062 0.28 1.97 100°k interce lion PASS 1 840.01 CB 2 0.38 4.00 0.6 C1.91 0 0.91 0.031 0.031 0.016 26.0 0.133 0.90 4.26 0.01 CB 3 PASS 1 840.01 CB 3 0.27 4.00 0.6 (1.65 0.01 0.66 0.050 0.031 0.016 30.0 0.108 0.73 3.44 100% interce lion PASS 1 840.01 CB 4 0.31 4.00 0.6 0.74 0.74 0.035 0.031 0.016 27.2 0.121 0.80 3.86 100% Interce lion PASS 1 840.01 CB 7 0.25 4.00 0.6 0.60 0 0.60 0.020 0.031 0.016 23.5 0.124 0.72 3.95 100°h interce lion PASS 1 840.01 CB 8 0.31 4.00 0.6 0.74 0 0.74 0.020 0.031 0.016 23.5 0.134 0.83 4.29 100% interce tlon PASS 1 840.01 CB 13 0.10 4.00 0.6 0.24 0 0.24 0.067 0.031 0.016 31.5 0.070 0.37 2.24 100% interce lion PASS 1 840.01 CB 14 0.01 4.00 0.6 0.02 0 0.02 0.020 0.031 0.016 23.5 0.037 0.10 1.18 100% interce lion PASS 1 840.01 CB 15 0.21 4.00 0.6 0.50 0.50 0.020 0.031 0.016 23.5 0.116 0.65 3.70 100% interce lion PASS 1 840.01 CB 17 0.27 4.00 0.6 0.65 - 0.65 0.057 0.031 0.016 31.1 0.104 0.72 3.34 100% interce ticn PASS 1 840.01 CB 18 0.28 4.00 0.6 0.67 - 0.67 0.025 0.031 0.016 24.6 0.124 0.76 3.96 100% interce lion PASS 1 840.01 CB 19 0.12 4.00 0.6 0.29 - 0.29 0.025 0.031 0.016 24.6 0.090 0.45 2.88 100% interce lion PASS 1 840.01 CB 24 0.14 4.00 0.6 0.34 0 0.34 0.029 0.031 0.016 25.2 0.093 0.48 2.98 100% interce lion PASS 1 840.01 CB 28 0.08 4.00 0.6 fi.19 0 0.19 0.050 0.031 0.016 30.0 0.068 0.34 2.17 100% interce lion PASS 1 840.01 CB 30 0.26 4.00 0.6 (i,62 0 0.62 0.020 0.031 0.016 23.5 0.125 0.74 4.01 100% interce lion PASS 1 840.01 CB 38 0.09 4.00 0.6 Ci.22 0 0.22 0.050 0.031 0.016 30.0 0.071 0.37 2.27 100% interce lion PASS 1 840.01 CB 39A 0.06 4.00 0.6 0.14 0 0.14 0.050 0.031 0.016 30.0 0.061 0.28 1.95 100% interce lion PASS 1 840.01 CB 41 0.30 4.00 0.6 0.72 0 0.72 0.050 0.031 0.016 30.0 0.111 0:78 3.57 100°~ interce lion PASS 1 840.01 CB 43 0.07 4.00 0.6 0.17 0 0.17 0.050 0.031 0.016 30.0 0.065 0.31 2.07 100% interce lion PASS 1 840.01 CB 44 0.11 4.00 0.6 Ci.26 0 0.26 0.030 0.031 0.016 25.7 0.084 0.42 2.89 100% interce lion PASS 1 840.01 CB 44a 0.03 4.00 0.6 Ci.07 0 0.07 0.030 0.031 0.016 25.7 0.052 0.18 1.65 100% interce lion PASS 1 840.01 CB 44b 0.01 4.00 0.6 0.02 0 0.02 0.030 0.031 0.016 25.7 0.034 0.09 1.10 100% interce lion PASS 1 840.01 CB 48 0.13 4.00 0.6 0.31 0 0.31 0.030 0.031 0.016 25.7 0.090 0.46 2.87 100°h interce lion PASS 1 840.01 CB 52 0.16 4.00 0.6 0.38 0 0.38 0.030 0.031 0.016 25.7 0.097 0.53 3.10 100°~ interce lion PASS 1 840.01 CB 53 0.71 4.00 0.8 1.70 0 1.70 0.030 0.031 0.016 25.7 0.169 1.33 5.42 0.37 Cb 39b PASS 1 840.01 - 4.00 0.6 - 0 - 0.030 0.031 0.016 25.7 0.000 PASS 1 840.01 CATCH BASINS IN SUMP CONDITION CB 5 0.19 8.21 0.6 0.94 0 0.94 SUMP 0.031 0.119 3.80 PASS 1 640.01 CB 9 0.26 8.21 0.6 1.28 - 1.28 SUMP 0.031 0.146 4.68 PASS 1 840.01 CB 10 0.30 8.21 0.6 1.48 0 1.48 SUMP 0.031 0.161 5.15 PASS 1 840.01 C611 0.24 8.21 0.6 1.18 0 1.18 SUMP 0.031 0.139 4.44 PASS 1 840.01 CB 16 0.51 8.21 0.6 2.51 0 2.51 SUMP 0.031 0.229 7.33 PASS 1 840.01 CB 26 0.34 8.21 0.6 1.67 0 1.67 SUMP 0.031 0.175 5.60 PASS 1 840.01 CB 27 0.42 8.21 0.6 2.07 0 2.07 SUMP 0.031 0.201 6.44 PASS 1 840.01 CB 29 0.85 8.21 0.6 4..19 0 4.19 SUMP 0.031 0.322 10.31 PASS 1 840.01 CB 31 1.18 8.21 0.6 '..81 0 5.81 SUMP 0.031 0.401 12.83 PASS 1 840.01 DI 32 0.23 8.21 0.6 1.13 0 1.13 SUMP 0.031 0.135 4.31 PASS 1 840.01 CB 33 0.52 8.21 0.6 1.56 0 2.56 SUMP 0.031 0.232 7.43 PASS 1 840.01 CB 35 0.28 8.21 0.6 1.38 0 1.38 SUMP 0.031 0.154 4.92 PASS 1 840.01 CB 36A 0.06 8.21 0.6 (I.30 0 0.30 SUMP 0.031 0.055 1.76 PASS 1 840.01 CB 36 0.07 8.21 0.6 (i.34 0 0.34 SUMP 0.031 0.061 1.95 PASS 1 840.01 CB 37 0.15 8.21 0.6 0.74 0 0.74 SUMP 0.031 0.101 3.24 PASS 1 840.01 CB 398 0.05 8.21 0.6 0.25 0.37 0.62 SUMP 0.031 0.090 2.87 PASS 1 840.01 CB 40 0.33 8.21 0.6 1.63 0 1.63 SUMP 0.031 0.171 5.49 PASS 1 840.01 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i Inlet Capacity Chart PROJECT: Long Creek Club Apartments LocarloN: Charlotte Date 1/5/2007 JDB Rainfall Intensit for curb inlets 4.00 in/hr for curb inlets (in sump) - no relief 9.21 inlhr for and inlets 7.03 in/hr CURB INLET INTERCEPTION RATE F OR INLETS WITH LONGITUDINAL SLOPES Draina a Inlet Add'nl Total Lon it. Trans. Mannin 's Inlet B ass Std # Structure Area Intensity Flow Flow Flow Slo e, S I) Slope, S t) Coeff. Depth Capacity Spread Flow # of T e of Number ac (In/hr) Cc cfs cfs cfs fUft ftlft n K d ft cfs (T-ft) Q-cfs Tolnlet# Remarks Inlets Inlet CB 42 0.12 8.21 0.6 0.59 0 0.59 SUMP 0.031 0.087 2.79 PASS 1 840.01 CB 47 0.56 8.21 0.6 2.76 0 2.76 SUMP 0.031 0.244 7.80 PASS 1 840.01 CB 49 0.67 8.21 0.6 3.30 0 3.30 SUMP 0.031 0.275 8.60 PASS 1 840.01 CB 51 0.53 8.21 0.6 2.61 0 2.61 SUMP 0.031 0.235 7.52 PASS 1 840.01 CB 56 0.13 8.21 0.8 0.64 0 0.64 SUMP 0.031 0.092 2.95 PASS 1 840.01 CB 56 A 0.31 8.21 0.6 1.53 0 1.53 SUMP 0.031 0.164 5.26 PASS 1 840.01 CB 56 B 0.09 8.21 0.6 G.44 0 0.44 SUMP 0.031 0.072 2.31 PASS 1 840.01 CB 56 C 0.12 8.21 0.6 G.59 0 0.59 SUMP 0.031 0.087 2.79 PASS 1 840.01 CB 57 0.60 8.21 0.6 2.96 0 2.96 SUMP O.D31 0.255 8.17 PASS 1 840.01 CB 58 0.51 8.21 0.6 2.51 0 2.51 SUMP 0.031 0.229 7.33 PASS 1 840.01 CB 54 0.16 8.21 0.6 0.79 0 0.79 SUMP 0.031 0.106 3.39 PASS 1 840.01 GRATE IN LETS Y112 2.82 4.00 0.6 E~.77 6.77 0.030 0.031 0.016 25.7 0.325 3.95 9.14 2.82 1 YI20 1.70 4.00 0.6 4.08 4.08 0.030 0.031 0.016 25.7 0.232 2.25 7.56 1.83 1 YI21 0.39 4.00 0.6 0.94 0.59 1.53 0.021 0.031 0.016 23.5 0.120 0.69 5.60 0.84 1 YI22 0.19 4.00 0.6 0.46 0.82 1.28 0.021 0.031 0.016 23.5 0.107 0.57 5.24 0.71 1 840.14 YI23 0.10 4.00 0.6 0.24 0.9 1.14 0.021 0.031 0.016 23.5 0.099 0.50 5.02 .0.64 1 840.14 YI34 0.08 4.00 0.6 0.19 0.71 0.90 0.031 0.016 #N/A 0.085 5.47 SUMP 1 840.14 YI39 0.10 4.00 0.6 0.24 0.71 0.95 0.031 0.016 #N/A 0.088 5.66 SUMP 1 840.14 Lone Creclc Club ADartrnents - Proaosed Storm Water Pine Schedule - Mannine's >;auation Pipe Segment Drainage Area acres A(ac) x C rn ~ ~ .. E V ~ w~' B ? 2 y ~ G v o ~• ' ~ ~ _a E 7 z ~ ~~ L c. U ° ~ o o ~' w Rim F,lev. Inv. UP Inv. D\VN Onsite Storm W uter 5 stem Co mbined. St orm Anal sls CB-1 CB-2 29040 2.38 2.38 0.70 1.67 167 7.03 5.0 1.0 11.71 18 RCP 0013 0.0341 19A 60% 10.97 PASS 767.00 760.00 750.10 CB-2 CB-3 196.37 0.38 2.76 0.70 0.27 1.93 7.03 5,D 1.00 13.58 18 RCP 0.013 0.0402 21.1 G4% 11.92 PASS 757.00 750.00 742.10 CB-3 CB-4 240.80 0.27 3.03 0.70 0.19 2.12 7.03 5.0 1.00 14.91 18 RCP 0.013 0.0619 26.1 57% 14.78 PASS 749.00 742.00 727.10 CB1l CB-4A 225.20 0.31 3.34 0.70 0.22 2.34 7.03 5.0 1.00 16.44 18 RCP 0.013 0.0442 22.1 74% 12.49 PASS 739.00 727.00 717.05 CB-5 FES-4A 146.30 0.19 0.19 0.70 0.13 2.07 7.03 5.0 1.00 14.52 18 RCP 0.013 0.0202 14.9 97 % 8.44 PASS 725.50 720.00 717.05 CB-4A FES-6 91.30 0.31 3.84 0.70 0.22 2.56 7.03 5.0 1.00 17.96 24 RCP 0.013 0.0088 21.2 85% G.74 PASS 729.40 716.80 716.00 CB-7 CB-8 50.00 0.25 0.25 0.70 0.18 0.18 7.03 5.0 1.0 1.23 15 RCP 0.013 0.0100 6.5 19% 5.26 PASS 753.10 745.60 745.10 CB-8 CB-9 134.40 0.31 0.56 0.70 0.22 0.39 7.03 5.0 1.0 2.76 15 RCP 0.013 0.0268 10.6 26% 8.60 PASS 753.10 74500 741.40 CB-10 CB-9 22.00 0.30 0.30 0.70 0.21 0.21 7.03 5.0 1.0 1.48 18 RCP 0.013 0.0091 10.0 15% 5.66 PASS 750.84 741.30 741.10 CB-9 CB-16 103.20 0.26 1.12 0.70 0.18 0.78 7.03 5.0 1.0 5.51 18 RCP 0.013 0 0087 9.8 56% 5.55 PASS 750.84 741.00 740.10 CB-11 CB-15 169.20 0.24 0.24 0.70 0.17 0.17 7.03 5.0 1.0 1.18 15 RCP 0.013 0.0044 4.3 27% 3.50 PASS 753.50 746.50 745.75 YI-12 CB-13 67.60 4.16 4.16 0.70 2.91 2.91 7.03 5.0 10 20.47 24 RCP 0.013 0.0104 23.0 89% 7.33 PASS 752.80 748.00 747.30 CB-13 CB-14 77.40 0.01 4.17 0.70 0.01 2.92 7.03 5.0 1.0 20.52 24 RCP 0.013 0.0142 27.0 76% 8.59 PASS 756.00 747.20 746.10 CB-14 CB-15 22.30 0.19 4.36 0.70 0.13 3.05 7.03 5.0 1.0 21.46 24 RCP 0.013 0.0404 45.4 47% 14.47 PASS 752.40 746.00 745.10 CB-15 CB-16 125.70 0.21 4.61 0.70 0.15 3.37 7.03 5.0 1.D 23.67 24 RCP 0.013 0.0390 44 7 53% 14.22 PASS 752.00 745.00 740.10 CB-16 CB-17 181.40 0.51 6.44 0.70 0.36 4.51 7.03 5.0 1.0 31.69 24 RCP 0.013 0.0436 47.2 67% 15.03 PASS 749.50 740.00 732.10 CB 34 D CB 34 C 44.00 0.05 0.05 0.70 0.04 0.04 7.03 5.0 1.0 0.25 15 RCP 0.013 0.0114 6,9 4% 5.60 PASS 750.50 744.50 744.00 CB 34 C CB 34 B 44.60 0.05 0.10 0.70 0.04 0.07 7.03 5.0 1.0 0.49 15 RCP 0.013 0.0090 6.1 8 % 4.98 PASS 750.50 743.90 743.50 CB 34 B CB 34 48.50 0.05 0.15 0.70 0.04 0.11 7.03 5.0 1.0 0.74 15 RCP 0.013 0.0701 17.1 4% 13.92 PASS 750.50 743 40 740.00 CB 34A CB 34 51.40 0.05 0.05 0.70 0.04 0.04 7.03 5.0 1.0 0.25 15 RCP 0.013 0.0778 18.0 1% 14.67 PASS 750.50 744.50 740.50 CB-34 CB-17 127.20 0.06 0.26 0.70 0.04 0.04 7.03 5.0 1.0 0.30 