Loading...
HomeMy WebLinkAbout20071061 Ver 1_Stormwater Plans_200707021 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LOWE'S OF WHITEVILLE COLUMBUS COUNTY, NC STORMWATER MANAGEMENT EROSION CONTROL REPORT Prepared for: JEMSITE DEVELOPMENT, INC. P.O. Box 1000 Jefferson, NC 28640 Prepared by: ~. ~ ~w ~Y ,~'" ~t ~: ~) ~ i e--., t t. ~. _ i~l `°`"° ~°~~j 1 ~'~~ ~ ~ 'G ~ti~~. LAND PLANNING ASSOCIATES, INC. DBA LAND PLANNING ASSOCIATES of N.C., INC. 110 West ls` Avenue Suite A Easley, SC 29640 PHONE: 846 242-6072 FAX: 208 730-8214 Revised: June 29, 2007 ~ ~ 6~,. ~'a ~ o coo~e(o~o'o o Qs Y,9C® ~'°~ ® ~ ~. Q SEAL S 8 6 m ~>` GI{dE~Q~~ ® / ~~ TABLE OF CONTENTS General Description ...................................................................................1 Predevelopment .......................................................................................1 Post-development .....................................................................................2 Erosion Control .......................................................................................6 Site Location Figure 1 - Predevelopment Figure 2 -Post-development NRCS Soil Data NOAA Rainfall Data Appendix A -Curve Numbers Calculation Appendix B - Hydraflow Hydrograph Appendix C -Wet Detention Pond Calculations Appendix D - Faircloth Skimmer Calculations Appendix E -Anti-flotation Device Appendix F -Apron Calculations LOWE'S OF WHITEVILLE COLUMBUS COUNTY, NC ' Stormwater Management Erosion Control Report GENERAL DESCRIPTION ' This project involves the design of a Stormwater Management System for the proposed Lowe's development in Whiteville, North Carolina near the corner of US Hwy 701 and N.C. Hwy 130. ' H C ' enter ome s The site is approximately 14.16 acres and a new 80,000 square foot Lowe with associated parking and access will take up 12.35 acres. The remaining acreage will ' consist of the stormwater detention ponds and grassed areas. According to the Soil Survey of Whiteville, North Carolina the soils encountered on this ' site consist primarily of Norfolk Urban land complex, Goldsboro, and Lynchburg, which consist of fine sandy loam, and sandy clay. Their hydrologic soil groups are B, B, and C respectively. During erosion control calculations group C was used. The rainfall data was ' taken from the Point Precipitation Frequency Estimates form NOAA Atlas 14, Volume 2, Version 2 at the Whiteville, NC gage. PREDEVELOPMENT CONDITIONS The site consists of mild slopes with scattered shrub areas and asphalt. The site had 1.21 acres of impervious surfaces. An isolated wetland, 0.77 acres in size is located on the west side of the property. From the existing contours four predevelopment drainage areas were delineated. The first drainage area takes up the northeast section of the site and is 5.34 acres with a weighted curve number of 65. The time of concentration as determined using Hyrdaflow Hydrographs is based on 3001inear feet of a sheet flow over grass at a 1.57% slope, then 68.4 feet of shallow concentrated flow over an unpaved surface at 1.64% slope for a time of 23.4 minutes. The preceding information was input into Hydraflow Hydrographs. PRE-DEVELOPMENT RUNOFF (cfs) DRAINAGE AREA 1 5.34 ac 2 year 3.94 10 year 10.69 25 year 16.08 100 year 27.09 The second drainage area makes up the center and south portion of the site. It is 6.13 acres is size and has a weighted curve number of 73. The time of concentration as determined by Hyrdaflow Hydrographs is based on 3001inear feet of sheet flow at a 1.77% slope over grass, then 159.4 feet of shallow concentrated flow over an unpaved surface at a 1.51 -1- slope for a time of 23.9 minutes. The preceding information was input into Hydraflow Hydrographs PRE-DEVELOPMENT RUNOFF (cfs) DRAINAGE AREA 2 6.13 ac 2 year 7.48 10 year 16.54 25 year 23.56 100 year 37.00 The third drainage area is 2.29 acres in size and has a weighted curve number of 62. The isolated wetland is located here. The time of concentration as determined by Hyrdaflow Hydrographs is based on 3001inear feet of sheet flow at a 2.2% slope over grass, then 70.4 feet of shallow concentrated flow over an unpaved surface at 0.14% slope for a time of 22.7 minutes. The preceding information was input into Hydraflow Hydrographs. PRE-DEVELOPMENT RUNOFF (cfs) DRAINAGE AREA 3 2.29 ac 2 year 1.31 10 year 4.01 25 year 6.21 100 year 10.73 The fourth drainage area is a section located at the north corner. It is 0.4 acres, with a weighted curve number of 65. The time of concentration as determined by Hyrdaflow Hydrographs is based on 132.1 linear of sheet flow at a 0.15% slope over grass for a time of 31.5 minutes. The preceding information was input into Hydraflow Hydrographs. PRE-DEVELOPMENT RUNOFF (cfs) DRAINAGE AREA 4 0.4 ac 2 year 0.24 10 year 0.67 25 year 1.01 100 year 1.69 The data collected from each drainage area produced the following total runoff for the site. PRE-DEVELOPMENT RUNOFF (cfs) COMBINED TOTAL 2 year 12.95 10 year 31.81 25 year 46.55 100 year 76.25 -2- POST-DEVELOPMENT CONDITIONS After construction site will have four new drainage areas and two detention ponds. Runoff will be collected by curb and grate inlets, and carried with reinforced concrete pipes to the ponds. In accordance with the regulations set by the Army Corps of Engineers the wetland will be filled in. The first post-development drainage basin consists of the Lowe's building, the rear access area, and the Stormwater Management (SWM) Pond A. The 8.07 acre area has a weighted curve number of 88. The time concentration is based on 300.0 linear feet of sheet flow at a 0.5% slope over the roof and 5601inear feet of shallow concentrated flow through drainage pipe at a 1.0% slope for a time of 9.2 minutes. The preceding information was input into Hydraflow Hydrographs. POST-DEVELOPMENT RUNOFF (cfs) DRAINAGE BASIN 1 8.07 ac 2 year 32.75 10 year 56.13 25 year 72.37 100 year 102.11 The second post-development drainage basin consists of the north and northwest portions the parking lot and the smaller portion of SWM Pond B. The 3.31 acre area has a weighted curve number of 94. The time of concentration is based on 2961inear feet of sheet flow at a 1.9% slope over the parking lot and 176 feet of shallow concentrated flow over asphalt and through drainage pipe at a 2.4% slope for a time of 3.6 minutes. The preceding information was input into Hydraflow Hydrographs. POST-DEVELOPMENT RUNOFF (cfs) DRAINAGE BASIN 2 3.31 ac 2 year 16.31 10 year 26.09 25 year 32.87 100 year 45.34 The third post-development drainage basin consists of the eastern portion of the parking lot and the larger portion of SWM Pond B. The 1.99 acre area has a weighted curve number of 87. The time of concentration is based on 1391inear feet of sheet flow at a 2.5% slope over the parking lot and 381 feet of shallow concentrated flow over asphalt and through drainage pipe at a 1.7% slope for a time of 3.7 minutes. The preceding information was input into Hydraflow Hydrographs. -3- c POST-DEVELOPMENT RUNOFF (cfs) DRAINAGE BASIN 3 1.99 ac 2 year 9.24 10 year 15.97 25 year 20.65 100 year 29.22 The post-development area four is the area sloping away from the parking area and the ' back side of the SWM ponds. This area will be vegetated to reduce stormwater runoff. The area is 0.79 acres and has a curve number of 61. The time of concentration is base on ii 0 L SO linear feet of sheet flow at a 30.0% slope over grass for a time of 1.7 minutes. POST-DEVELOPMENT RUNOFF (cfs) DRAINAGE BASIN 4 0.79 2 year 1.07 10 year 3.05 25 year 4.65 100 year 7.82 The data collected from each drainage area produced the following total runoff for the site (Hydrograph calculations are located in Appendix B). POST-DEVELOPMENT RUNOFF (cfs) COMBINED TOTAL not controlled 2 year 59.37 10 year 101.24 25 year 130.54 100 year 184.49 Since the total runoff volume from the post-developed state is higher than the total runoff volume from the predevelopment conditions detention ponds were needed to reduce the runoff for compliance. Drainage area 1 drains to SWM Pond A and drainage areas 2 and 3 drain into SWM Pond B which is one pond connected by three 12" RCPs under the entrance drive. Stormwater Management Pond A This pond controls the runoff from drainage area 1 which is the building and the rear access area. It was designed as a wet detention basin with the capacity to remove 90% of the Total Suspended Solids (TSS). The basin was designed according to NCDENR Stormwater BMP Manual. It is split into three parts, the normal pool, temporary pool, and the forebay. The normal pool has a bottom elevation of 83 and a top elevation of 88. A forebay is located in the west side of the basin, and is 20.2 % of the normal pool volume. The remaining storage is provided for controlling runoff. The basin bottom elevation is 88 and drains with a 36" riser structure with a 24" barrel pipe. A 10 foot emergency spillway is provided at 96. The pond has a top elevation of 97, so 1 foot freeboard is present. A 5" -4- orifice is located at 88 which controls the first inch of runoff to be release in 48 hours (First flush calculations are located in Appendix C.) STORMWATER MANAGEMENT POND A Tem ora Pool Time Period Inflow (cfs) Outflow (cfs) Max Elevation (ft) 2 year 32.75 0.90 90.27 10 year 56.13 1.21 91.86 25 year 72.37 1.38 92.89 100 year 102.11 13.17 93.5 POND A Tem ora Pool Pond Elevation Area (sf) Volume (cf) 88 18,510.0 0 89 21,255.9 19,883 90 23,997.8 42,510 91 26,857.8 67,938 92 29,836.1 96,285 93 33,023.4 127,715 94 36,364.9 162,409 95 39,792.9 200,488 96 43,273.3 242,021 97 46,804.3 287,060 Stormwater Management Pond B This pond controls the runoff from drainage areas 2 and 3 which consist of the parking area. It was designed as a wet detention basin with the capacity to remove 90% of the Total Suspended Solids (TSS). The basin was designed according to NCDENR Stormwater BMP Manual. It is split into three parts, the normal pool, temporary pool, and the forebay. The normal pool has a bottom elevation of 84 and a top elevation of 90. A forebay is 22% of the normal pool volume. Both are located in the larger of the two ponds The remaining storage is provided for controlling runoff. The basin's bottom elevation is 90 and drains with a 36" riser structure with a 24" barrel pipe. A 10 foot emergency spillway is provided at 94. Three 12" pipes allow water to be stored in the smaller pond. The pond has a top elevation of 95, so 1 foot freeboard is present. A 3" orifice is located at 90 which controls the first inch of runoff to be release in 48 hours (First flush calculations are located in Appendix C). STORMWATER MANAGEMENT POND B Tem ora Pool Time Period Inflow (cfs) Outflow (cfs) Max Elevation (ft) 2 year 25.55 0.34 92.24 10 year 42.06 0.61 93.52 25 year 53.52 3.36 93.71 100 year 74.56 28.75 94.34 -5- II 1 L POND B Tem ora Pool Pond Elevation Area (sf) Volume (cf) 90 14,141 0 91 16,900 15,520 92 19,896 33,918 93 23,171 55,452 94 26,719 80,397 *95 19,966 103,739 * Surface area from only the larger portion Once all the stormwater runoff had been routed through the ponds the total combined runoff volume for the site was calculated. COMPARSION RUNOFF (cfs) COMBINED TOTAL Design Storm Predevelopment Post-Development (throu Pond) 2 year 12.95 2.42 10 year 31.81 5.18 25 year 46.55 9.87 100 year 76.25 21.81 Erosion Control Calculations In order to control erosion on the site the development has been divided into three phases. In the first phase, the site will be cleared and silt fence will be installed around the perimeter of the site. During the second phase, the access road to Joe's BBQ Banquet Hall will be relocated to a new location along the east side of the property. Stormwater Management Ponds A & B will be graded during this phase and act as sediment basins for this site. The wet ponds and their forebays will also be installed. Through diversion ditches, water will be directed to the basins. Along with the basins the sub-building pad will be established at 99.0. In the third phase, the entire site will be graded to finished grade, paved, and stormwater inlets and pipes will be installed. Proper inlet protect will be provided. The two basins designed for the property have been located where the permanent detention ponds will remain on the site. The basins meet the required 1,800 cf per acre of disturbed area and a surface area of 0.01 Ac*(Qlo) according to the NCDENR Erosion and Sediment ' Control Design Manual. Faircloth Skimmers were designed to dewater the basins in 2-5 days. The outlet structures for these basins have been detailed in the plans for this site. ' Sediment Basin #A Area Draining to Sediment Basin: 8.07 acres ' Qio for the area is 27.21 cfs ~ o. 1 1 1 1 1 1 1 1 1 1 1 1 Per NCDENR Requirements Volume Required is 1,800 cf/acre 1,800 * 8.07 = 14,526 cf Surface Area required is 435 sf * Qio 435 * 27.21 = 11,836.4 sf Volume provided @ 88.7 Surface Area provided @ 88.0 Spillway to carry 10 year storm is 10 feet Basin to be cleaned out at `/2 required storage, therefore cleanout is required at 92.0. POND A Pond Elevation Area (sf) Volume (cf) 88 18,510.00 0 89 21,255.95 19,883 90 23,997.82 42,510 91 26,857.88 67,938 92 29,836.18 96,285 93 33,023.46 127,715 94 36,364.98 162,409 95 39,792.90 200,488 96 43,273.35 242,021 97 46,804.31 287,060 A 10 foot emergency spillway has been placed at elevation 96.0, so one foot of freeboard has been provided for the pond. The outlet structure for the pond consists of a 24 inch barrel pipe with a 36 inch diameter riser with the top of the riser set at elevation 93. There will be one 6 inch diameter Faircloth Skimmer to dewater the basin with 2-5 days. After construction the 6 inch Faircloth Skimmer will be decreased to a 5 inch orifice at elevation 88 to control the first inch of runoff from the entire developed area. Sediment Basin #B Area Draining to Sediment Basin: 5.23 acres Qio for the area is 17.63 cfs Per NCDENR Requirements Volume Required is 1,800 cf/acre 1,800 * 5.23 = 9,414.0 cf -7- Surface Area required is 435 sf * Qio 435 * 17.63 = 7,669.1 sf Volume provided @ 90.0 Surface Area provided @ 90.0 Spillway to carry 10 year storm will be 10 feet. Basin to be cleaned out at %2 required storage, therefore cleanout is required at 93.0 A 10 foot emergency spillway has been placed at elevation 93.0, so one foot of freeboard has been provided for the pond. The outlet structure for the pond consists of a 24 inch barrel pipe with a 36 inch diameter riser with the top of the riser set at elevation 93.5. There will be one 5 inch diameter Faircloth Skimmer to dewater the basin within 2-5 days. After construction a 3 inch diameter orifice at elevation 90 will control the first inch of runoff from the entire developed site. POND B Pond Elevation Area (sf) Volume (cf) 90 14,141 0 91 16,900 15,520 92 19,896 33,918 93 23,171 55,452 94 26,719 80,397 *95 19,966 103,739 * Surface Area from larger portion of Pond B -8- ' NC-130 & US-701-BR, Columbus, North Carolina, United States - ... http://maps.google.com/maps?f=q&hl=en&geocode=&q=NC-130+... ' Address NC-130 & US-701-BR Notes Lowe's of Whiteville, Nc ~ .~ NC d ~ ~_ 'ti'C. ~43~ Ii ' SlrpppiY ZrK~ Rsi 5fipn~,rY Lpg A'U t i ~` .~ ~~ X1007 Google ~' ', ', 1 lofl 701 / ~1,,,4n°r~ T~' rat 1~a ~a;i StafFaR ~c1 a a w .i a~' P Doti' b~' ey Map data Cz200J NAVTEQ 6/29/2007 5:03 PM aIZB OEL'90Z9 ~ E3Wd A803NJ3H~ $tl~'Aa NMtli10 aZ09 ~oN 1~3fOiJd zms zazasa SL4£'9f+Z'0££ x; ,t s ~ ~ - ~~ cn ~ a»EZ A 3 b'NIlO2i`d0 H12iON '3lll/~311HM 3 3,~ ~~ - ~ 04982 ~N `uos~a;;af ..~ -~~.~.._._ G~ .~ ~:~ w~ 0006 xo8 'O'd ~ ~ S v~d _ ,~~ de_~ - a o 1 ~O S.~MOI ` x~ w j ~~~®~ ')~l '~uacudo~anaa aaiswa~ ~ ~ ~ __ ~3 i inn ~oR ~ ~N '3lll ~ °"" ! ~3 SNOIlI4NOO'dOl3n3a-32~d O ~. _ ::.; ~ :, ~_~ ~_~~_ __._._.... _e.____ ~ . -. ®..._ ~ ~....~____~ ~~~~ ~~! _~ ~~ U m g ~~ ~Lr+Y - L002 '62 ~• Wa3}off •uagow itg Pa}}odd •Qap•asog-a~gna}MA-XC6-6T90L0\1N3~213d C6 lIAI7\uOKaP\Oag\7N 'a11Na}NA s,aaol -£20'9\W I_ I_ I_ I_ I_ I_ I_ I_ I_ I_ _. _ • • _-- - --~"_____ -~-- $ •m- fWd-AB a3N~3H~; SV~'A9 NMVJO ~ fZ0.9 oN 1~3fOild•T~~ V lZB-OfLSOZ q ~ zL~ZeZe~ sL4£•~4z•s££~v = ~ ~ b'NIION`d0 H1bON `3~~1/~311HM N (n I Ot96Z ~S A 3 - Z ya1~5 a tll 11 MOIL £ELL'96Z'9££ r ~ - ~ ~ ~ O ~~~In~lIHM __ ~ ' - .. 04982 ?M `uosiaaser 0~ ~ 'cN io 53m., tie ,id F~,Qi OOOL xoB 'O'd au »~ cn ~ ~ ~; ; ~ 0 1 30 S,3M0~ . t uauado ana a rsuaa ' ON '3~~In311HM 1108 ~~ SNOIlIdNOO 'dOl3/~3a-1SOd ,, a :.. O =~ ~ _. .-® • ~- ~ ' o J ,~] ~ .~ + ~ I ~i e ~ - ~; W ~ m z x n U ~ c -; _; .~. O Z i ~ O ~ c ~ Z a 5 m Q' ~ n ,m, o z ~= j c c• U 6~ 7 y g 2 OY r ~ i o o a f ri ,'~, = 2 °~ ~• 1 n w w ~ 7o a u e i ~ iZ O i & ~ b~ ~~ j i, ~ i g ~e A$. ~Lfl~ - L002 '62 ~+M yosylo~ 'uagwr JIg pa}}off b~xoH-+iW+~WA-XC6-6T90L0\1N3~M3d G6 ~IAI~\1+0K+P\0~0\]!1 '+ri~+sMA ~.+~0'1 - £20'9\W Hydrologic Soil Group-Columbus County, North Carolina N Meters A 0 45 90 180 270 Feet 0 150 300 600 900 U$~A Natural Resources Web Soil Survey 2.0 6/14/2007 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group-Columbus County, North Carolina MAP LEGEND Area of Interest (AOI) N Local Roads `,_ Area of Interest (AOI) Other Roads Soils Soil Map Units Soil Ratings 0 A 0 A/D 0 B 0 e/D Q C Q c/o Q D Not rated or not available Political Features Municipalities + Cities Urban Areas Water Features Oceans .-.-r Streams and Canals Transportation +++ Rails Roads n.x Interstate Highways ,. ,_ US Routes State Highways MAP INFORMATION Original soil survey map sheets were prepared at publication scale. Viewing scale and printing scale, however, may vary from the original. Please rely on the bar scale on each map sheet for proper map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nres.usda.gov Coordinate System: UTM Zone 17N This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Columbus County, North Carolina Survey Area Data: Version 7, Feb 23, 2007 Date(s) aerial images were photographed: 3/2/1999 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 2.0 6/14/2007 ~ Conservation Service National Cooperative Soil Survey Page 2 of 4 n 1 r Hydrologic Soil Group-Columbus County, North Carolina Hydrologic Soil Group Hydrologic Soll Group-Summary by Map Unit-Columbus County, North Carolina Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Fo Foreston loamy fine sand C 1.4 3.0% GoA Goldsboro fine sandy B 10.0 20.7% loam, 0 to 2 percent slopes Ly Lynchburg fine sandy C 9.9 20.6% loam NoA Norfolk loamy fine sand, B 0.2 0.3% 0 to 2 percent slopes NuB Norfolk-Urban land B 8.6 17.7% complex, 0 to 6 percent slopes Ra Rains fine sandy loam B/D 4.1 8.6% WaB Wagram loamy fine A 14.0 29.1% sand, 0 to 6 percent slopes Totals for Area of Interest (AOI) 48.2 100.0% ' ~ Natural Resources Web Soil Survey 2.0 6/14/2007 Conservation Service National Cooperative Soil Survey Page 3 of 4 ' Hydrologic Soil Group-Columbus County, North Carolina ' Description Hydrologic soil groups are based on estimates of runoff potential. Soils are ' assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. ' The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: ' Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. ' Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils ' have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or ' soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. ' Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. ' These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is ' for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options ' Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified ' Tie-break Rule: Lower ' Natural Resources Web Soil Survey 2.0 6/14/2007 Conservation Service National Cooperative Soil Survey Page 4 of 4 Depth to Water Table-Columbus County, North Carolina 709570 709640 709710 709780 7D9850 709920 709990 710060 710130 710200 ~: ~ ~ ` ,~ ~; i+ ~~ ~ ~ II, ~ ~ q. n /~- 11 ~ ~ #- ~ m I , :.. t ~ ~ ~ a, ~ ~ _ - s ~ ~. . ~ id e _ ~ v Tr ~F ~~ .. `X' 4r ~ :u O ~ ~, ~~ ~ ~ t ~ ~ ~ .:' Y..~ .. va.:. ~, Q1 M 0 ~ h ~~ 4. ~~ o x 1~ ~,: ~ ~ M ~ ~ 4 ~ ` ~ II ~ M , -'`4 4~ ~0' ~ I ~ I M: f ~ r F ~ ~ m ~+. ~.. `~.,~ ! f i~ i,.® V n ~ M 'H~'Y,, .'k, v ~ ~° r M 2 .- ~ ~. -, ' :. ~ '. ~ c u i .~~.~ ,.. ..,,~ m m ,~ I{ _ M r _ ~ ,. _~ 1 _ . o <. , ~ ' r ' M . ~ ; ~ ..., g Y ~ r ,~ M ~ ~ ~ ~'~ ~ , ' ~ .. .~, ~.3- ~< ~. 6e~ _ , '~ ~ ~ "' ~ ~' ~ ~ o ~ N •' -; ~ v ~. ~ . o ro r ., Syr 0.~ .. ~ N M M 709570 709640 709710 709780 7098 SG 709920 709990 710060 710130 710200 N Meters Feet A 0 50 100 200 300 0 ~~~~ Natural Resources Conservation Service 200 400 800 1,200 Web Soil Survey 2.0 National Cooperative Soil Survey 6/29/2007 Page 1 of 3 Depth to Water Table-Columbus County, North Carolina MAP LEGEND MAP INFORMATION area of Interest (AOI) Original soil survey map sheets were prepared at publication scale. Area of Interest (AOq Viewing scale and printing scale, however, may vary from the --- original. Please rely on the bar scale on each map sheet for proper Soils map measurements. Soil Map Units Source of Map: Natural Resources Conservation Service Soil Ratings Web Soil Survey URL: http://websoilsurvey.nres.usda.gov 0 0-25 Coordinate System: UTM Zone 17N Q 25 - 5o This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. 0 50 -100 Soil Survey Area: Columbus County, North Carolina 100 - 15o Survey Area Data: Version 7, Feb 23, 2007 0 iso -zoo Date(s) aerial images were photographed: 3/2/1999 ~ > zoo The orthophoto or other base map on which the soil lines were Political Features compiled and digitized probably differs from the background Municipalities imagery displayed on these maps. As a result, some minor shifting ® Cities of map unit boundaries may be evident. Urban Areas Water Features L~ Oceans .~-r Streams and Canals Transportation ++.~ Rails Roads ~ Interstate Highways -_ US Routes State Highways ~ Local Roads Other Roads USDA Natural Resources Web Soil Survey 2.0 6/29/2007 ~ Conservation Service National Cooperative Soil Survey Page 2 of 3 Depth to Water Table-Columbus County, North Carolina Depth to Water Table u ii 1 r D C Depth to Water Table- Summary by Map Unit -Columbus County, North Carolina Map unit symbol Map unit name Rating (centimeters) Acres In A01 Percent of AOI Fo Foreston loamy fine sand 84 3.4 15.8% NoB Norfolk loamy fine sand, 2 to 6 percent slopes 152 0.6 2.9% Ra Rains fine sandy loam 137 16.3 74.9% To Torhunta fine sandy loam 137 0.4 1.8% Wa6 Wagram loamy fine sand, 0 to 6 percent slopes >200 1.0 4.6% Totals for Area of Interest (AOI) 21.8 100.0% Description "Water table" refers to a saturated zone in the soil. It occurs during specified months. Estimates of the upper limit are based mainly on observations of the water table at selected sites and on evidence of a saturated zone, namely grayish colors (redoximorphic features) in the soil. A saturated zone that lasts for less than a month is not considered a water table. This attribute is actually recorded as three separate values in the database. A low value and a high value indicate the range of this attribute for the soil component. A "representative" value indicates the expected value of this attribute for the component. For this soil property, only the representative value is used. Rating Options Units of Measure: centimeters Aggregation Method: Dominant Component Component Percent Cutoff. None Specified Tie-break Rule: Higher Interpret Nulls as Zero: No Beginning Month: January Ending Month: December ' ~~ Natural Resources Conservation Service Web Soil Survey 2.0 National Cooperative Soil Survey 6/29!2007 Page 3 of 3 1 ' Precipitation Frequency Data Server 1 G C 1 ' lofl http://hdsc.nws.noaa, gov/cgi-bin/hdsc/buildout.perl?type~f&series... ' . POINT PRECIPITATION ~'';, FREQUENCY ESTIMATES ~ ~ FROM NOAA ATLAS 14 '4~, WHITEVILLE, NORTH CAROLINA (31-9352) 34.3167 N 78.7167 W 52 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Wed Jun 13 2007 Precipitation Frequency Estimates (inches) ARI* (years) 5 min 10 min 15 min 30 min 60 min 120 3 min hr 6 hr 12 hr 24 ~hr 48 hr 4 day 7 day 10 day 20 day 30 day 45 day 60 I day 0.46 0.73 - 0.92 1.26 1.57 1.83 1.95 2.33 2.73 3.18 3.71 4.19 4.88 5.56 7.49 9.35 11.70 14.06 ~ 0.54 0.87 1.09 1.51 1.89 2.22. 2.36 2.82 3.30 3.85 4.48 5.06 5.88 6.65 8.92 11.09113.82 16.57 I 0.64 1.02 1.29 1.83 2.34 2.81 3.00 3.59 14.22 4.97 5.74 6.40 7.38 8.22 10.85 13.27 16.32 19.32 10 .0.71 1.13 1.43 2.07 2.70 3.30 3.56 4.26 5.04 5.95 6.81 7.53 8.61 9.52 12.43 15.02 18.32 21.48 25 0.80 1.27 1.61 2.39 3.18 3.99.4.35 5.22 6.22 7.42 8.43 9.19 10.41 11.37 14.65 17.43 21.04 24.37 50 0.87 1.38 1.75 2.63 3.56 4.56 5.03 6.06 7.26:8.70 9.83 10.61 11.90 12.91 16.47 19.35 23.19 26.60 _100 0.93 1.48 1.88 2.87 3.96 5.17 5.77 6.97 8.41 110.14 11.39 12.16 13.51 14.55 18.37 21.30 25.36 28.80 200 1.00 1.58 2.00 3.11' 4.36 5.83 6.58 7.97 9.68 11.77. 13.12 13.87 15.24 116.30 20.38 23.32 27.57 31.01 ~ 500 _ 1.08 1.72 ( 2.16 3.43. 4.93 6.76 7.76 9.46 11.59 14.25 15.75 16.52 17.76 18.82 23.20 (26.08 30.58 33.92 r 1000 1.15 1.82 2.28 3.69 5.39, 7.55 8.78 10.74113.25 16.41 18.01. 18.79 .19.85 20.90 25.49 28.25 32.91- 36.12 ----- - 'These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. 6/13/2007 R:26 AM ~ APPENDIX A 1 1 r Project Name: Lowe's Whiteville, NC Date: 6/12/2007 Basin: DA #1 PRE Drainage area= 5.34 acres = 0.008 miZ Curve Number Land Use HSG: of Basin % of Basin A CN A B 100.0 CN B C 0.0 CN C D 0.0 CND Sum 100.0 Wei hted CN Impervious 15.8 98 98 98 98 15.48 Wooded -Fair 0.0 36 60 73 79 0.00 Open Space -Good 79.7 39 61 74 80 48.62 Residential (1/3 acre) 57 72 81 86 0.00 Residential (1/8 acre) 77 85 90 92 0.00 Gravel 4.5 76 85 89 91 3.83 Sum: 100.0 Sum: 64.10 Curve numbers taken from: TR-55 Use: 65 Basin: DA #2 PRE Drainage area= 6.13 acres = 0.010 miZ Curve Number Land Use HSG: % of Basin % of Basin A CN A B 0.0 CN B C 100.0 CN C D 0.0 CND Sum 100.0 Wei hted CN Impervious 4.6 98 98 98 98 4.51 Wooded -Fair 0.0 36 60 73 79 0.00 Open Space -Good 91.4 39 61 74 80 67.64 Residential (1/3 acre) 57 72 81 86 0.00 Residential (1/8 acre) 77 85 90 92 0.00 Gravel 4.0 76 85 89 91 3.56 Sum: 100.0 Sum: 72.14 Curve numbers taken from: TR-55 Use: 73 1 1 1 Basin: DA#3 PRE Drainage area= 2.29 acres = 0.004 miZ Curve Number Land Use HSG: % of Basin % of Basin A CN A B 100.0 CN B C 0.0 CN C D CND Sum 100.0 Wei hted CN Impervious 1.8 98 98 98 98 1.76 Wooded -Fair 36 60 73 79 0.00 Open Space -Good 98.2 39 61 74 80 59.90 Residential (1/3 acre) 57 72 81 86 0.00 Residential (1/8 acre) 77 85 90 92 0.00 Commercial 89 92 94 95 0.00 Sum: 100.0 Sum: 61.67 Curve nu mbers taken from: TR-55 Use: 62 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Basin: DA#4 PRE Curve Numl impervious Wooded -Fair Open Space -Good Residential (1/3 acre) Residential (1/8 acre) Commercial Drainage area= 0.40 acres = 0.001 mil A B C D % of Basin 100.0 0.0 % of Basin CN A CN B CN C CN D 10.2 98 98 98 98 36 60 73 79 89.8 39 61 74 80 57 72 81 86 77 85 90 92 89 92 94 95 Sum: 100.0 Curve numbers taken from: TR-55 Weighted CN 10.00 0.00 54.78 0.00 0.00 0.00 Sum: 64.77 Use: 65 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Project Name: Lowe's Whiteville, NC Date: 6/12/2007 Basin: DA #1 POST Drainage area= 8.07 acres = 0.013 miz Curve Nu Land Use Impervious Wooded -Fair Open Space -Good Residential (i/3 acre) Residential (1/8 acre) (Commercial HSG: A B C D % of Basin 95.0 5.0 % of Basin CN A CN B CN C CN D 72.0 98 98 98 98 36 60 73 79 28.0 39 61 74 80 57 72 81 86 77 85 90 92 89 92 94 95 100.0 Weighted CN 70.56 0.00 17.26 0.00 0.00 0.00 Sum: 87.82 Use: 88.00 Sum: 100.0 Curve numbers taken from: TR-55 i i Basin: DA #2 POST Drainage area= 3.31 acres = 0.005 miz rve N Impervious Wooded -Fair Open Space -Good Residential (1/3 acre) Residential (1/8 acre) Commercial HSG: A B C D % of Basin 90.0 10.0 of Basin CN A CN B CN C CN D 88.2 98 98 98 98 36 60 73 79 11.8 39 61 74 80 57 72 81 86 77 85 90 92 89 92 94 95 Sum 100.0 Weighted CN Sum: 100.0 Curve numbers taken from: TR-55 0.00 7.35 0.00 0.00 0.00 Sum: 93.79 Use: 94 Basin: DA #3 POST Drainage area= 1.99 acres = 0.003 mil m Land Use Impervious Wooded -Fair Open Space -Good Residential (1/3 acre) Residential (1/8 acre) Commercial HSG: A B % of Basin 90.0 % of Basin CN A CN B 68.0 98 98 36 60 32.0 39 61 57 72 77 85 89 92 C D 10.0 CN C CN D 98 98 73 79 74 80 81 86 90 92 94 95 Sum Sum: 100 Curve numbers taken from: TR-55 Weighted CN 66.64 0.00 19.94 0.00 0.00 0.00 Sum: 86.58 Use: 87 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Basin: DA #4 POST Drainage area= 0.87 acres = 0.001 miZ rve N Land Use Impervious Wooded -Fair Open Space -Good Residential (1/3 acre) Residential (1/8 acre) Commercial HSG: A % of Basin % of Basin CN A 0.0 98 36 100.0 39 57 77 89 B C D )0.0 0.0 NB CNC CND 98 98 98 60 73 79 61 74 80 72 81 86 85 90 92 92 94 95 Sum 100.0 Weighted CN 0.00 0.00 61.00 0.00 0.00 0.00 Sum: 61.00 Use: 61 Sum: 100.0 Curve numbers taken from: TR-55 1 ~ APPENDIX B r 1 L 1 Hydrograph Summary Report 1 Page 1 ~ HvA_ ~ Hyd. ___ Hvtlroaraoh Hydrograph Peak Peak F Time .__. ero Time to __ Volume Volume nflow _ Maximum ~ aximum ydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) II (ft) (tuft) I 1 i SCS Runoff 3.94 6 732 18,273 ---- I ------ ------ Predeveloped Area 1 ~ 2 i SCS Runoff 7.48 6 732 31,615 ---- ' ------ ------ Predeveloped Area 2 3 SCS Runoff ~ 1.31 6 732 6,540 ---- ------ ------ Predeveloped Area 3 4 SCS Runoff 0.24 6 738 1,412 ---- ------ ------ Predeveloped Area 4 5 ~ Combine 12.95 6 732 57,839 1, 2, 3, 4 ------ ------ Pre-developm Combined Total 6 SCS Runoff 32.75 1 i 719 75,731 ---- ------ ------ Post-Development Area 1 7 SCS Runoff 16.31 2 716 35,792 ---- ------ ------ Post-Development Area 2 8 SCS Runoff 8.22 2 716 16,927 ---- ------ ------ Post-Development Area 3 9 SCS Runoff 1.07 1 716 1,981 ---- ------ ------ Post-Development Area 4 10 Reservoir 0.90 1 890 38,666 6 90.27 49,411 SWM Pond A 11 Combine 24.53 2 716 52,719 7, 8, ------ ------ Combined Area 2 & 3 12 i i Reservoir 0.34 ~ 2 I i II ~ 1076 , ~~ 38,537 i ' 11 I 92.24 ~ 39,156 SWM Pond B ~ ', '~ ', 1 Proj. file: Lowes-Whiteville.gpw ' Return Period: 2 yr __ 'I __ Run date: 06-29-2007 Hydraflow Hydrographs by Intelisolve Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predeveloped Area 1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 5.34 ac 0.0 TR55 3.85 in 24 h rs Peak discharge = 3.94 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 24.3 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 18,273 cult 1 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.70 0.07 16.70 0.24 21.70 0.14 End 1 1 1 1 TR55 Tc Worksheet Page 1 Hyd. No. 1 Predeveloped Area 1 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.6 Travel Time ........................................ = 23.7 min Shallow Concentrated Flow Flow length = 68 ft Watercourse slope = 1.6 Surface description =Unpaved Average velocity = 2.07 ft/s Travel Time ........................................ = 0.6 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 24.3 min Hydraflow Hydrographs by Intelisolve 1 1 1 Cl Hyd. No. 1 - SCS Runoff - 2 Yr - Qp = 3.94 cfs - Predeveloped Area 1 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) ,~ Hyd. 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve 1 1 1 1 Hyd. No. 2 Predeveloped Area 2 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 6.13 ac 0.0 TR55 3.85 in 24 h rs Peak discharge = 7.48 cfs Time interval = 6 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 23.9 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 31,615 cult Hydrograph Discharge Table Time --Outflow (hrs cfs) 11.10 0.09 16.10 0.38 21.10 0.21 ...End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predeveloped Area 2 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.8 Travel Time ........................................ = 22.6 min Shallow Concentrated Flow Flow length = 159 ft Watercourse slope = 1.5 Surface description =Unpaved Average velocity = 1.98 ft/s Travel Time ................. ....................... = 1.3 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 23.9 min w Cl 0.0 2.4 4.9 7.3 9.8 12.2 14.6 Time (hrs) ,~ Hyd. 2 __ 17.1 19.5 22.0 24.4 Hyd. No. 2 - SCS Runoff - 2 Yr - Qp = 7.48 cfs - Predeveloped Area 2 Hydrograph Report Hyd. No. 3 Predeveloped Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 2.29 ac 0.0 TR55 3.85 in 24 hrs Page 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 1.31 cfs Time interval = 6 min Curve number = 62 Hydraulic length = 0 ft Time of conc. (Tc) = 22.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 6,540 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.80 0.06 16.80 0.09 21.80 0.05 End i TR55 Tc Worksheet Page 1 Hyd. No. 3 Predeveloped Area 3 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.2 Travel Time ........................................ = 20.7 min Shallow Concentrated Flow Flow length = 70 ft Watercourse slope = 0.1 Surface description =Unpaved Average velocity = 0.60 ft/s Travel Time ................. ....................... = 1.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 22.7 min Hydraflow Hydrographs by Intelisolve Hyd. No. 3 - SCS Runoff - 2 Yr - Qp = 1.31 cfs - Predeveloped Area 3 1. w v C1 1. 0. 0. 0.0 2.5 4.9 7.4 9.8 12.3 14.7 17.2 19.6 22.1 24.5 Time (hrs) ,~ Hyd. 3 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predeveloped Area 4 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 0.40 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 3.85 in Storm duration = 24 hrs Peak discharge = 0.24 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 31.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,412 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.70 0.00 16.70 0.02 21.70 0.01 ...End CJ Hyd. No. 5 -Combine - 2 Yr - Qp = 12.95 cfs -Pre-developm Combined Total 1 1 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) / Hyd. 1 Hyd. 2 Hyd. 3 Hyd. 4 Hyd. 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Post-Development Area 1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 8.07 ac 0.0 TR55 3.85 in 24 hrs Peak discharge = 32.75 cfs Time interval = 1 min Curve number = 88 Hydraulic length = 0 ft Time of conc. (Tc) = 9.2 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 75,731 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 9.17 0.33 10.00 0.49 10.83 0.95 11.67 5.20 12.50 3.10 13.33 1.53 14.17 1.03 15.00 0.87 15.83 0.71 16.67 0.62 17.50 0.56 18.33 0.50 19.17 0.44 20.00 0.38 20.83 0.36 21.67 0.35 22.50 0.34 23.33 0.33 End TR55 Tc Worksheet Page 1 Hyd. No. 6 Post-Development Area 1 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.5 Travel Time ..................... ................... = 4.6 min Shallow Concentrated Flow Flow length Watercourse slope Surface description Average velocity Travel Time ............ = 560 ft = 1.0 = Paved = 2.03 ft/s ............................ = 4.6 m i n Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 9.2 min ' Hyd. No. 6 - SCS Runoff - 2 Yr - Qp = 32.75 cfs -Post-Development Area 1 i I' 40 ~ I- -- _ -~ i -- - - ~- I I,, '~i ~ I,I i ~I 1 ~ I 30 -_ ~_ --- - '- -- - I -~-- ~- -- - - -1 1 N ', pr 20 - f- - - -~ - ~ ~-- ---~ _ --rt_ - - I I- ~ i ! ! I ' II ' ~ O 0.0 213 4.7 7.0 9.4 11.7 14.1 16.4 18.8 21.1 23.5 Time (hrs) ~ Hyd. 6 TR55 Tc Worksheet Hyd. No. 4 Predeveloped Area 4 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 132.1 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.2 Travel Time ........................................ = 31.5 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.0 Surface description =Paved Average velocity = 0.00 ft/s Travel Time ................. ....................... = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Page 1 Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 31.5 min 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hyd. No. 4 - SCS Runoff - 2 Yr - Qp = 0.24 cfs - Predeveloped Area 4 0.25 ~ '~ 0.2( 0.1; C3~ 0.1( O.o! o.o o.o 2.5 4.9 7.4 9.9 12.4 14.8 17.3 19.8 22.2 24.7 Time (hrs) Hyd. 4 I ~ ~ '~ ~ I - _ _ I - I ~ ~ ~ ~,I - ~ -, ~-- II ~ - -, ~~ I !', i - - - -- i -- _ ~ . ~ I _ i ', ' 1 I i ~, ~ ___- __ - - , i __ T , ' I' --_ I i ~ ~I I' ~, ~ _ _ _ - I' I Ir-- L- - -- 0 1 1 1 1 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Pre-developm Combined Total Hydrograph type =Combine Storm frequency = 2 yrs Inflow hyds. = 1, 2, 3, 4 Peak discharge = 12.95 cfs Time interval = 6 min Hydrograph Volume = 57,839 tuft Hydrograph Discharge Table Time Hyd. 1 + Hyd. 2 + Hyd. 3 + Hyd. 4 = (hrs) (cfs) (cfs) (cfs) (cfs) 15.00 0.33 0.49 0.12 0.03 20.00 0.15 0.23 0.06 0.01 ...End Outflow (cfs) 0.97 0.45 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 7 Post-Development Area 2 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 3.31 ac 0.0 TR55 3.85 in 24 h rs Peak discharge = 16.31 cfs Time interval = 2 min Curve number = 94 Hydraulic length = 0 ft Time of conc. (Tc) = 3.6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 35,792 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 8.20 0.16 9.87 0.31 11.53 1.32 13.20 0.67 14.87 0.37 16.53 0.26 18.20 0.21 End 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Page 1 Hyd. No. 7 Post-Development Area 2 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 296.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.9 Travel Time ..................... ................... = 2.7 min Shallow Concentrated Flow Flow length = 176 ft Watercourse slope = 2.4 Surface description =Paved Average velocity = 3.14 ft/s Travel Time ................. ....................... = 0.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ =min Total Travel Time, Tc ........................ = 3.6 min Hydraflow Hydrographs by Intelisolve 1 1 1 1 1 1 1 1 1 1 1 1 Hyd. No. 7 - SCS Runoff - 2 Yr - Qp =16.31 cfs -Post-Development Area 2 v U 0.0 2.0 3.9 5.9 7.9 9.9 11.8 13.8 15.8 17.8 19.7 '~, Time (hrs) ~, /Hyd. 7 1 1 Hydrograph Report Hyd. No. 8 Post-Development Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 1.99 ac 0.0 TR55 3.85 in 24 h rs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 9.67 0.08 11.33 0.38 13.00 0.40 14.67 0.21 16.33 0.14 18.00 0.12 19.67 0.09 End Page 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 8.22 cfs Time interval = 2 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 3.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 16,927 cult 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Page 1 Hyd. No. 8 Post-Development Area 3 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 139.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.5 Travel Time ........................................ = 1.3 min Shallow Concentrated Flow Flow length = 381 ft Watercourse slope = 1.7 Surface description =Paved Average velocity = 2.61 ft/s Travel Time ................. ....................... = 2.4 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ =min Total Travel Time, Tc ........................ = 3.7 min Hydraflow Hydrographs by Intelisolve 1 1 1 1 1 1 1 1 i ~ Cat Hyd. No. 8 - SCS Runoff - 2 Yr - Qp = 8.22 cfs -Post-Development Area 3 1 0.00 2.11 4.21 6.32 8.43 10.53 12.64 14.75 16.85 18.96 21.07 Time (hrs) ~! Hyd. 8 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 9 Post-Development Area 4 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 2 yrs 0.79 ac 0.0 TR55 3.85 in 24 h rs Peak discharge = 1.07 cfs Time interval = 1 min Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 1.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,981 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.70 0.01 12.53 0.09 13.37 0.06 14.20 0.04 15.03 0.04 15.87 0.03 16.70 0.03 17.53 0.02 18.37 0.02 19.20 0.02 20.03 0.02 20.87 0.02 21.70 0.02 22.53 0.02 23.37 0.02 End 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Post-Development Area 4 Storm frequency = 2 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 50.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 30.0 Travel Time ..................... ................... = 1.7 min Shallow Concentrated Fl ow Flow length = 0 ft Watercourse slope = 0.0 Surface description =Paved Average velocity = 0.00 ft/s Travel Time ........................................ = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 1.7 min 1 1 1 1 1 1 1 1 1 1 1 C3- Hyd. No. 9 - SCS Runoff - 2 Yr - Qp = 1.07 cfs -Post-Development Area 4 1. 1. 0. 0.~ 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) Hyd. 9 __ __ Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 10 ' SWM Pond A Hydrograph type = Reservoir Peak discharge = 0.90 cfs ' Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 6 Reservoir name = SWM Pond A Max. Elevation = 90.27 ft Max. Storage = 49,411 cult Storage Indication method used . Outflow hydrograph volume = 38,666 tuft ' Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs ' 8.33 0.19 88.04 0.01 0.01 ----- ----- ----- ----- ----- ----- ----- 0.01 9.17 0.33 88.08 0.02 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 10.00 0.49 88.13 0.05 0.04 0.04 ' 10.83 0.95 88.22 0.11 0.11 =___= _____ _____ _____ _____ _____ _____ 0.11 11.67 5.20 88.45 0.32 0.31 ----- ----- ----- ----- ----- ----- ----- 0.31 12.50 3.10 90.09 0.88 0.86 ----- ----- ----- ----- ----- ----- ----- 0.86 ' 13.33 1.53 90.22 0.90 0.89 0.89 14.17 1.03 90.27 0.93 0.90 ----- ----- ----- ----- ----- ----- ----- 0.90 15.00 0.87 90.27 0.93 0.90 ----- ----- ----- ----- ----- ----- ----- 0.90 15.83 0.71 90.26 0.92 0.90 0.90 ' 16.67 0.62 90.23 0.91 0.89 ----- ----- ----- ----- ----- ----- ----- 0.89 17.50 0.56 90.19 0.89 0.89 ----- ----- ----- ----- ----- ----- ----- 0.89 18.33 0.50 90.15 0.89 0.88 ----- ----- ----- ----- ----- ----- ----- 0.88 19.17 0.44 90.10 0.89 0.86 ----- ----- ----- ----- ----- ----- ----- 0.86 ' 20.00 0.38 90.05 0.87 0.85 ----- ----- ----- ----- ----- ----- ----- 0.85 20.83 0.36 90.00 0.84 0.84 ----- ----- ----- ----- ----- ----- ----- 0.84 ' 21.67 0.35 89.93 22.50 0.34 89.87 0.84 0.82 0.82 0.81 0.82 0.81 23.33 0.33 89.81 0.79 0.79 ----- ----- --- - ----- ----- ----- -- -- 0.79 ' ...End C 1 i Reservoir Report Page 1 Reservoir No. 1 - SWM Pond A Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 88.00 18, 510 0 0 1.00 89.00 21,256 19,883 19,883 2.00 90.00 23,998 22,627 42,510 3.00 91.00 26,858 25,428 67,938 4.00 92.00 29,836 28,347 96,285 5.00 93.00 33,023 31,430 127,715 6.00 94.00 36,365 34,694 162,409 7.00 95.00 39,793 38,079 200,488 8.00 96.00 43,273 41,533 242,021 9.00 97.00 46,804 45,039 287,060 Culvert /Orifice Structures Weir Structures IAl LB] [C] [D] IAl IB] [C] LDI Rise in = 24.0 5.0 0.0 0.0 Crest Len ft = 9.42 10.00 0.00 0.00 Span in = 24.0 5.0 0.0 0.0 Crest EI. ft = 93.00 96.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 0.00 0.00 Invert EI. ft = 88.00 88.00 0.00 0.00 Weir Type =Riser Broad --- --- Length ft = 98.0 0.0 0.0 0.0 Multi-Stage =Yes No No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration Rate = 0.00 in/hr/sgft Tailwater Elev. = 0.00 ft Stage / Storage I Discharge Table Stage Storage Elevation Clv A ft cult ft cfs 0.00 0 88.00 0.00 0.10 1,988 88.10 0.03 0.20 3,977 88.20 0.09 0.30 5,965 88.30 0.18 0.40 7,953 88.40 0.29 0.50 9,941 88.50 0.35 0.60 11,930 88.60 0.41 0.70 13,918 88.70 0.44 0.80 15,906 88.80 0.48 0.90 17,895 88.90 0.52 1.00 19,883 89.00 0.56 1.10 22,146 89.10 0.60 1.20 24,408 89.20 0.64 1.30 26,671 89.30 0.65 1.40 28,934 89.40 0.69 1.50 31,196 89.50 0.73 1.60 33,459 89.60 0.74 1.70 35,722 89.70 0.78 1.80 37,985 89.80 0.79 1.90 40,247 89.90 0.84 2.00 42,510 90.00 0.84 2.10 45,053 90.10 0.89 2.20 47,596 90.20 0.89 2.30 50,138 90.30 0.95 2.40 52,681 90.40 0.95 2.50 55,224 90.50 0.95 2.60 57,767 90.60 1.01 2.70 60,310 90.70 1.01 Note: All outflows have been analyzed under inlet and outlet control. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.03 --- --- 0.00 0.00 --- --- --- 0.03 0.09 --- --- 0.00 0.00 --- --- --- 0.09 0.18 --- --- 0.00 0.00 --- --- --- 0.18 0.28 --- --- 0.00 0.00 --- --- --- 0.28 0.34 --- --- 0.00 0.00 --- --- --- 0.34 0.39 --- --- 0.00 0.00 --- --- --- 0.39 0.44 --- --- 0.00 0.00 --- --- --- 0.44 0.48 --- --- 0.00 0.00 --- --- --- 0.48 0.52 --- --- 0.00 0.00 --- --- --- 0.52 0.55 --- --- 0.00 0.00 --- --- --- 0.55 0.59 --- --- 0.00 0.00 --- --- --- 0.59 0.62 --- --- 0.00 0.00 --- --- --- 0.62 0.65 --- --- 0.00 0.00 --- --- --- 0.65 0.68 --- --- 0.00 0.00 --- --- --- 0.68 0.71 --- --- 0.00 0.00 --- --- --- 0.71 0.74 --- --- 0.00 0.00 --- --- --- 0.74 0.76 --- --- 0.00 0.00 --- --- --- 0.76 0.79 --- --- 0.00 0.00 --- --- --- 0.79 0.81 --- --- 0.00 0.00 --- --- --- 0.81 0.84 --- --- 0.00 0.00 --- --- --- 0.84 0.86 --- --- 0.00 0.00 --- --- --- 0.86 0.89 --- --- 0.00 0.00 --- --- --- 0.89 0.91 --- --- 0.00 0.00 --- --- --- 0.91 0.93 --- --- 0.00 0.00 --- --- --- 0.93 0.95 --- --- 0.00 0.00 --- --- --- 0.95 0.97 --- --- 0.00 0.00 --- --- --- 0.97 1.00 --- --- 0.00 0.00 --- --- --- 1.00 Continues on next page... 1 1 SWM Pond A Page 2 Stage /Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.80 62,852 90.80 1.02 1.02 --- --- 0.00 0.00 --- --- --- 1.02 2.90 65,395 90.90 1.07 1.04 --- --- 0.00 0.00 --- --- --- 1.04 3.00 67,938 91.00 1.07 1.06 --- --- 0.00 0.00 --- --- --- 1.06 3.10 70,773 91.10 1.07 1.07 --- --- 0.00 0.00 --- --- --- 1.07 3.20 73,607 91.20 1.13 1.09 --- --- 0.00 0.00 --- --- --- 1.09 3.30 76,442 91.30 1.13 1.11 --- --- 0.00 0.00 --- --- --- 1.11 3.40 79,277 91.40 1.13 1.13 --- --- 0.00 0.00 --- --- --- 1.13 3.50 82,111 91.50 1.20 1.15 --- --- 0.00 0.00 --- --- --- 1.15 3.60 84,946 91.60 1.20 1.17 --- --- 0.00 0.00 --- --- --- 1.17 3.70 87,781 91.70 1.20 1.19 --- --- 0.00 0.00 --- --- --- 1.19 3.80 90,616 91.80 1.20 1.20 --- --- 0.00 0.00 --- --- --- 1.20 3.90 93,450 91.90 1.26 1.22 --- --- 0.00 0.00 --- --- --- 1.22 4.00 96,285 92.00 1.26 1.24 --- --- 0.00 0.00 --- --- --- 1.24 4.10 99,428 92.10 1.26 1.25 --- --- 0.00 0.00 --- --- --- 1.25 4.20 102,571 92.20 1.27 1.27 --- --- 0.00 0.00 --- --- --- 1.27 4.30 105,714 92.30 1.34 1.29 --- --- 0.00 0.00 --- --- --- 1.29 4.40 108,857 92.40 1.34 1.30 --- --- 0.00 0.00 --- --- --- 1.30 4.50 112,000 92.50 1.34 1.32 --- --- 0.00 0.00 --- --- --- 1.32 4.60 115,143 92.60 1.34 1.34 --- --- 0.00 0.00 --- --- --- 1.34 4.70 118,286 92.70 1.35 1.35 --- --- 0.00 0.00 --- --- --- 1.35 4.80 121,429 92.80 1.41 1.36 --- --- 0.00 0.00 --- --- --- 1.36 4.90 124,572 92.90 1.41 1.38 --- --- 0.00 0.00 --- --- --- 1.38 5.00 127,715 93.00 1.41 1.40 --- --- 0.00 0.00 --- --- --- 1.40 5.10 131,184 93.10 2.38 1.39 --- --- 0.99 0.00 --- --- --- 2.38 5.20 134,654 93.20 4.17 1.37 --- --- 2.81 0.00 --- --- --- 4.17 5.30 138,123 93.30 6.53 1.34 --- --- 5.15 0.00 --- --- --- 6.50 5.40 141,592 93.40 9.25 1.32 --- --- 7.94 0.00 --- --- --- 9.25 5.50 145,062 93.50 12.44 1.28 --- --- 11.09 0.00 --- --- --- 12.37 5.60 148,531 93.60 15.81 1.23 --- --- 14.58 0.00 --- --- --- 15.81 5.70 152,001 93.70 19.51 1.14 --- --- 18.37 0.00 --- --- --- 19.51 5.80 155,470 93.80 23.46 1.02 --- --- 22.45 0.00 --- --- --- 23.46 5.90 158,940 93.90 27.60 0.82 --- --- 26.78 0.00 --- --- --- 27.60 6.00 162,409 94.00 30.95 0.59 --- --- 30.36 0.00 --- --- --- 30.95 6.10 166,217 94.10 32.06 0.51 --- --- 31.55 0.00 --- --- --- 32.06 6.20 170,025 94.20 32.86 0.45 --- --- 32.40 0.00 --- --- --- 32.86 6.30 173,833 94.30 33.52 0.41 --- --- 33.10 0.00 --- --- --- 33.51 6.40 177,641 94.40 34.08 0.37 --- --- 33.70 0.00 --- --- --- 34.08 6.50 181,448 94.50 34.58 0.34 --- --- 34.24 0.00 --- --- --- 34.58 6.60 185,256 94.60 35.05 0.32 --- --- 34.73 0.00 --- --- --- 35.04 6.70 189,064 94.70 35.47 0.29 --- --- 35.18 0.00 --- --- --- 35.47 6.80 192,872 94.80 35.88 0.27 --- --- 35.60 0.00 --- --- --- 35.88 6.90 196,680 94.90 36.26 0.26 --- --- 36.00 0.00 --- --- --- 36.26 7.00 200,488 95.00 36.63 0.24 --- --- 36.39 0.00 --- --- --- 36.63 7.10 204,641 95.10 36.99 0.23 --- --- 36.76 0.00 --- --- --- 36.98 7.20 208,795 95.20 37.34 0.21 --- --- 37.11 0.00 --- --- --- 37.33 7.30 212,948 95.30 37.67 0.20 --- --- 37.47 0.00 --- --- --- 37.67 7.40 217,101 95.40 38.00 0.19 --- --- 37.81 0.00 --- --- --- 38.00 7.50 221,255 95.50 38.33 0.18 --- --- 38.14 0.00 --- --- --- 38.32 7.60 225,408 95.60 38.64 0.18 --- --- 38.47 0.00 --- --- --- 38.64 7.70 229,561 95.70 38.96 0.17 --- --- 38.78 0.00 --- --- --- 38.95 7.80 233,714 95.80 39.27 0.16 --- --- 39.09 0.00 --- --- --- 39.25 7.90 237,868 95.90 39.57 0.15 --- --- 39.40 0.00 --- --- --- 39.56 8.00 242,021 96.00 39.87 0.15 --- --- 39.71 0.00 --- --- --- 39.86 8.10 246,525 96.10 40.17 0.14 --- --- 39.99 0.82 --- --- --- 40.96 8.20 251,029 96.20 40.46 0.14 --- --- 40.31 2.33 --- --- --- 42.77 8.30 255,533 96.30 40.75 0.13 --- --- 40.61 4.27 --- --- --- 45.01 8.40 260,037 96.40 41.04 0.13 --- --- 40.91 6.58 --- --- --- 47.61 8.50 264,541 96.50 41.32 0.12 --- --- 41.18 9.19 --- --- --- 50.49 8.60 269,044 96.60 41.60 0.12 --- --- 41.48 12.08 --- --- --- 53.68 8.70 273,548 96.70 41.88 0.12 --- --- 41.72 15.23 --- --- --- 57.07 8.80 278,052 96.80 42.16 0.11 --- --- 42.03 18.60 --- --- --- 60.75 8.90 282,556 96.90 42.44 0.11 --- --- 42.30 22.20 --- --- --- 64.61 9.00 287,060 97.00 42.71 0.11 --- --- 42.56 26.00 --- --- --- 68.67 ...End 1 Hyd. No. 10 -Reservoir - 2 Yr - Qp = 0.90 cfs - SWM Pond A Cl /Hyd. 6 Hyd. 10 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Combined Area 2 & 3 Hydrograph type =Combine Storm frequency = 2 yrs Inflow hyds. = 7, 8 Peak discharge = 24.53 cfs Time interval = 2 min Hydrograph Volume = 52,719 cult Hydrograph Discharge Table Time Hyd. 7 + Hyd. 8 + (hrs) (cfs) (cfs) 10.00 0.34 0.10 11.67 3.84 1.64 13.33 0.62 0.34 15.00 0.36 0.20 16.67 0.25 0.14 18.33 0.20 0.11 Outflow (cfs) 0.44 5.48 0.96 0.55 0.39 0.32 ...End Hyd. No. 11 -Combine - 2 Yr - Qp = 24.53 cfs -Combined Area 2 & 3 2 2 ~, 1 Cat 1 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 15.9 17.9 19.9 Time (hrs) / Hyda 7 Hyd. 8 Hyd. 11 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 12 ' SWM Pond B Hydrograph type =Reservoir ' Storm frequency = 2 yrs Inflow hyd. No. = 11 Max. Elevation = 92.24 ft LIB n I Peak discharge Time interval Reservoir name Max. Storage = 0.34 cfs = 2 min = SWM Pond B = 39,156 tuft Storage Indication method used. Hydrograph Discharge Table Outflow hydrograph volume = 38,537 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 6.67 0.11 90.04 0.01 0.01 ----- ----- ----- ----- ----- ----- ----- 0.01 8.33 0.21 90.10 0.02 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 10.00 0.44 90.20 0.07 0.07 ----- ----- ----- ----- ----- ----- ----- 0.07 11.67 5.48 90.57 0.16 0.15 ----- ----- ----- ----- ----- ----- ----- 0.15 13.33 0.96 92.10 0.32 0.32 ----- ----- ----- ----- ----- ----- ----- 0.32 15.00 0.55 92.20 0.35 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 16.67 0.39 92.24 0.35 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 18.33 0.32 92.24 0.35 0.34 ----- ----- ----- ----- ----- ----- ----- 0.34 20.00 0.24 92.23 0.35 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 21.67 0.22 92.20 0.35 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 23.33 0.21 92.17 0.34 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 25.00 0.00 92.10 0.32 0.32 ----- ----- ----- ----- ----- ----- ----- 0.32 26.67 0.00 92.01 0.32 0.32 ----- ----- ----- ----- ----- ----- ----- 0.32 28.33 0.00 91.91 0.32 0.31 ----- ----- ----- ----- ----- ----- ----- 0.31 30.00 0.00 91.81 0.30 0.30 ----- ----- ----- ----- ----- ----- ----- 0.30 31.67 0.00 91.72 0.29 0.29 ----- ----- ----- ----- ----- ----- ----- 0.29 33.33 0.00 91.62 0.29 0.28 ----- ----- ----- ----- ----- ----- ----- 0.28 35.00 0.00 91.53 0.28 0.27 ----- ----- ----- ----- ----- ----- ----- 0.27 36.67 0.00 91.45 0.27 0.26 ----- ----- ----- ----- ----- ----- ----- 0.26 38.33 0.00 91.36 0.26 0.25 ----- ----- ----- ----- ----- ----- ----- 0.25 40.00 0.00 91.28 0.25 0.25 ----- ----- ----- ----- ----- ----- ----- 0.25 41.67 0.00 91.20 0.24 0.24 ----- ----- ----- ----- ----- ----- ----- 0.24 43.33 0.00 91.13 0.23 0.23 ----- ----- ----- ----- ----- ----- ----- 0.23 45.00 0.00 91.05 0.22 0.22 ----- ----- ----- ----- ----- ----- ----- 0.22 46.67 0.00 90.98 0.22 0.21 ----- ----- ----- ----- ----- ----- ----- 0.21 ..End 1 Reservoir Report CII 0 1 Page 1 Reservoir No. 2 - SWM Pond B Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 90.00 14,141 0 0 1.00 91.00 16,900 15,520 15,520 2.00 92.00 19,896 18,398 33,918 3.00 93.00 23,171 21,534 55,452 4.00 94.00 26,719 24,945 80,397 5.00 95.00 19,966 23,342 103,739 Culvert /Orifice Structures Weir Structures IAl IBI [C] IDl IAl IBl [Cl Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 9.42 10.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest EI. ft = 93.50 94.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 0.00 Invert EI. ft = 90.00 90.00 0.00 0.00 Weir Type =Riser Broad --- Length ft = 46.0 0.0 0.0 0.0 Multi-Stage =Yes No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 [D] 0.00 0.00 0.00 No Multi-Stage = n/a Yes No No Exfiltration Rate = 0.00 in/hr/sgft Tailwater Elev. = 0.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage /Storage /Discharge Table ' Stage Storage Elevation Clv A ft tuft ft cfs 0.00 0 90.00 0.00 ' 0.10 1,552 90.10 0.02 0.20 3,104 90.20 0.06 0.30 4,656 90.30 0.11 0.40 6,208 90.40 0.12 0.50 7,760 90.50 0.15 ' 0.60 9,312 90.60 0.16 0.70 10,864 90.70 0.18 0.80 12,416 90.80 0.20 0.90 13,968 90.90 0.20 1.00 15,520 91.00 0.22 ' 1.10 17,360 91.10 0.23 1.20 19,200 91.20 0.24 1.30 21,040 91.30 0.25 1.40 22,880 91.40 0.27 ' 1.50 24,719 91.50 0.27 1.60 26,559 91.60 0.29 1.70 28,399 91.70 0.29 1.80 30,239 91.80 0.30 1.90 32,079 91.90 0.32 ' 2.00 33,918 92.00 0.32 2.10 36,072 92.10 0.32 2.20 38,225 92.20 0.35 2.30 40,378 92.30 0.35 ' 2.40 42,532 92.40 0.35 2.50 44,685 92.50 0.38 2.60 46,838 92.60 0.38 2.70 48,992 92.70 0.38 2.80 51,145 92.80 0.38 2.90 53,299 92.90 0.38 3.00 55,452 93.00 0.41 3.10 57,946 93.10 0.41 Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.02 --- --- 0.00 0.00 --- --- --- 0.02 0.06 --- --- 0.00 0.00 --- --- --- 0.06 0.10 --- --- 0.00 0.00 --- --- --- 0.10 0.12 --- --- 0.00 0.00 --- --- --- 0.12 0.14 --- --- 0.00 0.00 --- --- --- 0.14 0.16 --- --- 0.00 0.00 --- --- --- 0.16 0.17 --- --- 0.00 0.00 --- --- --- 0.17 0.19 --- --- 0.00 0.00 --- --- --- 0.19 0.20 --- --- 0.00 0.00 --- --- --- 0.20 0.21 --- --- 0.00 0.00 --- --- --- 0.21 0.23 --- --- 0.00 0.00 --- --- --- 0.23 0.24 --- --- 0.00 0.00 --- --- --- 0.24 0.25 --- --- 0.00 0.00 --- --- --- 0.25 0.26 --- --- 0.00 0.00 --- --- --- 0.26 0.27 --- --- 0.00 0.00 --- --- --- 0.27 0.28 --- --- 0.00 0.00 --- --- --- 0.28 0.29 --- --- 0.00 0.00 --- --- --- 0.29 0.30 --- --- 0.00 0.00 --- --- --- 0.30 0.31 --- --- 0.00 0.00 --- --- --- 0.31 0.32 --- --- 0.00 0.00 --- --- --- 0.32 0.32 --- --- 0.00 0.00 --- --- --- 0.32 0.33 --- --- 0.00 0.00 --- --- --- 0.33 0.34 --- --- 0.00 0.00 --- --- --- 0.34 0.35 --- --- 0.00 0.00 --- --- --- 0.35 0.36 --- --- 0.00 0.00 --- --- --- 0.36 0.36 --- --- 0.00 0.00 --- --- --- 0.36 0.37 --- --- 0.00 0.00 --- --- --- 0.37 0.38 --- --- 0.00 0.00 --- --- --- 0.38 0.38 --- --- 0.00 0.00 --- --- --- 0.38 0.39 --- --- 0.00 0.00 --- --- --- 0.39 0.40 --- --- 0.00 0.00 --- --- --- 0.40 Continues on n ext page... 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SWM Pond B Stage /Storage /Discharge Table Stage Storage Elevation Clv A ft tuft ft cfs 3.20 60,441 93.20 0.41 3.30 62,935 93.30 0.41 3.40 65,430 93.40 0.44 3.50 67,924 93.50 0.44 3.60 70,419 93.60 1.41 3.70 72,913 93.70 3.27 3.80 75,408 93.80 5.61 3.90 77,902 93.90 8.32 4.00 80,397 94.00 11.48 4.10 82,731 94.10 14.90 4.20 85,065 94.20 18.66 4.30 87,399 94.30 22.69 4.40 89,734 94.40 25.18 4.50 92,068 94.50 26.30 4.60 94,402 94.60 27.15 4.70 96,736 94.70 27.86 4.80 99,071 94.80 28.49 4.90 101,405 94.90 29.05 5.00 103,739 95.00 29.56 ...End Page 2 Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.41 --- --- 0.00 0.00 --- --- --- 0.41 0.41 --- --- 0.00 0.00 --- --- --- 0.41 0.42 --- --- 0.00 0.00 --- --- --- 0.42 0.43 --- --- 0.00 0.00 --- --- --- 0.43 0.42 --- --- 0.99 0.00 --- --- --- 1.41 0.41 --- --- 2.81 0.00 --- --- --- 3.21 0.39 --- --- 5.15 0.00 --- --- --- 5.55 0.38 --- --- 7.94 0.00 --- --- --- 8.32 0.35 --- --- 11.09 0.00 --- --- --- 11.44 0.32 --- --- 14.58 0.82 --- --- --- 15.72 0.29 --- --- 18.37 2.33 --- --- --- 20.99 0.24 --- --- 22.45 4.27 --- --- --- 26.96 0.19 --- --- 24.99 6.58 --- --- --- 31.75 0.16 --- --- 26.13 9.19 --- --- --- 35.49 0.15 --- --- 27.00 12.08 --- --- --- 39.23 0.13 --- --- 27.73 15.23 --- --- --- 43.09 0.12 --- --- 28.36 18.60 --- --- --- 47.09 0.11 --- --- 28.93 22.20 --- --- --- 51.24 0.10 --- --- 29.46 26.00 --- --- --- 55.56 Hyd. No. 12 -Reservoir - 2 Yr - Qp = 0.34 cfs - SWM Pond B w Cl / Hyd. 11 Hyd. 12 0.0 4.8 9.6 14.4 19.2 24.0 28.8 33.6 38.4 43.2 4800 Time (hrs) ' Hydrograph Summary Report 1 l ~i ----_ 'i _ -- - I, --_ _ __ Proj. file: Lowes-Whiteville.gpw ' Return Period: 10 yr Page 1 Hvtl. Hyd. Hvdroareo~ Hydrograph Peak Peak Time Time Timeto I Time to i Volume Volume Inflow I Maximum I Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cult) _ __ - _ - 1 SCS Runoff 10.69 6 732 44,875 ---- ------ ------ Predeveloped Area 1 2 SCS Runoff 16.54 6 726 67,805 ---- ------ ------ Predeveloped Area 2 3 SCS Runoff 4.01 6 732 ~ 17,094 ---- I ------ - ped Area 3 ----- Predevelo 4 SCS Runoff 0.67 6 738 3,466 ---- ------ ~ ------ i Predeveloped Area 4 5 Combine 31.80 6 732 133,241 1, 2, 3, 4 ------ ------ Pre-developm Combined Total 6 SCS Runoff 56.13 ~ 1 719 133,874 ~ ---- ------ ------ Post-Development Area 1 7 SCS Runoff 26.09 2 716 59,105 ---- ------ ------ Post-Development Area 2 8 SCS Runoff 14.25 2 716 30,268 ---- ------ ------ Post-Development Area 3 9 SCS Runoff 3.05 1 716 5,297 ---- ------ ------ Post-Development Area 4 10 Reservoir 1.21 1 938 55,234 6 91.86 92,410 SWM Pond A 11 Combine 40.34 2 716 89,373 7, 8, ------ ------ Combined Area 2 & 3 12 t ~ Reservoir I 0.61 I , 2 i 1014 II 54,609 i 11 , i 93.52 ~ ~ i 68,380 SWM Pond B I III ~ ~' I Run date: 06-29-2007 Hydraflow Hydrographs by Intelisolve Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predeveloped Area 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 5.34 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 5.95 in Storm duration = 24 hrs Peak discharge = 10.69 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 24.3 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 44,875 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.90 0.11 15.90 0.56 20.90 0.29 End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predeveloped Area 1 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.6 Travel Time ........................................ = 23.7 min Shallow Concentrated Flow Flow length = 68 ft Watercourse slope = 1.6 Surface description =Unpaved Average velocity = 2.07 ft/s Travel Time ........................................ = 0.6 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 24.3 min 1 ~__ -- ~~ Hyd. No. 1 - SCS Runoff -10 Yr - Qp = 10.69 cfs - Predeveloped Area 1 1 v C~ 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) Hyd. 1 1 1 1 1 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predeveloped Area 2 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 6.13 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = 16.54 cfs Time interval = 6 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 23.9 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 67,805 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.00 0.17 15.00 0.93 20.00 0.41 ...End i i i i i TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predeveloped Area 2 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.8 Travel Time ........................................ = 22.6 min Shallow Concentrated Flow Flow length = 159 ft Watercourse slope = 1.5 Surface description =Unpaved Average velocity = 1.98 ft/s Travel Time ................. ....................... = 1.3 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 23.9 min 1 1 1 1 1 1 1 1 1 1 1 U 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) Hyd. 2 Hyd. No. 2 - SCS Runoff -10 Yr - Qp = 16.54 cfs - Predeveloped Area 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 3 Predeveloped Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 2.29 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = 4.01 cfs Time interval = 6 min Curve number = 62 Hydraulic length = 0 ft Time of conc. (Tc) = 22.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 17,094 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.30 0.05 16.30 0.20 21.30 0.11 End 1 1 1 1 1 1 1 TR55 Tc Worksheet Page 1 Hyd. No. 3 Predeveloped Area 3 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.2 Travel Time ........................................ = 20.7 min Shallow Concentrated Flow Flow length = 70 ft Watercourse slope = 0.1 Surface description =Unpaved Average velocity = 0.60 ft/s Travel Time ................. ....................... = 1.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 22.7 min Hydraflow Hydrographs by Intelisolve 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Time (hrs) Hyd. 3 __ 1 1 1 1 1 1 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 4 Predeveloped Area 4 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 0.40 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = 0.67 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 31.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 3,466 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.00 0.01 16.00 0.04 21.00 0.02 .End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predeveloped Area 4 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 132.1 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.2 Travel Time ........................................ = 31.5 min Shallow Concentrated Flow Flow length Watercourse slope Surface description Average velocity Travel Time ............ =oft = 0.0 = Paved = 0.00 ft/s ............................ = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 31.5 min 1 1 1 1 1 1 Hyd. No. 4 - SCS Runoff -10 Yr - Qp = 0.67 cfs - Predeveloped Area 4 0 0 w at 0 0 0 0.0 2.5 4.9 7.4 9.8 12.3 14.8 17.2 19.7 22.1 24.6 Time (hrs) Hyd. 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Pre-developm Combined Total Hydrograph type =Combine Storm frequency = 10 yrs Inflow hyds. = 1, 2, 3, 4 Peak discharge = 31.80 cfs Time interval = 6 min Hydrograph Volume = 133,241 cult Hydrograph Discharge Table Time Hyd. 1 + Hyd. 2 + (hrs) (cfs) (cfs) 15.00 0.69 0.93 20.00 0.31 0.41 ...End Hyd. 3 + Hyd. 4 = Outflow (cfs) (cfs) (cfs) 0.27 0.05 1.95 0.13 0.02 p.gg CJ Hyd. No. 5 -Combine -10 Yr - Qp = 31.80 cfs -Pre-developm Combined Total ii 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) / Hyd. 1 Hyd. 2 Hyd. 3 Hyd. 4 Hyd. 5 1 1 1 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 6 Post-Development Area 1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 8.07 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = 56.13 cfs Time interval = 1 min Curve number = 88 Hydraulic length = 0 ft Time of conc. (Tc) = 9.2 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 133,874 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 8.45 0.56 9.28 0.83 10.12 1.18 10.95 2.16 11.78 20.64 12.62 4.11 13.45 2.36 14.28 1.64 15.12 1.38 15.95 1.11 16.78 0.99 17.62 0.89 18.45 0.80 19.28 0.70 20.12 0.61 20.95 0.58 21.78 0.57 End 1 1 1 TR55 Tc Worksheet Page 1 Hyd. No. 6 Post-Development Area 1 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.5 Travel Time ........................................ = 4.6 min Shallow Concentrated Flow Flow length = 560 ft Watercourse slope = 1.0 Surface description =Paved Average velocity = 2.03 ft/s Travel Time ................. ....................... = 4.6 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 9.2 min Hydraflow Hydrographs by Intelisolve 1 1 Hyd. No. 6 - SCS Runoff -10 Yr - Qp = 56.13 cfs -Post-Development Area 1 6 5 4 v at 3 i~ 2 1 0.0 2.2 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 Time (hrs) J' Hyd. 6 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 7 Post-Development Area 2 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 3.31 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = 26.09 cfs Time interval = 2 min Curve number = 94 Hydraulic length = 0 ft Time of conc. (Tc) = 3.6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 59,105 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 7.33 0.26 9.00 0.46 10.67 0.91 12.33 2.54 14.00 0.70 15.67 0.47 17.33 0.36 19.00 0.29 End TR55 Tc Worksheet Page 1 Hyd. No. 7 Post-Development Area 2 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 296.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.9 Travel Time ........................................ = 2.7 min Shallow Concentrated Flow Flow length = 176 ft Watercourse slope = 2.4 Surface description =Paved Average velocity = 3.14 ft/s Travel Time ........................................ = 0.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 3.6 min i I, Hyd. No. 7 - SCS Runoff -10 Yr - Qp = 26.09 cfs -Post-Development ' Area 2 Cat 0.0 2.0 3.9 5.9 7.8 9.8 Time (hrs) ,~ Hyd. 7 11.8 13.7 15.7 17.6 19.6 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve Page 1 Hyd. No. 8 Post-Development Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 1.99 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = 14.25 cfs Time interval = 2 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 3.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 30,268 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 8.73 0.14 10.40 0.32 12.07 3.72 13.73 0.46 15.40 0.29 17.07 0.22 18.73 0.17 End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Post-Development Area 3 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 139.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.5 Travel Time ........................................ = 1.3 min Shallow Concentrated Flow Flow length = 381 ft Watercourse slope = 1.7 Surface description =Paved Average velocity = 2.61 ft/s Travel Time ................. ....................... = 2.4 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 3.7 min 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hyd. No. 8 - SCS Runoff -10 Yr - Qp =14.25 cfs -Post-Development Area 3 1 1 Cat 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 15.9 17.9 19.9 Time (hrs) Hyd. 8 __ ___ __ ~_ i Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Post-Development Area 4 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 10 yrs 0.79 ac 0.0 TR55 5.95 in 24 h rs Peak discharge = Time interval = Curve number = Hydraulic length = Time of conc. (Tc) _ Distribution = Shape factor = 3.05 cfs 1 min 61 Oft 1.7 min Type II 484 Hydrograph Volume = 5,297 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.30 0.03 12.13 0.41 12.97 0.16 13.80 0.11 14.63 0.09 15.47 0.07 16.30 0.06 17.13 0.06 17.97 0.05 18.80 0.05 19.63 0.04 20.47 0.04 21.30 0.04 22.13 0.03 22.97 0.03 23.80 0.03 .End TR55 Tc Worksheet Page 1 Hyd. No. 9 Post-Development Area 4 Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 50.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 30.0 Travel Time ........................................ = 1.7 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.0 Surface description =Paved Average velocity = 0.00 ft/s Travel Time .................... .................... = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 1.7 min Hydraflow Hydrographs by Intelisolve - ~,, Hyd. No. 9 - SCS Runoff -10 Yr - Qp = 3.05 cfs -Post-Development Area 4 Cl 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) * Hyd. 9 __ __ ____.. Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 10 SWM Pond A Hydrograph type =Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 6 Max. Elevation = 91.86 ft Peak discharge Time interval Reservoir name Max. Storage = 1.21 cfs = 1 min = SWM Pond A = 92,410 tuft Storage Indication method used. Hydrograph Discharge Table Outflow hydrograph volume = 55,234 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 6.67 0.28 88.06 0.02 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 7.50 0.38 88.11 0.03 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 8.33 0.52 88.17 0.07 0.07 ----- ----- ----- ----- ----- ----- ----- 0.07 9.17 0.81 88.25 0.14 0.14 ----- ----- ----- ----- ----- ----- ----- 0.14 10.00 1.10 88.36 0.25 0.24 ----- ----- ----- ----- ----- ----- ----- 0.24 10.83 1.98 88.54 0.37 0.36 ----- ----- ----- ----- ----- ----- ----- 0.36 11.67 9.86 88.98 0.55 0.54 ----- ----- ----- ----- ----- ----- ----- 0.54 12.50 5.12 91.50 1.19 1.15 ----- ----- ----- ----- ----- ----- ----- 1.15 13.33 2.51 91.73 1.20 1.19 ----- ----- ----- ----- ----- ----- ----- 1.19 14.17 1.68 91.82 1.21 1.21 ----- ----- ----- ----- ----- ----- ----- 1.21 15.00 1.42 91.85 1.24 1.21 ----- ----- ----- ----- ----- ----- ----- 1.21 15.83 1.15 91.86 1.24 1.21 ----- ----- ----- ----- ----- ----- ----- 1.21 16.67 1.00 91.85 1.23 1.21 ----- ----- ----- ----- ----- ----- ----- 1.21 17.50 0.90 91.82 1.21 1.21 ----- ----- ----- ----- ----- ----- ----- 1.21 18.33 0.81 91.78 1.20 1.20 ----- ----- ----- ----- ----- ----- ----- 1.20 19.17 0.71 91.74 1.20 1.19 ----- ----- ----- ----- ----- ----- ----- 1.19 20.00 0.62 91.68 1.20 1.18 ----- ----- ----- ----- ----- ----- ----- 1.18 20.83 0.59 91.62 1.20 1.17 ----- ----- ----- ----- ----- ----- ----- 1.17 21.67 0.57 91.56 1.20 1.16 ----- ----- ----- ----- ----- ----- ----- 1.16 22.50 0.55 91.49 1.19 1.15 ----- ----- ----- ----- ----- ----- ----- 1.15 23.33 0.53 91.43 1.15 1.14 ----- ----- ----- ----- ----- ----- ----- 1.14 ...End Reservoir Report Page 1 ' Reservoir No. 1 - SWM Pond A Hydraflow Hydrographs by Intelisolve Pond Data ' Pond storage is based on k nown contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 88.00 18, 510 0 0 1.00 89.00 21,256 19,883 19,883 2.00 90.00 23,998 22,627 42,510 ' 3.00 91.00 26,858 25,428 67,938 4.00 92.00 29,836 28,347 96,285 5.00 93.00 33,023 31,430 127,715 6.00 94.00 36,365 34,694 162,409 7.00 95.00 39,793 38,079 200,488 ' 8.00 96.00 43,273 41,533 242,021 9.00 97.00 46,804 45,039 287,060 Culvert /Orifice Structures Weir Structures ' IAl LBl [Cl LDl LAl LBl [C] IDl Rise in = 24.0 5.0 0.0 0.0 Crest Len ft = 9.42 10.00 0.00 0.00 ' Span in = 24.0 5.0 0.0 0.0 Crest EI. ft = 93.00 96.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 0.00 0.00 Invert EI, ft = 88.00 88.00 0.00 0.00 Weir Type =Riser Broad --- --- Length ft = 98.0 0.0 0.0 0.0 Multi-Stage =Yes No No No ' Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 ' Multi-Stage = n/a Yes No No Exfiltration Rate = 0.00 in/hr/sgft Tailwater Elev. = 0.00 ft Note: All outFlows have been analyzed under inlet and outlet control. Stage /Storage /Discharge Table ' Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 88.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.10 1,988 88.10 0.03 0.03 0.00 0.00 0.03 0.20 3,977 88.20 0.09 ___ 0.09 ___ 0.00 =__ 0.00 ___ ___ 0.09 0.30 5,965 88.30 0.18 0.18 --- --- 0.00 0.00 --- --- --- 0.18 0.40 7,953 88.40 0.29 0.28 --- --- 0.00 0.00 --- --- --- 0.28 0.50 9,941 88.50 0.35 0.34 0.00 0.00 _- --- 0.34 0.60 11,930 88.60 0.41 =__ 0.39 __= 0.00 =__ 0.00 _ 0.39 0.70 13,918 88.70 0.44 0.44 0.00 0.00 0.44 0.80 15,906 88.80 0.48 0.48 --- --- 0.00 0.00 --- --- --- 0.48 0.90 17,895 88.90 0.52 0.52 --- --- 0.00 0.00 --- --- --- 0.52 1.00 19,883 89.00 0.56 0.55 0.00 0.00 --- --- 0.55 ' 1.10 22,146 89.10 0.60 =__ 0.59 __= 0.00 0.00 __= 0.59 1.20 24,408 89.20 0.64 0.62 0.00 0.00 0.62 1.30 26,671 89.30 0.65 0.65 --- --- 0.00 0.00 --- --- --- 0.65 1.40 28,934 89.40 0.69 0.68 - 0.00 0.00 0.68 ' 1.50 31,196 89.50 0.73 -_ 0.71 = 0.00 =__ 0.00 ___ __= 0.71 1.60 33,459 89.60 0.74 0.74 0.00 0.00 0.74 1.70 35,722 89.70 0.78 0.76 --- --- 0.00 0.00 --- --- --- 0.76 1.80 37,985 89.80 0.79 0.79 --- --- 0.00 0.00 --- --- --- 0.79 1.90 40,247 89.90 0.84 0.81 - 0.00 0.00 0.81 ' 2.00 42,510 90.00 0.84 =__ 0.84 __ 0.00 =__ 0.00 ___ __= 0.84 2.10 45,053 90.10 0.89 0.86 0.00 0.00 0.86 2.20 47,596 90.20 0.89 0.89 --- --- 0.00 0.00 --- --- --- 0.89 2.30 50,138 90.30 0.95 0.91 --- --- 0.00 0.00 --- --- --- 0.91 ' 2.40 52,681 90.40 0.95 0.93 0.00 0.00 0.93 2.50 55,224 90.50 0.95 ___ 0.95 ___ 0.00 ___ 0.00 ___ ___ 0.95 2.60 57,767 90.60 1.01 0.97 --- --- 0.00 0.00 --- --- --- 0.97 2.70 60,310 90.70 1.01 1.00 --- --- 0.00 0.00 --- --- --- 1.00 ' Continues on next page... SWM Pond A Page 2 Stage /Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.80 62,852 90.80 1.02 1.02 --- --- 0.00 0.00 --- --- --- 1.02 2.90 65,395 90.90 1.07 1.04 --- --- 0.00 0.00 --- --- --- 1.04 3.00 67,938 91.00 1.07 1.06 --- --- 0.00 0.00 --- --- --- 1.06 3.10 70,773 91.10 1.07 1.07 --- --- 0.00 0.00 --- --- --- 1.07 3.20 73,607 91.20 1.13 1.09 --- --- 0.00 0.00 --- --- --- 1.09 3.30 76,442 91.30 1.13 1.11 --- --- 0.00 0.00 --- --- --- 1.11 3.40 79,277 91.40 1.13 1.13 --- --- 0.00 0.00 --- --- --- 1.13 3.50 82,111 91.50 1.20 1.15 --- --- 0.00 0.00 --- --- --- 1.15 3.60 84,946 91.60 1.20 1.17 --- --- 0.00 0.00 --- --- --- 1.17 3.70 87,781 91.70 1.20 1.19 --- --- 0.00 0.00 --- --- --- 1.19 3.80 90,616 91.80 1.20 1.20 --- --- 0.00 0.00 --- --- --- 1.20 3.90 93,450 91.90 1.26 1.22 --- --- 0.00 0.00 --- --- --- 1.22 4.00 96,285 92.00 1.26 1.24 --- --- 0.00 0.00 --- --- --- 1.24 4.10 99,428 92.10 1.26 1.25 --- --- 0.00 0.00 --- --- --- 1.25 4.20 102,571 92.20 1.27 1.27 --- --- 0.00 0.00 --- --- --- 1.27 4.30 105,714 92.30 1.34 1.29 --- --- 0.00 0.00 --- --- --- 1.29 4.40 108,857 92.40 1.34 1.30 --- --- 0.00 0.00 --- --- --- 1.30 4.50 112,000 92.50 1.34 1.32 --- --- 0.00 0.00 --- --- --- 1.32 4.60 115,143 92.60 1.34 1.34 --- --- 0.00 0.00 --- --- --- 1.34 4.70 118,286 92.70 1.35 1.35 --- --- 0.00 0.00 --- --- --- 1.35 4.80 121,429 92.80 1.41 1.36 --- --- 0.00 0.00 --- --- --- 1.36 4.90 124,572 92.90 1.41 1.38 --- --- 0.00 0.00 --- --- --- 1.38 5.00 127,715 93.00 1.41 1.40 --- --- 0.00 0.00 --- --- --- 1.40 5.10 131,184 93.10 2.38 1.39 --- --- 0.99 0.00 --- --- --- 2.38 5.20 134,654 93.20 4.17 1.37 --- --- 2.81 0.00 --- --- --- 4.17 5.30 138,123 93.30 6.53 1.34 --- --- 5.15 0.00 --- --- --- 6.50 5.40 141,592 93.40 9.25 1.32 --- --- 7.94 0.00 --- --- --- 9.25 5.50 145,062 93.50 12.44 1.28 --- --- 11.09 0.00 --- --- --- 12.37 5.60 148,531 93.60 15.81 1.23 --- --- 14.58 0.00 --- --- --- 15.81 5.70 152,001 93.70 19.51 1.14 --- --- 18.37 0.00 --- --- --- 19.51 5.80 155,470 93.80 23.46 1.02 --- --- 22.45 0.00 --- --- --- 23.46 5.90 158,940 93.90 27.60 0.82 --- --- 26.78 0.00 --- --- --- 27.60 6.00 162,409 94.00 30.95 0.59 --- --- 30.36 0.00 --- --- --- 30.95 6.10 166,217 94.10 32.06 0.51 --- --- 31.55 0.00 --- --- --- 32.06 6.20 170,025 94.20 32.86 0.45 --- --- 32.40 0.00 --- --- --- 32.86 6.30 173,833 94.30 33.52 0.41 --- --- 33.10 0.00 --- --- --- 33.51 6.40 177,641 94.40 34.08 0.37 --- --- 33.70 0.00 --- --- --- 34.08 6.50 181,448 94.50 34.58 0.34 --- --- 34.24 0.00 --- --- --- 34.58 6.60 185,256 94.60 35.05 0.32 --- --- 34.73 0.00 --- --- --- 35.04 6.70 189,064 94.70 35.47 0.29 --- --- 35.18 0.00 --- --- --- 35.47 6.80 192,872 94.80 35.88 0.27 --- --- 35.60 0.00 --- --- --- 35.88 6.90 196,680 94.90 36.26 0.26 --- --- 36.00 0.00 --- --- --- 36.26 7.00 200,488 95.00 36.63 0.24 --- --- 36.39 0.00 --- --- --- 36.63 7.10 204,641 95.10 36.99 0.23 --- --- 36.76 0.00 --- --- --- 36.98 7.20 208,795 95.20 37.34 0.21 --- --- 37.11 0.00 --- --- --- 37.33 7.30 212,948 95.30 37.67 0.20 --- --- 37.47 0.00 --- --- --- 37.67 7.40 217,101 95.40 38.00 0.19 --- --- 37.81 0.00 --- --- --- 38.00 7.50 221,255 95.50 38.33 0.18 --- --- 38.14 0.00 --- --- --- 38.32 7.60 225,408 95.60 38.64 0.18 --- --- 38.47 0.00 --- --- --- 38.64 7.70 229,561 95.70 38.96 0.17 --- --- 38.78 0.00 --- --- --- 38.95 7.80 233,714 95.80 39.27 0.16 --- --- 39.09 0.00 --- --- --- 39.25 7.90 237,868 95.90 39.57 0.15 --- --- 39.40 0.00 --- --- --- 39.56 8.00 242,021 96.00 39.87 0.15 --- --- 39.71 0.00 --- --- --- 39.86 8.10 246,525 96.10 40.17 0.14 --- --- 39.99 0.82 --- --- --- 40.96 8.20 251,029 96.20 40.46 0.14 --- --- 40.31 2.33 --- --- --- 42.77 8.30 255,533 96.30 40.75 0.13 --- --- 40.61 4.27 --- --- --- 45.01 8.40 260,037 96.40 41.04 0.13 --- --- 40.91 6.58 --- --- --- 47.61 8.50 264,541 96.50 41.32 0.12 --- --- 41.18 9.19 --- --- --- 50.49 8.60 269,044 96.60 41.60 0.12 --- --- 41.48 12.08 --- --- --- 53.68 8.70 273,548 96.70 41.88 0.12 --- --- 41.72 15.23 --- --- --- 57.07 8.80 278,052 96.80 42.16 0.11 --- --- 42,03 18.60 --- --- --- 60.75 8.90 282,556 96.90 42.44 0.11 --- --- 42.30 22.20 --- --- --- 64.61 9.00 287,060 97.00 42.71 0.11 --- --- 42.56 26.00 --- --- --- 68.67 ...End Hyd. No. 10 -Reservoir -10 Yr - Qp = 1.21 cfs - SWM Pond A N V Time (hrs) / Hyd. 6 Hyd. 10 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Combined Area 2 & 3 Hydrograph type =Combine Storm frequency = 10 yrs Inflow hyds. = 7, 8 Peak discharge = 40.34 cfs Time interval = 2 min Hydrograph Volume = 89,373 cult Hydrograph Discharge Table Time Hyd. 7 + Hyd. 8 + Outflow (hrs) (cfs) (cfs) (cfs) 8.33 0.34 0.11 0.46 10.00 0.61 0.25 0.85 11.67 6.39 3.15 9.54 13.33 0.98 0.56 1.54 15.00 0.56 0.32 0.88 16.67 0.40 0.23 0.62 18.33 0.32 0.18 0.50 End Hyd. No. 11 -Combine -10 Yr - Qp = 40.34 cfs -Combined Area 2 & 3 C~ 0.0 2.0 3.9 5.9 7.9 9.9 11.8 13.8 15.8 17.8 19.7 Time (hrs) / Hyd. 7 Hyd. 8 Hyd. 11 H d ro ra h Re o rt Y g p p Page 1 ' Hydraflow Hydrographs by Intelisolve Hyd. No. 12 ' SWM Pond B Hydrograph type = Reservoir Peak discharge = 0.61 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 11 Reservoir name = SWM Pond B Max. Elevation = 93.52 ft Max. Storage = 68,380 cult ' Storage Indication method used. Outflow hydrograph volume = 54,609 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs ' 5.00 0.16 90.05 0.01 0.01 ----- ----- ----- ----- ----- ----- ----- 0.01 6.67 0.28 90.13 0.03 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 8.33 0.46 90.24 0.08 0.08 0.08 10.00 0.85 90.45 0.13 0.13 -_ -- ----- - 0.13 11.67 9.54 91.10 0.23 0.23 ----- ----- ---- ----- ----- - ----- ----- 0.23 13.33 1.54 93.30 0.41 0.41 ----- ----- ----- ----- ----- ----- ----- 0.41 15.00 0.88 93.46 0.44 0.42 ----- 0.42 ' 16.67 0.62 93.52 0.62 0.42 ----- ----- ----- ----- 0.18 ----- ----- 0.60 18.33 0.50 93.51 0.56 0.42 ----- ----- 0.12 ----- ----- ----- ----- 0.55 20.00 0.38 93.50 0.45 0.43 ----- ----- 0.01 ----- ----- ----- ----- 0.43 ' 21.67 0.36 93.49 0.44 0.42 0.42 23.33 0.33 93.47 0.44 0.42 ----- ----- ----- ----- ----- ----- ----- 0.42 25.00 0.00 93.40 0.44 0.42 ----- ----- ----- ----- ----- ----- ----- 0.42 26.67 0.00 93.30 0.41 0.41 0.41 ' 28.33 0.00 93.20 0.41 0.41 _____ _____ _____ _____ _____ _____ _____ 0.41 30.00 0.00 93.10 0.41 0.40 ----- ----- ----- ----- ----- ----- ----- 0.40 31.67 0.00 93.01 0.41 0.39 ----- ----- ----- ----- ----- ----- ----- 0.39 ' 33.33 0.00 92.90 0.39 0.38 0.38 35.00 0.00 92.80 0.38 0.38 ----- ----- ----- ----- ----- ----- ----- 0.38 36.67 0.00 92.69 0.38 0.37 ----- ----- ----- ----- ----- ----- ----- 0.37 38.33 0.00 92.59 0.38 0.36 0.36 ' 40.00 0.00 92.49 0.37 0.35 ----- ----- 0.35 41.67 0.00 92.39 0.35 0.35 ----- ----- ----- ----- ----- ----- ----- 0.35 43.33 0.00 92.30 0.35 0.34 ----- ----- ----- ----- ----- ----- ----- 0.34 45.00 0.00 92.20 0.35 0.33 0.33 46.67 0.00 92.11 0.33 0.32 ----- ----- ----- ----- ----- ----- ----- 0.32 ...End ' Reservoir Report Page 1 Reservoir No. 2 - SWM Pond B Pond Data Pond storage is based on known contour areas. Average end area method used. Hydraflow Hydrographs by Intelisolve Stage /Storage Table Stage (ft) Elevation (ft) 0.00 90.00 1.00 91.00 2.00 92.00 3.00 93.00 4.00 94.00 5.00 95.00 Contour area (sgft) 14,141 16,900 19,896 23,171 26,719 19,966 Incr. Storage (cult) 0 15,520 18, 398 21,534 24,945 23,342 Total storage (cult) 0 15,520 33,918 55,452 80,397 103,739 Culvert /Orifice Structures LAl IBI Rise in = 24.0 3.0 Span in = 24.0 3.0 No. Barrels = 1 1 Invert EI. ft = 90.00 90.00 Length ft = 46.0 0.0 Slope % = 1.00 0.00 N-Value = .013 .013 Orif. Coeff. = 0.60 0.60 Multi-Stage = n/a Yes [C] 0.0 0.0 0 0.00 0.0 0.00 .000 0.00 No ID] 0.0 0.0 0 0.00 0.0 0.00 .000 0.00 No Weir Structures LAl LB] [C] Crest Len ft = 9.42 10.00 0.00 Crest EI. ft = 93.50 94.00 0.00 Weir Coeff. = 3.33 2.60 0.00 Weir Type =Riser Broad --- Multi-Stage =Yes No No xfiltration Rate = 0.00 in/hr/sgft Tailwater Elev. = IDl 0.00 0.00 0.00 --- No .00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage (Storage /Discharge Table Stage Storage El evation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 90.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.10 1,552 90.10 0.02 0.02 --- --- 0.00 0.00 --- --- --- 0.02 0.20 3,104 90.20 0.06 0.06 --- --- 0.00 0.00 --- --- --- 0.06 0.30 4,656 90.30 0.11 0.10 --- --- 0.00 0.00 --- --- --- 0.10 0.40 6,208 90.40 0.12 0.12 --- --- 0.00 0.00 --- --- --- 0.12 0.50 7,760 90.50 0.15 0.14 --- --- 0.00 0.00 --- --- --- 0.14 0.60 9,312 90.60 0.16 0.16 --- --- 0.00 0.00 --- --- --- 0.16 0.70 10,864 90.70 0.18 0.17 --- --- 0.00 0.00 --- --- --- 0.17 0.80 12,416 90.80 0.20 0.19 --- --- 0.00 0.00 --- --- --- 0.19 0.90 13,968 90.90 0.20 0.20 --- --- 0.00 0.00 --- --- --- 0.20 1.00 15,520 91.00 0.22 0.21 --- --- 0.00 0.00 --- --- --- 0.21 1.10 17,360 91.10 0.23 0.23 --- --- 0.00 0.00 --- --- --- 0.23 1.20 19,200 91.20 0.24 0.24 --- --- 0.00 0.00 --- --- --- 0.24 1.30 21,040 91.30 0.25 0.25 --- --- 0.00 0.00 --- --- --- 0.25 1.40 22,880 91.40 0.27 0.26 --- --- 0.00 0.00 --- --- --- 0.26 1.50 24,719 91.50 0.27 0.27 --- --- 0.00 0.00 --- --- --- 0.27 1.60 26,559 91.60 0.29 0.28 --- --- 0.00 0.00 --- --- --- 0.28 1.70 28,399 91.70 0.29 0.29 --- --- 0.00 0.00 --- --- --- 0.29 1.80 30,239 91.80 0.30 0.30 --- --- 0.00 0.00 --- --- --- 0.30 1.90 32,079 91.90 0.32 0.31 --- --- 0.00 0.00 --- --- --- 0.31 2.00 33,918 92.00 0.32 0.32 --- --- 0.00 0.00 --- --- --- 0.32 2.10 36,072 92.10 0.32 0.32 --- --- 0.00 0.00 --- --- --- 0.32 2.20 38,225 92.20 0.35 0.33 --- --- 0.00 0.00 --- --- --- 0.33 2.30 40,378 92.30 0.35 0.34 --- --- 0.00 0.00 --- --- --- 0.34 2.40 42,532 92.40 0.35 0.35 --- --- 0.00 0.00 --- --- --- 0.35 2.50 44,685 92.50 0.38 0.36 --- --- 0.00 0.00 --- --- --- 0.36 2.60 46,838 92.60 0.38 0.36 --- --- 0.00 0.00 --- --- --- 0.36 2.70 48,992 92.70 0.38 0.37 --- --- 0.00 0.00 --- --- --- 0.37 2.80 51,145 92.80 0.38 0.38 --- --- 0.00 0.00 --- --- --- 0.38 2.90 53,299 92.90 0.38 0.38 --- --- 0.00 0.00 --- --- --- 0.38 3.00 55,452 93.00 0.41 0.39 --- --- 0.00 0.00 --- --- --- 0.39 3.10 57,946 93.10 0.41 0.40 --- --- 0.00 0.00 --- --- --- 0.40 Continues on next page... SWM Pond B Page 2 Stage /Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.20 60,441 93.20 0.41 0.41 --- --- 0.00 0.00 --- --- --- 0.41 3.30 62,935 93.30 0.41 0.41 --- --- 0.00 0.00 --- --- --- 0.41 3.40 65,430 93.40 0.44 0.42 --- --- 0.00 0.00 --- --- --- 0.42 3.50 67,924 93.50 0.44 0.43 --- --- 0.00 0.00 --- --- --- 0.43 3.60 70,419 93.60 1.41 0.42 --- --- 0.99 0.00 --- --- --- 1.41 3.70 72,913 93.70 3.27 0.41 --- --- 2.81 0.00 --- --- --- 3.21 3.80 75,408 93.80 5.61 0.39 --- --- 5.15 0.00 --- --- --- 5.55 3.90 77,902 93.90 8.32 0.38 --- --- 7.94 0.00 --- --- --- 8.32 4.00 80,397 94.00 11.48 0.35 --- --- 11.09 0.00 --- --- --- 11.44 4.10 82,731 94.10 14.90 0.32 --- --- 14.58 0.82 --- --- --- 15.72 4.20 85,065 94.20 18.66 0.29 --- --- 18.37 2.33 --- --- --- 20.99 4.30 87,399 94.30 22.69 0.24 --- --- 22.45 4.27 --- --- --- 26.96 4.40 89,734 94.40 25.18 0.19 --- --- 24.99 6.58 --- --- --- 31.75 4.50 92,068 94.50 26.30 0.16 --- --- 26.13 9.19 --- --- --- 35.49 4.60 94,402 94.60 27.15 0.15 --- --- 27.00 12.08 --- --- --- 39.23 4.70 96,736 94.70 27.86 0.13 --- --- 27.73 15.23 --- --- --- 43.09 4.80 99,071 94.80 28.49 0.12 --- --- 28.36 18.60 --- --- --- 47.09 4.90 101,405 94.90 29.05 0.11 --- --- 28.93 22.20 --- --- --- 51.24 5.00 103,739 95.00 29.56 0.10 --- --- 29.46 26.00 --- --- --- 55.56 ...End Hyd. No. 12 -Reservoir -10 Yr - Qp = 0.61 cfs - SWM Pond B C~ / Hyd. 11 Hyd. 12 0.0 4.8 9.6 14.4 19.2 2400 28.8 33.6 38.4 43.2 48.0 Time (hrs) Hydrograph Summary Report Page 1 i Hyd. No. Hydrograph type Peak flow Time interval __ Time to peak ~ Volume Inflow hyd(s) T Maximum elevation --- Maximum storage _ ___. _ _-1 Hydrograph i description ~ (origin) (cfs) (min) (min) (tuft) (ft) (cult) ~ 1 SCS Runoff 16.08 6 ~ 732 66,502 ---- i ------ I ------ Predeveloped Area 1 2 SCS Runoff 23.56 6 726 95,676 ~ ---- ------ ------ Predeveloped Area 2 i 3 i SCS Runoff 6.21 6 732 25,881 ---- ------ ------ Predeveloped Area 3 4 SCS Runoff f 1.01 6 738 5,137 ---- ------ ~ ------ i Predeveloped Area 4 ~ 5 Combine 46.55 6 726 193,197 1, 2, 3, 4 ------ ------ Pre-developm Combined Total ~ 6 i SCS Runoff 72.37 1 719 175,541 ---- ------ ------ Post-Development Area 1 7 SCS Runoff 32.87 2 716 75,532 ---- ------ ------ Post-Development Area 2 8 SCS Runoff 18.45 2 716 39,862 ---- ------ ------ Post-Development Area 3 ~ 9 SCS Runoff 4.65 1 716 8,083 ---- ------ ------ Post-Development Area 4 10 Reservoir 1.38 1 962 64,665 j 6 92.89 124,299 SWM Pond A 11 Combine 51.32 2 716 115,394 7, 8, ------ ------ Combined Area 2 & 3 12 ~, ~~ I Reservoir I 3.36 2 752 I i I I 79,848 11 ~I I ~i ' 93.71 I, I 73,072 i SWM Pond B ~ ~' !I i Proj. file: Lowes-Whiteville.gpw Return Period: 25 yr Run date: 06-29-2007 Hydraflow Hydrographs by Intelisolve Hydrograph Report Hyd. No. 1 Predeveloped Area 1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 5.34 ac 0.0 TR55 7.42 in 24 h rs Page 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 16.08 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 24.3 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 66,502 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.40 0.17 15.40 0.88 20.40 0.40 End 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predeveloped Area 1 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.6 Travel Time ........................................ = 23.7 min Shallow Concentrated Flow Flow length = 68 ft Watercourse slope = 1.6 Surface description =Unpaved Average velocity = 2.07 ft/s Travel Time ................. ....................... = 0.6 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 24.3 min 1 1 1 Hyd. No. 1 - SCS Runoff - 25 Yr - Qp = 16.08 cfs - Predeveloped Area 1 2 1 ~ 1 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) ~" Hyd. 1 0.0 2.4 4.9 7.3 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predeveloped Area 2 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 6.13 ac 0.0 TR55 7.42 in 24 h rs Peak discharge = 23.56 cfs Time interval = 6 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 23.9 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 95,676 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 9.30 0.24 14.30 1.45 19.30 0.61 End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Predeveloped Area 2 Storm frequency = 25 yrs _~ _ Sheet Flow Manning's n-value = 0.150 ~ Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.8 ~ ........................................ Travel Time = 22.6 min i Shallow Concentrated Flow Flow length = 159 ft ~ ^ Watercourse slope = 1.5 Surface description =Unpaved Average velocity = 1 98 ft/s ~ Travel Time ........................................ = 1.3 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 23.9 min t Hyd. No. 2 - SCS Runoff - 25 Yr - Qp = 23.56 cfs - Predeveloped Area 2 25 -- --~I ~ - __ ~ 1- - _- - _- i I i i I i 20 -- ~ ~- 15 -- - - i _ _ _~I I t ~ ~ ~ I ~ ~ i 1 --' - , ~, ~, +- _ _~ - i, 0 0.0 2.4 4.9 7.3 9.7 12.1 14.6 17.0 19.4 21.9 24.3 Time (hrs) Hyd. 2 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Predeveloped Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 2.29 ac 0.0 TR55 7.42 in 24 h rs Peak discharge = 6.21 cfs Time interval = 6 min Curve number = 62 Hydraulic length = 0 ft Time of conc. (Tc) = 22.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 25,881 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.70 0.07 15.70 0.33 20.70 0.16 End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Predeveloped Area 3 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.2 Travel Time ........................................ = 20.7 min Shallow Concentrated Fl ow Flow length Watercourse slo e = 70 ft = 0 1 p . Surface description =Unpaved Average velocity Travel Time = 0.60 ft/s = 1 9 min ..................... ................... . Channel Flow ' Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 ' Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ..................... ................... =min ' i 1 Total Travel Time, Tc ..... ................... = 22.7 min Hyd. No. 3 - SCS Runoff - 25 Yr - Qp = 6.21 cfs - Predeveloped Area 3 w U 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) ~' Hyd. 3 __ _- Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predeveloped Area 4 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 0.40 ac 0.0 TR55 7.42 in 24 h rs Peak discharge = 1.01 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 31.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 5,137 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.40 0.01 15.40 0.07 20.40 0.03 End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predeveloped Area 4 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 132.1 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.2 Travel Time ........................................ = 31.5 min Shallow Concentrated Flow Flow length Watercourse slope Surface description Average velocity Travel Time ............ =oft =0.0% = Paved = 0.00 ft/s ............................ = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 31.5 min 1 1 1 1 1 1 1 1 1 1 1 v U Hyd. No. 4 - SCS Runoff - 25 Yr - Qp = 1.01 cfs - Predeveloped Area 4 1. 1. 0. 0.~ U.U Z.5 4.9 7.4 9.8 12.3 14.8 17.2 19.7 22.1 24.6 Time (hrs) .~` Hyd. 4 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Pre-developm Combined Total Hydrograph type =Combine Storm frequency = 25 yrs Inflow hyds. = 1, 2, 3, 4 Peak discharge = 46.55 cfs Time interval = 6 min Hydrograph Volume = 193,197 cult Hydrograph Discharge Table Time Hyd. 1 + Hyd. 2 + Hyd. 3 + Hyd. 4 = (hrs) (cfs) (cfs) (cfs) (cfs) 10.00 0.09 0.37 0.01 0.01 15.00 0.95 1.24 0.39 0.08 20.00 0.43 0.55 0.17 0.03 ...End Outflow (cfs) 0.48 2.65 1.18 Hyd. No. 5 -Combine - 25 Yr - Qp = 46.55 cfs -Pre-developm Combined Total CJ 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) / Hyd. 1 Hyd. 2 Hyd. 3 Hyd. 4 Hyd. 5 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Post-Development Area 1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 8.07 ac 0.0 TR55 7.42 in 24 hrs Peak discharge = 72.37 cfs Time interval = 1 min Curve number = 88 Hydraulic length = 0 ft Time of conc. (Tc) = 9.2 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 175,541 tuft Hydrograph Discharge Table Time --Outflow (hrs cfs) 8.18 0.73 9.02 1.13 9.85 1.44 10.68 2.42 11.52 5.47 12.35 8.47 13.18 3.43 14.02 2.27 14.85 1.86 15.68 1.52 16.52 1.29 17.35 1.17 18.18 1.04 19.02 0.92 19.85 0.80 20.68 0.75 End TR55 Tc Worksheet Hyd. No. 6 Post-Development Area 1 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.5 Travel Time ........................................ = 4.6 min Shallow Concentrated Fl ow Flow length = 560 ft Watercourse slope = 1.0 Surface description =Paved Average velocity = 2.03 ft/s Travel Time ........................................ = 4.6 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Page 1 Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 9.2 min Hyd. No. 6 - SCS Runoff - 25 Yr - Qp = 72.37 cfs -Post-Development Area 1 C1 0.0 2.1 4.3 6.4 8.6 10.7 12.9 15.0 17.2 19.3 21.5 Time (hrs) ' ~' Hyd. 6 Hydrograph Report Hyd. No. 7 Post-Development Area 2 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 3.31 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 7.42 in Storm duration = 24 hrs Hydrograph Discharge Table Time --Outflow (hrs cfs) 6.87 0.33 8.53 0.51 10.20 0.89 11.87 24.37 13.53 1.10 15.20 0.67 16.87 0.48 18.53 0.39 Page 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 32.87 cfs Time interval = 2 min Curve number = 94 Hydraulic length = 0 ft Time of conc. (Tc) = 3.6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 75,532 tuft End TR55 Tc Worksheet Page 1 Hyd. No. 7 Post-Development Area 2 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 296.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.9 Travel Time ........................................ = 2.7 min Shallow Concentrated Flow Flow length = 176 ft Watercourse slope = 2.4 Surface description =Paved Average velocity = 3.14 ft/s Travel Time ................. ....................... = 0.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 3.6 min Hyd. No. 7 - SCS Runoff - 25 Yr - Qp = 32.87 cfs -Post-Development Area 2 4 3 CJ 2 1 0.0 2.0 3.9 5.9 7.8 9.8 11.7 13.7 15.7 17.6 19.6 Time (hrs) ,~ Hyd. 7 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Post-Development Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 1.99 ac 0.0 TR55 7.42 in 24 h rs Peak discharge = 18.45 cfs Time interval = 2 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 3.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 39,862 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 8.43 0.19 10.10 0.38 11.77 7.24 13.43 0.67 15.10 0.40 16.77 0.29 18.43 0.23 .End 1 1 1 1 1 TR55 Tc Worksheet Hyd. No. 8 Post-Development Area 3 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 139.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.5 Travel Time ..................... ................... = 1.3 min Shallow Concentrated Flow Flow length = 381 ft Watercourse slope = 1.7 Surface description =Paved Average velocity = 2.61 ft/s Travel Time ................. ....................... = 2.4 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 3.7 min Page 1 Hydraflow Hydrographs by Intelisolve t ---- _- __ -__ - -- Hyd. No. 8 - SCS Runoff - 25 Yr - Qp = 18.45 cfs -Post-Development I~ Area 3 20 - _ - _~- - _ _ -_ !, ~ ~' ~ li 1 ~ ~ ~, _I 15 ~ - ~ ~ ~' I~ ~ ' I ~ I _ G _ - _ - -- -- -- -- 10 ~ __ I~ ~, ~ ~_ 5 I-- --~ -- - 1 I,I ( i ~ ~~ 0 '~,I 0.0 2.0 4.0 5.9 7.9 9.9 11.9 13.9 15.8 17.8 19.8 Time (hrs) ,~ Hyd. 8 I 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Post-Development Area 4 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 25 yrs 0.79 ac 0.0 TR55 7.42 in 24 h rs Peak discharge = Time interval = Curve number = Hydraulic length = Time of conc. (Tc) _ Distribution = Shape factor = 4.65 cfs 1 min 61 Oft 1.7 min Type II 484 Hydrograph Volume = 8,083 cuff Hydrograph Discharge Table Time --Outflow (hrs cfs) 10.97 0.05 11.80 1.77 12.63 0.29 13.47 0.18 14.30 0.13 15.13 0.11 15.97 0.09 16.80 0.08 17.63 0.07 18.47 0.07 19.30 0.06 20.13 0.05 20.97 0.05 21.80 0.05 22.63 0.05 ...End TR55 Tc Worksheet Page 1 Hyd. No. 9 Post-Development Area 4 Storm frequency = 25 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 50.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 30.0 Travel Time ..................... ................... = 1.7 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.0 Surface description =Paved Average velocity = 0.00 ft/s Travel Time ................. ....................... = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 1.7 min '~ Hyd. No. 9 - SCS Runoff - 25 Yr - Qp = 4.65 cfs -Post-Development Area 4 C~ 0.0 2.3 4.7 7.0 9.3 11.6 14.0 16.3 18.6 21.0 23.3 Time (hrs) ,~ Hyd. 9 ' H r yd ograph Report Page 1 ' Hydraflow Hyd rographs by Intelisolve Hyd. No. 10 ' SWM Pond A Hydrograph type = Reservoir Peak discharge = 1.38 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 6 Reservoir name = SWM Pond A Max. Elevation = 92.89 ft Max. Storage = 124,299 cult ' Stora a Indication method used g . Outflow h dro ra h volume = 64 665 cult Y 9 p . Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs ' 5.83 0.33 88.07 0.02 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 6.67 0.46 88.13 0.04 0.04 ----- ----- ----- ----- ----- ----- ----- 0.04 7.50 0.60 88.20 0.09 0.09 0.09 ' 8.33 0.79 88.28 0.17 0.16 ----- ----- ----- ----- ----- ----- ----- 0.16 9.17 1.18 88.40 0.29 0.28 ----- ----- ----- ----- ----- ----- ----- 0.28 10.00 1.56 88.54 0.37 0.36 ----- ----- ----- ----- ----- ----- ----- 0.36 ' 10.83 2.73 88.79 0.48 0.47 0.47 11.67 13.18 89.35 0.67 0.66 ----- ----- ----- ----- ----- ----- ----- 0.66 12.50 6.52 92.41 1.34 1.30 ----- ----- ----- ----- ----- ----- ----- 1.30 ' 13.33 3.18 92.69 14.17 2.14 92.81 1.35 1.41 1.35 1.37 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1.35 1.37 15.00 1.80 92.87 1.41 1.38 ----- ----- ----- ----- ----- ----- ----- 1.38 15.83 1.46 92.89 1.41 1.38 ----- ----- ----- ----- ----- ----- ----- 1.38 16.67 1.26 92.89 1.41 1.38 ----- ----- ----- ----- ----- ----- ----- 1.38 17.50 1.14 92.87 1.41 1.38 ----- ----- ----- ----- ----- ----- ----- 1.38 18.33 1.02 92.84 1.41 1.37 ----- ----- ----- ----- ----- ----- ----- 1.37 19.17 0.90 92.80 1.41 1.37 1.37 ' 20.00 0.78 92.75 1.38 1.36 1.36 20.83 0.74 92.70 1.35 1.35 ----- ----- ----- -- -- ----- ----- ----- 1.35 21.67 0.72 92.64 1.34 1.34 ----- ----- ----- ----- ----- ----- ----- 1.34 22.50 0.69 92.58 1.34 1.33 1.33 ' 23.33 0.67 92.52 1.34 1.32 ----- ----- ----- ----- ----- ----- ----- 1.32 ...End - Reservoir Report Page 1 _ Reservoir No. 1 - SWM Pond A Hydraflow Hydrographs by Intelisolve Pond Data ' Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table - Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 88.00 18, 510 0 0 1.00 89.00 21,256 19,883 19,883 2.00 90.00 23,998 22,627 42,510 3.00 91.00 26,858 25,428 67,938 4.00 92.00 29,836 28,347 96,285 5.00 93.00 33,023 31,430 127,715 6.00 94.00 36,365 34,694 162,409 7.00 95.00 39,793 38,079 200,488 8.00 96.00 43,273 41,533 242,021 9.00 97.00 46,804 45,039 287,060 Culvert /Orifice Structures Weir Structures [A] IB] [C] ID] IAl LBl [C] [Dl Rise in = 24.0 5.0 0.0 0.0 Crest Len ft = 9.42 10.00 0.00 0.00 Span in = 24.0 5.0 0.0 0.0 Crest EI. ft = 93.00 96.