Loading...
HomeMy WebLinkAboutSW3210401_Design Calculations_20210810Wet Pond Design Project Name: Waxhaw-Nixon Job Number: 18244 Step 1: Compute the water quality volume (WQV). WQv (Ft3) = (3630) X (RD) X (Rv) X (AD) Where: WQV = Water Quality Volume (Ft) AD = Drainage Area to Wet Pond (acres). Rv = Volumetric Runoff Coefficient = 0.05 + 0.9 (% Impervious) Rp = Design Storm Rainfall Depth (in). Typically 1.0". Percent Impervious = 60% AD = 17.96 acres Rp = 1.0 in Rv = 0.59 WQv = 38,465 Ft" Step 2: Determine Surface Area Requirements. Average Permanent Pool Depth = 5.28 Feet Percent Impervious = 60% SA / DA Ratio = 1.71 Required Surface Area = 13,378 Ft2 Step 3: Preliminary Temporary Water Quality Drawdown Calculations Pond Height above Orifice = 2.9 feet Orifice Invert Elevation = 0.0 feet Pond Surface Area at Height Above Orifice = 24,925 square feet Pond Surface Area at Orifice Invert Elevation = 13,378 square feet Orifice Diameter (D) = 3.50 inches = 0.29 feet Orifice Area (a) = 0.0668 square feet Average Surface Area (A) = 19,152 square feet Gravitational Constatnt (g) = 32.2 fft/sec2 Head (H) = 2.75 feet Discharge Coefficient (C) = 0.6 Time (t) = 197,598 seconds = 2.29 days Note: The above calculation is based on the Bernoulli Equation where: -2xA t _ - )0,5 X (0 - H0.5) C x a x (2g) Step 4: Compute Site Hydraulic Input Parameters. Condition Area (Ac) CN Tc (hours) Pre -developed 29.60 58 0.348 Post -developed 29.60 88 0.0833 Results Condition Q2-year Q10-year Q25-year Q50-year Pre -developed 10.15 34.94 54.52 71.52 Post -developed 4.89 16.27 32.72 50.21 POND 1 STAGE STORAGE CALCULATION Area Calculation - Forebay Contour Area Volume (ac-ft) Volume sq. It AC Inc Accum. cu. It 537 430 0.0099 0.0000 0.0000 0 538 706 0.0162 0.0129 0.0129 562 539 1012 0.0232 0.0196 0.0325 1417 540 1348 0.0309 0.0270 0.0595 2593 541 1716 0.0394 0.0351 0.0946 4121 542 2113 0.0485 0.0439 0.1385 6032 543 2542 0.0584 0.0534 0.1918 8356 544 3002 0.0689 0.0636 0.2554 11125 544.5 3703 0.0850 0.0384 0.2938 12798 Area Calculation - Main Pond Contour Area Volume ac-ft Volume sq. It AC Inc Accum. cu. It 537 6730 0.1545 0.0000 0.0000 0 538 7463 0.1713 0.1628 0.1628 7093 539 8225 0.1888 0.1800 0.3428 14934 540 9014 0.2069 0.1978 0.5407 1 23551 541 9831 0.2257 0.2162 0.7569 32970 542 10675 0.2451 0.2353 0.9922 43220 543 11546 0.2651 0.2550 1.2472 54328 544 12445 0.2857 0.2753 1.5225 66321 544.5 13796 0.3167 1 0.1505 1.6731 72878 Ave. Permanent Pool Depth 5.28 Volume Calculation - Permanent Pool Contour Area Volume ac-ft Volume sq. It AC Inc Accum. cu. It 537 7160 0.1644 0.0000 0.0000 0 538 8169 0.1875 0.1758 0.1758 7659 539 9237 0.2121 0.1997 0.3755 16356 540 10362 0.2379 0.2248 0.6003 1 26151 541 11547 0.2651 0.2514 0.8517 37100 542 12788 0.2936 0.2792 1.1309 49262 543 14088 0.3234 0.3084 1.4393 62695 544 15447 0.3546 0.3389 1.7782 77457 544.5 17499 0.4017 0.1890 1.9671 85688 Volume Calculation - Temporary Pool Contour Area Volume ac-ft Volume sq. It AC Inc Accum. cu. It 544.5 17499 0.4017 0.0000 0.0000 0 545 20064 0.4606 0.2154 0.2154 9383 546 22032 0.5058 0.4830 0.6984 30424 547 24099 0.5532 0.5293 1.2278 1 53482 548 26165 0.6007 0.5768 1.8046 78606 549 28501 0.6543 0.6273 2.4318 105931 550 30387 0.6976 0.6758 3.1077 135370 551 32547 0.7472 0.7222 3.8299 166831 552 34706 0.7967 0.7718 4.6017 200452 552.5 36129 0.8294 0.4065 5.0082 218159 553 37551 0.8621 0.4228 5.4311 236578 554 40927 0.9396 0.9005 6.3316 275805