15 RCP 0.013 0.0601 15.8 2% 12.89 PASS 750.50 740.50 732.85 CB-17 CB-24 74.40 0.27 6.97 0.70 0.19 4.74 9.92 5.0 1.25 58.76 36 RCP 0.013 0.0094 64.7 91% 9.17 PASS 745.00 731.10 730.40 CB-26 CB-27 179.10 0 34 0.34 0.70 0.24 0.24 7.03 5.0 1.0 1.67 15 RCP 0.013 0.0050 4.6 37% 3.73 PASS 742.00 738.60 737.70 CB-27 CB-28 171.10 0.42 0.76 0.70 0.29 0.53 7.03 5.0 1.0 3.74 15 RCP 0.013 0.0058 4.9 76 % 4.02 PASS 748.00 737.60 736.60 CB-29 CB-30 79.00 0.85 0.85 0.70 0.60 0.60 7.03 5.0 1.0 4.18 18 RCP 0.013 0.0051 7.5 56% 4.23 PASS 741.50 737.85 737.45 CB-30 YI-30A 36.80 0.26 1.11 0.70 0.18 0.76 7.03 5.0 1.0 5.46 18 RCP 0.013 0.0068 8.7 63% 4.90 PASS 741.00 737.35 737.10 YI-30A CB-28 113.70 0.21 1.32 O.7D 0.15 0.92 7.03 5.0 1.0 6.50 18 RCP 0.013 0.0057 7.9 82% 4.49 PASS 741.00 737.00 736.35 CB 28A CB-28 83.50 0.34 0.34 0.70 0.24 0.24 7.03 5.0 1.0 1.67 18 RCP 0.013 0.0078 9.3 18 % 5.24 PASS 741.00 737.00 736.35 CB-28 CB-31 193.30 0.08 2.50 0.70 0.06 1.75 7.03 5.0 1.0 12.30 36 RCP 0.013 0.0052 48.0 26% 6.80 PASS 745.00 734.85 733.85 CB-31 CB-32 87.00 1.18 3.68 0.70 0.83 2.58 7.03 5.0 1.0 18.11 42 RCP 0.013 0.0052 724 25% 7.54 PASS 738.80 733.35 732.90 CB-32 CB-33 102.30 0.23 3.91 0.70 0.16 2.74 7.03 5.0 1.0 19.24 48 RCP 0.013 0.0054 105.3 18% 8.40 PASS 738.60 732.40 731.85 CB-33 CB-24 182.10 0.52 4.43 0.70 0.36 3.10 7.03 5.0 1.0 21.60 54 RCP 0.013 0.0052 142.0 15% 8.96 PASS 738.40 731.35 730.40 CB-24 FES-25 57.60 0.14 11.54 0.70 0.10 7.94 9.92 5.0 1.25 98.43 54 RCP 0.013 0.0052 141.9 69% 8.95 PASS 744.00 730,30 730.00 i.nno (Trek ('Inh Anartrnentc _ Prnnnsed Stnrm Water Pine Sched~de - Ni~nninu's TmlatiMt ~ ~ Pipe Segnen[ Drainage Area acres A(ac)zC w Y ~ u- ~ u' S. v .~ ~. y, c~u E }, o ~ ~ F°, ~ Q '13 a ~ h a `L ~ ~ ~, w' >, n ~ o ~ 7 I'" a im Glev. nv. UP nv. ll1VN CB-18 CB-19 77.00 0.28 028 0.70 0.20 0.20 7.03 5.0 1.0 1.39 15 RCP 0.013 0.0377 12.5 11% 10.20 PASS 748.00 730.00 735.10 YI -20 YI-21 49 20 1.77 1.77 0.70 1 24 1.24 7.03 5.0 1.0 8.71 15 RCP 0.013 0.0965 20.1 43% 16.34 PASS 761.00 745 UO 740.25 YI-21 YI-22 38.70 0.39 2.16 0.70 0.27 1.51 7.03 5.0 1.0 10.63 18 RCP 0.013 0.0258 16.9 63% 9.55 PASS 753.50 740.00 739.00 CB-23 YI-22 56.60 0.10 0.10 0.70 0.07 0.07 7.03 5.0 1.0 0.49 15 RCP 0.013 0.0265 10.5 5% 8.56 PASS 746.00 740.00 738.50 YI-22 CB-19 118.60 0.19 2.45 0.70 0.13 1.72 9.92 5.0 1.25 21.27 30 RCP 0.013 0.0245 64.1 33% 13.08 PASS 745,00 738.00 735.10 CB-19 JB 19A 68.00 0.12 2.57 0.70 0.08 1.80 9.92 5.0 1.25 22.31 30 RCP 0.013 0.0456 87.6 25% 17.86 PASS 746.00 735.00 731.90 JB 19A FES-59 67.00 0.00 2.57 0.70 0.00 1.80 9.92 5.0 1.25 22.31 48 RCP 0.013 0.0060 111.0 20% 8.86 PASS 743.00 730.40 730.00 CB-58 CB-57 120.80 0.51 0.51 0.70 0.36 0.36 7.03 5.0 1.0 2.51 15 RCP 0.013 0.0058 4.9 51% 4.00 PASS 742.10 737.80 737.10 CB-57 CB-54 189.30 0.60 1.11 0.70 0.42 0.76 7.03 5.0 1.0 5.46 18 RCP 0.013 0.0077 9.2 59% 5.20 PASS 742.00 737.00 735.55 CB-54 CB-53 122.00 0.16 1.27 0.70 0.11 0.69 7.03 5.0 1.0 6.25 24 RCP 0.013 0.0053 16.5 38% 5.26 PASS 745.40 735.45 734.80 CB-56A CB 56 113.50 0.31 0.31 0.70 0.22 0.22 7.03 5.0 1.0 1.53 15 RCP 0.013 0.0079 5.8 27 % 4.68 PASS 741.00 737.50 736.60 CB-56 CB-56B 30.40 0.13 044 0.70 0.09 0.31 7.03 5.0 1.0 2.17 15 RCP 0013 0.0066 5.2 41% 4.26 PASS 740.10 736.50 736.30 CB-566 CB S6C 171.70 0.09 0.53 0.70 0.06 0.37 7.03 5.0 1.0 2.61 15 RCP 0.013 0.0052 4.7 56 % 3.81 PASS 739.00 736.20 735.30 CB-56C CB 53 70.60 0.12 0.65 0.70 0.08 0.46 7.03 5.0 1.0 3.20 15 RCP 0.013 0.0057 4.9 66% 3.96 PASS 739.00 735.20 734.80 C853 JB-53A 33.60 0.71 2.63 0.70 0.50 1.39 7.03 5.0 1.0 9.74 24 RCP 0.013 0.0060 17.5 56% 5.56 PASS 739.00 734.70 734.50 CB-52 JB-50 207.80 0.16 0.16 0.70 0.11 0.11 7.03 5.0 1.0 0.79 24 RCP 0.013 0.0053 16.5 5% 5.24 PASS 749.00 744.00 742.90 GB-51 GB-49 185.80 0.53 0.53 0.70 0.37 0.37 7.03 5.0 1.0 2.61 15 ftCP 0.013 0.0140 7.6 34% 6.22 PASS 745.60 742.00 739.40 CB-49 CB-08 74.80 0.67 1.20 0.70 0.47 0.84 7.03 5.0 1.0 5.91 24 RCP 0.013 0.0074 19.4 30% 6.18 PASS 743.00 738.G5 738,10 CB-05 CB-46 33.40 0.24 0.24 0.70 0.17 0.17 7.03 5.0 1.0 1.18 15 RCP 0.013 0.1287 23.2 5% 18.86 PASS 748.60 745.00 740.70 CB-46 CB-47 93.00 0.08 032 0.70 0.06 0.22 7.03 5.0 1.0 1.57 15 RCP 0.013 0.0054 4.7 33% 3.86 PASS 744.40 740.60 740.10 CB-07 CB-48 46.20 0.56 0.88 0.70 0.39 0.62 7.03 5.0 1.0 4.33 15 RCP 0.013 0.0054 4.8 91 % 3.87 PASS 743.50 740.00 739.75 CB-48 JB-50 102.60 0.13 2.21 0.70 0.09 1.55 7.03 5.0 1.0 10.89 24 RCP 0.013 0.0054 16.6 66% 5.27 PASS 743.80 738.00 737.45 JB-50 CB-42 207.60 0.00 2,37 0.70 0.00 1.66 7.03 5.0 1.0 11.67 24 RCP 0.013 0.0053 16.5 71% 5.24 PASS 749,00 737.35 736.25 C8~2 CB-01 37.50 0.12 2.49 0.70 0.08 1.74 7.03 5.0 1.0 12.26 24 RCP 0.013 0.0067 18.5 66% 5.88 PASS 749.00 736.15 735.90 CB-44A CB-448 22.50 0.03 0.03 0.70 0.02 0.02 7.03 5.0 1.0 0.15 15 RCP 0.013 0.0067 5.3 3% 4.29 PASS 754.80 751.40 751.25 CB-040 CB-44 164.90 0.01 0.04 0.70 0.01 0.03 7.03 5.0 1.0 0.20 15 RCP 0.013 0.0055 4.8 4% 3.88 PASS 754.80 751.15 750.25 CB-44 CB-43 104.30 0.11 0.15 0.70 0.08 0.11 7.03 5.0 1.0 0.74 15 RCP 0.013 0.0484 14.2 5% 11.57 PASS 755.10 750.15 745.10 CB-43 CB-41 103.10 0.07 0.22 0.70 0.05 0.15 7.03 5.0 1.0 1.08 15 RCP 0.013 0.0820 18.5 6% 15.05 PASS 751.20 745.00 736.55 CB-41 CB-38 82.30 0.30 3.01 0.70 0.21 2.11 7.03 5.0 1.0 14.62 24 RCP 0.013 0.0085 20.9 71 % 6.64 PASS 747.00 735.80 735.10 CB-35 CB 36a 75.50 0.28 0.28 0.70 0.20 0.20 7,03 5.0 1.0 1.38 15 RCP 0.013 0.0093 6.2 22% 5.06 PASS 743.80 737.50 736.80 CB 36 A CB-36 25.30 0.06 0.34 0.70 0.04 0.24 7.03 5 0 1.0 1.67 15 RCP 0.013 0.0079 5.7 29 % 4.67 PASS 744.10 736.70 736.50 CB-36 CB-37 66.00 0.07 0.41 0.70 0.05 0.29 7.03 5.0 1.0 2.02 15 RCP 0.013 0.0106 6.7 30% 5.41 PASS 744.50 736.40 735.70 CB-37 CB-38 51.00 0.15 0.56 0.70 0.1 t 0.39 7.03 5.0 1.0 2.76 15 RCP 0.013 0.0098 6.4 43 % 5.21 PASS 743.00 735.60 735.10 CB-38 CB-39 28.70 0.09 3.66 0.70 0.06 2.56 7.03 5.0 1.0 18.02 30 RCP 0.013 0.0052 29.7 61 % 6.05 PASS 743.00 732.35 732.20 CB-39 CB-39A 51.60 0.10 3.76 0.70 0.07 2.63 7.03 5.0 1.0 18.51 30 RCP 0.013 0.0058 31.3 59% 6.38 PASS 740.20 732.10 731.80 CB-40 CB-39a 57.90 0.33 0.33 0.70 0.23 0.23 7.03 5.0 1.0 1.62 15 RCP 0.013 0.0164 8.3 20% 6.73 PASS 741.80 734.00 733.05 Long Creek Club Apartments -Proposed Storm Water Pipe Schedule - Mannina's Lnuation Pipe Segment -rai nage Area A(a c) x C acres . - V V ~ ~ c J ~ c E _ 2 c o , ~ 7 v V ~ rn v_2i c v fi U E ~ T y ~ U ~ °o. _; w w F .a •~- U ~ •' U c _E ~ '3- G a 'E o v a ~' `~ ~r ~ ~ ~ ~ r ~ ~ ~ ~ r ~ r ~ ~ . ~ ~ Time of Concentration Long Creek Club Apartments Storm Bypass SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.240 Grass 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 100 ELEV UP (NGVD FT) 812.0 ELEV DOWN (NGVD FT) 810.0 LAND SLOPE (FT/FT) 0.020 0.000 TIME OF CONCENTRATION (HRS) 0.241 0.000 0.241 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u P FLOW LENGTH (FT) 1295 1 ELEV UP (NGVD FT) 810.0 0.0 ELEV DOWN (NGVD FT) 744.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.051 0.000 AVERAGE VELOCITY (FT/SEC) 3.642 0.000 TIME OF CONCENTRATION (HRS) 0.099 0.000 0.099 RECTANGULAR CHANNEL CHANNEL FLOW SEr #t SFr; i!2 SFr, ss cFr. rrd BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.ooo o.ooo 0.000 O.OOD 0.000 0.000 0.000 0.000 0.000 0.000 0 TRIANGULAR I:HANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) o.oo o.oo o.oo o.oo 0.00 0.00 0.00 0.00 o.oo o.o0 0.00 0.00 0.00 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA(SO.FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.340 20.378 (MIN) 0.204 USE zo MIN TRAPEZOIDAL CHANNEL SFr, a~ cFa ~~ cFr. ies cFr_ iee 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 o.ooo o.ooo o.ooo o.ooo 0.030 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 CIRCULAR CHANNEL (Gravity Flow) cFr_ ~~ cFr_ ~~ ccr_ ~z ccn ee 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 o.oooo o.oooo o.oooo o.oooo 0.000 o.ooo o.ooo o.ooo o.ooo o.ooo 0.000 0.000 0.000 0.000 0.000 Lone Creels Club Apartments - Proposed Storm Water Pine Schedule - Nianninn's Tnuafim>t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Yipe Selimtenl Drainage Area acres A(ac) x C ~ in c E U ~E "~' U T ~ ~ ' 4a.. U ~ w ~. vt o ~ ~ ~ N a. N w ~ a a e z u' Rim Elev. Inv. UP Inv. DWN Oftaite Storm Water S stem 1U 0 Yr. Storm Anal a YI 100 YI 101A 110.80 0.07 0.07 0.60 0.04 0.04 9.92 5.0 1.25 0.52 15 RCP 0.013 0.0248 10.2 5% 8.28 PASS 744.00 140.00 737.25 YI 101A YI 101© 8.20 9.94 10.01 0.60 5.96 5.96 6.26 20.0 1.25 46.67 30 RCP 0.013 0.0244 64,1 73% 13.06 PASS 743.50 736.00 735.80 YI 101B JB 103 103.00 9.94 19.95 0.60 5.96 11.97 fi.26 20.0 1.25 93.67 36 RCP 0.013 0.0398 133.1 70% 1886 PASS 743.50 735.70 731.60 YI 102 J8103 257.00 2.33 22.28 0.60 2.33 14.30 9.92 5.0 1.25 177.32 42 RCP 0.013 0.0521 229.7 77% 23.93 PASS 753.00 745.00 731.60 JB 103 JB 104 261.80 0.00 22.28 0.60 0.00 14.30 6.26 20.D 1.25 111.90 48 RCP 0.013 0.0088 134.6 83% 10.74 PASS 740.00 730.60 728.30 JB 104 JB 105 154.80 0.00 22.28 0.60 0.00 14.30 6.26 20.0 1.25 111.90 48 RCP 0.013 0.0078 126.5 88% 10.09 PASS 739.00 728.20 727.00 JB 105 JB 106 55.80 0.00 22.28 0.60 0.00 14.30 6.26 20.0 1.25 111.90 48 RCP 0.073 0.0108 149.0 75% 11.89 PASS 739.00 726.90 726.30 JB 106 HW 107 24.50 0.00 22.28 0.60 0.00 14.30 6.26 20.0 1.25 111.90 48 RCP 0.013 O.OD82 129.8 86% 10.36 PASS 739.00 726.20 726.00 ~ ~ ~ ~ ~ ~ ! ~ r ~ ~ ~ ~ ~ r, ~ ~ r i St01'111 S@W@f PI'Ofl~@ Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) 760 00 ~t5 Z S ~ ~.~ x`~ . 2.51 - Ln: 21 . 741.50 737.85 Out 753 00 . 746 00 . 739.00 k-t ~ ~.~- 732 0~ . 725 00 . 0 100 200 300 400 500 600 Reach (ft) 700 800 900 to-A#»f~ 810tiall6n:1-- to 9-~~1a31-+-29. n-:-aSta~ :81~81ta: PPSd 0 R1 tR1PPS-EI-73 .8 RIPefE . 'ED tl81Ti'r1= nv. u nv. v. u nv. nv. Inv. I. 730.40 In Inv. EI. 31.85 I Inv. EI. 32.9 Ihv. EI. 73 .85 In Inv. EI. 736 35 In Inv. Il FIIO'89. 5 In r 113.7Lf-18" L 0. ~/ 16" 0. L~~42 LY=36"052°0 -48 @-0,5 - f- 4" 0 2% Hydraflow Storm Sewers 2005 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r i r ~ ~ ~ Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) 760 00 ~t~ ZS ~ ~ ~-~ ~Z~ . 9+73.07 - Ln: 7 EI. 742.00 . EI. 738.60 Out 753 00 . 746 00 . 739.00 732.0 ° 725 00 . 0 100 200 300 400 500 Reach (ft) 600 700 800 900 1000 t 0&Ot#all ~:...-+~ ~ 0-1-2~~t 9-S 6 : ~t rt OAt#:0 Rtrrs- 8~ RlrerE . 38~ RirtfEl. 5:00 Rtrpi-E1-748:0 nv. u nv. u u nv. u nv. u n Inv. I. 730.40 In Inv. EI. 31.8 Inv. EI. 732 91~~inEl. 7 3.85 in Inv. EI. 73 .60 In Inv. EI. 737.7 In €._.a~ f a" s2 io Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) F~ S 2- ~ ~-}-o C~ `~ 773.00 tfan6~193.87 - Ln: 12 EI. 753.10 t 745.60 Out 0 In 763.00 753.00 743 00 . 733.00 723.00 0 50 100 150 200 250 300 350 400 Reach (ft) 450 500 550 600 Sta 0+ 0.06ta 100 - Ln: 1St 1+35.62 - n: 8 Sta 3+1 .56 - Ln: 9 Sta +24.97 - Ln 10 to 5+43.89 Grnd. I. SIk6tFl. 4.00 Ri EI. 745.0 Rim EI. 49.50 Rim I. 750.84 im EI. 75 . Inv. EI. ga0lrl fl. 7 0.30 O t In . EI. 731.10 Out Inv. EI. 40.00 Out Inv. I. 741.00 O t nv. EI. 74 . nv. . 07~ n -E1-732-T0 n nv. O:TO-1n nv. 'f-4 n nv. EI~4 . 6 Uc ~' _ ~ 5.. ~ -1 LL ~„ f - 54" @ 0. ~~ 62Lf - 24 @ 0.90%, Hydraflow Storm Sewers 2005 rr rr r~ rl~ rs r r~ r ~r r ~r r r rs r rr rr r r Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm ~~~5 25 Elev. (ft) 773.00 763.00 753.00 743.00 733.Ogg 723.00 0 5.06 - Ln: 14 753.50 X46.50 Out 50 100 150 200 250 300 350 400 450 500 550 600 650 Reach (ft) jt~ C~I~ Sta + 08; ~tt~ll- 11+35.6 - Ln: 8 Sta 3 10.56 - L : 9 a 4+35.8 - Ln: 13 Sta 6+ Gr_nd ~BQ= (Y44.L1 _ im irxi__E .5. irx~ ~it~E.l... 0 - Lf - 24 ' 0.9~ o Hydraflow Storm Sewers 2005 ~ ~ ~ ~ ~ ~ ~ i~ ~ ~ ~ i ~ ~ r ~ i ~ r Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) 777 00 > -Z~ °~ `~~ t 2 . 1~J1:[~ - Ln: 17 I. 752.80 IOL38.00 Out In 766 00 . 755 00 . 744.00 733 00 . 5 722 00 . 0 50 100 150 200 250 300 350 400 Reach (ft) 450 500 550 600 650 Sta 0+ O.OBta 00 - Ln: S 1+35.62 - Ln: 8 Sta 3+1 .56 - Ln: 9 S a 43C~G!18i5 .12x7: 1[in: 15 St 5+835~~ 6 Grnd. I. 7F3LarOHI. 44.00 ~ Ri EI. 745.0 Rim EI. 49.50 R Birr7fr2. 2.40 Ri EI. 7~7r0 Inv. EI. 7 mnfilOffrl. 30.30 O 1n . EI. 731.1 Out Inv. EI. 40.00 Out In ffihv7~f- ®00 Out In . EI. #hit2 nv. O~tn n . n -Inv. EI. U:1 n n v n n 7:3 1 c9 " ssr._._...... - 0. B /o 0 f - 54" @ 0. 7 62Lf - 24 @ 0.90% Hydraflow Storm Sewers 2005 __ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ r ~ ~ ~ ~ Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) 773.00 Sta 0+0 .00 - Outfall St 0+67.00 - L : 22 Sta 1+ 3.69 - Ln: 23 Sta 2 10.84 - Ln: 24 ~rnd__EL 3.10 F_l._7_4.fi...D. L. Z4E.Q .748.00 . 738.00 Out 763.00 ~ ~ 753.00 743.00 ~ 733.00 _o ~~ s°~~ 723.00 0 25 50 75 100 125 150 175 200 225 Reach (ft) Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) 786.00 773.00 760.00 747.00 734.00 721.00 0 3+40.09 - Ln: 27 ~ EI. 761.00 . EI. 745.00 Out 25 50 '75 100. 125 150 175 200 225 250 275 300 325 350 Reach (ft) Sta +00.00 - Outfa~3 a 0+67. 0 - Ln: 2 Sta +33.69 Ln: 23 Sta 2+ 2.30 a:~0. 0 - Ln. __ _~.r~t .._El rnrl El_. 46_ im ELZ46, _El._7~ i ~ ~ 4 .1 .66% 0 7-0L 0'=@-U. 091 Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) Ff~S Coy `~ ~ ~ s~ 760.00 . 8 - Ln: 52 I ~ 1 EtJ742:0 IrrrEl. 2.10 nv. ~ v. u nv u nv. 7.80 Out Inv. EI. 30.40 Idnv EI. 733 11Q nEl . R&1. 6f84.80 In I v. EI. 735. 5 In Inv EI. 737.1 in 753.00 746.00 739.00 f - 4" 60 % - ZLt' - .0.5 732.0057 725.00 0 50 100 150 200 250 300 350 400 450 500 Reach (ft) 550 600 650 700 Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) ~~ b v ~ ~ ~°~ 756.00 + + - + + + - + 37 - Ln: 56 r-n -~ 0~. ~ -~~ I~~u'~9~B I:-7~l imp. 1.00 A A:3 ~t~ . _ ~8~.79--OL+ ~736.5A 7.50 Out ~ ~ 750.00 r~ 744.00 "~ ~ 738.00 Lf -15" @ 1. 1 f - 4" @ .60%11 .48Lf - 15" @ 0. 5% f - 24" 3 0 732.00 5 726.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 Reach (ft) Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm ~~~j~0 ~ ~PJ~~ Elev. (ft) 764.00 756.00 748.00 740.00 732.00% 724.00 0 .86 - Ln: 40 '45.60 42.00 Out 50 100 1°'.0 200 250 300 350 400 450 500 550 600 650 700 750 Reach (ft) ta-0 OOS;I®-0 Testa ~-11&3~ n:3t1~- +2821 rT~~n: 3+ : 3 to 4+46: ~-- L~E~ n-3 Sta-7+ i~ -~ im.. _El... Inw€ . -1n - .0.~_ ~ ifi3~EF-~- 1t3-1 -Inv. 1 Tr~S:siia. 6~5-I a - mr. Et~3 5-In- inv-Et. 8:-1 ttmr 8:65- N39:40- 7L - 4" ~-28 0 ~Q2-5bLT--Z ~~ Q:54 0 67-0/ 2. 5Lf - 24" : fi= 3t~ ~{~~~ .0_ o Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) ~E ~ C©~ ~o C('~ ~ 764.00 5.57 - Ln: 38 748.80 745.00 Out 756.00 748.00 740.00 732.00 5 724.00 0 50 100 150 200 250 300 350 400 450 Reach (ft) 500 550 600 650 Sta-O+ O~O~t 54vitarr} al-~+~n88 n-3-Sta-2 20SkW-~t~6~ 3~-L-n33 ta3+4 . ---L-n: ta-4+46.- taL4tt~44 -L-n3 4a-6 I -Sim ~m_EI. .. -. Inv-Et-7 if t:t 9~ 42®tTh85:1 -t nv-E :- 88r9fftln7 8-25-I mrEt-737-. 51 ImrEt- ~l-E~t-74 . 0-I s-r4tr~ ors5~t = za ~-o-sago 8 .25Lf - 24" 0 % f- i " 67 1 -F-30' ~~ Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm Elev. (ft) ~~~ ~`~ ~ ~~ ~~ 773.00 27.55 - Ln: 42 . 755.10 750.00 Out 763.00 753.00 743.00 733.00 723.00 0 50 t00 150 200 250 300 Reach (ft) 350 400 450 Sta 0+00.0 - O8ti~lD+57.54• Ln:St@ 1+09.5 -'6jr87386 - Ln: 3 Sta 2+2 .11 - Ln: 32 Sta 3+ 3.21 - Ln: 41 Sta 4 Grnd. EI. 7 QZim EI. 742. 0 Rim EI. 40 0=1. 743.00 Rim EI. 47.00 Rim EI. 751.20 Rim Inv. EI. 730. 0 _ Itnv. EI. 730. 0 dfiv. EI. 38 Q=Oi7ii2.35 Out Inv. EI. 35.80 Out Inv. EI. 45.00 Out Inv. E . nv. I. nv. 1~5~'r07n nv. I v. n d . o 82.25Lf - 24" @ 0.8 Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm DES ~~ ~ c(~ ~~ Elev. (ft) 756.00 750.00 744.00 738.00 732.00 726.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 Reach (ft) Hydraflow Storm Sewers 2005 Storm Sewer Profile Proj. file: reames rev with 4 ft less hw.stm ~ES ~~ '~ C~ ~~ Elev. (ft) 751.00 Sta 0 00.00 - utfall to 0+57.5 - Ln: 29 Sta 1+15.39 - Ln: 46 uad _E1~3II.0 ..0. i EI. 741.80 n EI. 734.00 Out 746.00 cn 741.00 736.00 o f - 15" 731.00 726.00 0 10 20 30 40 50 60 70 80 90 100 110 120 Reach (ft) Hydraflow Storm Sewers 2005 f I n RIP RAP APRON SIZING Ctased ~~, Army Corps c}f engineers Ftet~orts h4-7(7-2 PROJECT NAME: Long Creek Club h+-~ z-:a, <~nd N.J. Standards for Soil Erasiar~ and STRUCTURE NUMBER: FES 6 Sediment {:or!trol {1~~a;? Input: Pipe Diameter, Do 24 Inches or 2 Feet Peak Flow, Q10 1'7 CFS (Always use FULL FLOW) Talwater depth, Tw 0:8 Feet (If Unknown, use 0.2 x Diameter in Feet ) Design: Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 24.8 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 30'.8- Feet Wide (Only if no well-defined channel downstream ) dso Stone Size = 0.35 dso in Feet 4,2: dso in Inches dso = 0.016/TW x (q) RIP RAP GRADATION PER NCDOT SPECIFICATIONS RIP RAP CLASS MINIMUM (IN.) MIDRANGE (IN.) MAXIMU (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 2.5 f s Silt Loam, Loam 3,0 fps Sand Cla Loam 3.5 f s Cla Loam 4.O fps Cla ,fine Gravel 5.O f s Cobbles 5.5 fps ii n 1 1 1 RIP RAP APRON SIZING ~~~:;~~ ~~, ~~~„y ~:~,rK,s of t_i,gir,eers F:e~;ar~s !