Loading...
HomeMy WebLinkAbout20170239 Ver 1_C203844 - Inspection 7-29-2021 Follow up_20210806 C203844—NC119 U-3109A—Site 13 Inspection Review 7-29-2021 Follow-Up All the following noted corrections below have been completed as of August 5, 2021. Provided are photo documentation and dates of completion: 1. Place additional cross-staking at the wattle at the 66" culvert inlet.—Completed 8-2-2021 ,., 2. Secure geotextile fabric and wattles along the spillway of Basin 15.1—Completed 8-2-2021 } • • k.. I ��a T vi' •mFs� 3. Place additional wattle upslope to prevent overflow from by-passing controls at Basin 15.1. - Completed 8-2-2021 4. Tighten section of super silt fence and secure EC matting with pin stakes along hillside and stream bank. -Completed 8-4-2021 • � 2 � 1 zzF. �-. IP ar 'fit 5. Remove Sediment within Basin 27.1-Completed 8-5-2021 • •