Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20130638 Ver 1_Site Plan_20130624
CUtjyHI H D' SHEET TITLE CA COVER C.2 LINE A & B SANITARY SEWER RELOCATION 0.3 LINE C SANITARY SEWER RELOCATION C.4 EROSION CG iTROL DETAILS C.5 STREAM CROSSING DETAILS C.6 EROSION CQ4TROL NOTES.& SEEDING SCHEDULE C.7 TRAFFIC COITROL DETAILS NOTICE TO CONTRACTOR 1) THE CONTRACTOR SHALL FIELD VERIFY THE ONSITE T.B.M. W/ EXISTING ELEVATIONS. THE CONTRACTOR SHALL IMMEDIATELY CONTACT W.K. DICKSON & CO., INC. @ 828.327.6911 IF ANY DISCREPANCIES ARE FOUND IN ELEVATIONS SHOWN. 2) THE UNDERGROUND UTILITIES SHOWN HEREON WERE MARKED BY LDSI, INC. ON FEBRUARY 5th, 2013 AND THOSE MARKS WERE FIELD LOCATED BY SOUTHEAST GEOMATICS GROUP, INC. ON FEBRUARY 5th & 7th, 2013. THE ACCURACY OF FIELD MARKED UNDERGROUND UTILITIES IS +/- 30 INCHES HORIZONTALLY, UNLESS OTHERWISE INDICATED. THE DEPTH OF THESE UTILITIES IS UNKNOWN, UNLESS OTHERWISE INDICATED. THE UNDERGROUND UTILITY ;MARKINGS WERE LOCATED USING TRIMBLE ROBOTIC TOTAL STATION USING THE NAD83/2012 DATUM HAVING AN ACCURACY OF +/- 0.1 of PLEASE NOTE THAT N.C. LAW REQUIRES THAT THE NC ONE CALL CENTER BE NOTIFIED PRIOR TO PERFORMING ANY EXCAVATION. CALL 811 OR 1- 800 - 6324949 OR VISIT 16+/`16VW.NCOCC.ORG. zz_czmm= , INU. ALL MUM I7 t t,=11VtV. r1=rMVU .4 •'lAnAUF /'.........,.. -gut A...... o,........: :a.,t,�b. JML1Y 1 � 9 7Ai4 LIU, kly juE F-01 ki, I 11 cog iq 11ii I'll � 1iX., 'Kill PROP. LINE A SHEET C.2 —NJ PROP. LINE B I SHEET C.2 ,� Sw PROP., LINE C SHEET C.3 -, v F�,.�rylp Copp IPh L!J'Al ki 4 NA 3rd St IF S G 7th St SW 2 J > > -+-' �rz < > rn < c0 :-5- co Ln 00 v v `(D (° 6thStS _ W l'tL3�uQID ., INC., �v > �C 81� T �2 mifFigroloml, EXISTING LEGEN z -- -- PROPERTY BOUNDARY ffiQPOSED R/w RIGHT -OF -WAY -- - SBACK SETBACK - - — - - - -- PE PERMANENT EASEMENT PE TCE TEMP. CONSTRUCTION EASEMENT TCE m LIMITS OF DISTURBANCE 1 D PDE PERMANENT DRAINAGE EASEMENT PDE — --- --- — INDEX CONTOUR --100 -- - -- - -- -- - INTERVAL CONTOUR 96 z STORM DRAINAGE PIPE ® STORM DRAINAGE STRUCTURE p STORM DRAINAGE MANHOLE - -- - - -- - -- ROOF DRAIN RD --- --- — HYDROLOGIC FEATURE — - -x x x--- -- FENCE T T T T GUARDRAIL T T T -I--- - - --f— RAILROAD LINE ¢-- `a SIGN T CURB AND GUTTER CONCRETE WALK /PAD 777 HEAVY -DUTY ASPHALT3w�; Q LIGHT -DUTY ASPHALT , t - - - - - - eFM - - - - - - FORCE MANN —FM- ------ - - - - -- GRAVITY SEWER SS ® SANITARY SEWER MANHOLE coo SANITARY SEWER CLEAN OUT �- ------ eB - - - - -- BOTTOM OF BANK BB ------ 1s - - - - -- TOP OF BANK. TB DITCH LINE ------ ow - - - - -- OVERHEAD 4 #4RE —ow- - - - - - - UE ------ UNDERGROUND ELECTRIC UE ------ FO- - --- -- FIBER OPTIC CABLE FO ------ 4`G - - - - -- UNDERGROUND GAS G ------ T - - - - -- UNDERGROUND TELEPHONE UT POWER POLE ( 3 LIGHT POLE x �- GUY WIRE SHRUB LIME TREE LINE - - - - -- s-w - - - - -- WATER LINE w "V0 GATE VALE 0 EXISTING WATER METER X y/ RELOCATE WATER METER RECONNECT TO EXISTING WATER METER WATER SERVICE AIR RELEASE VALVE BEGIN /ENO RESTRAINED JOINT PIPE -b- FIRE HYDRANT _ PERMANENT DIVERSION DITCH TEMPORARY DIVERSION DITCH --So 7DO-- 0 TEMPORARY SILT FENCE -- ® - TREE C3 SHRUB 0 SOIL BORE ELEV x SPOT ELEVATION ELEV x BENCHMARK ELEVATION CHECK DAIS INLET PROTECT ION RIP -RAP TEMPORARY SEEDING TS PERMANENT SEEDING PS TELEPHONE PEDESTAL @ TELEVISION PEDESTAL ® FIBER OPTIC PEDESTAL ° MAILBOX rF1 Wsii+w� °V °�� PROFESSIONAL SEAL r 4 RELEASE NUMBER CONTROL DATA SET DATE RELEASED HOR. DATUM: NO GRID (NAD 83) VERT. DATUM: NAVD 88 z 0 E is U 10 ; o ir ,o I d U w cc m � o a O a. U- w z Z 0 uj uj ©O M z. Qz F¢-- ©OU© W C/) cr m w a°"�Q z a O I-` IL 50 W Ir w oc o z O loc 0 0 w Q w w O Z z o o _o X y/ LL U- w a Z O uj uj ©O M z. Qz F¢-- ©OU© W C/) cr m w a°"�Q z a O I-` IL 50 W Ir w oc o PROJ. DATE: IJUNE 2413 Q.C.: Q.C. DATE: DRAWING NUMBER: Cal PROD. NO.: 20120174.00 -HI w z w uj uj M z. w ©u� dII-- o W C/) x- o W w ct o N O I-` IL 50 arc ® w oc PROJ. DATE: IJUNE 2413 Q.C.: Q.C. DATE: DRAWING NUMBER: Cal PROD. NO.: 20120174.00 -HI Nlf- MANHOLE TO BE REHABILITATED.- Jessee H. Winstead PLUG INVERT IN. RIM=996.66' PROP. 5'0 MANHOLE #2 EXISTING SANITARY SEWER LINE A STA. 2+71.95 TO BE REMOVED AND REPLACED D8 947 PG 721 INV IN=991. 13' PID. 373108896344 INV OUT=991.12' J AS SHOWN. EXISTING SANITARY SEWER r if TO BE ABANDONED7`(,' i ss ' ~ 1-1 '1�1 0 NIF _ I I 1 1-1 1-1 1-11 1., IN. lylt, _j PROP. 4'0 MANHOLE #3 Walter W. Cline NEW LATERAL PIPE CONNECTED Lj NI `N- Norman R. Fisher I LINE A* STA. 3+69.36 D8 2607 PG 1280 NN D8 834 PG 363 TO NEW SEWER AND EXISTING PID, J73108896079 23: PID. 373108896427 SSMH_ 115 LATERAL PIPE PC P1 -RIA4=996.02' /k, K FS IN r111 %\ NN 0 ,,,—INV IN=990.34'(N) SO*1 1'07nE 271.96 0 04 �N_ Q INV IN=990.96(E) 11N N., 3. INV OUT=990.20' ♦ N & - 1 0 1% .00 ZT r _PE K PE��PS 7, N 5 N NN APPROXIMATE LOCATION ,y (/ f�� J g Iky3 ' r j K 7`� PE If) 0% l 04 0 N L. N, 01 �. i Ir 526. 0 /r! r '\ NN Ti— TOE+-,P TCE— N 60 0 ISS N NIF NIF I 1 N, - 1-1 I John U. Wellborn No,,,7non R. F7sharN`N. ss ----- - x -- Er 1609 PG 354 D8 2060 PG 1296 PID. 373108896234 Oz' PID.,373108895089,,, BD INN 3r ------ 3n ---- 3A EXISTING SANITARY SEWER TO BE ABANDONED NIF CO PROP. WIRE AND STONE ----- -- th E. Nicholas Kenneth REINFORCED OUTLET D8 2191 PG 1442 1 N Nlr INSTALLED AT LOW POINT. PID. J73108895425 %lot Jeffrey U. Moore SEE DETAIL. IN"N D8 3099 PC 904 PID. 373108885847 00 PROP. 0 MANHOLE #1 Co- . N FENCE, TYP. . E A 87A. 0+00.00 PROP. TEMP. SILT (t sTALTNEw 'SERVICE LATERAL ► W SEE DETAIL R. WITH CLEANOUT TO PROPERTY LINE. SERVICE LINE EXTENSION TEMP. GRAVEL CONSTRUCTION CONNECT TO NEW MANHOLE. 171 1.%j UO=, 1-. I OTHERS) n-no) SSUH-123 kD ENTRAN(,',E/EXIT, TYP. RIM=999.35* SEE DETAIL T. 'INSTALL NEW SERVICE LATERAL W -3 INY 1N=992.,97#(W) WITH CLEk,40UT TO PROPERTY LINE. PROP. TEMP. CHECK 1;VV IN492.64?(E). CONNECT TO NEW MAIN SEWER. DAM, TYPICAL. SSUH-110 hVY OUT-992.42' R11d=986.27' NIF SEE DETAIL S. INV IN=980.69(CO from APT) Yount Apartments, LLC INV OUT=980.36' D8 2863 PC 163 N PID, 373108894224 EXIST. MANHOLE STA. 4+99.54 F Edgar H. WaltonNJr. , J 08 2141 PG 840 PID. 373108883898 PROP. INLET PROTECTION, TYP. fi SEE DETAIL. ......... 0 SS14H- 109 RIM=982.43' INV IN=976.62' INV OUT=976 01' j 8TH A VEN41C SW 1006 l000 998 996 994 990 986 984 982 980 976 974 972 I. 970 968 1004 1002 1000 998 996 994 992 990 988 986 984 982 980 978 976 974 972 970 968 -0+25 0+00 0+0 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 (RIGHT <- NAME: L: INC. ALL RIGHTS RESERVED.'.REPROC 7400HI - Conover SW Area *Sewer Rehab JAS 1022 1020 1018 1016 1014 1012 1010 1008 1006 1004 1002 1000 998 996 994 992 990 988 986 984 0 Z Zb LLJ .0 0- Z Q, SSRN- 187 UJ— Cr QZ© RIM== 996.12' cc W > 00Q cc as Z) CC Lj INV IN =989.55' CO From Houses 0 (00 Z W INV IN=991.92' CO From House Opposite V Side of Street 0 CC. ,I INV OUT-989.16' ,VV Ou cc < W Z W < 0 2t W Z 4:k LE , 0 co PROP. 4'0 MANHOLE #4 1F.F1 90 l< Lu n'21913 0. Z < — LINE B STA. 3+73.03 0 C14 cr_ W 110�IN STA. STA. 0+00.00 PROP. INLET PROTECTION, TYP. cc SEE DETAIL. NV 995.,35' I I V C e— 04 0) if O W: _j IS') 6 (D 00 11 0 Z ------- - ----- ------ 11 ""' " ----- -------- ------ ..... .... . FF 0-- 87H -AVENUE SW N. ------ cam. T Z Lu • Z 0) -r Z < + or W iY Fy rr R) IL Z < 11 W x. IL _j EXIS77NO I I DEJ-\1 00, O W ... . .... . . LLI 0 + 6 00 eh . . ..... .... EXIST WA TER SER W CE. ct Lu- 77 CON7RACTOR APPROXIMATE TO FIELD VERIFY N.=� Lu > REPLACE -WITH MATCH EXISTING 20 LF 8" EXISTING DIP. GRADE. 8" VCP_ I:Pliop., @ OF 8" DIP 0-50% SLOPE d- —1 x __A fit OF -50% P. 97-42 L 81' DIP SLOPE .... ..... . @ Op , (% J0 0; 4)/p fi ............ . . . . . . . . . . . ...... ...... EXISTING GRADE - —T_ _7 .......... I-o" U EXIST APPROXIMATE WATER fi ---- _j rT t CONTRACTOR TO FIELD. VERIFY"\ 4 0 4S C> p 0 < ------- j 0 Z R5 fi EXIST: WATER SERVICE. DEP7H. APPROXIMATE :5 R ------- --- ----- -- 1004 1002 1000 998 996 994 992 990 988 986 984 982 980 978 976 974 972 970 968 -0+25 0+00 0+0 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 (RIGHT <- NAME: L: INC. ALL RIGHTS RESERVED.'.REPROC 7400HI - Conover SW Area *Sewer Rehab JAS 1022 1020 1018 1016 1014 1012 1010 1008 1006 1004 1002 1000 998 996 994 992 990 988 986 984 0 'NN N "5V23"W-3 3.03' KIM ZJ � 0 -- ----- ---- 0. __ss__ _Ss_ ---- ss-- -ss _Ss EXIS77NG 4' DIA. SERVICE LATERAL INV. 993.53' (APPROXIMATE LOCA770N) PROP. TEIVIR CHECK DAM, TYPICAL. INSTALL NEW SERVICE LATERAL SEE DETAILS. WITH CLEANOUT TO PROPERTY LINE, TYP OF 3. SERVICE LINE EXTENSION CONNECT TO NEW MAIN SEWER. TO HOUSE, TYP. (BY OTHERS) NIF NIF NIF Sean Fitzgerald Thomas P. Pinkney Randall L. Roll D8 3074 PG 1825 D8 656 PG 212 D8 1472 PG 514 PID. 373108872744 PID. 373108872634 PID. 373108872545 . . .- �- ............... NIF Maria W. Mon talvo DB 2252 PG 806 PID. 373108871702 Z Zb LLJ .0 0- Z Q, SSRN- 187 UJ— Cr QZ© RIM== 996.12' cc W > 00Q cc as Z) CC Lj INV IN =989.55' CO From Houses 0 (00 Z W INV IN=991.92' CO From House Opposite V Side of Street 0 CC. ,I INV OUT-989.16' ,VV Ou cc < W Z W < 0 2t W Z 4:k LE , 0 co PROP. 4'0 MANHOLE #4 EXIST. MANHOLE EXISI 0. Z < — LINE B STA. 3+73.03 0 C14 cr_ W 110�IN STA. STA. 0+00.00 PROP. INLET PROTECTION, TYP. cc SEE DETAIL. NV 995.,35' I I V .0, ow_�Ow Cfir____-r-0W 0 0-- 87H -AVENUE SW N. 'NN N "5V23"W-3 3.03' KIM ZJ � 0 -- ----- ---- 0. __ss__ _Ss_ ---- ss-- -ss _Ss EXIS77NG 4' DIA. SERVICE LATERAL INV. 993.53' (APPROXIMATE LOCA770N) PROP. TEIVIR CHECK DAM, TYPICAL. INSTALL NEW SERVICE LATERAL SEE DETAILS. WITH CLEANOUT TO PROPERTY LINE, TYP OF 3. SERVICE LINE EXTENSION CONNECT TO NEW MAIN SEWER. TO HOUSE, TYP. (BY OTHERS) NIF NIF NIF Sean Fitzgerald Thomas P. Pinkney Randall L. Roll D8 3074 PG 1825 D8 656 PG 212 D8 1472 PG 514 PID. 373108872744 PID. 373108872634 PID. 373108872545 . . .- �- ............... NIF Maria W. Mon talvo DB 2252 PG 806 PID. 373108871702 1020 1018 1016 i 1014 1012 1008 1006 1004 1002 998 994 992 990 988 986 984 -0+10+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PAITE,_ WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, ,add\Plan Set120120174 DESIGN.dwg -#### - June 7, 2013 - Jordan Isenhour P K IC D1C&C%;XS0N&'8 community infrastructure consultants Transportation + Water Resources Urban Development + Geornatics 401 4th Street, SW Suite 201 Hickory, NC 28602 (y) 828.327.6911 (0 $28.327.9164 www.wkdickson.com NO. UCENSE NO. F-W74 Z 0 E WO 9 i,- - 10 EL Z 0 Z 8 O cc uj Cr. 8 Z Z 0 C/) U, co 0 x 0: Z LLJ .0 0- Z Q, 0 UJ— Cr QZ© cc W > 00Q cc as Z) CC Lj 0 (00 Z W W C0 0 CC. 0C 0 W Z cc < W Z W < 0 2t W Z 4:k LE , 0 co Z ick w LL W F- 0 _j 0. Z < — U -, 0) < 0 C14 cr_ W cc -4 O W . . ..... .... EXIST WA TER SER W CE. CON7RACTOR APPROXIMATE TO FIELD VERIFY N.=� —1 EXISTING GRADE I-o" U EXIST APPROXIMATE WATER SERVICE. DEPTH.—— ---- rT t CONTRACTOR TO FIELD. VERIFY"\ 0 4S C> p 0 < ------- j 0 Z R5 EXIST: WATER SERVICE. DEP7H. APPROXIMATE :5 R _-CONTRACTOR TO FIELD VERIFY W Z_ Z -------- -- 01, V%1 fl EXIST 15" RCP sr -_ APPROXIMATE CONTRACTOR TO DEPTH. FIELD VERIFY 3 EXIST 2" APPROXIMATE GAS. SIZE AND DEPTH , CONTRACTOR TO FIELD VERIFY f T_ 1020 1018 1016 i 1014 1012 1008 1006 1004 1002 998 994 992 990 988 986 984 -0+10+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PAITE,_ WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, ,add\Plan Set120120174 DESIGN.dwg -#### - June 7, 2013 - Jordan Isenhour P K IC D1C&C%;XS0N&'8 community infrastructure consultants Transportation + Water Resources Urban Development + Geornatics 401 4th Street, SW Suite 201 Hickory, NC 28602 (y) 828.327.6911 (0 $28.327.9164 www.wkdickson.com NO. UCENSE NO. F-W74 Z 0 E WO 9 i,- - 10 EL Z 0 Z 8 O cc uj Cr. 8 Z Z 0 C/) U, co 0 x 0: W05. DATE: JUNE 2013 . Q.C.: Q.C. DATE: DRAWING NUMBER: • PROJ, NO..: 20120174.00.Hi Z LLJ .0 0- Z Q, 0 UJ— Cr QZ© cc W > 00Q cc as Z) CC Lj 0 (00 Z W W C0 0 CC. 0C 0 W Z cc < W Z W < 0 2t W Z 4:k LE , 0 co Z ick w LL W F- 0 _j 0. Z < — U -, 0) < 0 C14 cr_ W cc W05. DATE: JUNE 2013 . Q.C.: Q.C. DATE: DRAWING NUMBER: • PROJ, NO..: 20120174.00.Hi APPROXIMATE L0CA770N--\ SSMH- 197 RlAf=978.85' INV IN=975 61*(N) INV IN=97561'(E) EXISTING SANITARY SEWER INV OUT 975.59' TO BE ABANDONED SSUH- 196 EXIST. MANHOLE NIF' RIM=978.20' STA. 6+45.54 Robbie K. Hass D6 2123 PG 308 INV IN=974.78*' --- PROP. WIRE AND STONE PID. 373112769933 INV OUT 974,69' S88*27"32W REINFORCED OUTLET _ss ----- SS ------ SS-- INSTALLED AT LOW POINT. -SS SEE DETAIL. EXISTING SANITARY SEWER 7 TO BE ABANDONED TO__",�_ p DOWNSTREAM MANHOLE (MH-195) PROP. WO MANHOLE #7 LINE C STA. 6+18.51 ``^� ' -_ err f 196 _SS APPROXIMATE LOCATION --\ WETLAND IMPACT HOUSE ON 41 E OIN 1-1 F p US PERM IMPACT (WI) = 0.050 AC SYSTEM SEP77C TEMP. IMPACT (W2) = 0.215 AC IN V 952. J2' PROP. 4'0 MANHOLE #5 q89 096116 "W _9Aft Irk' LINE C STA. 2+48.26 SSUH- 199 RIU=979. 03' INV IN=97588' INV OUT=975.94' (Does appear to have backwards Inverts in manhole) -67.68' / PROP. TEMP. CHECK SSM(H-054 PROP. STREAM IMPACT NO. S1 DAM, TYPICAL. 4�? RIU=94J.62' is r SEE DETAIL S. STA. 4+70 INV IN=9J6.48** PROPOSED ANTI-SEEPAGE INV OUT=9J6.28' STA. 5+08 j1jY V 7# COLLAR, SEE DETAIL If PROPOSED ANTI-SEEPAGE -1 . . . ..• . . J- COLLAR, SEE DETAIL L /. Li <P, •-7` An 't I/ x h -, .. rJ" r Q� I /fir r f \�INV = 962.90' 7 r PC pi IF-7 7- 7�x N88-21-42-W 197.5& INV 960.06' PE -p;"- PE K-K PE PE - EXIST. MANHOLE TCE STA. 0+00.00 PROP. TEMP. SILT SSUH-055 INV 952-556' FENCE, TYP. RIM=950.64P Rlhf. 961.59'(6C) SEE DETAIL R. INV IN= 94J. 7 II(E) J WV 1N =943.40 (S) IN-95Z82' OU T- 95Z 77' INV OUT 942.5,2 (Full of Trash) NIF K & N Rentals, Inc. D8 3037 PO I336 TOP OF PIPE. 958.18'(18"CPP) PID. 373112767776 PROP. 4'0 MANHOLE #6 Full of Trash NIF I LINE C STA. 4+45.84 C1 NIF K & N Rentals, Inc. / I Paulette M. Suntan yv D8 3037 PC 1776 961.55(r8C))- -373112767776 OUT 95Z 74' AZ� TEMP. GRAVEL CONSTRUCTION PID. D6 2859 PG 1207 e� ON, e, PID. 373112768762 -7 ENTRANCE/EXIT, TYP. N1, F NIF SEE DETAIL T. K & N Rentals, Inc. Irene E. Ha g man SSUH-057 D8 2531 PG 605 Nlr . 'r SSUH'-055A D8 2698 P482 O' WIDE PERMANENT MAINTENANCE RIY=955.49 PID.* 373112766750 K , &Z N Rentals, Inc. RIM=969.33>_, PID.373112769619 CORRIDOR CENTERED ON SEWER LINE INV IN=944.47' D& 2526 PG 1972 INV IN=959.97' INV OUT=944.21' PID 373112767606 INV OUT=959.72',, THROUGH WETLAND. 968 968 986 2 +.50 -2+00 COPYRIGHT; *,+W.K, DICKSON &CO., INC,: ALLRIGHTS RE FILE NAME. L.\Pr9jeqts\CON0V12012017400HI - Conover SW -1+50 -1+00 -0+50 0+00 0+50 1+00 1+56) 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 986 984 982 980 978 976 974 972 970 968 966 964 962 960 958 956 954 952 950 948 7+00 ?PRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO-THIS-DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO Rehab ELoject\Caddflan Set120120174 DESIGN.dwg -#### - June 7. 2013 - Jordan Isenhour FULL SCALE: 1,0= 40' 0 44' 80, HOR. DATUM: No GRID (NAD 83) VERT. DATUM: NAVD 88 w OC\1 Z Z 0 0 U. a LU (a z cr) UJ .0 w z cc iii 1[ 0 z CL 0 Z aC .. .. .. 0 d 6 Q 2z z ;�L:)i5 U.1 U Lj :3 CC o w N 0) LO o6- w z w > > :j w z s6e 984 cc w a<- t; 8 z Lij 0 w Q C) w Cl) w CC U) ac < ------ - --- �1 L 14.1 < 0 LU z cr 0 t= 9:z z < w U_ x C\1 I.- Z LU 0_: C\1 LO L z ©I cc --- - ------ - z < 964 f 982 U-) 00 I'M. W! J cc a. 962 980 .... ......... .. .. ....... PROPOSED i�EJAIM,'_S ST F EA 1 4E A C .0 SING, it z 0 z > z z '960., 978. T_ .... ... 7 puo 100 14 R_ w C> 00 L D W z a.- m h�g csi 0 EXISTING GRADE- tt 954197? 52 974 , 970 .. ... .... .. .. Ui Q} 1qr ,-- U! i 0) 0. 0+ i i q It < t- 00 wz tr 11 1 ---- 1. 1-- - ------- - -- sit, (< 9 0 96q CL w RZ2 - --- -------- ...... ....... '648 960 EXIS77NG GRADE iii • -1 4_J . ......... J 0?. '946 96�' -1 Or ___ .9 r 4 .. ...... . .... 956, i�40 jST f?y 038 958 j I I I . ..... T ..... .. ... )?,C J47.58 .. ..... .. DIP 078 o /a . LF pp IJK P. 12.67 LJ OF 8" Dip 0.50% SLO . ..... _ t iE _ .?€ i p 934 952 STA. 5+08 PROPOSED ANTI-SEEPAGE . ..... 932 95Q PROPOSED COLLAR, STA. 4+70 ANTI-SEEPAGE- SEE DETAIL COLLAR, SEE DETAIL j 930 948. 2 +.50 -2+00 COPYRIGHT; *,+W.K, DICKSON &CO., INC,: ALLRIGHTS RE FILE NAME. L.\Pr9jeqts\CON0V12012017400HI - Conover SW -1+50 -1+00 -0+50 0+00 0+50 1+00 1+56) 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 986 984 982 980 978 976 974 972 970 968 966 964 962 960 958 956 954 952 950 948 7+00 ?PRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO-THIS-DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO Rehab ELoject\Caddflan Set120120174 DESIGN.dwg -#### - June 7. 2013 - Jordan Isenhour FULL SCALE: 1,0= 40' 0 44' 80, HOR. DATUM: No GRID (NAD 83) VERT. DATUM: NAVD 88 w OC\1 Z Z 0 0 U. a LU (a z cr) UJ .0 w z cc iii 1[ PRoi. DATE. + JUN5013 Q.0 m P O.C. DATE: . DRAWING. NUMBER: 93 PROD. NO.:.. 20120174.00.H1 0 z CL 0 Z aC .. .. .. 0 d 6 Q 2z z ;�L:)i5 U.1 U Lj :3 CC Cr =) at cr cc w a<- t; 8 z Lij 0 w Q C) w Cl) w CC U) ac < 14.1 < 0 LU z cr 0 t= 9:z z < w U_ x C\1 I.- Z LU 0_: C\1 LO L z ©I cc PRoi. DATE. + JUN5013 Q.0 m P O.C. DATE: . DRAWING. NUMBER: 93 PROD. NO.:.. 