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 0.00 0.00 Invert EI. ft = 88.00 88.00 0.00 0.00 Weir Type =Riser Broad --- --- Length ft = 98.0 0.0 0.0 0.0 Multi-Stage =Yes No No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration Rate = 0.00 in/h r/sgft Tailwater Elev. = 0.00 ft Stage /Storage /Discharge Table Stage Storage Elevation Clv A ft tuft ft cfs 0.00 0 88.00 0.00 0.10 1, 988 88.10 0.03 0.20 3,977 88.20 0.09 0.30 5,965 88.30 0.18 0.40 7,953 88.40 0.29 0.50 9,941 88.50 0.35 0.60 11,930 88.60 0.41 0.70 13,918 88.70 0.44 0.80 15,906 88.80 0.48 0.90 17,895 88.90 0.52 1.00 19,883 89.00 0.56 1.10 22,146 89.10 0.60 1.20 24,408 89.20 0.64 1.30 26,671 89.30 0.65 1.40 28,934 89.40 0.69 1.50 31,196 89.50 0.73 1.60 33,459 89.60 0.74 1.70 35,722 89.70 0.78 1.80 37,985 89.80 0.79 1.90 40,247 89.90 0.84 2.00 42,510 90.00 0.84 2.10 45,053 90.10 0.89 2.20 47,596 90.20 0.89 2.30 50,138 90.30 0.95 2.40 52,681 90.40 0.95 2.50 55,224 90.50 0.95 2.60 57,767 90.60 1.01 2.70 60,310 90.70 1.01 Note: All outflows have been analyzed under inlet and outlet control. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.03 --- --- 0.00 0.00 --- --- --- 0.03 0.09 --- --- 0.00 0.00 --- --- --- 0.09 0.18 --- --- 0.00 0.00 --- --- --- 0.18 0.28 --- --- 0.00 0.00 --- --- --- 0.28 0.34 --- --- 0.00 0.00 --- --- --- 0.34 0.39 --- --- 0.00 0.00 --- --- --- 0.39 0.44 --- --- 0.00 0.00 --- --- --- 0.44 0.48 --- --- 0.00 0.00 --- --- --- 0.48 0.52 --- --- 0.00 0.00 --- --- --- 0.52 0.55 --- --- 0.00 0.00 --- --- --- 0.55 0.59 --- --- 0.00 0.00 --- --- --- 0.59 0.62 --- --- 0.00 0.00 --- --- --- 0.62 0.65 --- --- 0.00 0.00 --- --- --- 0.65 0.68 --- --- 0.00 0.00 --- --- --- 0.68 0.71 --- --- 0.00 0.00 --- --- --- 0.71 0.74 --- --- 0.00 0.00 --- --- --- 0.74 0.76 --- --- 0.00 0.00 --- --- --- 0.76 0.79 --- --- 0.00 0.00 --- --- --- 0.79 0.81 --- --- 0.00 0.00 --- --- --- 0.81 0.84 --- --- 0.00 0.00 --- --- --- 0.84 0.86 --- --- 0.00 0.00 --- --- --- 0.86 0.89 --- --- 0.00 0.00 --- --- --- 0.89 0.91 --- --- 0.00 0.00 --- --- --- 0.91 0.93 --- --- 0.00 0.00 --- --- --- 0.93 0.95 --- --- 0.00 0.00 --- --- --- 0.95 0.97 --- --- 0.00 0.00 --- --- --- 0.97 1.00 --- --- 0.00 0.00 --- --- --- 1.00 Continues on next page SWM Pond A Page 2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.80 62,852 90.80 1.02 1.02 --- 0.00 0.00 -- 1.02 2.90 65,395 90.90 1.07 1.04 =__ 0.00 0.00 __= =__ _ 1.04 3.00 67,938 91.00 1.07 1.06 0.00 0.00 1.06 3.10 70,773 91.10 1.07 1.07 --- --- 0.00 0.00 --- --- --- 1.07 3.20 73,607 91.20 1.13 1.09 --- - - 0.00 0.00 ___ --- -- 1.09 3.30 76,442 91.30 1.13 1.11 0.00 0.00 _ 1.11 ' 3.40 79,277 91.40 1.13 1.13 0.00 0.00 --- 1.13 3.50 82,111 91.50 1.20 1.15 --- - -- 0.00 0.00 --- --- --- 1.15 3.60 84,946 91.60 1.20 1.17 --- --- 0.00 0.00 --- --- 117 3.70 87,781 91.70 1.20 1.19 --- -- 0.00 0.00 --- 1.19 ' 3.80 90,616 91.80 1.20 1.20 0.00 0.00 ___ __= 1.20 3.90 93,450 91.90 1.26 1.22 0.00 0.00 1.22 4.00 96,285 92.00 1.26 1.24 --- --- 0.00 0.00 --- --- --- 1.24 4.10 99,428 92.10 1.26 1.25 _ 0.00 0.00 ___ --- 1.25 4.20 102,571 92.20 1.27 1.27 =__ _ = 0.00 0.00 =__ 1.27 ' 4.30 105,714 92.30 1.34 1.29 0.00 0.00 --- 1.29 4.40 108,857 92.40 1.34 1.30 --- --- 0.00 0.00 --- --- --- 1.30 4.50 112,000 92.50 1.34 1.32 --- --- 0.00 0.00 ___ --- --- 1.32 4.60 115,143 92.60 1.34 1.34 -- 0.00 0.00 --- --- 1.34 ' 4.70 118,286 92.70 1.35 1.35 =__ = 0.00 0.00 =__ 1.35 4.80 121,429 92.80 1.41 1.36 0.00 0.00 1.36 4.90 124,572 92.90 1.41 1.38 --- - -- 0.00 0.00 --- --- --- 1.38 5.00 127,715 93.00 1.41 1.40 --- --- 0.00 0.00 ___ --- --- 1.40 5.10 131,184 93.10 2.38 1.39 0.99 0.00 -- - 2.38 5.20 134,654 93.20 4.17 1.37 ___ ___ 2.81 0.00 __= _ __ 4.17 5.30 138,123 93.30 6.53 1.34 --- --- 5.15 0.00 --- 6.50 5.40 141,592 93.40 9.25 1.32 --- --- 7.94 0.00 --- --- --- 9.25 5.50 145,062 93.50 12.44 1.28 11.09 0.00 ___ --- 12.37 ' 5.60 148,531 93.60 15.81 1.23 =__ __= 14.58 0.00 =__ 15.81 5.70 152,001 93.70 19.51 1.14 18.37 0.00 --- 19.51 5.80 155,470 93.80 23.46 1.02 __ --- - 22.45 0.00 _-- _-- --- 23.46 5.90 158,940 93.90 27.60 0.82 --- --- 26.78 0.00 ___ --- --- 27.60 6.00 162,409 94.00 30.95 0.59 - 30.36 0.00 ___ -- 30.95 6.10 166,217 94.10 32.06 0.51 __ -_ 31.55 0.00 = ___ 32.06 6.20 170,025 94.20 32.86 0.45 --- --- 32.40 0.00 --- 32.86 6.30 173,833 94.30 33.52 0.41 --- --- 33.10 0.00 --- --- --- 33.51 6.40 177,641 94.40 34.08 0.37 --- 33.70 0.00 -__ 34.08 6.50 181,448 94.50 34.58 0.34 =__ 34.24 0.00 =__ ___ 34.58 6.60 185,256 94.60 35.05 0.32 34.73 0.00 35.04 6.70 189,064 94.70 35.47 0.29 -- --- - 35.18 0.00 --- --- --- 35.47 6.80 192,872 94.80 35.88 0.27 -- --- - 35.60 0.00 --- --- --- 35.88 6.90 196,680 94.90 36.26 0.26 --- 36.00 0.00 ___ --- 36.26 7.00 200,488 95.00 36.63 0.24 =__ 36.39 0.00 ___ 36.63 7.10 204,641 95.10 36.99 0.23 36.76 0.00 --- 36.98 7.20 208,795 95.20 37.34 0.21 --- --- 37.11 0.00 --- --- --- 37.33 7.30 212,948 95.30 37.67 0.20 - 37.47 0.00 --- 37.67 7.40 217,101 95.40 38.00 0.19 =__ _= 37.81 0.00 -_ __= 38.00 7.50 221,255 95.50 38.33 0.18 38.14 0.00 38.32 7.60 225,408 95.60 38.64 0.18 -- --- - 38.47 0.00 --- --- --- 38.64 7.70 229,561 95.70 38.96 0.17 --- --- 38.78 0.00 --- --- --- 38.95 7.80 233,714 95.80 39.27 0.16 39.09 0.00 -- 39.25 1 7.90 237,868 95.90 39.57 0.15 =__ __= 39.40 0.00 _ ___ __= 39.56 8.00 242,021 96.00 39.87 0.15 39.71 0.00 39.86 8.10 246,525 96.10 40.17 0.14 __ --- - 39.99 0.82 _-- _-- --- 40.96 8.20 251,029 96.20 40.46 0.14 40.31 2.33 - 42.77 ' 8.30 255,533 96.30 40.75 0.13 =__ __= 40.61 4.27 =__ -_ _ = 45.01 8.40 260,037 96.40 41.04 0.13 40.91 6.58 47.61 8.50 264,541 96.50 41.32 0.12 _- --- - 41.18 9.19 --- --- --- 50.49 8.60 269,044 96.60 41.60 0.12 -- --- - 41.48 12.08 --- --- --- 53.68 8.70 273,548 96.70 41.88 0.12 41.72 15.23 --_ --- 57.07 ' 8.80 278,052 96.80 42.16 0.11 =_= __= 42.03 18.60 =__ 60.75 8.90 282,556 96.90 42.44 0.11 42.30 22.20 64.61 9.00 287,060 97.00 42.71 0.11 --- --- 42.56 26.00 --- --- --- 68.67 ...End 1 1 Hyd. No. 10 -Reservoir - 25 Yr - Qp = 1.38 cfs - SWM Pond A w Cat / Hyd. 6 Hyd. 10 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Combined Area 2 & 3 Hydrograph type =Combine Storm frequency = 25 yrs Inflow hyds. = 7, 8 Peak discharge = 51.32 cfs Time interval = 2 min Hydrograph Volume = 115,394 cult Hydrograph Discharge Table Time Hyd. 7 + Hyd. 8 + (hrs) (cfs) (cfs) 8.33 0.46 0.18 10.00 0.80 0.35 11.67 8.15 4.23 13.33 1.23 0.71 15.00 0.70 0.41 16.67 0.49 0.29 18.33 0.40 0.23 Outflow (cfs) 0.64 1.15 12.38 1.94 1.11 0.78 0.63 ...End Hyd. No. 11 -Combine - 25 Yr - Qp = 51.32 cfs -Combined Area 2 & 3 C~ 0.0 2.0 3.9 5.9 7.9 9.8 11.8 13.8 15.7 17.7 19.7 Time (hrs) / Hyd. 7 Hyd. 8 'Hyd. 11 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 12 SWM Pond B Hydrograph type =Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 11 Max. Elevation = 93.71 ft Peak discharge = 3.36 cfs Time interval = 2 min Reservoir name =SWM Pond B Max. Storage = 73,072 cult Storage Indication method used. Outflow hydrograph volume = 79,848 cuff Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 6.67 0.41 90.20 0.06 0.06 ----- ----- ----- ----- -_--- ----- ----- 0 06 8.33 0.64 90.36 0.11 0.11 ----- ----- _____ _____ _____ _____ _____ . 0 11 10.00 1.15 90.64 0.17 0.16 ----- ----- ----- ----- ----- ----- ----- . 0 16 11.67 12.38 91.45 0.27 0.26 ----- ----- ----- ___-- ___-_ ___-_ ___-_ . 0 26 13.33 1.94 93.66 2.45 0.41 ----- ----- 2.01 ----- ----- ----- ----- . 2 42 15.00 1.11 93.59 1.29 0.42 ----- ----- 0.86 ----- ----- ----- ----- . 1 28 16.67 0.78 93.55 0.91 0.42 ----- ----- 0.47 ----- ----- ----- ----- . 0 90 18.33 0.63 93.53 0.71 0.42 ----- ----- 0.28 ----- ----- ----- ----- . 0 70 20.00 0.48 93.51 0.56 0.42 ----- ----- 0.12 ----- ----- ----- ----- . 0 55 21.67 0.45 93.50 0.48 0.43 ----- ----- 0.04 ----- ----- ----- ----- . 0 46 23.33 0.42 93.50 0.45 0.43 ----- ----- 0.00 ----- ----- ----- ----- . 0 43 25.00 0.00 93.44 0.44 0.42 ----- ----- ----- ___-- ___-_ __-__ _-___ . 0 42 26.67 0.00 93.34 0.42 0.42 ----- ----- ----- ___-- ___-_ __-__ __-__ . 0 42 28.33 0.00 93.24 0.41 0.41 ----- ----- ----- ----- ----- ----- . 0 41 30.00 0.00 93.14 0.41 0.40 ----- ----- ----- ----- ----- ----- ----_ ----- . 0 40 31.67 0.00 93.05 0.41 0.40 ----- ----- ----- _____ _____ _____ _____ . 0 40 33.33 0.00 92.95 0.40 0.39 ----- ----- ----- ----- ----- ----- ----- . 0 39 35.00 0.00 92.84 0.38 0.38 ----- ----- ----- ----- ----- ----- ----- . 0 38 36.67 0.00 92.73 0.38 0.37 ----- ----- ___-- ___-- ___-_ __-__ ___-- . 0 37 38.33 0.00 92.63 0.38 0.37 ----- ----- ----- ----- ----- ----- ----_ . 0 37 40.00 0.00 92.53 0.38 0.36 ----- ----- ----- ----- ----- ----- ----- . 0 36 41.67 0.00 92.43 0.36 0.35 ----- ----- ----_ _____ _____ _____ _____ . 0 35 43.33 0.00 92.34 0.35 0.34 ----- ----- ___-- ___-- ___-- ___-_ . 0 34 45.00 0.00 92.24 0.35 0.34 ----- ----- ___-- ___-- __-__ -____ _____ ___-- . 0 34 46.67 0.00 92.15 0.34 0.33 ----- ----- ----- ----- ----- ----- ----- . 0.33 ...End Reservoir Report Page 1 Reservoir No. 2 - SWM Pond B Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 90.00 14,141 0 0 1.00 91.00 16,900 15,520 15 520 2.00 92.00 19,896 18,398 , 33 918 3.00 93.00 23,171 21,534 , 55 452 4.00 94.00 26,719 24,945 , 80 397 5.00 95.00 19, 966 23, 342 , 103, 739 Culvert /Orifice Structures Weir Structures [A] [B] [~] [Dl [Al [B] [~l [Dl Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 9.42 10.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest EI. ft = 93.50 94.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 0.00 0.00 Invert EI. ft = 90.00 90.00 0.00 0.00 Weir Type =Riser Broad --- --- Length ft = 46.0 0.0 0.0 0.0 Multi-Stage =Yes No No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration Rate = 0.00 in/h r/sgft Tailwater Elev . = 0.00 ft Stage /Storage /Discharge Table Stage Storage Elevation Clv A ft tuft ft cfs 0.00 0 90.00 0.00 0.10 1,552 90.10 0.02 0.20 3,104 90.20 0.06 0.30 4,656 90.30 0.11 0.40 6,208 90.40 0.12 0.50 7,760 90.50 0.15 0.60 9,312 90.60 0.16 0.70 10,864 90.70 0.18 0.80 12,416 90.80 0.20 0.90 13,968 90.90 0.20 1.00 15,520 91.00 0.22 1.10 17,360 91.10 0.23 1.20 19,200 91.20 0.24 1.30 21,040 91.30 0.25 1.40 22,880 91.40 0.27 1.50 24,719 91.50 0.27 1.60 26,559 91.60 0.29 1.70 28,399 91.70 0.29 1.80 30,239 91.80 0.30 1.90 32,079 91.90 0.32 2.00 33,918 92.00 0.32 2.10 36,072 92.10 0.32 2.20 38,225 92.20 0.35 2.30 40,378 92.30 0.35 2.40 42,532 92.40 0.35 2.50 44,685 92.50 0.38 2.60 46,838 92.60 0.38 2.70 48,992 92.70 0.38 2.80 51,145 92.80 0.38 2.90 53,299 92.90 0.38 3.00 55,452 93.00 0.41 3.10 57,946 93.10 0.41 Note: All outflows have been analyzed under inlet and outlet control. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.02 --- --- 0.00 0.00 --- --- --- 0 02 0.06 --- --- 0.00 0.00 --- . --- --- 0.06 0.10 --- --- 0.00 0.00 --- --- --- 0.10 0.12 --- --- 0.00 0.00 --- --- --- 0 12 0.14 --- --- 0.00 0.00 --- . --- --- 0 14 0.16 --- --- 0.00 0.00 --- . --- --- 0 16 0.17 --- --- 0.00 0.00 --- . --- --- 0 17 0.19 --- --- 0.00 0.00 --- . --- --- 0.19 0.20 --- --- 0.00 0.00 --- --- --- 0.20 0.21 --- --- 0.00 0.00 --- --- --- 0 21 0.23 --- --- 0.00 0.00 --- . --- --- 0 23 0.24 --- --- 0.00 0.00 --- . --- --- 0.24 0.25 --- --- 0.00 0.00 --- --- --- 0.25 0.26 --- --- 0.00 0.00 --- --- --- 0.26 0.27 --- --- 0.00 0.00 --- --- --- 0 27 0.28 --- --- 0.00 0.00 --- . --- --- 0 28 0.29 --- --- 0.00 0.00 --- . --- --- 0.29 0.30 --- --- 0.00 0.00 --- --- --- 0.30 0.31 --- --- 0.00 0.00 --- --- --- 0.31 0.32 --- --- 0.00 0.00 --- --- --- 0.32 0.32 --- --- 0.00 0.00 --- --- --- 0 32 0.33 --- --- 0.00 0.00 --- . --- --- 0 33 0.34 --- --- 0.00 0.00 --- . --- --- 0 34 0.35 --- --- 0.00 0.00 --- . --- --- 0 35 0.36 --- --- 0.00 0.00 --- . --- --- 0.36 0.36 --- --- 0.00 0.00 --- --- --- 0 36 0.37 --- --- 0.00 0.00 --- . --- --- 0 37 0.38 --- --- 0.00 0.00 --- . --- --- 0.38 0.38 --- --- 0.00 0.00 --- --- --- 0.38 0.39 --- --- 0.00 0.00 --- --- --- 0.39 0.40 --- --- 0.00 0.00 --- --- --- 0.40 Continues on next page... SWM Pond B Stage /Storage /Discharge Table Stage Storage Elevation Clv A ft tuft ft cfs 3.20 60,441 93.20 0.41 3.30 62,935 93.30 0.41 3.40 65,430 93.40 0.44 3.50 67,924 93.50 0.44 3.60 70,419 93.60 1.41 3.70 72,913 93.70 3.27 3.80 75,408 93.80 5.61 3.90 77,902 93.90 8.32 4.00 80,397 94.00 11.48 4.10 82,731 94.10 14.90 4.20 85,065 94.20 18.66 4.30 87,399 94.30 22.69 4.40 89,734 94.40 25.18 4.50 92,068 94.50 26.30 4.60 94,402 94.60 27.15 4.70 96,736 94.70 27.86 4.80 99,071 94.80 28.49 4.90 101,405 94.90 29.05 5.00 103,739 95.00 29.56 ...End Page 2 Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.41 --- --- 0.00 0.00 --- --- --- 0.41 0.41 --- --- 0.00 0.00 --- --- --- 0.41 0.42 --- --- 0.00 0.00 --- --- --- 0 42 0.43 --- --- 0.00 0.00 --- --- --- . 0 43 0.42 --- --- 0.99 0.00 --- --- --- . 1.41 0.41 --- --- 2.81 0.00 --- --- --- 3.21 0.39 --- --- 5.15 0.00 --- --- --- 5.55 0.38 --- --- 7.94 0.00 --- --- --- 8.32 0.35 --- --- 11.09 0.00 --- --- --- 11.44 0.32 --- --- 14.58 0.82 --- --- --- 15.72 0.29 --- --- 18.37 2.33 --- --- --- 20.99 0.24 --- --- 22.45 4.27 --- --- --- 26.96 0.19 --- --- 24.99 6.58 --- --- --- 31.75 0.16 --- --- 26.13 9.19 --- --- --- 35.49 0.15 --- --- 27.00 12.08 --- --- --- 39.23 0.13 --- --- 27.73 15.23 --- --- --- 43.09 0.12 --- --- 28.36 18.60 --- --- --- 47 09 0.11 --- --- 28.93 22.20 --- --- --- . 51.24 0.10 --- --- 29.46 26.00 --- --- --- 55.56 Hyd. No. 12 -Reservoir - 25 Yr - Qp = 3.36 cfs - SWM Pond B / Hyd. 11 Hyd. 12 0.0 4.8 9.6 14.4 19.2 24.0 28.8 33.6 38.4 43.2 48.0 Time (hrs) Hydrogra~ Hyd. i~ Hydrograph No. type ~h Summary Report Peak Time Time to Volume ~ Inflow Maximum Maximum flow interval peak ~ hyd(s) elevation storage (origin) (cfs) (mm) (mm) (tuft) (ft) (cult) t ~ 1 SCS Runoff 27.09 6 726 110,205 ---- ------ ------ t 2 SCS Runoff ~', 37.00 6 726 150,111 ---- I ------ ------ 3 ~ SCS Runoff ~ 10.73 6 726 43,910 i ---- ------ ------ 4 SCS Runoff ~ 1.69 6 738 8,513 ~ ---- ------ ------ 5 Combine 76.25 I 6 726 312,739 1, 2, 3, 4 ------ ------ 6 SCS Runoff 102.11 1 719 253,562 --__ ______ _----_ 7 i SCS Runoff 45.34 2 716 106,023 8 i SCS Runoff 26.14 2 716 57,861 ---- ------ ------ t 9 SCS Runoff 7.82 1 716 13,829 ---- ------ ------ 10 ~ Reservoir 13.17 1 736 132,200 6 93.52 145,866 ' 11 Combine 71.47 2 716 163,885 7, 8, ------ ------ 12 Reservoir 28.75 2 722 128,071 11 94.34 88,273 it ' I I ~'~. Ali I ' I 1 I I i I! 'i '~ ICI ~~ ~ ~ 'I I! ' Proj. file: Lowes-Whiteville.gpw ', Return Period: 100 yr Page 1 Hydrograph description Predeveloped Area 1 Predeveloped Area 2 Predeveloped Area 3 Predeveloped Area 4 Pre-developm Combined Total Post-Development Area 1 Post-Development Area 2 Post-Development Area 3 Post-Development Area 4 SWM Pond A Combined Area 2 & 3 SWM Pond B Run date: 06-29-2007 Hydraflow Hydrographs by Intelisolve Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predeveloped Area 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 5.34 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 10.14 in Storm duration = 24 hrs Peak discharge = 27.09 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 24.3 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 110,205 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 9.60 0.29 14.60 1.57 19.60 0.69 End 1 1 1 TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Predeveloped Area 1 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.6 Travel Time ........................................ = 23.7 min Shallow Concentrated Flow Flow length = 68 ft Watercourse slope = 1.6 Surface description =Unpaved Average velocity = 2.07 ft/s Travel Time ................. ....................... = 0.6 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ =min Total Travel Time, Tc ........................ = 24.3 min Hyd. No. 1 - SCS Runoff -100 Yr - Qp = 27.09 cfs - Predeveloped Area 1 C3~ 0.0 2.4 4.9 7.3 9.7 12.1 14.6 17.0 19.4 21.9 24.3 Time (hrs) ,~ Hyd. 1 Hydrograph Report Hyd. No. 2 Predeveloped Area 2 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 100 yrs 6.13 ac 0.0 TR55 10.14 in 24 h rs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 8.60 0.38 13.60 2.95 18.60 0.99 23.60 0.65 End Page 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 37.00 cfs Time interval = 6 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 23.9 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 150,111 cult TR55 Tc Worksheet Page 1 Hyd. No. 2 Predeveloped Area 2 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.8 Travel Time ........................................ = 22.6 min Shallow Concentrated Flow Flow length = 159 ft Watercourse slope = 1.5 Surface description =Unpaved Average velocity = 1.98 ft/s Travel Time ................. ....................... = 1.3 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 23.9 min 1 1 1 1 1 1 1 C3- 0.0 2.4 4.9 7.3 9.7 12.1 14.6 17.0 19.4 21.9 24.3 Time (hrs) " Hyd. 2 Hyd. No. 2 - SCS Runoff -100 Yr - Qp = 37.00 cfs - Predeveloped Area 2 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Predeveloped Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 100 yrs 2.29 ac 0.0 TR55 10.14 in 24 h rs Peak discharge = 10.73 cfs Time interval = 6 min Curve number = 62 Hydraulic length = 0 ft Time of conc. (Tc) = 22.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 43,910 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.00 0.12 15.00 0.60 20.00 0.27 ...End TR55 Tc Worksheet Page 1 Hyd. No. 3 Predeveloped Area 3 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.2 Travel Time ........................................ = 20.7 min Shallow Concentrated Flow Flow length = 70 ft Watercourse slope = 0.1 Surface description =Unpaved Average velocity = 0.60 ft/s Travel Time ........................................ = 1.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 22.7 min 1 1 1 1 1 1 1 1 Cl Hyd. No. 3 - SCS Runoff -100 Yr - Qp =10.73 cfs - Predeveloped Area 3 1 0.0 2.4 4.9 7.3 9.8 12.2 14.6 17.1 19.5 22.0 24.4 Time (hrs) ~' Hyd. 3 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Predeveloped Area 4 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 100 yrs 0.40 ac 0.0 TR55 10.14 in 24 h rs Peak discharge = 1.69 cfs Time interval = 6 min Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 31.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 8,513 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 9.40 0.02 14.40 0.13 19.40 0.06 24.40 0.02 End 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Page 1 Hyd. No. 4 Predeveloped Area 4 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 132.1 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.2 Travel Time ..................... ................... = 31.5 min Shallow Concentrated Flow Flow length Watercourse slope Surface description Average velocity Travel Time ............ =oft = 0.0 = Paved = 0.00 ft/s ............................ = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 31.5 min Hydraflow Hydrographs by Intelisolve Hyd. No. 4 - SCS Runoff -100 Yr - Qp = 1.69 cfs - Predeveloped Area 4 2. 1. v ~ 1. 0. 0. 0.0 2.5 4.9 7.4 9.8 12.3 14.7 17.2 19.6 22.1 24.5 Time (hrs) ~' Hyd. 4 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Pre-developm Combined Total Hydrograph type =Combine Storm frequency = 100 yrs Inflow hyds. = 1, 2, 3, 4 Peak discharge = 76.25 cfs Time interval = 6 min Hydrograph Volume = 312,739 cult Hydrograph Discharge Table Time Hyd. 1 + Hyd. 2 + Hyd. 3 + (hrs) (cfs) (cfs) (cfs) 10.00 0.39 0.83 0.12 15.00 1.45 1.81 0.60 20.00 0.64 0.79 0.27 Hyd. 4 = Outflow (cfs) (cfs) 0.03 1.36 0.12 3.97 0.05 1.75 ...End Hyd. No. 5 -Combine -100 Yr - Qp = 76.25 cfs -Pre-developm Combined Total CJ 0.0 2.4 4.9 7.3 9.7 12.1 Time (hrs) / Hyd. 1 Hyd. 2 Hyd. 3 14.6 17.0 19.4 21.9 24.3 Hyd. 4 Hyd. 5 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Post-Development Area 1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 100 yrs 8.07 ac 0.0 TR55 10.14 in 24 hrs Peak discharge = 102.11 cfs Time interval = 1 min Curve number = 88 Hydraulic length = 0 ft Time of conc. (Tc) = 9.2 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 253,562 tuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 7.43 1.02 8.27 1.28 9.10 1.88 9.93 2.36 10.77 3.95 11.60 11.80 12.43 10.29 13.27 4.57 14.10 3.03 14.93 2.53 15.77 2.06 16.60 1.76 17.43 1.60 18.27 1.43 19.10 1.26 19.93 1.09 20.77 1.03 End R55 Tc Worksh T eet Hyd. No. 6 Post-Development Area 1 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 300.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 0.5 ~ ..................... Travel Time = 4.6 min ................... Shallow Concentrated Fl ow ~ Flow length = 560 ft Watercourse slope = 1.0 - Surface description =Paved Average velocity = 2.03 ft/s .................... Travel Time = 4.6 min .................... Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 _ Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft ................... Travel Time =min ..................... Total Travel Time, Tc ... ..................... = 9.2 min Page 1 Hydraflow Hydrographs by Intelisolve Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Post-Development Area 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 3.31 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 10.14 in Storm duration = 24 hrs Peak discharge = 45.34 cfs Time interval = 2 min Curve number = 94 Hydraulic length = 0 ft Time of conc. (Tc) = 3.6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 106,023 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 6.27 0.46 7.93 0.59 9.60 0.95 11.27 2.78 12.93 2.13 14.60 1.05 16.27 0.71 17.93 0.58 ..End TR55 Tc Worksheet Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Post-Development Area 2 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 296.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 1.9 Travel Time ........................................ = 2.7 min Shallow Concentrated Flow Flow length Watercourse slope Surface description Average velocity Travel Time ............ = 176 ft = 2.4 = Paved = 3.14 ft/s ............................ = 0.9 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Total Travel Time, Tc ........................ = 3.6 min Hyd. No. 7 - SCS Runoff -100 Yr - Qp = 45.34 cfs -Post-Development Area 2 i 'I - -- _ --~ - ~--- - _- 50 I ~ ~~ I~ ~ I I ', 40 ~ _ _- _~ _-- --__ a __ ~, 30 __ _ _ I - ~ --- it I --- - - C1 ~ ~ _ Time (hrs) ~* Hyd. 7 Hydrograph Report Hyd. No. 8 Post-Development Area 3 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration SCS Runoff 100 yrs 1.99 ac 0.0 TR55 10.14 in 24 hrs Page 1 Hydraflow Hydrographs by Intelisolve Peak discharge = 26.14 cfs Time interval = 2 min Curve number = 87 Hydraulic length = 0 ft Time of conc. (Tc) = 3.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 57,861 tuft Hydrograph Discharge Table Time --Outflow (hrs cfs) 8.10 0.26 9.77 0.50 11.43 1.75 13.10 1.11 14.77 0.60 16.43 0.41 18.10 0.33 End TR55 Tc Worksheet Page 1 Hyd. No. 8 Post-Development Area 3 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 139.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 2.5 Travel Time ........................................ = 1.3 min Shallow Concentrated Flow Flow length = 381 ft Watercourse slope = 1.7 Surface description =Paved Average velocity = 2.61 ft/s Travel Time ................. ....................... = 2.4 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time .................... .................... =min Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 3.7 min Hyd. No. 8 - SCS Runoff -100 Yr - Qp = 26.14 cfs -Post-Development Area 3 3 2 '~ 2 v CJ 1 i '~ 1 0.0 2.0 3.9 5.9 7.9 9.9 11.8 13.8 15.8 17.7 19.7 Time (hrs) ,~ Hyd. 8 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Post-Development Area 4 Hydrograph type Storm frequency Drainage area Basin Stope Tc method Total precip. Storm duration SCS Runoff 100 yrs 0.79 ac 0.0 TR55 10.14 in 24 h rs Peak discharge = 7.82 cfs Time interval = 1 min Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 1.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 13,829 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 10.50 0.08 11.33 0.24 12.17 0.93 13.00 0.36 13.83 0.24 14.67 0.19 15.50 0.16 16.33 0.13 17.17 0.12 18.00 0.11 18.83 0.10 19.67 0.09 20.50 0.08 End TR55 Tc Worksheet Hyd. No. 9 Post-Development Area 4 Storm frequency = 100 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 50.0 ft Two-year 24-hr precip. = 3.85 in Land slope = 30.0 Travel Time ........................................ = 1.7 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.0 Surface description =Paved Average velocity = 0.00 ft/s Travel Time ................. ....................... = 0.0 min Channel Flow Cross section flow area = 0.0 sgft Wetted perimeter = 0.0 ft Channel slope = 0.0 Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ =min Page 1 Hydraflow Hydrographs by Intelisolve Total Travel Time, Tc ........................ = 1.7 min Hyd. No. 9 - SCS Runoff -100 Yr - Qp = 7.82 cfs -Post-Development Area 4 v C3- -~ _ - _r ~ ~ ~ ~___ I ~rn ~ 0.00 2.07 4.13 6.20 8.27 10.33 12.40 14.47 16.53 18.60 20.67 Time (hrs) ~' Hyd. 9 __ Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 10 SWM Pond A Hydrograph type =Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 6 Max. Elevation = 93.52 ft Peak discharge Time interval Reservoir name Max. Storage = 13.17 cfs = 1 min = SWM Pond A = 145,866 cult Storage Indication method used. Hydrograph Discharge Table Outflow hydrograph volume = 132,200 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 6.67 0.85 88.27 0.16 0.16 ----- ----- ----- ----- ----- ----- ----- 0.16 7.50 1.04 88.38 0.28 0.27 ----- ----- ----- ----- ----- ----- ----- 0.27 8.33 1.33 88.51 0.35 0.35 ----- ----- ----- ----- ----- ----- ----- 0.35 9.17 1.91 88.70 0.44 0.43 ----- ----- ----- ----- ----- ----- ----- 0.43 10.00 2.44 88.94 0.53 0.53 ----- ----- ----- ----- ----- ----- ----- 0.53 10.83 4.15 89.29 0.65 0.65 ----- ----- ----- ----- ----- ----- ----- 0.65 11.67 19.31 90.08 0.88 0.86 ----- ----- ----- ----- ----- ----- ----- 0.86 12.50 9.08 93.49 11.99 1.29 ----- ----- 10.65 ----- ----- ----- ----- 11.94 13.33 4.42 93.28 5.95 1.35 ----- ----- 4.58 ----- ----- ----- ----- 5.93 14.17 2.97 93.18 3.81 1.37 ----- ----- 2.44 ----- ----- ----- ----- 3.81 15.00 2.49 93.13 2.91 1.38 ----- ----- 1.53 ----- ----- ----- ----- 2.91 15.83 2.02 93.10 2.36 1.39 ----- ----- 0.97 ----- ----- ----- ----- 2.36 16.67 1.75 93.07 2.06 1.39 ----- ----- 0.67 ----- ----- ----- ----- 2.06 17.50 1.58 93.04 1.84 1.39 ----- ----- 0.44 ----- ----- ----- ----- 1.83 18.33 1.42 93.02 1.64 1.39 ----- ----- 0.24 ----- ----- ----- ----- 1.63 19.17 1.25 93.01 1.47 1.40 ----- ----- 0.06 ----- ----- ----- ----- 1.45 20.00 1.08 92.98 1.41 1.39 ----- ----- ----- ----- ----- ----- ----- 1.39 20.83 1.03 92.95 1.41 1.39 ----- ----- ----- ----- ----- ----- ----- 1.39 21.67 0.99 92.91 1.41 1.38 ----- ----- ----- ----- ----- ----- ----- 1.38 22.50 0.96 92.88 1.41 1.38 ----- ----- ----- ----- ----- ----- ----- 1.38 23.33 0.93 92.83 1.41 1 ~7 ----- _____ _____ _____ _____ _____ _____ , ~~ ..End Reservoir Report Page 1 Reservoir No. 1 - SWM Pond A Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 88.00 18, 510 0 0 1.00 89.00 21,256 19,883 19,883 2.00 90.00 23,998 22,627 42,510 3.00 91.00 26,858 25,428 67,938 4.00 92.00 29,836 28,347 96,285 5.00 93.00 33,023 31,430 127,715 6.00 94.00 36,365 34,694 162,409 7.00 95.00 39,793 38,079 200,488 8.00 96.00 43,273 41,533 242,021 9.00 97.00 46,804 45,039 287,060 Culvert I Orifice Structures Ip-] LB] Rise in = 24.0 5.0 Span in = 24.0 5.0 No. Barrels = 1 1 Invert EI. ft = 88.00 88.00 Length ft = 98.0 0.0 Slope % = 1.00 0.00 N-Value = .013 .013 Orif. Coeff. = 0.60 0.60 Multi-Stage = n/a Yes [C) 0.0 0.0 0 0.00 0.0 0.00 .000 0.00 No LDl 0.0 0.0 0 0.00 0.0 0.00 .000 0.00 No Weir Structures IA] LB] [C] ID] Crest Len ft = 9.42 10.00 0.00 0.00 Crest EI. ft = 93.00 96.00 0.00 0.00 Weir Coeff. = 3.33 2.60 0.00 0.00 Weir Type =Riser Broad --- --- Multi-Stage =Yes No No No xfiltration Rate = 0.00 in/hr/sgft Tailwater Elev. = 0.00 ft Stage (Storage /Discharge Table Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 88.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- 0 00 0.10 1,988 88.10 0.03 0.03 --- --- 0.00 0.00 --- --- --- . 0 03 0.20 3,977 88.20 0.09 0.09 --- --- 0.00 0.00 --- --- --- . 0 09 0.30 5,965 88.30 0.18 0.18 --- --- 0.00 0.00 --- --- --- . 0 18 0.40 7,953 88.40 0.29 0.28 --- --- 0.00 0.00 --- --- --- . 0 28 0.50 9,941 88.50 0.35 0.34 --- --- 0.00 0.00 --- --- --- . 0 34 0.60 11,930 88.60 0.41 0.39 --- --- 0.00 0.00 --- --- --- . 0 39 0.70 13,918 88.70 0.44 0.44 --- --- 0.00 0.00 --- --- --- . 0 44 0.80 15,906 88.80 0.48 0.48 --- --- 0.00 0.00 --- --- --- . 0 48 0.90 17,895 88.90 0.52 0.52 --- --- 0.00 0.00 --- --- --- , 0 52 1.00 19,883 89.00 0.56 0.55 --- --- 0.00 0.00 --- --- --- . 0 55 1.10 22,146 89.10 0.60 0.59 --- --- 0.00 0.00 --- --- --- . 0 59 1.20 24,408 89.20 0.64 0.62 --- --- 0.00 0.00 --- --- --- . 0 62 1.30 26,671 89.30 0.65 0.65 --- --- 0.00 0.00 --- --- --- . 0 65 1.40 28,934 89.40 0.69 0.68 --- --- 0.00 0.00 --- --- --- . 0 68 1.50 31,196 89.50 0.73 0.71 --- --- 0.00 0.00 --- --- --- . 0 71 1.60 33,459 89.60 0.74 0.74 --- --- 0.00 0.00 --- --- --- . 0 74 1.70 35,722 89.70 0.78 0.76 --- --- 0.00 0.00 --- --- --- . 0 76 1.80 37,985 89.80 0.79 0.79 --- --- 0.00 0.00 --- --- --- . 0 79 1.90 40,247 89.90 0.84 0.81 --- --- 0.00 0.00 --- --- --- . 0 81 2.00 42,510 90.00 0.84 0.84 --- --- 0.00 0.00 --- --- --- . 0 84 2.10 45,053 90.10 0.89 0.86 --- --- 0.00 0.00 --- --- --- . 0 86 2.20 47,596 90.20 0.89 0.89 --- --- 0.00 0.00 --- --- --- . 0 89 2.30 50,138 90.30 0.95 0.91 --- --- 0.00 0.00 --- --- --- . 0 91 2.40 52,681 90.40 0.95 0.93 --- --- 0.00 0.00 --- --- --- . 0 93 2.50 55,224 90.50 0.95 0.95 --- --- 0.00 0.00 --- --- --- . 0 95 2.60 57,767 90.60 1.01 0.97 --- --- 0.00 0.00 --- --- --- . 0 97 2.70 60,310 90.70 1.01 1.00 --- --- 0.00 0.00 --- --- --- , 1.00 Con tinues on next page... SWM Pond A Page 2 Stage /Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.80 62,852 90.80 1.02 1.02 --- --- 0.00 0.00 --- --- --- 1 02 2.90 65,395 90.90 1.07 1.04 --- --- 0.00 0.00 --- --- --- . 1 04 3.00 67,938 91.00 1.07 1.06 --- --- 0.00 0.00 --- --- --- . 1 06 3.10 70,773 91.10 1.07 1.07 --- --- 0.00 0.00 --- --- --- . 1 07 3.20 73,607 91.20 1.13 1.09 --- --- 0.00 0.00 --- --- --- . 1 09 3.30 76,442 91.30 1.13 1.11 --- --- 0.00 0.00 --- --- --- . 1 11 3.40 79,277 91.40 1.13 1.13 --- --- 0.00 0.00 --- --- --- . 1 13 3.50 82,111 91.50 1.20 1.15 --- --- 0.00 0.00 --- --- --- . 1 15 3.60 84,946 91.60 1.20 1.17 --- --- 0.00 0.00 --- --- --- . 1 17 3.70 87,781 91.70 1.20 1.19 --- --- 0.00 0.00 --- --- --- . 1 19 3.80 90,616 91.80 1.20 1.20 --- --- 0.00 0.00 --- --- --- . 1 20 3.90 93,450 91.90 1.26 1.22 --- --- 0.00 0.00 --- --- --- . 1 22 4.00 96,285 92.00 1.26 1.24 --- --- 0.00 0.00 --- --- --- . 1 24 4.10 99,428 92.10 1.26 1.25 --- --- 0.00 0.00 --- --- --- . 1 25 4.20 102,571 92.20 1.27 1.27 --- --- 0.00 0.00 --- --- --- . 1 27 4.30 105,714 92.30 1.34 1.29 --- --- 0.00 0.00 --- --- --- , 1 29 4.40 108,857 92.40 1.34 1.30 --- --- 0.00 0.00 --- --- --- . 1 30 4.50 112,000 92.50 1.34 1.32 --- --- 0.00 0.00 --- --- --- . 1 32 4.60 115,143 92.60 1.34 1.34 --- --- 0.00 0.00 --- --- --- . 1 34 4.70 118,286 92.70 1.35 1.35 --- --- 0.00 0.00 --- --- --- . 1 35 4.80 121,429 92.80 1.41 1.36 --- --- 0.00 0.00 --- --- --- . 1 36 4.90 124,572 92.90 1.41 1.38 --- --- 0.00 0.00 --- --- --- . 1 38 5.00 127,715 93.00 1.41 1.40 --- --- 0.00 0.00 --- --- --- . 1 40 5.10 131,184 93.10 2.38 1.39 --- --- 0.99 0.00 --- --- --- . 2 38 5.20 134,654 93.20 4.17 1.37 --- --- 2.81 0.00 --- --- --- . 4 17 5.30 138,123 93.30 6.53 1.34 --- --- 5.15 0.00 --- --- --- . 6 50 5.40 141,592 93.40 9.25 1.32 --- --- 7.94 0.00 --- --- --- . 9 P5 5.50 145,062 93.50 12.44 1.28 --- --- 11.09 0.00 --- --- --- . 12 37 5.60 148,531 93.60 15.81 1.23 --- --- 14.58 0.00 --- --- --- . 15 81 5.70 152,001 93.70 19.51 1.14 --- --- 18.37 0.00 --- --- --- . 19 51 5.80 155,470 93.80 23.46 1.02 --- --- 22.45 0.00 --- --- --- . 23 46 5.90 158,940 93.90 27.60 0.82 --- --- 26.78 0.00 --- --- --- . 27 60 6.00 162,409 94.00 30.95 0.59 --- --- 30.36 0.00 --- --- --- . 30 95 6.10 166,217 94.10 32.06 0.51 --- --- 31.55 0.00 --- --- --- . 32 06 6.20 170,025 94.20 32.86 0.45 --- --- 32.40 0.00 --- --- --- . 32 86 6.30 173,833 94.30 33.52 0.41 --- --- 33.10 0.00 --- --- --- . 33 51 6.40 177,641 94.40 34.08 0.37 --- --- 33.70 0.00 --- --- --- . 34 08 6.50 181,448 94.50 34.58 0.34 --- --- 34.24 0.00 --- --- --- . 34 58 6.60 185,256 94.60 35.05 0.32 --- --- 34.73 0.00 --- --- --- . 35 04 6.70 189,064 94.70 35.47 0.29 --- --- 35.18 0.00 --- --- --- . 35 47 6.80 192,872 94.80 35.88 0.27 --- --- 35.60 0.00 --- --- --- . 35 88 6.90 196,680 94.90 36.26 0.26 --- --- 36.00 0.00 --- --- --- . 36 26 7.00 200,488 95.00 36.63 0.24 --- --- 36.39 0.00 --- --- --- . 36 63 7.10 204,641 95.10 36.99 0.23 --- --- 36.76 0.00 --- --- --- . 36 98 7.20 208,795 95.20 37.34 0.21 --- --- 37.11 0.00 --- --- --- . 37 33 7.30 212,948 95.30 37.67 0.20 --- --- 37.47 0.00 --- --- --- . 37 67 7.40 217,101 95.40 38.00 0.19 --- --- 37.81 0.00 --- --- --- . 38 00 7.50 221,255 95.50 38.33 0.18 --- --- 38.14 0.00 --- --- --- . 38 32 7.60 225,408 95.60 38.64 0.18 --- --- 38.47 0.00 --- --- --- . 38 64 7.70 229,561 95.70 38.96 0.17 --- --- 38.78 0.00 --- --- --- . 38 95 7.80 233,714 95.80 39.27 0.16 --- --- 39.09 0.00 --- --- --- . 39 25 7.90 237,868 95.90 39.57 0.15 --- --- 39.40 0.00 --- --- --- . 39 56 8.00 242,021 96.00 39.87 0.15 --- --- 39.71 0.00 --- --- --- . 39 86 8.10 246,525 96.10 40.17 0.14 --- --- 39.99 0.82 --- --- --- . 40 96 8.20 251,029 96.20 40.46 0.14 --- --- 40.31 2.33 --- --- --- . 42 77 8.30 255,533 96.30 40.75 0.13 --- --- 40.61 4.27 --- --- --- . 45 01 8.40 260,037 96.40 41.04 0.13 --- --- 40.91 6.58 --- --- --- . 47 61 8.50 264,541 96.50 41.32 0.12 --- --- 41.18 9.19 --- --- --- . 50 49 8.60 269,044 96.60 41.60 0.12 --- --- 41.48 12.08 --- --- --- . 53 68 8.70 273,548 96.70 41.88 0.12 --- --- 41.72 15.23 --- --- --- . 57 07 8.80 278,052 96.80 42.16 0.11 --- --- 42.03 18.60 --- --- --- . 60 75 8.90 282,556 96.90 42.44 0.11 --- --- 42.30 22.20 --- --- --- . 64 61 9.00 287,060 97.00 42.71 0.11 --- --- 42.56 26.00 --- --- --- . 68.67 End Hyd. No. 10 -Reservoir -100 Yr - Qp = 13.17 cfs - SWM Pond A c~ 1 1 / Hyd. 6 Hyd. 10 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 1902 21.6 24.0 Time (hrs) Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Combined Area 2 & 3 Hydrograph type =Combine Storm frequency = 100 yrs Inflow hyds. = 7, 8 Peak discharge = 71.47 cfs Time interval = 2 min Hydrograph Volume = 163,885 cult Hydrograph Discharge Table Time Hyd. 7 + Hyd. 8 + (hrs) (cfs) (cfs) 8.33 0.68 0.30 10.00 1.14 0.56 11.67 11.39 6.23 13.33 1.68 0.99 15.00 0.96 0.57 16.67 0.68 0.40 18.33 0.55 0.32 Outflow (cfs) 0.98 1.70 17.61 2.68 1.53 1.08 0.87 ...End Hyd. No. 11 -Combine -100 Yr - Qp = 71.47 cfs -Combined Area 2 & 3 CJ Time (hrs) / Hyd. 7 Hyd. 8 'Hyd. 11 0.0 2.0 3.9 5.9 7.8 9.8 11.8 13.7 15.7 17.6 19.6 Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 12 SWM Pond B Hydrograph type =Reservoir Peak discharge = 28.75 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 11 Reservoir name =SWM Pond B Max. Elevation = 94.34 ft Max. Storage = 88,273 cult Storage Indication method used. Outflow hydrograph volume = 128,071 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.67 17.61 92.12 0.33 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 13.33 2.68 93.71 3.44 0.40 ----- ----- 2.98 ----- ----- ----- ----- 3.38 15.00 1.53 93.62 1.70 0.42 ----- ----- 1.27 ----- ----- ----- ----- 1.69 16.67 1.08 93.58 1.21 0.42 ----- ----- 0.79 ----- ----- ----- ----- 1.21 18.33 0.87 93.55 0.97 0.42 ----- ----- 0.54 ----- ----- ----- ----- 0.96 20.00 0.66 93.53 0.76 0.42 ----- ----- 0.33 ----- ----- ----- ----- 0.75 21.67 0.61 93.52 0.65 0.42 ----- ----- 0.22 ----- ----- ----- ----- 0.64 23.33 0.57 93.52 0.61 0.42 ----- ----- 0.17 ----- ----- ----- ----- 0.59 25.00 0.00 93.46 0.44 0.42 ----- ----- ----- ----- ----- ----- ----- 0.42 26.67 0.00 93.35 0.43 0.42 ----- ----- ----- ----- ----- ----- ----- 0.42 28.33 0.00 93.26 0.41 0.41 ----- ----- ----- ----- ----- ----- ----- 0.41 30.00 0.00 93.16 0.41 0.40 ----- ----- ----- ----- ----- ----- ----- 0.40 31.67 0.00 93.06 0.41 0.40 ----- ----- ----- ----- ----- ----- ----- 0.40 33.33 0.00 92.96 0.40 0.39 ----- ----- ----- ----- ----- ----- ----- 0.39 35.00 0.00 92.85 0.38 0.38 ----- ----- ----- ----- ----- ----- ----- 0.38 36.67 0.00 92.75 0.38 0.37 ----- ----- ----- ----- ----- ----- ----- 0.37 38.33 0.00 92.65 0.38 0.37 ----- ----- ----- ----- ----- ----- ----- 0.37 40.00 0.00 92.54 0.38 0.36 ----- ----- ----- ----- ----- ----- ----- 0.36 41.67 0.00 92.45 0.36 0.35 ----- ----- ----- ----- ----- ----- ----- 0.35 43.33 0.00 92.35 0.35 0.34 ----- ----- ----- ----- ----- ----- ----- 0.34 45.00 0.00 92.25 0.35 0.34 ----- ----- ----- ----- ----- ----- ----- 0.34 46.67 0.00 92.16 0.34 0.33 ----- ----- ----- ----- ----- ----- ----- 0.33 ...End Reservoir Report Page 1 Hydraflow Hydrographs by Intelisolve Reservoir No. 2 - SWM Pond B Pond Data Pond storage is based on k nown contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 90.00 14,141 0 0 1.00 91.00 16,900 15,520 15,520 2.00 92.00 19,896 18,398 33,918 3.00 93.00 23,171 21,534 55,452 4.00 94.00 26,719 24,945 80,397 5.00 95.00 19,966 23,342 103,739 Culvert /Orifice Structure s Weir Structures [A] (B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 9.42 10.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest EI. ft = 93.50 94.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 0.00 0.00 Invert EI. ft = 90.00 90.00 0.00 0.00 Weir Type =Riser Broad --- --- Length ft = 46.0 0.0 0.0 0.0 Multi-Stage =Yes No No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration Rate = 0.00 in/hr/sgft Tailwater Elev. = 0.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage /Storage /Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 90.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- 0.00 0.10 1,552 90.10 0.02 0.02 --- --- 0.00 0.00 --- --- --- 0.02 0.20 3,104 90.20 0.06 0.06 --- --- 0.00 0.00 --- --- --- 0.06 0.30 4,656 90.30 0.11 0.10 --- --- 0.00 0.00 --- --- --- 0.10 0.40 6,208 90.40 0.12 0.12 --- --- 0.00 0.00 --- --- --- 0.12 0.50 7,760 90.50 0.15 0.14 --- --- 0.00 0.00 --- --- --- 0.14 0.60 9,312 90.60 0.16 0.16 --- --- 0.00 0.00 --- --- --- 0.16 0.70 10,864 90.70 0.18 0.17 --- --- 0.00 0.00 --- --- --- 0.17 0.80 12,416 90.80 0.20 0.19 --- --- 0.00 0.00 --- --- --- 0.19 0.90 13,968 90.90 0.20 0.20 --- --- 0.00 0.00 --- --- --- 0.20 1.00 15,520 91.00 0.22 0.21 --- --- 0.00 0.00 --- --- --- 0.21 1.10 17,360 91.10 0.23 0.23 --- --- 0.00 0.00 --- --- --- 0.23 1.20 19,200 91.20 0.24 0.24 --- --- 0.00 0.00 --- --- --- 0.24 1.30 21,040 91.30 0.25 0.25 --- --- 0.00 0.00 --- --- --- 0.25 1.40 22,880 91.40 0.27 0.26 --- --- 0.00 0.00 --- --- --- 0.26 1.50 24,719 91.50 0.27 0.27 --- --- 0.00 0.00 --- --- --- 0.27 1.60 26,559 91.60 0.29 0.28 --- --- 0.00 0.00 --- --- --- 0.28 1.70 28,399 91.70 0.29 0.29 --- --- 0.00 0.00 --- --- --- 0.29 1.80 30,239 91.80 0.30 0.30 --- --- 0.00 0.00 --- --- --- 0.30 1.90 32,079 91.90 0.32 0.31 --- --- 0.00 0.00 --- --- --- 0.31 2.00 33,918 92.00 0.32 0.32 --- --- 0.00 0.00 --- --- --- 0.32 2.10 36,072 92.10 0.32 0.32 --- --- 0.00 0.00 --- --- --- 0.32 2.20 38,225 92.20 0.35 0.33 --- --- 0.00 0.00 --- --- --- 0.33 2.30 40,378 92.30 0.35 0.34 --- --- 0.00 0.00 --- --- --- 0.34 2.40 42,532 92.40 0.35 0.35 --- --- 0.00 0.00 --- --- --- 0.35 2.50 44,685 92.50 0.38 0.36 --- --- 0.00 0.00 --- --- --- 0.36 2.60 46,838 92.60 0.38 0.36 --- --- 0.00 0.00 --- --- --- 0.36 2.70 48,992 92.70 0.38 0.37 --- --- 0.00 0.00 --- --- --- 0.37 2.80 51,145 92.80 0.38 0.38 --- --- 0.00 0.00 --- --- --- 0.38 2.90 53,299 92.90 0.38 0.38 --- --- 0.00 0.00 --- --- --- 0.38 3.00 55,452 93.00 0.41 0.39 --- --- 0.00 0.00 --- --- --- 0.39 3.10 57,946 93.10 0.41 0.40 --- --- 0.00 0.00 --- --- --- 0.40 Continues on next page... SWM Pond B Stage /Storage /Discharge Table Stage Storage Elevation Clv A ft cult ft cfs 3.20 60,441 93.20 0.41 3.30 62,935 93.30 0.41 3.40 65,430 93.40 0.44 3.50 67,924 93.50 0.44 3.60 70,419 93.60 1.41 3.70 72,913 93.70 3.27 3.80 75,408 93.80 5.61 3.90 77,902 93.90 8.32 4.00 80,397 94.00 11.48 4.10 82,731 94.10 14.90 4.20 85,065 94.20 18.66 4.30 87,399 94.30 22.69 4.40 89,734 94.40 25.18 4.50 92,068 94.50 26.30 4.60 94,402 94.60 27.15 4.70 96,736 94.70 27.86 4.80 99,071 94.80 28.49 4.90 101,405 94.90 29.05 5.00 103,739 95.00 29.56 ...End Page 2 Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.41 --- --- 0.00 0.00 --- --- --- 0.41 0.41 --- --- 0.00 0.00 --- --- --- 0.41 0.42 --- --- 0.00 0.00 --- --- --- 0.42 0.43 --- --- 0.00 0.00 --- --- --- 0.43 0.42 --- --- 0.99 0.00 --- --- --- 1.41 0.41 --- --- 2.81 0.00 --- --- --- 3.21 0.39 --- --- 5.15 0.00 --- --- --- 5.55 0.38 --- --- 7.94 0.00 --- --- --- 8.32 0.35 --- --- 11.09 0.00 --- --- --- 11.44 0.32 --- --- 14.58 0.82 --- --- --- 15.72 0.29 --- --- 18.37 2.33 --- --- --- 20.99 0.24 --- --- 22.45 4.27 --- --- --- 26.96 0.19 --- --- 24.99 6.58 --- --- --- 31.75 0.16 --- --- 26.13 9.19 --- --- --- 35.49 0.15 --- --- 27.00 12.08 --- --- --- 39.23 0.13 --- --- 27.73 15.23 --- --- --- 43.09 0.12 --- --- 28.36 18.60 --- --- --- 47.09 0.11 --- --- 28.93 22.20 --- --- --- 51.24 0.10 --- --- 29.46 26.00 --- --- --- 55.56 Hyd. No. 12 -Reservoir -100 Yr - Qp = 28.75 cfs - SWM Pond B N w V ~ 40 0 - ~ . ~~,v 0.0 4.8 9.6 14.4 19.2 24.0 28.8 33.6 38.4 43.2 48.0 Time (hrs) / Hyd. 11 Hyd. 12 ~ APPENDIX C 1 1 1 1 1 1 1 1 1 1 LAND PLANNING ASSOCIATES, INC. NCDENR DWQ STORMWATER MANAGEMENT CALCULATIONS Project Name: Lowe's of Whiteville, NC PEI Project No.: 6.023 BASIN "A" INFORMATION TOTAL AREA DRAINING TO POND (DA)= 351,529 SF = 8.07 AC IMPERVIOUS SURFACES DRAINING TO POND: Paved Areas = 173101 SF Buildings = 80000 SF Sidewalks = Off-Site = SF TOTAL = 253,101 SF DRAINAGE AREA PERCENT IMPERVIOUS (%IMP) = 72.0% NORMAL POOL SURFACE AREA REQUIREMENTS (Based on 85 % TSS Removal Chart) POND DEPTH = 5 FT SA/DA % = 5.14 (FROM CHART) SURFACE AREA REQUIRED = 18,069 SF SURFACE AREA PROVIDED = 18,510 SF @ ELEVATION 88 FMSL Therefore, Normal Pool surface area is ADEQUATE Page 1 of 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LAND PLANNING _ ASSOCIATES, INC. POND AND FOREBAY VOLUMES BELOW NORMAL POOL POND VOLUME Contour Incremental Cumulative Elevation Area Volume Volume (FT) (SF) (CF) (CF) Bottom Pool Elev. 83 6123.5 0 0 (Bottom of Wet Pond) 84 7808.7 6966.1 6966.1 85 9655 8731.85 15697.95 86 1163.3 5409.15 21107.1 87 13833 7498.01 28605.11 Top of Pool Elev. 88 18510 16171 44776 FOREBAY VOLUME Contour Incremental Cumulative Elevation Area Volume Volume (FT) (SF) (CF) (CF) Bottom Elevation 83 706 0 0 84 1149 928 928 85 1677 1413 2341 86 2273 1975 4316 87 2957 2615 6931 Normal Pool Elev. 88 5796 4377 11307 FOREBAY VOLUME MUST REPRESENT 20% OF TOTAL NORMAL POOL VOLUME. FOREBAY VOLUME (WITHIN +/- 2%) = 0.2 x (POND VOL. + FOREBAY VOL.) = 9534 TO 12899 CF FOREBAY VOLUME PROVIDED = 11307 CF FOREBAY VOLUME REPRESENTS 20.2% OF NORMAL POOL VOLUME Page 2 of 3 LAND PLANNING ~~ ASSOCIATES, INC. REQUIRED STORAGE VOLUME TO TREAT FIRST 1-INCH OF RUNOFF (Based on Schueler Method) R = 0.05 + 0.009 x %IMP = 0.05 + 0.009 x 72.0% = 0.698 VOLUME REQ. _ (1 "/12) x R x DA _ (1"/12) x 0.698 x 351,529 = 20,447 CF VOL. PROVIDED = 42,510 CF @ ELEVATION 89.02 Therefore, storage volume is ADEQUATE FIRST 1-INCH STORAGE AND RELEASE Contour Incremental Cumulative *Outflow Release Elevation Area Volume Volume Rate Time (FT) (SF) (CF) (CF) (CFS) (HRS) Temporary Pool Elev. 88 18510 0 0 0 0 (SWM POND) 89 21256 19883 19883 0.164 33.6 89.02 23900 452 20447 0.166 0.8 90 23998 23470 43917 0.232 28.1 91 26858 25428 69345 0.284 24.8 92 29836 28347 97692 0.328 24.0 93 33023 31430 129122 0.367 23.8 94 36365 34694 163816 0.402 24.0 95 39793 38079 201895 0.434 24.4 96 43273 41533 243428 0.464 24.9 97 46804 45039 288466 0.492 25.4 HOURS FIRST 1" OF RUNOFF RELEASED IN 62.5 DAYS 2.6 ORIFICE DIAMETER = 5 INCHES Page 3 of 3 1 1 1 1 1 1 1 1 1 1 1 1 1 LAND PLANNING ~~ ASSOCIATES, INC. NCDENR DWQ STORMWATER MANAGEMENT CALCULATIONS Project Name: Lowe's of Whiteville, NC PEI Project No.: 6.023 BASIN "B" INFORMATION TOTAL AREA DRAINING TO POND (DA)= 230,868 SF = 5.30 AC IMPERVIOUS SURFACES DRAINING TO POND: Paved Areas = 177307 SF Buildings = SF Sidewalks = Off-Site = SF TOTAL = 177,307 SF DRAINAGE AREA PERCENT IMPERVIOUS (%IMP) = 76.8% NORMAL POOL SURFACE AREA REQUIREMENTS (Based on 85 % TSS Removal Chart) POND DEPTH = 6 FT SA/DA % = 4.4 (FROM CHART) SURFACE AREA REQUIRED = 10,158 SF SURFACE AREA PROVIDED = 10,587 SF ~ ELEVATION 90 FMSL Therefore, Normal Pool surface area is ADEQUATE 1 of 3 LAND PLANNING _ ASSOCIATES, INC. POND "B" AND FOREBAY VOLUMES BELOW NORMAL POOL POND VOLUME Contour Incremental Cumulative Elevation Area Volume Volume (FT) (SF) (CF) (CF) Bottom Elevation 84 50 0 0 (Bottom of Wet Pond) 85 1814 932 932 86 2796 2305 3237 87 38$8 3342 6579 88 5048 4468 11047 Normal Pool Elev. 89 6277 5662.5 16709.5 90 10587 8432 25142 FOREBAY VOLUME Contour Incremental Cumulative Elevation Area Volume Volume (FT) (SF) (CF) (CF) Bottom Elevation 85 126 0 0 86 455 291 291 87 899 677 968 88 1415 1157 2125 89 2004 1710 3834 Normal Pool Elev. 90 4488 3246 7080 FOREBAY VOLUME MUST REPRESENT 20% OF TOTAL NORMAL POOL VOLUME. FOREBAY VOLUME (WITHIN +/- 2%) = 0.2 x (POND VOL. + FOREBAY VOL.) = 5478 TO 7411 CF FOREBAY VOLUME PROVIDED = 7080 FOREBAY VOLUME REPRESENTS 22.0% CF OF NORMAL POOL VOLUME 2of3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LAND PLANNING ~~ ASSOCIATES, INC. R~UIRED STORAGE VOLUME TO TREAT FIRST 1-INCH OF RUNOFF (Based on Schueler Method) R = 0.05 + 0.009 x %IMP = 0.05 + 0.009 x 76.8% = 0.741 VOLUME REQ. _ (1 "/12) x R x DA _ (1 "/12) x 0.741 x 230,868 = 14,260 CF VOL. PROVIDED = 14,400 CF ~ ELEVATION 90.97 Therefore, storage volume is ADEQUATE FIRST 1-INCH STORAGE AND RELEASE Contour Incremental Cumulative *Outflow Release Elevation Area Volume Volume Rate Time (FT) (SF) (CF) (CF) (CFS) (HRS) Temporary Pool Elev. 90 14141 0 0 0 0 90.97 15550 14400 14400 0.058 68.7 91 15920 472 14872 0.059 2.2 92 19896 17908 32780 0.084 59.5 93 23171 21534 54314 0.102 58.4 94 26719 24945 79259 0.118 58.6 95 19996 23358 102616 0.132 49.1 FIRST 1" OF RUNOFF RELEASED IN 71.0 HOURS 3.0 DAYS ORIFICE DIAMETER = 3 INCHES 3of3 ~ APPENDIX D n i [~ 1 Determining the Skimmer Size and the Required Orifice for Faircloth Skimmers February 2007 Important note: The orifice sizing chart in the Pennsylvania Erosion Control Manual and reproduced in the North Carolina Design Manual DOES NOT APPLY to Faircloth Skimmers. It will give the wrong size orifice and not specify which size Faircloth Skimmer is required. Please use the information below to choose the size skimmer required for the basin volume provided and determine the orifice size required for the drawdown time, typically 4-7 days in Pennsylvania and 3 days in North Carolina. The size of a Faircloth Skimmer, for example a 4" skimmer, refers to the maximum diameter of the skimmer inlet. The inlet on each of the 8 skimmer sizes offered can be reduced to adjust the flow rate by cutting a hole or orifice in a plug using an adjustable cutter (both supplied with the skimmer). Determining the skimmer size needed and the orifice for that skimmer required to drain the sediment basin's volume in the required time involves two steps: First, determining the size skimmer required based on the volume to be drained and the number of days to drain it; and Second, calculate the orifice size to adjust the flow rate and "customize" the skimmer for the basin's volume. The second step is not always necessary if the flow rate for the skimmer with the inlet wide open equals or is close to the flow rate required for the basin volume and the drawdown time. Both the skimmer size and the required orifice radius for the skimmer should be shown for each basin on the erosion and sediment control plan. Make it clear that the dimension is either the radius or the diameter. It is also helpful to give the basin volume in case there are questions. During the skimmer installation the required orifice can be cut in the plastic plug using the supplied adjustable cutter and installed in the skimmer using the instructions provided. The plan review and enforcement authority may require the calculations showing that the skimmer used can drain the basin in the required time. Determining the Skimmer Size Step 1. Below are approximate skimmer maximum flow capacities based on typical draw down requirements, which can vary between States and jurisdictions and watersheds. If one 6" skimmer does not provide enough capacity, multiple skimmers can be used to drain the basin. For drawdown times not shown, multiply the 24-hour figure by the number of days required. Example: A basin's volume is 29,600 cubic feet and it must be drained in 3 days. A 3" skimmer with the inlet wide open will work perfectly. (Actually, the chart below gives 29,322 cubic feet but this is well within the accuracy of the calculations and the basin's constructed volume.) Example: A basin's volume is 34,000 cubic feet and it must be drained in 3 days. The 3" February 1, 2007 skimmer is too small; a 4" skimmer has enough capacity but it is too large, so the inlet will need ' to be reduced using step 2 to adjust the flow rate for the basin's volume. (It needs a 3.2" diameter orifice.) NEW 1'/z" skimmer: 1,728 cubic feet in 24 hours 6,912 cubic feet in 4 days with a 1'/2" head 3,456 cubic feet in 2 days 12,096 cubic feet in 7 days 5,184 cubic feet in 3 days 2" skimmer: 3,283 cubic feet in 24 hours 13,132 cubic feet in 4 days with a 2" head 6,566 cubic feet in 2 days 22,982 cubic feet in 7 days 9,849 cubic feet in 3 days ' 2'h" skimmer: 5,500 cubic feet in 24 hours 22,000 cubic feet in 4 days with a 2" head 11,000 cubic feet in 2 days 38,500 cubic feet in 7 days ' 16,500 cubic feet in 3 days 3" skimmer: 9,774 cubic feet in 24 hours 39,096 cubic feet in 4 days ' with a 3" head 19,547 cubic feet in 2 days 68,415 cubic feet in 7 days 29 322 cubic feet in 3 days , 4" skimmer: 18,267 cubic feet in 24 hours 72,000 cubic feet in 4 days ' with a 3.3" head 36,534 cubic feet in 2 days 127,869 cubic feet in 7 days 54,803 cubic feet in 3 days 5" skimmer: 32,832 cubic feet in 24 hours 131,328 cubic feet in 4 days ' with a 4" head 65,664 cubic feet in 2 days 229,824 cubic feet in 7 days 98,496 cubic feet in 3 days ' 6" skimmer: 51,840 cubic feet in 24 hours 207,360 cubic feet in 4 days with a 5" head 103,680 cubic feet in 2 days 362,880 cubic feet in 7 days 155,520 cubic feet in 3 days ' " skimmer: 97,978 cubic feet in 24 hours 391,912 cubic feet in 4 days 8 with a 6" head 195,956 cubic feet in 2 days 685,846 cubic feet in 7 days CUSTOM 293,934 cubic feet in 3 days ' MADE BY ORDER CALL! ' Determining the Orifice Step 2. To determine the orifice required to reduce the flow rate for the basin's volume and the number of days to drain the basin, simply use the formula volume = factor (from the chart ' below) for the same size skimmer chosen in the first step and the same number of days. This calculation will give the area of the required orifice. Then calculate the orifice radius using Area = n rand solving for r r = (Area/3.14) .The supplied cutter can be adjusted to this radius to , ' cut the orifice in the plug. The instructions with the plug and cutter has a ruler divided into tenths of inches. Again, this step is not always necessary as explained above. ' An alternative method is to use the orifice equation with the head for a particular skimmer shown on the previous page and determine the orifice needed to give the required flow for the volume and draw down time. C = 0.59 is used in this chart. " skimmer is the smallest skimmer that will drain 34,000 cubic feet in 3 days but a Example: A 4 4" inlet will drain the basin too fast. To determine the orifice required use the factor of 4,362 February 1, 2007 2 n 1 n 1 1 C' [', 1 r from the chart below fora 4" skimmer and a drawdown time of 3 days. 34,000 cubic feet = 4,362= 7.79 square inches of orifice required. Calculate the orifice radius using Area = ~ rz and solving for r, r = (7.8/3.14) and r = 1.58". As a practical matter 1.6" is about as close as the cutter can be adjusted and the orifice cut.. Factors (in cubic feet of flow per square inch of opening through a round orifice with the head for that skimmer and for the drawdown times shown) for determining the orifice radius for a basin's volume to be drained. This quick method works because the orifice is centered and has a constant head (given above in Step 1). 1'/z" skimmer: 960 to drain in 24 hours 3,840 to drain in 4 days 1,920 to drain in 2 days 6,720 to drain in 7 days 2,880 to drain in 3 days 2" skimmer: 1,123 to drain in 24 hours 4,492 to drain in 4 days 2,246 to drain in 2 days 7,861 to drain in 7 days 3,369 to drain in 3 days 2'/z" skimmer: 1,144 to drain in 24 hours 4,576 to drain in 4 days 2,304 to drain in 2 days 8,064 to drain in 7 days 3,432 to drain in 3 days 3" skimmer: 1,382 to drain in 24 hours 5,528 to drain in 4 days 2,765 to drain in 2 days 9,677 to drain in 7 days 4,146 to drain in 3 days 4" skimmer: 1,454 to drain in 24 hours 5,816 to drain in 4 days 2,908 to drain in 2 days 10,178 to drain in 7 days 4,362 to drain in 3 days 5" skimmer: 1,642 to drain in 24 hours 6,568 to drain in 4 days 3,283 to drain in 2 days 11,491 to drain in 7 days 4,926 to drain in 3 days 6" skimmer: 1,814 to drain in 24 hours 7,256 to drain in 4 days 3,628 to drain in 2 days 12,701 to drain in 7 days 5,442 to drain in 3 days 8" skimmer: 1,987 to drain in 24 hours 7,948 to drain in 4 days 3,974 to drain in 2 days 13,909 to drain in 7 days 5,961 to drain in 3 days J. W. Faircloth 8~ Son, Inc. Post Office Box 757 412-A Buttonwood Drive Hillsborough, North Carolina 27278 Telephone (919) 732-1244 FAX (919) 732-1266 FairclothSkimmer.com jwfaircloth@earthlink.net Orifice sizing Revised 2-2-01; 3-3-05; 2-1-07 February 1, 2007 3 ii ~ APPENDIX E 1 1 1 r 1 LAND ~ PLANNING = ASSOCIATES, INC. CALCULATION SHEET rAGE 1 OF 1 PROJECT NO. 6.009 CLIENT: Lowe's Home Centers, INC. SUBJECT: SWM Report Prepared By RKM Date 6/12/07 ' PROJECT: Lowe's of Whiteville, NC Anit-floatation Calculations Reviewed By PMR Date 6/12/07 SWM Pond A & B Approved By Date ' Anti Floatation Device POND A ' ant = (volume concrete)(1501b / cf) F buo y ' (volume riser)(641b / cf) _ (Vconc)(150 lb / cf) Volume in Riser: Riser height: 93.0 - 88.0 = 5 ft. ' Riser Diameter: 36 inches, therefore area = 7.07 sf Volume = 5 * 7.07 = 35.35 cf ' (35.35)(64) _ (Vconc)(I50) Vconc = 15.08 cf t Assume length and width of footing to be 4 feet (allowing at least 6 "clear on each side of riser) and assume depth to be minimum of 2 feet. Vconc =(4)(4)(2) = 32.0 cf ' 32.0 cf> 18.08 cf, therefore acceptable. POND B t F buoyant = (volume concrete)(1501b / cf) (volume riser)(641b / cf) _ (Vconc)(150 Ib / cf) Volume in Riser: Riser height: 93.5 - 90.0 = 3.5 ft. ' Riser Diameter: 48 inches, therefore area = 7.07 sf Volume = 3.5 * 7.07 = 24.75 cf ' (24.75)(64) _ (Vconc)(150) Vconc = 10.56 cf Assume length and width of footing to be 4 feet (allowing at least 6 "clear on each side of riser) and assume depth to be minimum of 2 feet. Vconc =(4)(4)(2) = 32.0 cf ' 32.0 cf> 10.56 cf, therefore acceptable. ' P:16.023-Lowe'sWhdeville,NClDocslSWMlanti-tloetatbn.doc ~ APPENDIX F ii ii 1 1 1 1 1 1 1 1 1 1 1 1 LAND ~ PLANNING = ASSOCIATES, INC. CALCULATION SHEET rAGE 1 OF 2 PROJECT NO. 6.009 CLIENT: Lowe's Home Centers. Inc. SUBJECT:SWM Report Prepared By RKM Date 6/13/07 PROJECT: Whiteville, NC Pond Inlet & Outlet Auron Calculations Reviewed By PMR Date 6/13/07 SWM Pond A & B Approved By Date TASK: Design of outlet protection apron for the sedimentation pond. CALCULATIONS: Pond Outlet Q2s rear= 9.31 cfs (Larger of two flows from A and B) Culvert Size = 24 inch Using Figure 8.06a (attached) the following sizes for the outlet apron are as follows: Riprap Sizes Flow = 9.31 cfs: DSO= 0.5 feet = 6 inches Dn,,aX = 1.5 x DSO = 9 inches Thickness = 1.5 x DMax = 13.5 inches Beginning Width = 3 x Pipe Diameter = 6 feet Length = 18 feet Ending Width =Pipe Diameter + Length = 2 feet + 18 feet = 20 feet (use on both A and B) Pond Inlet Q25 rear = 22.29 cfs (Larger of two flows from A and B) Culvert Size = 42 inch Using Figure 8.06a (attached) the following sizes for the outlet apron are as follows: Riprap Sizes Flow = 9.31 cfs: DSO= 0.7 feet = 8.4 inches DMaX= 1.5 x Dso = 12.6 inches P:16.023 - Lowe's Whdeville, NCIDocsISWMlaproncalc.doc 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LAND ~~ PLANNING ~ ASSOCIATES, INC. CALCULATION SHEET PAGE 2 OF 2 PROJECT NO. 6.009 CLIENT: Lowe's Home Centers. Inc. SUBJECT:SWM Report Prepared By RICM Date 6/13/07 PROJECT: Whiteville, NC Pond Inlet & Outlet Apron Calculations Reviewed By PMR Date 6/13/07 SWM Pond A & B Approved By Date Thickness = 1.5 x DMax = 18.9 inches Beginning Width = 3 x Pipe Diameter = 10.5 feet Length = 22 feet Ending Width =Pipe Diameter + Length = 3.5 feet + 22 feet = 25.5 feet (use on both A and B) P:16.023 - Lowe's Whiteville, NCIDocsISWMlaproncalc.doc