Loading...
HomeMy WebLinkAboutNCC203414_NOT Closeout Documents_20210805 Sedimentation/Constiruction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200 County: Johnston Project: Sassarixa Swamp Mitigation Site River basin: Neuse Person financially responsible:Wildlands Engineering,Inc-Shawn Wilkerson, Project#: JOHNS-2020-013 President Address: 1430 S Mint Street,Suite 104,Charlotte,NC 28203 1. Project Location: Old Olive Road,Smithfield Pictures: No 2. Weather and soil conditions: Sunny,dry,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): N/A Title: Inspection report: Sent Report Date given/sent: August 02,2021 9. Corrective action needed: 10. Comments: Project work is complete.Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO1)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lauren Garcia Others present: Date of inspection: August 02,2021 Time arriving on site: 9:00 AM Time leaving site: 9:30 AM cc: