Loading...
HomeMy WebLinkAbout20211161 Ver 1_Meeting Request Review_20210715 -,414117 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWircnmenred Quaffry ID#* 20211161 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* eads\rjconchilla Pre-Filing Meeting Request submitted 7/15/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Ray Bode Contact Email Address* rbode@jmt.com Project Name* Proposed Realignment of Kelly Drive(S.R. 1521)to Nash Street(S.R. 1519), Lee County, NC; NCDOT TIP R-5959 Project Owner* Central Carolina Community College Project County* Lee Owner Address: Street Address 1105 KELLY DR Address Line 2 City State/Bovine/Region Sanford NC Fbstal/Zip Code Country 27330 US Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* NCDOT Project R-5959 is a proposed new connection between Kelly Drive and Nash Street with possible pedestrian improvements including a multi-use path and a proposed roundabout.The project study area encompasses approximately 27.6 acres and is entirely on the campus of Central Carolina Community College in Sanford, North Carolina.JMT has determined the limits of jurisdictional waters of the U.S. (WOUS)(including wetlands)within the boundaries for the site and is requesting a Preliminary Jurisdictional Determination (PJD)to confirm those boundaries. Please attach the documentation you would like to have the meeting about. R-5959 PJD REQUEST TO USACE.pdf 6.94MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature zaoeg Submittal Date 7/15/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes (7 No If rrore information is needed,please add comrents for the errail notification below.