July 1, 2021
SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER
INSPECTION REPORT
Piedmont Natural Gas, Inc.
Attn: Mr. Dave Vena, PE, Project Manager
4270 Piedmont Row Drive
Charlotte, NC 27210
RE: Washington Interconnect (Pitt-2020-012)
Dear Sir,
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
A �/.
J. Randall Jones, Jr., PE
Environmental Engineer
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
D �' q, North C:aroflna Deparha5ent of Environmental Quality Division of Ener p 'Anetal and Land Resources
E
.w `'
Washington Regional Office 943 Wxhis�ytora Square Mail i Washingtorr,North Carolina2788g
Sediii-ieiitatioii/CotistrLICtion
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481
County: Pitt Project: Washington Interconnect River basin: Tar-Pamlico
Person financially responsible:Piedmont Natural Gas-Duke Energy-Dave M Project##: PITT-2020-012
Vena,Engineering Project Manager
Address: 4720 Piedmont Row Drive,Charlotte,NC 28210
1. Project Location: SR 1565 &SR 1563,WASHINGTON
Pictures: No
2. Weather and soil conditions: 90, Sunny,Warm Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: July Ol,2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-
monitoring or self-inspections are required. Project is in compliance and released under the
SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGOI)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:https://edocs.deq.ne.gov/FormsIN0001-
Termination. Please note that this correspondence must be uploaded as part of completing the
NOT process.
cc:
Reported by: Randall Jones Others present:
Date of inspection: June 28,2021 Time arriving on site: 4:30 PM Time leaving site: 4:45 PM