HomeMy WebLinkAboutNCC204024_NOT Signed Certification_20210805 NCG01 Notice of Termination (NOT) Certification Form
Directions:
Print this form,complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N.Salisbury Street,6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.221
General Permit Certificate of Coverage (COC) No.: Al q- aoy0 aY
Name of Project: c4c"-- < 4V Pk-1
Per NC General Statute 143-215.6B(i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report,plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief,such information is true, complete, and accurate.
Legally Responsible Organizational Entity: Kn 6tXGIL 0o/,-t C--S -R—\ qA)c-,(f--- C
*Legally Responsible Person:
Title of Legally R onsible Person: AM-A)r+6C,k 446L We ,
pLr—^N6L,E, L.L"---
*Signature: Date:
Print Name a Title of Signed (only if authorized individual signing differs from Legally Responsible Person):
* IMPORTANT NOTE. This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV,Section B, Item(6) of the NCGO10000 permit.
For more information on signatory requirements,see Part IV, Section B, Item (6)of the NCGO10000 permit.