HomeMy WebLinkAboutNCC205074_Modification Review_20210811 Action History (UTC-05:00) Eastern Time(US&Canada)
Submit by Anonymous User 8/9/2021 1:51:29 PM(ADD TO FILE Submittal)
Approve by Morman,Alaina 8/11/2021 12:55:21 PM(Construction COC ADD TO FILE Review-NCC205074)
• The task was assigned to Morman,Alaina.The due date is:August 12,2021 5:00 PM
8/9/2021 1:51 PM
EESS - 1 •
NORYH CAIiOLINA
EnYlrenmemf&Quality
Certificate of NCC205074
Coverage (COC) Enter the Certificate of Coverage Ninber(Use capital letters)
No.*
Information associated with this permit:
Project Name Whiteville 115kV Substation
Address 555 Flitter Hill Road,Whiteville, NC
County Columbus
Latitude 34.3260
Longitude -78.6896
Permittee Listed Duke Energy Progress, Inc
Legally Responsible Alan Lewis
Individual
NC Reference No. NCG01-2020-5074
E&SC Plan ID Colurtr2021-004
Original NOI 35223
Tracking No.*
Date COC Issued* 11/06/2020
Prior Rescission This field will populate only if CCChas already been rescinded.
Date
Modification Information:
Reason for r Closed-Out Lots/Outparcels in E&SC Plan
Modification* r Additional Lots/Outparcels Approved-E&SC Revised
F Other Revision(s)to E&SC Plan
r Legally Responsible Individual and/or Site Contact Has Changed
r Multiple Reasons(List)
Addional Ivbre information(e.g.,new Site Contact details).If lots are being added,please include specific lot nunbers.
Explanation Limits disburbance increase by.37 acres.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance,etc.(only upload applicable
sheets).
For changes to the legally responsible individual,you must upload this form.
Supporting Upload Supporting Documentation(%vised ERSC Approval,(lose-Out Doc,etc.)
Documentation COLUM-2021-004 Approval Revised 8-6-2021.pdf 308.59KB
Mast be FDFfon-rat
North Carolina General Statute 143-215.66(1) provides that:
Anyperson who knowinglymakes anyfalse statement,representation,or certification in anyapplication,record,report,plan,or other
documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article;orwho falsifies,tampers with,or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand
dollars($10,000).
17 I hereby request modification to coverage under the NPDES Stormwater Permit
for the subject project site. I am familiar with the information contained in this
request and to the best of my knowledge and belief such information is true,
complete and accurate.
Specify if you are:* r The Legally Responsible Individual
f Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV, Section B,
Item(6)of that permit.
Signature
� Cul!
Type Name* Alan W. Lewis
Title* Manager Substation Engineering
Organization* Duke Energy Progress, LLC
Date* 08/09/2021
Email Address* Alan.Lewis@duke-energy.com
Errail for confirrration
Telephone Number* 9195467451
Contact nun ber if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email Additional email for confirmation
(Optional)
Original Permittee alan.levas@duke-energy.com
Email
Original Site Contact brian.lowther@duke-energy.com
Email
Review Date 08/11/2021
Rescinded Since
Submitted?
Request Date 20210809
Formatted
Review Date 20210811
Formatted