20120174.00.H1 CLASS A STONE 1 FT HEIGHT,1 FT, BEYOND EDGES: POST -FILTER FABRIC 36" MIN. WIDTH COMPACTED $OIL STEEL POST 36' GRADE (MAX.) 10 FT. MAX. SPACING WITH W'RE SUPPORT FENCE i 19 GAUGE HARDWARE CLOTH 4= /—W/ 114" MESH OPENING 9" MAX (RECOMMENDED) STORAGE HEIGHT V_ • II1,��II/I1 /# #./r�:�r## #LAM► 15 WA WA ► ##irl�r�,���1 PONDING HEIGHT GAUGE HARDWARE CLOTH /-19 W/ 1/4" MESH OPENING RUNOFF NOTES: 7=r 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE _ SEDIMENT WHEN DEPOSITS REACH 30% OF FENCE HEIGHT. 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. �� 3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING = j-1 EFFICIENCY. ROCK SECTION DETAIL TRENCH WITH GRAVEL SILT FENCE - WIRE & STONE REINFORCED OUTLET NOT TO SCf_ CATCH BASIN —j 19 GAUGE HARDWARE CLOTH W/ 1/4" MESH OPENING. STEEL POST PLAN 4' MAX SPACING BETWEEN POSTS. 2 - NO, 5 WASHED z r FILTER STONE C FL--- LOW-. N 7 `fl F�-- -L-- -- 3'4" ANCHOR FABRIC MESH IN 16" OF NO.5 WASHED STONE SECTION A NOTES: 1 SEDIMENT SHALL BE REMOVED AND TPAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE. SEDIMENT HASACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. 2: THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED. 3: CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION SHALL BE MINIMIZED. 4. THE SEDIMENT TRAP SHALL BE REMOV'rED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY CATCH BASIN SEDIMENT TRAP NOT TO SCALE ECO05 SERVED. REPRODUCTION OR USE OF THE CO Area Sewer Rehab ProjectkCaddlPlan Sett201201 FIGURE I INTITIAL OR TRENCH ♦ rye 4„ STAKE AT V INTERVALS FIGURE 2 INTERMITTENT . BEGINING OF STAKE AT EMBANKME VINTERVALS '011?-_CT101V OF Fl- OW—__ WA IlAd. Ifi�lli�sru�.�. %•I,�/►,r►,,rIhl/�n-1►I,. 4„ „, ,,, ,,, ��,_ ,�, „,._,,, ,,,. ", EROSION CONTROL MATTING MUST ��I i1 -1 T 1 _0�11!i I (1 =I i —I! 1—C �1L I f =l 1 I ��,I {— MEET OR EXCEED THE FOLLOWING REQUIREMENTS: I-1�1 �IIII I }I 1I IIIIM ETIIITIIIIITIII1 1I (FIGURE 3 100 % COCONUT FIBER (COIR) TWINE WOVEN INTO A HIGH STRENGTH MATRIX. � TOP OF BANK THICKNESS - 0.35 IN. MINIMUM. - TENSILE STRENGTH -1740 LB /FT MINIMUM TERMINATION SHEAR STRESS -4.5 LBSISQFT FIGURE 4 FLOW VELOCITY- OBSERVED 12 FT /SEC WEIGHT - 23OZ/SY TERMINAL ANCHOR TRENCH SIZE - 9.84FT X 165 FT (180 SY) "C" FACTOR - 0.002 OPEN AREA (MEASURED) - 48% SLOPES - UP TO A MAXIMUM OF 1:1 EROSION CONTROL MATTING INSTALLATION NOT TO SCALE 344 >ARS PIPE O.:G. BELL M TRENCH WALL -• -- TRENCH WALL POURED... , v-,- - vv. - (SIDES NEXT TO TRENCH NOT FORMED) 12 "MIN. NOTE: FORMS NOT REQUIRED BELOW SPRING LINE, CONCRETE MAY BE PLACED SEE NOTE AGAINST SHAPED BANKS IN LIEU OF FORMS. 4„ CONCRETE PLACED ON � UNDISTURSED SOIL AS DETERMINIED BY ENGINEER. SECTION CONCRETE SEEPAGE COLLAR NOT TO SCALE 8L020.dwg DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, - # # ## - June 7, 2013 - Jordan Isenhour INSTALLATION NOTES: SITE PREPARATION GRADE AND COMPACT AREA. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. 2 REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL 5TART NEW HAVE DIRECT CONTACT WITH THE SOIL ROLL IN CHECK SLOT, OVERLAP PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. MINIMUM V C1 °Oltn TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE EXISTING GRADE CITY. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. O DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED. SEEDING a- APPLY SEED TO SOIL BEFORE PLACING MATTING. WHEN USING PERMANENT LINER, APPLY ADDITIONAL SEED AFTER INSTALLATION AND z FILL MAT WITH SOIL. INSTALLATION OVERLAP ADJACENT MATS 3" AND ANCHOR EVERY 18'" ACROSS THE OVERLAP. U THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE LOWER ELEVATION MAT. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. Q DO NOT STRETCH TIGHT. z 0 O WATER LEVEL ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS. EXCAVATE INITIAL ANCHOR TRENCH 12 "X6" ACROSS THE EMBANKMENT AT THE LOWER END OF THE PROJECT AS SHOWN ON SHEET 5. SEE FIGURE 1 FOR INITIAL ANCHOR TRENCH. PLACE 6" x 6" CHECK SLOTS AT 30' INTERVALS ALONG THE EMBANKMENT AND WEIR. CO SEE FIGURE 2. CUT 4!'x 4" TRENCH ALONG TOP OF BANK FOR MAT TERMINATION. EXTEND MAT TO THE EDGE OF THE ASPHALT OR 2 TO 3 FEET ABOVE THE CREST IF POSSIBLE. w BEGINNING AT THE CENTER OF THE EMBANKMENT AT THE DOWNSTREAM END OF THE AREA TO BE LINED, PLACE THE END OF THE ROLL IN ANCHOR TRENCH AND SECURE WITH BIODEGRADABLE STAKES OR PINS. SEE FIGURE 1. a� PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 3" OVERLAP. SECURE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND OoU4 COMPACT SOIL. Z UNROLL MAT OVER COMPACTED ANCHOR TRENCH, STOP AT NEXT CHECK SLOT OR W TERMINAL ANCHOR. UNROLL ADJACENT ROLLS IN SAME MANNER, WITH A MINIMUM OF W OF OVERLAP. in STAPLE AT 18" INTERVALS ALONG OVERLAP. d FOLD AND SECURE MAT ROLLS TIGHTLY INTO CHECK SLOTS. LAY MAT IN CHECK SLOT, FOLD BACK AGAINST ITSELF, ANCHOR THROUGH BOTH LAYERS, BACKFILL AND COMPACT ¢ SOIL, CONTINUE ROLLING MAP UPSTREAM. SEE FIGURE 2. ► BEGIN NEW ROLLS IN CHECK SLOT, AND OVERLAP ENDS MINIMUM OF 1'. SEE FIGURE 4 FOR TERMINATION AT UPSTREAM END. Q.d MAINTENANCE W INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY) GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION NOT OCCU U _MUST BENEATH THE RECP. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE Z GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. 