-f 7n Z PROJECT NAME: Long Crrek Club I-i-72-~, and fV.J. Standards far `ioif Erosion and STRUCTURE NUMBER: fES 25 Sudirrent Cantra~ (19~~9j Input: ,Pipe Diameter, Do 54, Inches or 4.5 Feet Peak Flow, Q10 51:.23 CFS (Always use FULL FLOW) Tailwater depth, Tw 5.85 Feet (If Unknown, use 0.2 x Diameter in Feet ) Desian: Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 18.1 feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 1'9.9 Feet Wide (Only if no well-defined channel downstream ) 5o Stone Size = 0.07 ' dso in Feet p_g dso in Inches - dso = 0.016/TW x (q) RIP RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP MINIMUM MIDRANGE MAXIMU CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 2.5 f s Silt Loam, Loam 3.0 fps Sand Cla Loam 3.5 f s Cla Loam. 4.0 # s Cla ,fine Gravel 5.0 f s Cobbles 5:5 fps. 0 ii 1 R'IP RAP APRON SIZING ~~s~dor,,~r>„yc',orpsotEngine~:rsFtepc>rtshl-iG-2 PROJECT NAME: Long Crrek Club r~ ~z-~, and f~..l. Standards for Soil ro~~ion and STRUCTURE NUMBER: FES 59 Sidi;: ant f~ontrol (19991 Input: Pipe Diameter, Do 48 Inches or 4 Feet Peak Flow, Q10 34:8. CFS (Always use FULL FLOW) Tailwater depth, Tw 5.85 Feet (If Unknown, use 0.2 x Diameter in Feet ) Design: Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 13.1 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 17.2 ' Feet Wide (Only if no well-defined channel downstream ) d5o Stone Size = 0.05. d5o in Feet 0.6 dso in Inches dso = 0.016/TW x (q) RIP RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP MINIMUM MIDRANGE MAXIMU CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam- 2.5I;f s Silt Loam, Loam'. 3.O fps Sand Cla Loam 3.5 f "s Cla Loam 4.0 f s Cla ,fine Gravel 5:0 f s Cobbles 5.5 fps 7 1 1 RIP RAP APRON SIZING a~~~d 4r, Farr~y corps ~~, Eng~nee~s H~~~o~c, hi-7U 2 PROJECT NAME: Long Creek Club (-1-72-;g: and N.J. Standards for Soil erosion and STRUCTURE NUMBER: FES 60 5e:~~-[i;~cxr,t t.:ur:tro~ t19~r~~ Input:. Pipe Diameter, Do 48 Inches or 4 Feet Peak Flow, Q10 35' CFS (Always use FULL FLOW) Tailwater depth, Tw 5:85 Feet (If Unknown, use 0.2 x Diameter in Feet ) Desi n: Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 43.1 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 17.3 Feet Wide (Only if nowell-defined channel downstream ) d5o Stone Size = 0:05' d5o in Feet 0.6 d5o in Inches dso = 0.016/TW x (q) • RIP RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP MINIMUM MIDRANGE MAXIMU CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE'. VELOCITY. Sand -Loam 2'.5 f s Silt Loam, Loam 3.0 #ps Sande Cla .Loam 3.5 # s Cla ' Loam 4'.0 f s Cla ,fine Gravel 5.0' f s Cobbles 5.5 fps RIP RAP APRON SIZING Based an Army Corps E}t Engineers Reports Fi..70-'L PROJECT NAME: Long Creek Club ~i-~z-:; tsr~d r~.~. Sfar~dards tar Soil Erosion and STRUCTURE NUMBER: Detention Basin outlets S~r{ir~ent %,ura:ra( 41595? .:Input: Pipe Diameter, Do 48 Inches or 4 Feet Peak Flow, Q10 28' CFS (Always use FULL FLOW) Tailwater depth, Tw 0.8 Feet (If Unknown, use 0.2 x Diameter in Feet ) Design: Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 34.3 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 46.3. Feet Wide (Only if no well-defined channel downstream ) dso Stone Size = 0,27- dso in Feet 3.2 dso in Inches dso = 0.016/TW x (q) RIP RAP G RADATfON PER NCDOT SPECIFICATIONS RIP RAP MINIMUM MIDRANGE MAXIMU CLASS (IN.) (IN.) (4N.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 2.5 f s Silt Loam, Loam 3.0 fps Sand. Cla Loam 3.5 # s Cla Loam - 4.O f s Cla ,fine Gravel 5.O f s Cobbles' 5.5 fps ~. 1 1 n 1 R1 P RAP APRON SIZING 3~sea o~, ,army corps of Engineers Reports }i-7~-2 PROJECT NAME: Long Creek Club hi-72-5, ar"d N.J. ~tanderds for SoiE Erosion ar,ci STRUCTURE NUMBER: Bypass Outlet 5e~iment ~.ar~trol (1~?99i Input: Pipe Diameter, Do 48 Inches or 4 Feet Peak Flow, Q10 30 CFS (Always use FULL FLOW) Tailwater depth, Tw 0.8 Feet (If Unknown, use 0.2 x Diameter in Feet ) Design: Do^0.5 If TW <Do/2, Wa = 3Do + La Apron Length, La = 34.8 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 46'$ Feet Wide (Only if no well-defined channel downstream ) dso Stone Size = 0.29 dso in Feet 3.5 dso in Inches dso = 0.016ITW x (q) RIP-RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP ':MINIMUM MIDRANGE MAXIMU CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 2.5 f s Silt Loam, Loam 3.0' fps Sand Cla Loam 3.5 f s Cla Loam 4.0 # s Cla ,fine Gravel 5.0 # s Cobbles 5.5 fps 1 i RIP RAP APRON SIZING 3aseu can Fumy <;ar~s of engineers Reporis 1-~-70-2 PROJECT NAME: Long Creek Club h~-72-:i, and N.,t. Standards for Scri( ~r~siaf7 Land STRUCTURE NUMBER: Erosion Control Basin 1 5eci3rnent ~,ar,trc~1 t~sggi I~ . Pipe Diameter, Do 36 Inches or 3 Feet Peak Flow, Q10 21 CFS (Always use FULL FLOW) Tailwater depth, Tw 1 Feet (If Unknown, use 0.2 x Diameter in Feet ) Design: Do^0.5 If TW <Dol2, Wa = 3Do + La Apron Length, La = 28:.3 Feet Long If TW > Do/2,Wa = 3Do+ 0.4La Apron Width, Wa = 37.3' Feet Wide (Only if nowell-defined channel downstream ) d5o Stone Size = 0.21 5o in Feet 2.6 ' d5o in Inches dso = 0.016/TVII x (q) RIP RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP ' MINIMUM MIDRANGE MAXIMU CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 2.5 f s Silt Loam,. Loam 3.0 fps Sand Cla Loam 3.5 f s Cla Loam 4A f s Cla ,.fine Gravel 5.0 f s Cobbles 5.5 fps' 1 1 1 1 1 1 1 1 1 1 1 1 1 Ditch 1 - OfFsite Interceptor -Min. Slope Worksheet for Triangular Channel Project Description Worksheet Offsite ditch1-min slc Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coeffic 0.040 . Slope 015000 ft/ft C /r ~l~ Left Side Slope 0.50 V : H Right Side Slope 0.50 V : H Discharge 12.00 cfs Results Depth 1.36 ft Flow Area 3.7 ftz Wetted Perim 6.07 ft Top Width 5.43 ft Critical Depth 1.17 ft Critical Slope 0.032305 ft/ft Velocity 3.26 fUs Velocity Head 0.17 ft Specific Enerc 1.52 ft Froude Numbs 0.70 Flow Type 5ubcritical fJ~~.e = I.5' /~/1 ~ Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 01:19:01 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 Ditch 1 - Offsite Interceptor -Max Slope Worksheet for Triangular Channel Project Description Worksheet Offsite ditch1-max sl Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coeffic 0.040 Slope 140000 ft/ft Left Side Slope 0.50 V : H Right Side Slope 0.50 V : H Discharge 12.00 cfs Results Depth 0.89 ft Flow Area 1.6 ft2 Wetted Perim 3.99 ft Top Width 3.57 ft Critical Depth 1.17 ft Critical Slope 0.032304 ft/ft Velocity 7.53 ft/s Velocity Head 0.88 ft Specific Enerc 1.77 ft Froude Numbs 1.99 Flow Type supercritical Ge//) ,~55[d M~ ~~"TG~I 2l ~t~P I.,! 21.t ~ ii ~ 52p~ 5~o P~ ~Q:ECS~~ r' S~ ~d~ QA~f - D . ~i ~ v K ' Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 01:17:47 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 DITCH LINING SPREADSHEET TRACTIVE FORCE METHOD T =Shear Stress y =Unit Weight of Water s =slope in ft/ft d =depth of flow in channel Ditch d (ft) s (ft/ft) y 1 (offsite) Max Slope 0.89 0.13 62.4 1 (offsite) Min Slope 1.36 0.014 62.4 Reference: NC DENR Erosion and Sediment Control Planning and Design Manual -Appendix 8, Page 8.05.10 through 8.05.12 All flow calculations were completed assuming grass lined ditches. T(Ibs/ftz) 7.22 1.19 MATERIAL RECOMMENDATIONS Required linings: Permanent TRM with the following properties: Required Shear Stress Ditch 1 7.22 (Ibs/ft2 ) Permanent TRM;s are manufactured by: American Excelsior Colbond Geosynthetics Contech Construction Products North American Green SI Geosolutions Tenax Corp. All permanent ditch linings shall be installed in accordance with the Manufacturer's recommendations. NONDEGRADABLE RECPs ~ EROSION CONTROL Performance / Design Values Index Property Composition Slope Channel Applications Applications ` ~~ -o c m E ~ ~ s o ~ a ~_ a d ~ N a~i ~ ~ N c~^ O y ~ d ~ M W z z ~ ae ~ c o. r a E ~-- a ~e a ~ ~ ~ ~ .