HomeMy WebLinkAbout20170239 Ver 1_C203844 - Inspection 7-29-2021 Follow up_20210806 C203844—NC119 U-3109A—Site 13
Inspection Review 7-29-2021 Follow-Up
All the following noted corrections below have been completed as of August 5, 2021. Provided are
photo documentation and dates of completion:
1. Place additional cross-staking at the wattle at the 66" culvert inlet.—Completed 8-2-2021
,.,
2. Secure geotextile fabric and wattles along the spillway of Basin 15.1—Completed 8-2-2021
}
•
•
k..
I ��a T vi' •mFs�
3. Place additional wattle upslope to prevent overflow from by-passing controls at Basin 15.1. -
Completed 8-2-2021
4. Tighten section of super silt fence and secure EC matting with pin stakes along hillside and
stream bank. -Completed 8-4-2021
• � 2 � 1 zzF. �-.
IP
ar 'fit
5. Remove Sediment within Basin 27.1-Completed 8-5-2021
•
•