2 DI PIPE. ONE FULL --/ CONCRETE ANTI- SEEP- -/ PIPE SEGMENT CENTERED COLAR, TYPICAL ON STREAM CENTERLINE SEE DETAIL SHEET C.4 INSTALL IF NOTED ON PLANS TYPICAL CREEK CROSSING DETAIL FOR SEWER LINE NOT TO SCALE WL009C DICKS community Infrastructure consultants Transportation + Water Resources Urban Development +: Geomatics 401 4th Street, SW Suite 201 Hickory, NO 28602 (V) 828.327.6911 M828.327,9164 www.wkdickson.com NC. LICENSE NO F-0374 FULL SCALE :1"= NA 0 - I mom HOR. DATUM: NO GRID (NAD 83) VERT. DATUM: NAVA 88 Z ¢Iw Iii U W C1 °Oltn EXISTING GRADE SEE CREEK CROSSING STABILIZATION O ctn DETAILS ON SHEET C.5 a- Z Z (n z O U iL Cr Q z 0 O WATER LEVEL { w CREEK BED CO DI PIPE. ONE FULL --/ CONCRETE ANTI- SEEP- -/ PIPE SEGMENT CENTERED COLAR, TYPICAL ON STREAM CENTERLINE SEE DETAIL SHEET C.4 INSTALL IF NOTED ON PLANS TYPICAL CREEK CROSSING DETAIL FOR SEWER LINE NOT TO SCALE WL009C DICKS community Infrastructure consultants Transportation + Water Resources Urban Development +: Geomatics 401 4th Street, SW Suite 201 Hickory, NO 28602 (V) 828.327.6911 M828.327,9164 www.wkdickson.com NC. LICENSE NO F-0374 FULL SCALE :1"= NA 0 - I mom HOR. DATUM: NO GRID (NAD 83) VERT. DATUM: NAVA 88 z O; 4 Uj U" ;.w I Q , I Z Iii U W C1 a ct O ctn a z O; 4 Uj U" ;.w I Q , I PROD. DATE,.• JUNE 2013 Q.C.: Q.C. DATE: DRAWING NUMBER: PROD. NO. ". 201 261 14.W. HI Z O U W z O U iL Cr Q z LL w I CO w rr a� Z OoU4 Z W in d (!) Lu ¢ ► > Q.d O w W I- Z U J U PROD. DATE,.• JUNE 2013 Q.C.: Q.C. DATE: DRAWING NUMBER: PROD. NO. ". 201 261 14.W. HI U W cc iL , z Ca Qzz00 Zt (j) OoU4 ¢ ► W ® O w cr cc U J U Z w CIC LLI z Ly 2 W Z w ® t1C <C Z x Q W Q I= .Z. n F- U � S LL CD.: z : ....... Cl w rn 0, O N ,... C1C � <I; C.? cc n- c,O....ccIx N LL 0 . LU „W.t w :CC PROD. DATE,.• JUNE 2013 Q.C.: Q.C. DATE: DRAWING NUMBER: PROD. NO. ". 201 261 14.W. HI COPYRIGHT ©, W.K. DICKSON & CO., INC: Al t_ RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, ",0ATHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:1Pro'ects\C0NOVt2012017400HI - Coriover SW Area Sewer Rehab Pro ectkCaddlPlan Set\201201 74 DETAlLS.dw - # # ## -June 7, 2013 - Jordan Isenhour FULL SCALE: V= NA 0 - HOR. DATUM:.NC GRID (NAD 83) VERT. DATUM: NAVD 88 U KEY IN MATTIN3 PER MANUFACTURERS INSTRUCTIONS LIVE STAKE PLANTINGS SEE DETAIL. BELOW COIR FIBER MATTING (4008 /m2) © o f0C 0- 9 " -12" DIAMETER A COIR FIBER ROLL GRAVEL SUBSTRATE oZip �. 50150 MIX OF IN SITU SOIL AND # 5 STONE GRADE CONTROL ROCK 50 / 50 MIX CLASS B / 9 RIP RAP 's? .. ¢ z.a 0 COIR FIBER ROLL TO BE HELD cV / \ IN PLACE WITH WOODEN \� \\ STAKES TOP OF BANK INSTRUCTIONS URERS BOTTOM OF BANK O EXIST BANK >.C1f O0U O a o .� o cc. Lip .z 0- cr. cc 00 0 m _ a a O z SEE STREAM BED CONTROL DETAIL X 0 57< � FLOW 0 i W W J MATCH EXISTING STREAM BED GRADE B U °p v LL B . 'LL1 O cc Q Q U � AOO 00 r) 0 00 0 CREEK CROSSING STABILIZATION o0 0 0 0 W NOT TO SCALE O O v Z BOTTOM OF BANK W U tr > CHANNEL SEEDING CONSTRUCTION NOTES: TOP OF BANK d TEMPORARY SEED MIX 1. INSTALL EROSION CONTROL MAXIMUM � O Z%� LATE WINTER/EARLY SPRING MEASURES AND TREE WIDTH OF DISTURBANCE 0 X O PROTECTION AS SHOWN ON -RYE (GRAIN) @ 120 LB /ACRE PLAN. THE CONTRACTOR MAY LIMITED TO 40 < MODIFY OR RELOCATE EROSION SUMMER CONTROL MEASURES TO MAKE WU)J..OW c\j - GERMAN MILLET @ 40 LB /AOR£ ADJUSTMENTS FOR A UNFORESEEN FIELD CONDITIONS. - SUDANGRASS @ 50 LB /ACP,E (AS A SUBSTITUTE) ALL RELOCATION SHALL HAVE W o THE APPROVAL OF THE STREAM BED CONTROL - PLAN VIEW O a. t U W. FALL ENGINEER. -RYE (GRAIN) @ 120 LB /ACRE 2. CLEAR AND GRUB AREA OF ALL EROSION CONTROL MATTING EROSION CONTROL MATTING TRASH AND EXOTICANVASIVE SEE SHEET C.4 -- MATCH EXISTING CHANNEL FULLBANK WIDTH (SEE SHEET C.4) VEGETATION. { ) tIC W PERMANENT RIPARIAN SEED MIX $IDEALLY PLANTED EITHER 3. STABILIZE GRADED BANKS WITH SEED AND MULCH. BANKFULL ELEVATION ca AUG -SEPT OR MAR APR) 4. INSTALL COIR FIBER MAT PER a - REDTOP @ 7 LBlACR£ MANUFACTURERS INSTRUCTION. 1,5' MIN. INVERT SET AT PROFILE SWITCH GRASS @ 50 LB /ACRE 5. INSTALL PLANTS AS DESCRIBED -SEDGE @ 10 LS /ACRE IN PLANTING NOTES ON THIS GRADE -RICE CUTGRASS @ 20 LWA•CRE SHEET. G1. NOTE: 2.5' OZ ALTERNATIVE SPECIES MAY BE USED UPON APPROVAL BY FILTER TYP. THE ENGINEER. FABRIC GRAVEL SUBSTRATE GRADE CONTROL ROCK U) r% 50 ! 50 MIX OF IN SITU SOIL 50 150 MIX CLASS B i 1 RIP RAP STREAM STABILIZATION STABILI NOTES AND # 5 STONE NOT TO SCALE STREAM BED CONTROL - SECTION A-A BANKFULL ELEVATION COIR FIBER TOP OF RIFFLE FLOW -- BOTTOM OF RIFFLE PLANT LIST MATTING (SEE PROFILE (MATCH EXISTING ELEV.) TO 2 ---±� �-.-- FOR DESIGN ELEV.) DESIGN BED FLATTOP* " SLOPE VARIES DETAIL END LIVE STAKES SHOULD BE 2 -3 FEET LIVE STAKE SPECIES SURFACE �•� 0.5' TO 1.5' LONG. ADDITIONALLY, THE STAKES SCIENTIFIC NAME COMMON NAME PERCENT LATERAL " SHOULD HAVE A DIAMETER OF 0.75 TO - —a - Carpus amomum Silky Dogwood 50% BUD 2 INCHES. Vibumum dentatum Arrowwood 26% O Sambucus Canadenis Elderberry 25% O J ALL PLANTING AREAS SIDE BRANCH , REMOVED AT COIR FIBER FABRIC MAT NOT BE CUT WITH PLANTING IMPLEMENTS. THE ' IjjIIN 1. 'MIN SLIGHTANGLE SMALLEST OPENING NECESSARY TO ACCOMMODATE EACH PLANT SHALL BE O MIN 1$ CUT INTO THE FABRIC USING A SHARP KNIFE OR SHEARS. PLANT SPACING FILTER O FABRIC GRAVEL SUBSTRATE PLANTS SHALL BE INSTALLED IN STAGGERED ROWS. PLANT SPACING SHALL S;E 50 i 50 MIX OF IN SITU SOIL GRADE CONTROL ROCK APPROXIMATELY TWO FEET (2A) BETWEEN PLANTS IN THE SAME ROW. ROWS; AND # 5 STONE 50150 MIX CLASS B / 1 RIP RAP COIR FIBER SHALL BE STAGGERED SUCH THAT ROWS ARE APPROXIMATELY TWO FEET MATTING (2.0') APART. CONTRACTOR REQUIRED TO USE COMBINATION OF ALL PLANT SPECIES. ' STREAM BED CONTROL - PROFILE 13-13 45 DEGREE TAPERED BUTT END LIVE STAKE ff \� STREAM BED CONTROL DETAIL SECTION VIEW LIVE STOUT STAKES SHALL ''� NOT TO SCALE BE SPACED 2 FEET APART, 2" 2� MIN z NOTE: Ix -r or �:. �drrf• -� PRIOR TO ANY LAND DISTURBING ACTIVITIES CONTRACTOR SHALL CLEARLY In ,/fii �M /%i`�%r/�/ ;r MARK WITH ORANGE FABRIC FENCING ALL WETLANDS, STREAMS, SURFACE WATERS, AND RIPARIAN BUFFERS LOCATED ON THE PROJECT SITE WHERE LIVE STAKE IMPACTS ARE NOT ALLOWED. NOT TO SCALE COIR FIBER ROLL COPYRIGHT ©, W.K. DICKSON & CO., INC: Al t_ RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, ",0ATHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:1Pro'ects\C0NOVt2012017400HI - Coriover SW Area Sewer Rehab Pro ectkCaddlPlan Set\201201 74 DETAlLS.dw - # # ## -June 7, 2013 - Jordan Isenhour FULL SCALE: V= NA 0 - HOR. DATUM:.NC GRID (NAD 83) VERT. DATUM: NAVD 88 PROJ. DATE:: JUNE 201.3 . Q.C.: O.C. DATE: DRAWING NUMBER: . PROJ. NO.:-., ; 20120174..00 I U W r © o f0C 0- oZip �. Z O LL .. ¢ z.a 0 Z =� O >.C1f O0U O V cc. Lip .z 0- cr. cc n m _ z i 1�- tA . 'LL1 O cc cr_ U W O Z " W U tr > d cc O Z%� aj 0 X O O < 0 �z=¢ WU)J..OW c\j W o O a. t U W. cn W in tIC W ca Z a Q, I G1. OZ to W d Z cr. U) r% PROJ. DATE:: JUNE 201.3 . Q.C.: O.C. DATE: DRAWING NUMBER: . PROJ. NO.:-., ; 20120174..00 I U W f0C 0- �. Z O .. ¢ z.a 0 =� >.C1f O0U O cc. Lip .z 0- cr. cc m _ z i W ® . 'LL1 O cc cr_ U W Z Z W tr > d 4 W O Z%� aj 0 X O < 0 �z=¢ WU)J..OW c\j W o CC ¢ cc tIC W PROJ. DATE:: JUNE 201.3 . Q.C.: O.C. DATE: DRAWING NUMBER: . PROJ. NO.:-., ; 20120174..00 I UUiN 1 CIV 1 b Ur 1 rIND UULoUMr_1N 1; AVU1 I IUM UK UCLC 11UN 20174 DETAILS.dwg -# # ## - June 7, 2013 - Jordan Isenhour P TEMPORARY SEEDING -- LATE WINTER /EARLY SPRING Seeding Mixture Species Rote (lb /acre) Rye (grain) 120 Annual lespedezo (Kobe in Piedmont 50 an.:1 Coastal Plain, Korean in Mountains) Omit annual lespedezo when duration of temporary cover is not to extend beyond vane. Seeding dates Mountains — Above 2500 ft: Feb. 15 —May 15 Below 2500 ft: Feb. 1--May 1 Piedmont -- Jan. 1 —May 1 Coastal Plain — Dec.1 —Apr. 15 Soil arn..endments Follow recommendations of soil tests or apply 2,000 lb /ocre ground agricultural limestone and 750 lb /acre 10 -10 -10 fertilizer. Mulch Apply 4,000 Ib /ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im- mediately following erosion or other damage. TEMPORARY_ SEEDING SCHEDULE — SUMMER Seeding mixture Species Rote (lb /acre) &�rmon millet 40 In the Piedmont and Mountains, a small— stemmed Sudongross may be substit. ted at a rate of 50 lb /acre. Seeding dates Mounta ns — May 15 —Aug. 15 Piedmont — May 1 —Aug. 15 Coastal Plain — Apr. 15 —Aug. 15 Soil amendments Follow .recommendations of soil tests or apply 2,000 Ib /ocre ground ogricult"rol limestone and 750 Ib /ocre 10 -10 -10 fertilizer. Mulch Apply 4,,000 Ib /ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight, con be used as an anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, fertilize and mulch immedictely following erosion or other damage. TEMPORARY SEEDING SCHEDULE — FALL Seeding mixture Species Rate (lb /acre) Rye (grain) 120 Seeding dates Mountains — Aug. 15 —Dec. 15 Coastal Plain and Piedmont — Aug. 15 —Dec. 30 Soil amendments Follow sail tests or apply 2,000 lb /acre ground agricultural lime- stone ord 1,000 lb /acre 10 -10 -10 fertilizer. Mulch Apply 4,000 lb /acre straw. Anchor straw by tacking with asphalt, netting cw a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Mainteinance Repair arid refertilize damaged areas immediately. Topdress with 50 lb /ocre of nitrogen in March. if it is necessary to extend temporary cover beyond June 15, overseed with 50 lb /acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedezo in late Feb {ruory or early March. PERMANENT SEEDING — GRASS —LINED CHANNELS Seeding Mixture Species Rate (lb /acre) Tall fescue 175 -200 (3 lb/1000 sq. ft.) Kentucky bluegrass 20 (1 lb /1000 sq. ft.) Nurse plants Between May 1 and Aug. 15, add 10 Ib /ocre German millet or 15 lb /acre Sudongross. Prior to May 1 or after Aug. 15, add 40 lb /acre rye (grain). Seeding dates Best Possible Below 2500 ft: Aug. 15— Septa 1 July 25 —Sept. 15 Mar. 1 —Apr. 1 Mar. 1 —May 10 Above 2500 ft: July 25 —Aug. 15 July 15 —Aug. 30 Soil amendments Mar. 20 —Apr. 20 Mar. 5 —May 15 Apply lime and fertilizer according to soil tests, or apply 4,000 lb /ocre ground agricultural limestone and 1,200 Ib /ocre 10 -10 -10 fertilizer. Mulch Use jute, excelsior matting, or a similar channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb /acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash downslope where they con clog drainage devices. Maintenance Inspect and repair mulch frequently. Refertilize in late winter according to soil tests or apply 150 lb/acre 10 -10 -10 fertilizer (3 Ib /1000 sq. ft.). Mow regularly to a height of 2 -4 inches. PERMANENT SEEDING SCHEDULE -- MIXTURE 41M Seeding Mixture Species Rate (lb /acre) Tali fescue 100 Sericea lespedezo 20 Korean lespedeza 10 Redtop 5 Kentucky bluegrass 5 Seeding note After Aug. 1, use unscarified seed for sericea lespedezo. Nurse plants Between May 1 and Aug. 15 add 10 lb/acre German millet or 15 lb /acre Sudongross. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). it may be beneficial to plant the grasses in late summer and overseed the lespedezos in March. Seeding dates Best Possible Below 2500 ft: Aug. 15 —Sept. 1 July 25 —Sept. 15 Mar. 1 —Apr. 1 Mar. 1 —May 10 Above 2500 ft: July 25 —Aug. 15 July 15 —Rug. 30 Mar. 20 —Apr. 20 Mar. 5 —May 15 Complete seeding earlier in the fall, and start later in spring on north and east facing slopes. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb /acre ground agricultural limestone and 1,000 lb /acre 5 -10 -10 fertilizer. Mulch Apply 4,040- -5,000 lb /acre grain' straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Mow no more than once a year. Refertilize in the second year unless growth is fully adequate. Reseed, fertilize and mulch damaged areas immediately. 