• ~ SC250 Vmax3 TRM 3 -Center UV Stabilized straw 1 coconut >1:1 478 (10) 18.29 (0.72) 7.28 x 10.19 100 [4] Corrugated synthetic (500 x 700) P300 TRM 2 UV Stabilized PP >1:1 384 (8.0) 14.30 (0.56) 4.37 x 4.37 90 synthetic (300 x 300) C350 Vmax3 TRM 3 -Center UV Stabilized coconut >1:1 574 (12) 16.36 (0.64) 9.47 x 13.13 86 [4] Corrugated synthetic (650 x 900) P550Vmax3 TRM 3 -Center UV Stabilized PP >1:1 672 (14) 19.30 (0.76) 18.93 x 21.84 100 [4] Corrugated synthetic (1300 x 1500) Landlok TRM TRM 2 Synthetic PP 1:1 575 (12) 10.2 (0.4) 5.8 x 4.3 90 [4] 120 (formerly (400 x 300) Landlok 450) LandlokTRM TRM 1 Synthetic (with PP 1:1 479 (10) 10.2 (0.4) 5.8 x 4.3 90 [4] 180 (formerly a geotextile (400 x 300) Landlok 1051) backing) LandlokTRM TRM 0 NA 3-D woven PP 0.75:1 575 (12) 6.4 (0.25) 29.2 x 26.2 90 [5] 300 (Woven) (2000 x 1800) Pyramat 600 HPTRM 0 NA 3-D woven PP 0.5:1 718 (15) 10.2 (0.4) 58.4 x 43.8 90 [5] (formerly (Woven) (4000 x 3000) Pyramat) • • Multimat 100 TRM 3 Synthetic PP 1:1 479 (10) 700 (17.8) 10 x 15 85 (685 x 1027) ~• - ~ '~ • TerraGuard 45P rRl;n 2 S)~nrhetic PP 1:1 371.23 (7.75) 12.69 (0.5) 4.2 (288) 80 • • • PP-5 8 oz. TRM Double Net Polypropylene Synthetic >1:1 4.2 Unvegetated 7.8 4.555 80 PP-510 oz. TRM Double Net Polypropylene Synthetic >1:1 4.2 Unvegetated 8.7 4.204 80 PP-512 oz. TRM Double Net Polypropylene Synthetic >1:1 4.4 Unvegetated 9.4 4.38 80 [1] ECB =Erosion control blanket [2] Synthetic or organic netting [4] =1000 hrs exposure MCN =Mulch control nettings [3] For short duration (0.5 hour) peak flow [5) = 3000 hrs exposure OWT =Open weave textile events. For long duration flow design TRM =Turf reinforcement mat values, please contact the manufacturer. T tD N O O Ul I d N O rn ~_ a N_ J fD 7 0 135 GFR recommends you contact the manufacturers before making any specifyinglpurchasing decisions. 1 t EROSION CONTROL 0 c c N N E m 0 0 N 0 NONDEGRADABLE RECPs Performance 1 Design Values Index Property Composition Slope Channel Applications Applications ,M^_, -.. -a X ~p ~^ d ~ ++ A C O H ~ Y y L C d ,__, ~ N Z u 'O d C S N y COJ .~.~ ~ VN1 r C~ ~ G$ - 41 u1 ~ M P 41 Z tJ ?~+ O d d d ~~ .C~ C$ NtG dG C ++Lfl d 0~ ~ C A~•C O O ~ W ~ ~?~ d .x i9 O y d O OlL d Y ~v ~ ~ 'N~ ~' f y ~ h~+O+ -~~ ` d OC 3 Z Z ~ OC in to D d L F Q~ G V ~~ Z F- a Y ~ Q .°~ . ReryclexTRM 8 TRM 2 synthetic 100% rerycled 0.5:1 383 (8) 1.3 (0.51) 5.78 (396) 80 x 90 ft (WxL) polyester Enkamat 7010 TRM NA NA nylon 1:1 384 (8) 10 (0,4) 2.33 (160) 8D Enkamat 7018 TRM NA NA nylon 1:1 432 (9) 16.7 (0.65) 2.19 (150) 80 Enkamat 7020 TRM NA NA nylon 0.5:1 480 (10) 19.3 (0.75) 3.5 (24D) 80 Enkamat 5 TRM NA NA nylon 0.5:1 480 (10+) 19.3 (0.75) 43.8 (3000) 80 (7520) Enkamat II TRM NA NA nylon 1:1 384 (8) 10 (0.4) 2.19 (150) 80 (7712) TRM C-35 TRM 2 synthetic PP-green 2:1 170 (3.5) 8.9 (0.35) 2.1 x 1.6 80 [4] (145 x 110) TRM C-45 TRM 2 synthetic PP-green 1.5:1 340 (7) 12.7 (0.5) 2.4 x 1.8 80 [4] (170 x 130) TRM C-60 TRM 2 synthetic PP-black 1:1 380 (8) 15.2 (0.6) 3.2 x 2.4 80 [4] (220 x 165) •• • • i . • • • . f ECP-2 TRM 2 synthetic polypropylene 1:1 (3.21) (0.564) NP NP ECC-3 TRM 3 synthetic coconut >1:1 (3.5) (0.295) (1017x761) 96 ~ • ~ ~ • ~ • ~ Macmat N10 TRM NP synthetic nylon 1:1 NP 10.2 (D.4) 233 x 1.16 stabilized (160 x 80) Macmat N20 TRM NP synthetic nylon 1:1 NP 17.8 (0.7) 3.5 x 2.1 stabilized (240 x 145) MacMat R6 TRM NP synthetic geocomposite 1:2 NP 10.2 (0.4) 35 (2398) stabilized MacMat R8 TRM NP synthetic geocomposite 1:2 NP 20.0 (0.8) 51 (3500) stabilized 0 ~ [1 ] ECB =Erosion control blanket [2] Synthetic or organic netting [4] =1000 hrs exposure ~ MCN =Mulch control nettings [3] Por short duration (0.5 hour) peak flow ; ' OWT =Open weave textile events. For long duration flow design 1 34 TRM =Turf reinforcement mat values, please contact the manufacturer. GFR recommends you contact the manufacturers before making any specifying/purchasing decisions. YI 101 Weir Worksheet Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet Yi 101A Type Sharp Crested Rectangul Solve For Headwater Elevation Input Data Discharge 46.67 cfs '~` Crest Elevation '43.50 ft ~ ~. ~ .~ Tailwater Elevation '39.00 ft -7~~ p0 Discharge Coefficif 3.33 US Crest Length 16.00 ft Number of Contrac 0 Resu Its Headwater Elevation '44.42 ft `[`~~{-~2 Headwater Height Abo~ 0.92 ft Tailwater Height Above -4.50 ft Flow Area 14.6 ftz Velocity 3.19 ft/s Wetted Perimeter 17.83 ft Top Width 16.00 ft 6 ~ p TN u~T Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 04:42:00 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 YI 101 Weir Worksheet Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet YI 101 B Type Sharp Crested Rectangul Solve For Headwater Elevation Input Data Discharge 46.67 cfs .-~. Crest Elevation '43.50 ft ~74~3 •~ Tailwater Elevation '39.00 ft "~'2Jq , '~ Discharge Coefficif 3.33 US Crest Length 16.00 ft Number of Contrac 0 Results Headwater Elevation '44.42 ft "'-( ~{y ~ `~Z Headwater Height Abo~ 0.92 ft Tailwater Height Above -4.50 ft Flow Area 14.6 ftz Velocity 3.19 ft/s Wetted Perimeter 17.83 ft Top Width 16.00 ft ~~ ~l Q ~1(~`f Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 04:42:15 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 YI 102 Worksheet Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet Yi 102 Type Sharp Crested Rectangul Solve For Headwater Elevation Input Data Discharge 12.50 cfs Crest Elevation '53.00 ft `~ ~ ~j . UD Tailwater Elevation '39.00 ft -~39 ~Q Discharge CoefficiE 3.33 US Crest Length 16.00 ft Number of Contrac 0 Results Headwater Elevation '53.38 ft ~5 3 . 3~ Headwater Height Abo~ 0.38 ft Tailwater Height Above -14.00 ft Flow Area 6.1 ft2 Velocity 2.05 fUs Wetted Perimeter 16.76 ft Top Width 16.00 ft ~t../J~ vP~~NU~~ ~ _ Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 04:42:29 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 YI 12 Wier Length Worksheet Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet yi 12 Type Sharp Crested Rectangul Solve For Headwater Elevation Input Data Discharge 20.47 cfs Crest Elevation '52.80 ft ~ Z~Z . Tailwater Elevation '50.00 ft '~~ , ~ Discharge Coefficif 3.33 US Crest Length 16.00 ft Number of Contrac 0 Results Headwater Elevation '53.33 ft Headwater Height Abo~ 0.53 ft Tailwater Height Above -2.80 ft Flow Area 8.5 ft2 Velocity 2.42 ft/s Wetted Perimeter 17.06 ft Top Width 16.00 ft / ~L.I~$ '~P ~NI.E~~ Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 04:42:58 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I YI 20 Weir Length Worksheet Worksheet for Sharp Crested Rectangular Weir Project Description Worksheet YI20 Type Sharp Crested Rectangul Solve For Headwater Elevation Input Data Discharge 8.71 cfs Crest Elevation '61.00 ft 'Tfp l .~~ Tailwater Elevation '50.00 ft '~,~ : ~~ Discharge Coefficic 3.33 US Crest Length 16.00 ft Number of Contrac 0 Resu Its Headwater Elevation '61.30 ft "[ b 1. ~~ ~ Headwater Height Abo~ 0.30 ft Tailwater Height Above -11.00 ft Flow Area 4.8 ft2 Velocity 1.82 ft/s Wetted Perimeter 16.60 ft Top Width 16.00 ft ~~ ~~ sr~-.~~-°r Title: Long Creek Club Apartments Project Engineer. J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/14/07 04:43:25 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 C 1 ii 1 City of Charlotte -Land Development Division Wet Pond Worksheet Project Name: ,L~~cxiI ~l< C~cc6 NA~~1'~tc~~P7~s Date: ~ ~~ r ~ BMP location narrative: Attach schematic describing wet pond location and information relative to BMP. Wet Yond summary Basin drainage area to pond: ~ ~ ~-. ac. (Delineated on attached drainage area map) Proposed Impervious Area Percentage: Jr.~ % (Detailed impervious area calculations attached) SA/DA ratio required: ®, c~/ (Use State BMP manual chart) Permanent Pool Surface Area Required: ~ S,~Z sq. ft. Permanent Pool Surface Area Provided: l$T_ sq. ft. Permanent Pool Elevation: ? 3~.0o ft. (elevation of the orifice invert) Forebay Volume Percentage: 'LS°lo % (calc showing between 15% and 25% attached) Average Depth Provided: ft. (calculation attached) Runoff volume: ~, y3 acre-ft. (calculation attached) Diameter of orifice: 1. S` in. (for water quality drawdown between 2-5 days) Emergency pipe diameter: g in. (calculations attached) Temporary Pool Elevation: '13~fs SS _ ft. (routing calculations attached) Spillway Elevation: ~(/ P ft. (calculation attached) Spillway weir length: ~!,'A ft. (calculation attached) Top of Berm Elevation: ~ `3~ ft, Freeboard Provided: ,tom', ~ in. Basin Diagram (fill in the blanks) Permanent Pool Elevation / 75% 75% Sediment Removal Elevation ~~ -------- ---- Z~.~ 1_ 25 % - _ - - -Sediment Removal Elevation Bottom Elevation TZ~P _________________ ~2~ 25% Bottom Elevation Forebay Main Pond • IC CHAIiIATTE_ ENGINEERING &~PROPERTY MANAGEMENT Land Development Division 600 East Fourth Street, Charlotte, North Carolina 28202-2844 Revised 7/2005 Telephone: 704/336-6692 Fax: 704/336-6586 landnermits.charmeck.nru Long Creek Club Apartments Wet Pond Drawdown t = Runoff Volume (ft3)/Orifice Flowrate (cfs) Orifice Flowrate is Q = Ca(2gh)~5 V 149,585.00 d = diameter of orifice in inches 1.5 Q 0.35 cfs a = area of orifice in square feet 0.049087 9 = Gravity Constant (32.2 ft/sec2) 32.2 t 421,922.87 sec C = Orifice Constant (.6) 0.6 117.20 hrs h = average head over invert of orifice [(temp pool elevation - invert of orifice)/2] 2.25 4.88 days t = time to draw down in seconds Job No 3151 Date: 5/11/2007 By JDB Total Area Area (sf) Total 880,426 Surface Area Provided: Long Creek Club Apartments NC DWQ Water Quality Pond Sizing Calculation Impervious Permanent Area % Impervious Pool Depth From Table Req'd Surface Req'd Surface (sf) Area (ft) SA/DA Area (AC) Area (ft2) 488,556 0.55 4 0.0188 0.38 16,552.01 1f~,927 SF At Elev. = 730 Wet Detention Basiri Stage Storage Elev Area OH Inc. Vol. (CF) 2 21137 2 30785 2 41144 2 44927 0.55 13585 1.45 40650.75 2 62575 Cum. Vol (CF) 21137 51922 93066 137993 151578 192228.75 254803.75 Wet Pond Emergency Drawdown Worksheet for Circular Channel Project Description Worksheet Wet Pond Emergent Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coeffic 0.013 Slope 005000 ft/ft Diameter 8 in Discharge 0.60 cfs Results Depth 0.41 ft Flow Area 0.2 ftz Wetted Perime 1.21 ft Top Width 0.65 ft Critical Depth 0.36 ft Percent Full 61.8 Critical Slope 0.007344 ft/ft Velocity 2.65 fbs Velocity Head 0.11 ft Specific Energy 0.52 ft Froude Numbe 0.79 Maximum Disc 0.92 cfs Discharge Full 0.85 cfs Slope Full 0.002466 ft/ft Flow Type. 3ubcritical Title: Long Creek Club Apartments Project Engineer: J Barnard x:\...\calcs\reames.fm2 SUBSURFACE INVESTIGATIONS FlowMaster v6.0 [614b] 05/15/07 07:56:24 AM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 ' - ~N~j COX C~~ t ~w ~, ~ v ~ __ __ __ ~L ~~3_ = _ ~i7~ ~ ~ c __ ' ___ _ ~ ~~C~/-~ U S ~2~d = ~~~; 530 ~ Z = /l ~ Z ~ ~- _ __ ~_ 2M PEA ~~US ~~u~/ i~l~,ce" ~ ~ 1. Z /~~, Z __ ~ ~~-- __ ~~ ~~ ~i~-f ~~iP t~~~ __ __ _ __ _ '. - - - - __ _ _ _ _ __ City of Charlotte Land Development Division Detention Worksheet Date: ~ " /~~ Project Name: ~tJGa ~EE K Cl-~'6 1 1 Project Description: Attach brief explanation of detention plans and any assumptions if necessary. PRE-DEVELOPED SUMMARY Basui area: ~~ ~ ~ ~ ac. (Delineated on attached map) Tune of Concentration, Tcpre: ~~-~- min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Meck. Storm Water Design Manual -SCS Travel Time. Curve Number, Cnp,-e: ~© POST-DEVELOPED SUMMARY Basin area: ~-~•~-~ ac. (Delineated on attached map) Time of Concentration, Tcpost~ ~ min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Meck. Storm Water Design Manual -SCS Travel Time. Curve Number, Cnpost: 8~ DETENTION SUMMARY Computer Method Used*: ~•c p~A ~'io~ ~~cpc204RAP-~5 *Land Development Plan Review Staff will verify all detention submittals using HEC-1 for compliance with the City of Charlotte Detention Ordinance. This summary is to accompany all detention analysis and is not intended to replace that requirement. Pre (cfs) Post (cts) 1Zouted (cfs) Elevation 2 yr. ~ ~• ~ ~ ~D . ~~ ~ ~ ~ ~ `~3 Co . ~ ~ loyr. 3~-.~~- 1Z3ot~2 a~.~3 ~-~~,~3 Pg 1 of 3 Revised 3/2005 City of Charlotte -Land Development 1 C 1 1 PRE-DEVELOPED SUB-BASIN CALLS: Sub-basin Name/Level: (Coord. with attached DA map) Type of Flow Travel Length (ft.) Slope (%) Mannings n) Time (min.) Sheet Unpaved "3C7O Jam, 3 C~ - Z a 3r ..~ Sheet Paved '"" " Shallow Conc. n awed 35s ~ ~ ~ l Shallow Conc. Paved "' `^ Channel Pie -'" "' TOTAL N/A N/A N/A 'I'C Pre = Z`7~ Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreage/Total Area) x (CIS 07 • SCo l~ n~leJe~ Wu~cr,S C2Gi ~ Ui 0 `-~-. Lo .tom ~- 1~~IK~S G ~3 a~, ~S D, ~q '' Qc~.colz#- °B Goo a. 9 ~ .`~°~ t. ~~ ~~r L ~3 3Z~ ~~ a~ , ~- cN - ~ t ~ Pre - POST-DEVELOPED SUB-BASIN CALLS: Sub-basin Name/Level: (Coord. with attached DA map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Un aved Sheet Paved Shallow Conc. Un aved Shallow Conc. Paved ~ 5t.( /~1.~ Channel Pipe TOTAL N/A __ _. N/A N/A Tc P°St= Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreage/Total Area) x (Cl~ ~le2Z i.~, r~~~s ~ - g8 ,~/, y3 ~ ,ate 0 5 ~~ ~- --- _ ~ ~ z . ~ 9 CNP°st= ~ ~ ~.~ Pg 2 of 3 Revised 3/2005 City of Charlotte -Land Development 1 1 1 STORAGE /DISCHARGE CALCULATIONS * If applicable. If yes, complete Underground Storage Volume Table Elevation Under round * Above Ground Total Acc. Volume Acc. Volume for all Structures (cf) Area (sq. ft.) Inc. Volmne (cf) Acc. Volume (c fl (cf) (Above and Underground) Stage Discharge Co= orifice coefficient: Cw =weir coefficient. Orifice Area unit shall be square feet (sf). Elevation / Stage (ft) Orifice 1 In. Irly. Area Co= Orifice 2 In. Inv. Area Co= Weir 1 Ft. Inv. Cw= Weir 2 / Em. Spillway (Controlled by outlet pipe/struct) Ft' Inv. Cw= Outlet Control Pipe Dia. Length Inv. Co= Emergency Spillway (Free flow out of pond) Ft. Inv. Cw= Total Q (cfs) Underground Storage Volume Table (If Applicable) Provide additional storage volume tables if more structures are used. Elevation Acc. Volume (cf) Under^T~,u~d Suuc ~e ~~ # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Jnder ~~~~d Suuc<<tre g ## Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) T '__-__-__._ ~ ~~-__ _•- Juuci~rcuuu Juuc~ute # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) inderground Sixucture # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Pg 3 of 3 Revised 3/2005 City ofCharlotte -Land Development 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Wet Detention Basin Stage Storage Elev Area DH Inc. Vol. n . ~r°726 979 '" .. ~~~'< ~ .728 ~ ~~-. - _ ~ 11.858 ~~~t,~`~7;30 ' ~° 18927 ks~ ~~ t` ~ 732 , ' _, 2221.7;.. ` ~ ff "!~34 227<1'0 ~~~i::734`55 ~ ~' 26690 °;!:~;-'.736 +- -~ 29380 (CF) 2 21137 2 30785 2 41144 2 44927 0.55 13585 1.45 40650.75 2 62575 =°: w ;" ; ,~ d738 33195 Cum. Vol (CF) 21137 51922 93066 137993 151578 192228.75 254803.75 Time of Concentration Long Creek Clu b Apartments Permanent Detention Pond -Pre Developed Flow SHEET FLOW SEG #1 SEG #2 MANNING'S "n" 0.240 Grass 10-YEAR, 24- HR. RAIN FALL (IN) 3.12 FLOW LENGTH (FT) 300 ELEV UP (NGVD FT) 776.0 ELEV DOWN (NGVD FT) 760.0 LAND SLOPE (FT/FT) 0.053 0.000 TIME OF CONCENTRATION (HRS) 0.392 0.000 0.392 SHALLOW CONCENTRATED FLOW SEG #1 SEG #2 SURFACE DESCRIPTION (P OR U) u _ P FLOW LENGTH (FT) 355 1 ELEV UP (NGVD FT) 760.0 0.0 ELEV DOWN (NGVD FT) 728.0 0.0 WATERCOURSE SLOPE (FT/FT) 0.090 0.000 AVERAGE VELOCITY (FT/SEC) 4.844 0.000 TIME OF CONCENTRATION (HRS) 0.020 0.000 0.020 RECTANGULAR CHANNEL CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TRIANGULAR CHANNEL CHANNEL FLOW SEG #1 SEG #2 SEG #3 SEG #4 TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo o.oo o.oo o.oo 0.00 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 TOTAL TIME OF CONCENTRATION (HRS) LAG TIME (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?H:1 V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING'S "n" AVERAGE VELOCITY (FT/SEC) TIME OF CONCENTRATION (HRS) 0.412 24.731 (MIN) 0.247 USE 2a MIN TRAPEZOIDAL CHANNEL cFr. !t~ cFa fey CFr: !t t cFr. !td 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.oo0 0 CIRCULAR CHANNEL (Gravity Flow) SFG #7 SF(, #2 SF(; !f3 SFC !!d 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 0 0 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.000 0.000 0.000 o.ooo o.ooo o.ooo o.ooo o.ooo The Club at Northlake Soil Type Surnmary Soil Symbol Description Hydrologic Group CeB2 Cecil sandy clay loam 2-8°io eroded B CeD2 Cecil sandy clay loam 8-15% eroded B EnB Enon sandy loam 2-8% C EnD Enon sandy loam 8-15% C MO Monacan Soils C PaE Pacolet Sandy Loam 15-2°i% B WkE Wilkes Loam 8-15% C t Hydrograph Return Period Recap ~.u,vc, CK~-rr ~ 6 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph i i No. type Hyd(s) descr pt on (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 7.94 14.10 20.34 30.58 37.87 53.26 65.38 73.65 Pre Develped Flows 2 SCS Runoff ------- 53.67 70.44 85.60 108.42 123.62 153.95 176.60 191.65 Large Pond -post 4 Reservoir 2 0.12 0.14 0.15 0.17 0.00 103.77 148.14 170.71 Large Pond ~ ~ ~ ~~ ~ ~~ ~ ~, w ~ U~./, ~~ r 5 ~-- ~,- ~ ~ ~ ~3~~ SS ou L~S ~~ ~ ~ ~ (~.~ ~ ~ c ~v~ 1-E. -L Q-~ 4 ~ ~ ,.! p W tom- C~u !a i.i^~c i I Proj. file: reames detention 1yr stage.gpw Monday, May 14 2007, 9:04 PM 0 1 Hydraflow Hydrograpns oy inteusoive ' Hydrograph Summary Report 1 1 0 U 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 7.94 1 730 36,186 ---- ------ ------ Pre Develped Flows 2 SCS Runoff 53.67 1 718 109,551 ---- ------ ------ Large Pond -post 4 Reservoir 0.12 1 1446 15,633 2 734.55 159,448 Large Pond reames detention 1yr stage.gpw Return Period: 1 Year Monday, May 14 2007, 9:04 PM Hydraflow Hydrograpns by inteusoive Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 4 Large Pond ' Hydrograph type =Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 2 ' Reservoir name =Large Pond Monday, May 14 2007, 9:4 PM Peak discharge = 0.12 cfs Time interval = 1 min Max. Elevation = 734.55 ft Max. Storage = 159,448 cult Storage Indication method used. Wet pond routing start elevation = 730.00 ft. ' Large Pond Q (cfs) Hyd. No. 4 -- 1 Yr ' 60.00 -- - -- i 50.00 I ' 40.00 - i ' 30.00 - I 20.00 --~~----- ' 10.00 - ' 0 00 Hydrograph Volume = 15,633 tuft 0 5 10 15 19 Hyd No. 4 Hyd No. 2 24 29 34 39 44 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 --~ 0.00 48 Time (hrs) Pond Report ' Hydraflow Hydrographs by Intelisolve Pond No. 1 -Large Pond ' Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Monday, May 14 2007, 4:55 PM ' Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 725.50 00 0 0 0.50 726.00 9,279 2,320 2,320 ' 1.50 727.00 11,447 10,363 12,683 2.50 4.50 728.00 730.00 11,858 18,927 11,653 30,785 24,335 55,120 ~- /~t'~iZA7.4C ~~O t'' 6 50 732.00 22,217 41,144 96,264 . 8.50 734.00 25, 710 47, 927 144,191 ' 10.50 736.00 29,380 55,090 199,281 12.50 738.00 33,195 62,575 261,856 13.50 739.00 35,163 34,179 296,035 ' Culvert I Orifice Structures [A] [Bl [C] [Dl ' Rise (in) = 48.00 1.50 12.00 9.00 Span (in) = 48.00 1.50 12.00 9.00 No. Barrels = 2 1 8 4 Invert EI. (ft) = 725.50 730.00 734.60 735.60 Length (ft) = 85.00 0.00 0.00 0.00 Slope (%) = 0.50 0.00 0.00 0.00 ' N-Value Orif. Coeff. = .013 = 0.60 .013 0.60 .013 0.60 .013 0.60 Multi-Stage = n/a No Yes Yes 1 Stage (ft) ~~ 14.00 ~~3~)12.00 ~•3~~ 10.00 '~~3~4~ 8.00 ~"l~°L) 6.00 ~~~ 4.00 ' ~'~g~ 2.00 0 00 Note: CuIveNOrifice outflows have been analyzed under inlet and outlet control. Stage /Discharge Stage (ft) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 `'pig _ ~A2GtiE ~s'r'-a2`€ s _ A~~ _~ 1r.~ _c~_t> _ ~ Vic., ~ -- ~t~b'~ _ __ CZ2~ l 0.00 40.00 ' Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 48.00 0.00 0.00 0.00 Crest EI. (ft) = 737.00 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type =Riser --- --- --- Multi-Stage =Yes No No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft 80.00 120.00 160.00 200.00 240.00 280.00 320.00 360.00 400.00 Discharge (cfs) 16 ii [] 1 n 1 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No, type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- ------- 14.10 20.34 30.58 37.87 53.26 65.38 73.65 Pre Develped Flows 2 SCS Runoff ------- ------- 70.44 85.60 108.42 123.62 153.95 176.60 191.65 Large Pond -post 4 Reservoir 2 ------- 33.50 40.03 48.01 61.67 107.86 139.45 160.07 Large Pond Proj. file: reames detention REV 51407.gpw Monday, May 14 2007, 9:12 PM riyarariow riyarograpns oy in[eusoive ~~ r 0 1 1 1 n 0 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 14.10 1 729 57,279 ---- ------ ------ Pre Develped Flows 2 SCS Runoff 70.44 1 717 145,437 --- ------ ------ Large Pond -post 4 Reservoir 33.50 1 723 139,924 2 736.11 202,715 Large Pond reames detention REV 51407.gpw Return Period: 2 Year Monday, May 14 2007, 9:12 PM Hydraflow Hydrographs by Intelisolve ~ Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 4 Large Pond Hydrograph type =Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 2 ' Reservoir name =Large Pond Monday, May 14 2007, 9:12 PM Peak discharge = 33.50 cfs Time interval = 1 min Max. Elevation = 736.11 ft Max. Storage = 202,715 cult Storage Indication method used. Wet pond routing start elevation = 734.40 ft. Large Pond ' Q (cfs) Hyd. No. 4 -- 2 Yr Hydrograph Volume = 139,924 cult 80.00 T 70.00 - I - - - -- -- - - 60.00 ' 50.00 ' 40.00 - ' 30.00 - - -- ~ ~ ~~ I ' 20.00 - __~ ~ - ~ - ~ 10.00 Q (cfs) 80.00 70.00 60.00 50.00 40.00 ~n nn VV.VV 20.00 10.00 n nn _ --- - ---- - 0.00 vvv 0 3 5 8 10 13 ' ----- Hyd No. 4 Hyd No. 2 15 18 20 23 25 Tirne (hrs) Hydrograph Summary Report [] n n u 1 1 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 37.87 1 729 138,397 ---- ------ ------ Pre Develped Flows 2 SCS Runoff 123.62 1 717 262,835 ---- ------ ------ Large Pond -post 4 Reservoir 61.67 1 723 257,322 2 737.13 234,690 Large Pond reames detention REV 51407.gpw Return Period: 10 Year Monday, May 14 2007, 9:12 PM Hydraflow Hydrographs by inteusoive Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Large Pond ' Hydrograph type =Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 2 ' Reservoir name =Large Pond Monday, May 14 2007, 9:12 PM Peak discharge = 61.67 cfs Time interval = 1 min Max. Elevation = 737.13 ft Max. Storage = 234,690 cult Storage Indication method used. Wet pond routing start elevation = 734.40 ft. Large Pond ' Q (cfs) Hyd. No. 4 -- 10 Yr Hydrograph Volume = 257,322 cult 140.00 - T-- ' 120.00 100.00 -----~ - -- I ~ i i 80.00 60.00 ' 40.00 ' 20.00 - I Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 n nn _ -- - --- ~ -- - -- 0.00 Vvv 0 3 5 8 10 13 ' Hyd No. 4 Hyd No. 2 15 18 20 23 25 Time (hrs) c 1' ' Hydrograph Summary Report n 0 1 1 1 0 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 53.26 1 728 191,637 ---- ------ ------ Pre Develped Flows 2 SCS Runoff 153.95 1 717 332,014 ---- ------ ------ Large Pond -post 4 Reservoir 107.86 1 721 326,502 2 737.46 245,034 Large Pond reames detention REV 51407.gpw Return Period: 25 Year Monday, May 14 2007, 9:12 PM Hydraflow Hydrographs by Intelisolve 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 4 Large Pond ' Hydrograph type =Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 2 Reservoir name =Large Pond Storage Indication method used. Wet pond routing start elevation = 734.40 ft Q (cfs) 160.00 140.00 120.00 100.00 80.00 1 t~V.UU 40.00 20.00 Large Pond Hyd. No. 4 -- 25 Yr Q (cfs) 160.00 140.00 120.00 100.00 Monday, May 14 2007, 9:12 PM Peak discharge = 107.86 cfs Time interval = 1 min Max. Elevation = 737.46 ft Max. Storage = 245,034 cult Hydrograph Volume = 326,502 cult '- a~ _i~ ~! I 80.00 vv.vv 40.00 20.00 0.00 0.00 0 3 Hyd No. 4 5 8 10 - Hyd No. 2 13 15 18 20 23 25 Time (hrs) 1; ' Hydrograph Summary Report 1~ Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 65.38 1 728 233,739 ---- ------ ------ Pre Develped Flows 2 SCS Runoff 176.60 1 717 384,455 ---- ------ ------ Large Pond -post 4 Reservoir 139.45 1 720 378,942 2 737.63 250,291 Large Pond reames detention REV 51407.gpw Return Period: 50 Year Monday, May 14 2007, 9:12 PM Hydraflow Hydrographs by Intelisolve ~ Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Large Pond ' Hydrograph type =Reservoir Storm frequency = 50 yrs Inflow hyd. No. = 2 ' Reservoir name =Large Pond Monday, May 14 2007, 9:12 PM Peak discharge = 139.45 cfs Time interval = 1 min Max. Elevation = 737.63 ft Max. Storage = 250,291 cult Storage Indication method used. Wet pond routing start elevation = 734.40 ft. Lar a Pond 9 Q (cfs) Hyd. No. 4 -- 50 Yr Hydrograph Volume = 378,942 cult 180.00 --- -- --- ~~ 150.00 - ' 120.00 ~ ~ 90.00 I i ~ 60.00 --~ -- ~ - - i 1 30.00 Q (cfs) 180.00 150.00 120.00 90.00 60.00 30.00 n nn 0.00 0 2 5 7 9 12 Hyd No. 4 Hyd No. 2 14 16 19 21 23 26 Time (hrs) 1 ' Hydrograph Summary Report 0 [1 1 1 1 1' Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 73.65 1 728 262,626 ---- ------ ------ Pre Develped Flows 2 SCS Runoff 191.65 1 717 419,609 ---- ------ ------ Large Pond -post 4 Reservoir 160.07 1 720 414,096 2 737.73 253,319 Large Pond reames detention REV 51407.gpw Return Period: 100 Year Monday, May 14 2007, 9:12 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Large Pond ' Hydrograph type =Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 2 Reservoir name =Large Pond Large Pond Hyd. No. 4 -- 100 Yr Storage Indication method used. Wet pond routing start elevation = 734.40 ft. Q (cfs) 210.00 ' ~ - -- 180.00 i - 150.00 ---- ~ , 120.00 - ' 90.00 ' 60.00 ---- 30.00 Q (cfs) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0 00 0 2 5 7 9 Hyd No. 4 Hyd No. 2 Monday, May 14 2007, 9:12 PM Peak discharge = 160.07 cfs Time interval = 1 min Max. Elevation = 737.73 ft Max. Storage = 253,319 cult Hydrograph Volume = 414,096 cult 12 14 16 19 21 23 26 Time (hrs) 1~ 1 1 1 1 0 Project No. DWQ fl ~D ' ~ ~ q ~ (to be provided by DWQ DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stonnwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : '~kc_ G1 ~~ca a-t N ~ ~~-t~,,1a: k e Contact Person: ~"~o~ `~A~~ACto Phone Number: ~jtZ For projects with multiple basins, specify which basin this worksheet applies to: _ ~2 _'4Z"Z-2 ' Basin Bottom Elevation ~ ZCa .a ft. (average elevation of the floor of the basin) Permanent Pool Elevation 7`~~0® ft. (elevation of the orifice invert