HomeMy WebLinkAbout20210191 Ver 1_Pre-Filing Meeting Information_20210808DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210191 1
Mooresville Regional Office - (704) 663-1699
Donna Hood
Pre-Filing Me eting Reque st submitte d 1/27/2021
Larry Thompson
lthompson@ncdot.gov
Bridge No. 035 on SR 1134 (Millingport Road) over Long Creek;
17BP.10.PE.147
NCDOT Highway Division 10
Stanly
City
Albemarle
State / Province / Region
NC
Postal / Zip Code
28001
Country
USA
Street Address
716 W Main Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Donna Hood
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
NCDOT proposes to replace the existing functionally deficient bridge
on SR 1134 (Millingport Road) over Long Creek with a new bridge.
STV Engineers is providing planning, design, and Section 404/401
services on behalf of Division 10; a MCDC has been prepared; a
delineation of waters of the U.S. has been completed - jurisdictional
waters of the U.S. in the project area include Long Creek, no
wetlands were identified within the study area. An approximately
eight-mile off-site detour would be required for the full duration of
construction. The project has a Let date of May 5, 2021.
2/1/2021
2/2/2021
2/3/2021
2/4/2021
2/5/2021
R_147_Bridge_Stanly035_Figure1_WatersMa…826.17KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
1/27/2021