HomeMy WebLinkAboutNCC203631_NOT Closeout Documents_20210806 Sedimentation/Constiruction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094
(910)433-3300
The Highlands at Bedford,Phase
County: Hoke Project: Two-Lot 84 River basin: Cape Fear
Person financially responsible:H&H Constructors,Inc.-Brian Walker,Division Project#: Hoke-2021-003
Manager&Agent NCC20361
Address: 2919 Breezewood Avenue,Suite 400,Fayetteville,NC
1. Project Location: Gladstone Street,McLauchlin
Pictures: No
2. Weather and soil conditions: sunny/workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: April 29,2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGO1)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present:
Date of inspection: April 27,2021 Time arriving on site: 3:18 PM Time leaving site: 3:27 PM
cc: