HomeMy WebLinkAbout20090922 Ver 2_NC DMF Comments_20210810Staff Review Form
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
6* Yes r No
ID#* Version* 2
20090922
Is this project a public transportation project?*
r Yes
r No
Reviewer List:* Chris Pullinger:eads\rcpullinger
Select Reviewing Office:*
Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
✓ For the Record Only (Courtesy Copy)
✓ New Project
✓ Modification/New Project with Existing ID
✓ More Information Response
r Other Agency Comments
✓ Pre -Application Submittal
✓ Re-Issuance\Renewal Request
✓ Stream or Buffer Appeal
Is this supplemental information that needs to be sent to the Corps?*
c Yes No
Please choose the commenting agency.*
✓ DCM Comments
✓ DFM Comments
✓ WRC Comments
Project Contact Information
c DCM Permit
c USFWS Comments
r: Other
ivuuivir uomrnems
Name: James Harrison
Who is submitting the inforrration?
Email Address: james.harrison@ncdenr.gov
Project Information
Existing ID #:
20090922
20170001(no dashes)
Project Name:
Existing Version:
Greenville Boating Access Area - Port Terminal Road
Is this a public transportation project?
C Yes
✓ No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
c Yes C No c: Unknown
County (ies)
Please upload all files that need to be submited.
aickthe upload button or drag and drop files here to attach docurrent
Only pdf or krre files are accepted.
Describe the attachments
or comments:
The proposed work is located in waters designated as Anadromous Fish Spawning Area (AFSA) under WRC
jurisdiction. As such, the permit should include a moratorium of February 15 to June 30 for in -water work
associated with this project.
Sign and Submit
fJ By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
J. f7�, �SDhi
Submittal Date: Is filled in autorretically.