Loading...
HomeMy WebLinkAbout20170969 Ver 1_Compliance Evaluation Inspection_20210811Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20170969 NCDOT - Replace Bridge 29 on NC 226 (B-5170) Mitchell NCDOT - Replace Bridge 29 on NC 226 (B-5170) NC DOT Division 13 8/11/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 11' 39''+36° 06' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Offce on August 11, 2021. Marvin Dillingham (NCDOT inspector) was present during the inspection. NPDES records are up to date. Site is compliant with the 401 Water Quality Certification with additional conditions. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20170969 8/11/2021 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Site is under construction so not all of the impacts are in place.Comment: page:2