Loading...
HomeMy WebLinkAboutNCC204036_NOT Signed Certification_20210806 CGO1 Notice of Termination (NOT) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOT(Rescission)form. Then,mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy,Mineral& Land Resources Stormwater Program 512 N.Salisbury Street,61h Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: NCC204036 Name of Project: Washington Interconnect Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement,representation,or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law,I certify that: I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief,such information is true,complete,and accurate. Legally Responsible Organizational Entity: Piedmont Natural Gas J Duke Energy *Legally Responsible Person: Dave Vena Title of Legally R onsiblAe Per on- Senior Project Manager *Signature: uv� R3�r Date: - Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person): * IMPORTANT NOTE. This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president,or a manager that is authorized in accordance with Part iV,Section B, Item(6)of the NCGO10000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCGO10000 permit.