Loading...
HomeMy WebLinkAboutSW4200702_Supplement-EZ Form_20210810SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION _ 1 Project Name Lewisville Community Center 2 Project Area ac 4.76 3 Coastal Wetland Areal 0 4 Surface Water Area._(aC) 0 High 5 Is this eCt H' h or Low Qer[si 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 8 Width of vegetated setbacks prov_idedLfeet Will the vegetated setback remain vegetated? If.UlUA is proposed in the setback, does it meet NCAC 02H.10W(%cxq)_ 9 10 Is streambank stabilization ff0PGSW on this project? NUMBER AND TYPE OF SCMS: 11 12 Infiltration System _ Bioretention Cell 1 13 14 Wet Pond Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting_(RIhIHj 18 Green Roof 19 Level Spreader -Filter Strip (L.S-FS Disconnected lmpervivus Surface,(01S) 20 21 JTeatmenfSale 22 qry Pond 2$. Steii'ItFflller 24 Silva Cell 25 i3a3dilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title:_ Adam Carroll. PE, Sr. Protect nager 28 anlzation: Timmons Group_ 29 Street address: 8642 W. Market Street, Suite 136 30 31 City, Stake,. Zip; _ _ _ Ahgne numher(s): Email: Greensboro, NC, 27409 _ _ _ 336-478-3346 adam.carroll@timmons.com 32 Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here ```,►`��jtl lrl 111///'•• SEAL - 38573 H A z�rNrrrliiti►►►►► J 84 4 d 441 Signaturet Designer 7-3-ZO7,1 Seal Date DRAINAGE AREAS 1 Is this a high density roiect? Yes 2 If so number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS L�A{�Ep DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Biocell 5 Total drainage areas .ft 207415 124146 6 Onsite drainage area (sq ft 207415 124146 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 82673 sf 73240 sf 9 New BUA on subdivided lots (subject to ermittin (sq ft) 10permitting) New BUA not on subdivided lots (subject to sf 82673 sf 73240 sf 11 Offsite BUA (sq fi 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 59478 sf 51600 sf Sidewalk (sq ft 11311 sf 9921 sf Roof C§q ft 11719 sf 11719 sf Roadwaylsq. ft Future sq ft Other, please specify in the comment box below sq.ft) 13 New infiltrating permeable pavement on subdivided lots (sg ft 14 New infiltrating permeable pavement not on subdivided lots sq fib 15permitting) Existing BUA that will remain (not subject to s. ft 16 Existing BUA that is already permitted (s-q ft) 17 Existing BUA that will be removed (sq_ft) 9953 sf 18 Percent BUA 40% 59% 19 Design storm,(inches) 1.0 in 20 _ Design volume of SCM cu ft 6001 cf 21 Calculation method for design volume Sim le Method ADDITIONAL 22 INFORMATION Please use this space to provide any additional information about the ldrainage area(s): BIORETENTION CELL 1 Drainage area number 1 2 _ Minimum Tguired treatment volume du ft _ _. MRLENUH, E 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side stapes of the SCM (H:V.)? _ Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? 3:1 6 No 7 Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method 1wdewataring;the SCM for maintenance? Pump (preferred) Yes 10 If applicable, will the SCM be cleaned out after construction? 11 Does the maintenance access comply with General MDC (a)? Yes 12 Does the drainage easement comply with General MDC (9)? If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes 13 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is theraan O&M Plan that compl€es Wlth General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 as the SCIVI desig-nay an NC Iicensed professional? Yet 610RETE"ON CELL MhC FROM 08H 11052 SHWT elevation (fmsi) <905 Bottom althe bforeienfian celll {fmsl] 909.83 Ponding depth of the design storm (inches) 12 in ISudace area of the bioretenton_ cell (square feet) 6005 sf 18 19 20 21 22 Design volume of SCM (cu ft) 6005 cf 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface (in) 12 in 25 HOight of peak attenuation outlet above the planting surface (in). 12 in 26 Infiltration rate of the in s€tu soil (inch/hour) 27 Diameter of the underdrain pipes (it applicable) _ Does the design include Internal Water Storage [1Ws.)? If so, eievat€on;oi.thetcp of the I W S (Imsl) Elevation of the planting surface (fmsl) What type of vegetation will be planted? (grass, trees/shrubs, other)? Media depth (inches) Percentage of medium to coarse washed sand by volume 6 in 28 Yes 29 912.5 30 914 31 32 33 Grass 30 in 75-85% 34 35 Percentage of fines (silt and clay) by Volume_ Percentage of organic matter by volume 8-15% 5-10% 36 Type of organic material TBD 37 Pihosphorus Index (P-lrtdexjof.medtt3 (unitises] 10 to 50 38 Will compaction be avoided during construction? Yes 39 40 Will cell be maintained to a one inch/hour standard? Depth of mulch, if applicable (in_ches) Yes NA 41 Type of mulch, if applicable _ How many clean out pipes are being installed? ype of pretreatment that will be used: NA 42 43 13 ore ay ADDITIONAL 44 INFORMATION Please use this space to provide any additional information about the bioretention cell(s): _ Final cell mix to be reviewed and verified to meet NCDEQ prior to Installation. SHWT was not found in the boring nearest to the biocell. The depth shown is the termination elevation of the boring.