out) Temporary Pool Elevation °~ 3'3y io i ft. (elevation of the outlet structure invert in) ' Permanent Pool Surface Area l~-, 5l o sq. ft. (water surface area at permanent pool elevation) Drainage Area ~0 ~ ~~} ac. (on-site and off=site drainage to the basin) ' Impervious Area i 1. X19 ac. (on-site and off-site drainage to the basin) Permanent Pool Vohune 5 ~ , Ul t ~ cu. ft. (combined volume of main basin and forebay) ' Temporary Pool Vohune fie} , SS f cu. ft. (volume detained on top of the permanent pool) Forebay Volume I~ i~~'L cu. ft. ' SA/DA used ~ ~~ i ~ I (surface area to drainage area ratio) Diameter of Orifice o? . ~ in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST ' The following checklist outlines design requirements per the Stonnwater Best Management Practices manual (N.C. Department of Enviromnent, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Imtial m the space provided to mdicate the follovv~ng design requirements have ' been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials The temporary pool controls runoff from the 1 inch storm event. ' The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. SEE. CSttiyCl~ED a~3j A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' Vegetation to the permanent pool elevation is specified. St/E ~-Rp~u~p An emergency drain is provided to drain the basin. ~~ j~~,~D The permanent pool depth is between 3 and 6 feet (required n~mum of 3 feet). ' The temporary pool draws down in 2 to 5 days. The forebay volume is approxunately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. ' Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. ' Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every stone event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. t A responsible party is designated in the O&M plan. FORMS G100 09/97 Page 1 of 1 1 1 1 1 1 1 1 1 1 E ~I ~ L G N E N ~ R IN ~ The Club at Northlake Wet Detention Pond Worksheet -Required Items Exceptio~as There are several items on the "Required Items Checklist" for the Wet Detention Basin Worksheet. These items are explained below as requested. Side Slopes: Due to space constraints on the site, the pond has been designed with 2.5 H to 1 V side slopes. These slopes will be specified to receive temporary matting until vegetation has been established. Vegetation to the Permanent Pool Elevation: Will be specified prior to completion of detailed design. Emergency Drain: An emergency drain will be included in the design of the outlet structures as part of the final design. Leved Spreader Worksheet -Required Items Exceptions Bypass Method: The level spreader for this project is for the 1" runoff drawdow_n_ from the wet detention basin. Bypass structures will be provided and will be included in the final detailed stormwater system design. Plan details for the Bypass provided: See above. Atlanta 1061 Cambridge Square, Suite B Alpharetta, GA 30004 Ph 678.339.0640 Fax 678.339.0534 www.eaaleonline.net 1-866.EAGLENC Charlotte 2013 Van Buren Avenue Indian Trail, NC 28079 Ph 704.882.4222 Fax 704.882.4232 ' WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. ' 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is ' reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). ' The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads _1_ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads _1_ feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) p Permanent Pool Elevation 730.00 f Sediment R~?mwal FI_ 7~7 ~~ 75% I - Sediment Removal Elevation 727 ~ 75 /o -------------------------- - ' Bottom E vation 726 5% 0 FOREBAY MAIN POND i 1 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These ' plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Page 1 of 2 ' 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All ' accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. ' I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or reJspolnsible party. Print name:.. ~1,(~,~~s !~~ y6xG~,~ Title Addi Phone:. ' Signature: Date: 1 ' official seal, ~7zy Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ~Shl~i~ ll• Cf Y,UIQI~r , a Notary Public for the State of ~-~ ~(~,J~'O~.Ik1CX_~, County of -~lecl(lenbura , do hereby certify that ~i1~S L• ~rYV~1'] personally appeared before me this _ ~~ da of y an~7 ,and acknowledge the due execution of the forgoing wet [wetland) detention basin main enance requirements. Witness my hand and ''•• ,900 • • a a .... o o a a - o ~~ V• o :~ p ` ~ ~ Y •~ ~Y O ~O ~~Q~Q SEAL My commission expires ~~ ' ~" D~0 ~ ~• r%~~ Page 2 of 2 1 DWQ Project No. DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET ' I. PROJECT INFORMATION (please complete the following information): Project Name : ~__I ~E: ~..1kb ce-t Nc~~ ~e.kz Contact Person: ~"©Itir\~4~cdtn~tdZ Phone Number: (ice) t~$Z -~Z2~.- ' Level Spreader ID: . Level Spreader Length ~ ft. (perpendicular to flow) Drainage Area o2f3 • ~ } ac. (on-site and off-site drainage to the level spreader) ' Impervious Area il. y`1 ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope ~ .S % (6% for forested, leaf littler cover, 8% for thick ground cover)* grass ' Max. Dischargefrom a 10 YearStorm ~ cfs C I-i-arsaue,y7~Tt3~.O~.cr,rj S~P~.~A'i~ ~TeucT~Q.~.~ Max. Discharge to Level Spreader O . ~ t cfs Filter Strip/Buffer Vegetation =~+~~-T (thick ground cover or grass, canopied forest with leaf litter ' groundcover) Pre-treatment or Bypass Method Wes.-t-~1~~ p II. REQUIRED ITEMS CHECKLIST t Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. /f a requirement has not been met, attach an exptanafion of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for ' additional information and will substantially delay final review and approval of the project. A licants Initials Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf ' litter. rr' A Pre-Form Scour Holes are on flat slopes only No structures are located in protected buffers* ' If bypass method specified in the Draft Level Spreader Design Option Document: Bypass method is specified (if applicable) and plan details and calculations are provided Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass ' discharge. ~-~ ~!o su~~ctures are located in protected buffers. Plan details for the bypass and outlets are provided. ' The operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. ' * Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. 1 1 1 1 1 1 1 1 1 1 LEVEL SPREADER OPERATION AND MAINTENANCE AGREEMENT The level spreader is defined as an elongated, level threshold, designed to diffuse stormwater runoff. Maintenance activities shall be performed as follows: 1. After construction and until vegetation has been established, level spreader(s) shall be inspected after every rainfall. Thereafter, level spreader(s) shall be inspected at least every month and more frequently during the fall season and after heavy rainfall events: a. Accumulated sediment, leaves, and trash shall be removed, and repairs made if required. b. Inspect level spreader(s) for evidence of scour, undercutting, settlement of the structure, and concentrated flows downhill from the level spreader(s). c. A level elevation shall be maintained across the entire flow-spreading structure at all times. Repair or replace the level spreader if it is damaged. d. Mow vegetative cover to a height of six (6) inches and prune plants if they cover over half of the level spreader surface. e. Repair eroded areas and replace/replant dead or damaged vegetation. 2. The contractor should avoid the placement of any material on and prevent construction traffic across the structure. If the measure is damaged by construction traffic, it shall be repaired immediately. 3. Inspect and repair the collection system (e.g., catch basins, pipes, swales, riprap) four (4) times a year to maintain proper functioning. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: ~~rtti~5 L~ ~~~~ Title: ~~P l~ritlsi`oi7~~hc1 _~,~~/~XS ~,U~.D~7i~, ~.~~~~r-r.s..S /1 L Address: Phon Signature: =Y~~~ i Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. ' I, ~S~'1~C.I~GY1 ~• Chard del-- , a Notary Public for the State of ~Or~ U.~,rD~ `I'1CL. County of ~~ (,Kl,r~n~r~, do hereby certify that ~am~~~gn ' personally appeared before me this ~St day of , ~~, and acknowledge the due execution of the forgoing wet ~wetiandj detention basin maintenance requirements. Witness my hand and _..._.. ~•~ ~~ ~'. 0 a ~ ••• Y pVfl1.~~ ~ Ca .~ t a , ~.• a ~~~0 SEAL My commission expires ~ a 7 °2~ l Page 1 of 1