1. GROUND COVER -- WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE (1) ACRE, A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. 2. GRADED SLOPES AND FILLS — PER THE GROUND COVER SCHEDULE SHOWN HERE, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. GROUND COVER SCHEDULE EROSION CONTROL SEQUENCE OF CONSTRUCTION NOTES 1. SCHEDULE A PRECONSTRUCTION CONFERENCE ON -SITE WITH THE PERIMETER DIKES, EROSION CONTROL INSPECTOR FROM THE MOORESVILLE REGIONAL OFFICE OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND 7 DAYS NATURAL RESOURCES (NCDENR, 704- 663 - 1699), AND THE ENGINEER'S HIGH QUALITY WATER (HQW) ZONES REPRESENTATIVE. 2. BEFORE INITIATION OF CONSTRUCTION, INSTALL PERIMETER EROSION 7 DAYS CONTROL MEASURES SHOWN ON THE PLANS INCLUDING SILT FENCE AND STONE OUTLETS AT CREEK CROSSINGS ALONG WITH ANY NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED REQUESTED BY THE NCDENR INSPECTOR RESULTING FROM THE 14 DAYS PRECONSTRUCTION MEETING, CLEARING AREAS ONLY AS NEEDED TO INSTALL THE DEVICES. OWNER SHALL PERFORM SELF INSPECTION - AFTER PERIMETER CONTROLS (SILT FENCE, CONSTRUCTION W ENTRANCES, ETC.) ARE INSTALLER, 3. INSTALL SEWER MAIN. EROSION CONTROL DETAILS ARE SHOWN ON THE AND HWQ ZONES) DRAWINGS AND STRUCTURE LOCATIONS ARE DEFINED IN THE PLAN VIEWS. 4. REMOVE/REINSTALL SILT FENCE AND STONE OUTLETS DAILY AS W REQUIRED TO FACILITATE CONSTRUCTION AT CREEK CROSSINGS INSTALLED BY DIRECT BURY. 5. MAINTENANCE OF EROSION CONTROL DEVICES IS THE CONTRACTOR'S RESPONSIBILITY. AFTER EACH RAID STORM THE DEVICES SHALL BE INSPECTED FOR DAMAGE AND REPAIRS MADE AS NEEDED. ANY SILT ACCUMULATION SHALL BE REMOVED IMMEDIATEDLY AND DISPOSED OF PROPERLY. 6. RESEED AND MULCH DISTURBED AREAS AS GRADING IS COMPLETED ALONG ALL CONSTRUCTION. ALL DISTURBED AREAS MUST BE Z' VEGETATED OR OTHERWISE STABILIZED WITHIN THE NUMBER OF DAYS NOTED IN THE GROUND COVER SCHEDULE AFTER BEING DISTURBED. THE CONTRACTOR SHALL UTILIZE I HE SEEDING AND MULCHING SCHEDULES NOTED ON THE DRAWINGS. NO MORE THAN 1,000 LF OF ROAD SHOULDER SHALL BE DISTURBED PRIOR TO CLEANING /SEEDING. A. ALL LOCATIONS DISTURBED DURING CONSTRUCTION WILL BE RESTORED ACCORDING TO THE PERMANENT SEEDING SCHEDULE AS W SHOWN ON THE PLANS. B.: :!F THE WATER AND /OR SEWER LINE IS LOCATED WITHIN AN EXISTING . DITCH LINE, AND THE CHANNEL. VELOCITY EXCEEDS 2 FT. /SEC., TEMPORARY CHANNEL LINERS (JUTE NET, STRAW WITH NET, < Q j FIBERGLASS ROVING, GEOTEXTILE FABRIC, ETC.) SHALL BE USED AS �C SHOWN ON THE PLANS AND AS DIRECTED BY THE ENGINEER. THESE DITCH LINES: WILL BE RESTORED'ACCORDING TO THE PERMANENT SEEDING SCHEDULE AS SHOWN Ohl THE PLANS. 7.... AFTER COMPLETE STABILIZATION OF DISTURBED AREAS AND AS DIRECTED BY THE ENGINEER, REMOVE EROSION CONTROL DEVICES FROM THE SITE. X Q��C1p CL �o EROSION CONTROL DEVICE MAINTENANCE NOTES 1 THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE AND REPAIR OF THE EROSION CONTROL DEVICES UNTIL CONSTRUCTION IS .0 COMPLETE. 2 ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CHECKED Z FOR STABILITY.AND OPERATION FOLLOWING EVERY RUNOFF I I PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE PER WEEK. 3. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL W PRACTICES AS DESIGNED. . _ 4. .:: SEDIMENT IS TO BE BE REMOVED FROM THE SEDIMENT TRAPS, BASINS _j AND INLET PROTECTION DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. 5. GRAVEL IS TO BE CLEANED AND/OR REPLACED WHEN THE SEDIMENT I POOL NO LONGER DRAINS PROPERLY. 6. SEDIMENT IS TO BE REMOVED FROM BEHIND SILT FENCE WHEN IT w `BECOMES APPROXIMATELY 0.50' DEEP AT THE FENCE. THE SILT dui FENCE IS TO BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 7 PERMANENT GROUND COVER MUST BE ESTABLISHED WITHIN THE Q PROPOSED DITCHES AND CHANNELS. $. ALL DISTURBED AREAS ARE TO BE F=ERTILIZED, SEEDED AND MULCHED P �. AS NEEDED IN ACCORDANCE WITH THE SPECIFICATIONS. 9. ADDITIONAL MECHANICAL MEASURES WILL BE REQUIRED IF ' fn VEGETATIVE COVER CANNOT BE ESTABLISHED AS PROPOSED. 10... CONTRACTOR SHALL MAINTAIN A RAIN GAUGE ON SITE AND PROVIDE WEEKLY /POST RAINFALL INSPECTION REPORTS TO THE OWNER IN Z3 St_ ACCORDANCE WITH NCDLR REQUIREMENTS. SEWER LINE DATA TABLE i TOTAL PROJECT /DISTURBED AREA 1.57 ACRES NofUC):W UUiN 1 CIV 1 b Ur 1 rIND UULoUMr_1N 1; AVU1 I IUM UK UCLC 11UN 20174 DETAILS.dwg -# # ## - June 7, 2013 - Jordan Isenhour P TEMPORARY SEEDING -- LATE WINTER /EARLY SPRING Seeding Mixture Species Rote (lb /acre) Rye (grain) 120 Annual lespedezo (Kobe in Piedmont 50 an.:1 Coastal Plain, Korean in Mountains) Omit annual lespedezo when duration of temporary cover is not to extend beyond vane. Seeding dates Mountains — Above 2500 ft: Feb. 15 —May 15 Below 2500 ft: Feb. 1--May 1 Piedmont -- Jan. 1 —May 1 Coastal Plain — Dec.1 —Apr. 15 Soil arn..endments Follow recommendations of soil tests or apply 2,000 lb /ocre ground agricultural limestone and 750 lb /acre 10 -10 -10 fertilizer. Mulch Apply 4,000 Ib /ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im- mediately following erosion or other damage. TEMPORARY_ SEEDING SCHEDULE — SUMMER Seeding mixture Species Rote (lb /acre) &�rmon millet 40 In the Piedmont and Mountains, a small— stemmed Sudongross may be substit. ted at a rate of 50 lb /acre. Seeding dates Mounta ns — May 15 —Aug. 15 Piedmont — May 1 —Aug. 15 Coastal Plain — Apr. 15 —Aug. 15 Soil amendments Follow .recommendations of soil tests or apply 2,000 Ib /ocre ground ogricult"rol limestone and 750 Ib /ocre 10 -10 -10 fertilizer. Mulch Apply 4,,000 Ib /ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight, con be used as an anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, fertilize and mulch immedictely following erosion or other damage. TEMPORARY SEEDING SCHEDULE — FALL Seeding mixture Species Rate (lb /acre) Rye (grain) 120 Seeding dates Mountains — Aug. 15 —Dec. 15 Coastal Plain and Piedmont — Aug. 15 —Dec. 30 Soil amendments Follow sail tests or apply 2,000 lb /acre ground agricultural lime- stone ord 1,000 lb /acre 10 -10 -10 fertilizer. Mulch Apply 4,000 lb /acre straw. Anchor straw by tacking with asphalt, netting cw a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Mainteinance Repair arid refertilize damaged areas immediately. Topdress with 50 lb /ocre of nitrogen in March. if it is necessary to extend temporary cover beyond June 15, overseed with 50 lb /acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedezo in late Feb {ruory or early March. PERMANENT SEEDING — GRASS —LINED CHANNELS Seeding Mixture Species Rate (lb /acre) Tall fescue 175 -200 (3 lb/1000 sq. ft.) Kentucky bluegrass 20 (1 lb /1000 sq. ft.) Nurse plants Between May 1 and Aug. 15, add 10 Ib /ocre German millet or 15 lb /acre Sudongross. Prior to May 1 or after Aug. 15, add 40 lb /acre rye (grain). Seeding dates Best Possible Below 2500 ft: Aug. 15— Septa 1 July 25 —Sept. 15 Mar. 1 —Apr. 1 Mar. 1 —May 10 Above 2500 ft: July 25 —Aug. 15 July 15 —Aug. 30 Soil amendments Mar. 20 —Apr. 20 Mar. 5 —May 15 Apply lime and fertilizer according to soil tests, or apply 4,000 lb /ocre ground agricultural limestone and 1,200 Ib /ocre 10 -10 -10 fertilizer. Mulch Use jute, excelsior matting, or a similar channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb /acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash downslope where they con clog drainage devices. Maintenance Inspect and repair mulch frequently. Refertilize in late winter according to soil tests or apply 150 lb/acre 10 -10 -10 fertilizer (3 Ib /1000 sq. ft.). Mow regularly to a height of 2 -4 inches. PERMANENT SEEDING SCHEDULE -- MIXTURE 41M Seeding Mixture Species Rate (lb /acre) Tali fescue 100 Sericea lespedezo 20 Korean lespedeza 10 Redtop 5 Kentucky bluegrass 5 Seeding note After Aug. 1, use unscarified seed for sericea lespedezo. Nurse plants Between May 1 and Aug. 15 add 10 lb/acre German millet or 15 lb /acre Sudongross. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). it may be beneficial to plant the grasses in late summer and overseed the lespedezos in March. Seeding dates Best Possible Below 2500 ft: Aug. 15 —Sept. 1 July 25 —Sept. 15 Mar. 1 —Apr. 1 Mar. 1 —May 10 Above 2500 ft: July 25 —Aug. 15 July 15 —Rug. 30 Mar. 20 —Apr. 20 Mar. 5 —May 15 Complete seeding earlier in the fall, and start later in spring on north and east facing slopes. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb /acre ground agricultural limestone and 1,000 lb /acre 5 -10 -10 fertilizer. Mulch Apply 4,040- -5,000 lb /acre grain' straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Mow no more than once a year. Refertilize in the second year unless growth is fully adequate. Reseed, fertilize and mulch damaged areas immediately. 1. GROUND COVER -- WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE (1) ACRE, A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. 2. GRADED SLOPES AND FILLS — PER THE GROUND COVER SCHEDULE SHOWN HERE, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. GROUND COVER SCHEDULE SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, W SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH W NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 14 DAYS AND HWQ ZONES) 1. PER THE GROUND COVER SCHEDULE SHOWN HERE, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, DISTURBED AREAS SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. TO BE $��,ba9sti ^Att�,�r® S A� t IN •. a -Y/v�tvaeIAN l PROFESSIONAL SEAL FULL SCALE:1 NA 0 - HOR. DATUM: NO GRID (NAD 83) VERT. DATUM:,NAVD 88 . Uj o� C3 CL co PROJ. DATE JUNE 2013 Q.C. DATE: DRAWING NUMBER: ■ PROD. NO... 20+1 zo1.74.®aHi W O U arc W H Z U W U � 0 O CC U_ Z' Z W O_ ( . Z G aw. � W .. 00Z �.. U < Q j �C cc o I© m W X Q��C1p CL �o Z Z a; .0 Z w Z cn I I p p cti o W U Z _j W W Uj I c h z w dui rL 'O PROJ. DATE JUNE 2013 Q.C. DATE: DRAWING NUMBER: ■ PROD. NO... 20+1 zo1.74.®aHi W C� W H U W � 0 0 CC Z' IL Z G W .. 00Z �.. < Q j �C > © I=-. m W X Q��C1p CL �o O Z w . Z X U W U Z _j W W Uj W w dui 'O cc Q cc W Q � P �. ® w U r ' fn = ~ W Z.,_.. to Z3 St_ :0 NofUC):W BY PROJ. DATE JUNE 2013 Q.C. DATE: DRAWING NUMBER: ■ PROD. NO... 20+1 zo1.74.®aHi ROAD CLASSIFICATION A URBAN (40 MPH OR LESS) 900' URBAN (45 MPH OR GREATER) 350' RURAL 500' C 8 A MAX. WORK AREA 200'* MAX. WARNING SIGN SEQUENCE IN OPPOSITE DIRECTION SAME AS SHOWN ABOVE NOTE: ALL WARNIING, SIGNS SHALL BE A MINIMUM OF 48" x 48" AND REFLECTORIZED WHEN USED AT NIGHT. ROAD CLASSIFICATION A B C URBAN (40 MPH OR LESS) 900' 100' '100' URBAN (45 MPH OR GREATER) 350' 350' 350' RURAL 500' 1 500' 1 500' FILE NAME: L :iPra ecislCONOV12092097400HI Conover SW Area Sewer Rehab tiro ec�t c;aaakI setWai 20I 74 ut aIL5.aw -tune r, aoi - jaraan tsenraour FULL SCALE: # "= NA 0 HOR. DATUM: NO GRID (NAD 83) VERT. DATUM: NAVD 88 Ili Q M 0 0 h o� CL U z 0 W U CL c1C 4 1 t 1 Z V} Z 0 O JZ0 U O O©C~J� 7 d. a�HO Lu O Z W L cr W O oc .0 EWC k W Q h- W z .J k W ce W � Z�K U3 W " 0 -' E^.. Z 0 cc Q Ir aC o . a LU U: a i_ cl) ~ !Q�z LL LL W. cj) _ ' C� CY ti . U W d CL 4 1 t 1 Z 0 JZ0 O©C~J� 7 a�HO Z W w W O oc Q U. W Z .J W ce W � U3 W z -' E^.. Z 0 cc Q Ir aC W Q �.: U: a i_ cl) ~ LL LL W. cj) N O C� L>w. LLI W a. cv u. U �t N- Lt.