HomeMy WebLinkAboutNCC203603_NOT Closeout Documents_20210805 HOLLY
� Town of Holly Springs
SPRINGS Engineering Department
�}If{G NFF�tP[SOYFC[.
Certificate of Completion For
Soil Erosion and Sedimentation Control
PROJECT Southern Crossroads Ralph Stephens Rd. Sidewalk PHASE N/A
LAND DISTURBING PERNHT NO. 19-2020
FINANCIALLY RESPONSIBLE Southern Crossroads Inc.
PARTY
This is to certify that on the above referenced project the grading has been
completed, all utilities and streets have been installed, and permanent stabilization
has been successfully achieved in or along all roads and utilities in accordance with
the approved erosion control plan. With this certificate, the Town of Holly Springs
Engineering Department certifies that the above referenced project is in final
compliance with the Town's Soil Erosion and Sedimentation Control Ordinance
and therefore closes the active erosion control file for the above referenced project.
4-22-21
Erosion Control Inspector
Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or
sedimentation issues at this site.
9024 Certificate of Completion Page 1
2/25/2006