Loading...
HomeMy WebLinkAbout20210191 Ver 1_Pre-Filing Meeting Information_20210808DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20210191 1 Mooresville Regional Office - (704) 663-1699 Donna Hood Pre-Filing Me eting Reque st submitte d 1/27/2021 Larry Thompson lthompson@ncdot.gov Bridge No. 035 on SR 1134 (Millingport Road) over Long Creek; 17BP.10.PE.147 NCDOT Highway Division 10 Stanly City Albemarle State / Province / Region NC Postal / Zip Code 28001 Country USA Street Address 716 W Main Street Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Donna Hood Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date NCDOT proposes to replace the existing functionally deficient bridge on SR 1134 (Millingport Road) over Long Creek with a new bridge. STV Engineers is providing planning, design, and Section 404/401 services on behalf of Division 10; a MCDC has been prepared; a delineation of waters of the U.S. has been completed - jurisdictional waters of the U.S. in the project area include Long Creek, no wetlands were identified within the study area. An approximately eight-mile off-site detour would be required for the full duration of construction. The project has a Let date of May 5, 2021. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 R_147_Bridge_Stanly035_Figure1_WatersMa…826.17KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 1/27/2021