Loading...
HomeMy WebLinkAboutNCC204036_NOT Closeout Documents_20210806 ROY COOPER Governor JOHN NICHOLSON interim Secretary �r v + BRIAN WRENN NORTH CAROLINA Director Environmental Quality July 1, 2021 SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER INSPECTION REPORT Piedmont Natural Gas, Inc. Attn: Mr. Dave Vena, PE, Project Manager 4270 Piedmont Row Drive Charlotte, NC 27210 RE: Washington Interconnect (Pitt-2020-012) Dear Sir, Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, A �/. J. Randall Jones, Jr., PE Environmental Engineer (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report D �' q, North C:aroflna Deparha5ent of Environmental Quality Division of Ener p 'Anetal and Land Resources E .w `' Washington Regional Office 943 Wxhis�ytora Square Mail i Washingtorr,North Carolina2788g Sediii-ieiitatioii/CotistrLICtion North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481 County: Pitt Project: Washington Interconnect River basin: Tar-Pamlico Person financially responsible:Piedmont Natural Gas-Duke Energy-Dave M Project##: PITT-2020-012 Vena,Engineering Project Manager Address: 4720 Piedmont Row Drive,Charlotte,NC 28210 1. Project Location: SR 1565 &SR 1563,WASHINGTON Pictures: No 2. Weather and soil conditions: 90, Sunny,Warm Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: July Ol,2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self- monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.ne.gov/FormsIN0001- Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. cc: Reported by: Randall Jones Others present: Date of inspection: June 28,2021 Time arriving on site: 4:30 PM Time leaving site: 4:45 PM