LETTER OF APPROVAL
Stanly County Airport Authority
Attention: Ken Swaringen
43222 Lowder Aviation Parkway
New London,North Carolina 28127
RE: Project Name: Runway 22 On Airport Tree Obstruction Removal(Express Review)
Acres Approved: 9.0
Project ID: STANL-2021-016
County: Stanly
City:New London
Address: Lowder Aviation Parkway
River Basin: Yadkin
Stream Class: Other
Submitted By: Stanly County Airport Authority
Date Received by LQS: February 15,2021
Plan Type: New
Dear Mr. Swaringen:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-
disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge a fee for coverage under the NCGO1 permit. However, on or after May 1,2019,a$100 fee will be
charged annually.This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh.
Q E Q�� North Carolina Department of Environmental Quality I Division of Energy;Mineral and land Resources
Mooresville Regional Office 1 610 East Center Avenue,Suite 301 1 Mooresville.North Carolina 28115
NO r M CCUNA
°p"°"" °'E"°°"'"•""°"m 704.663.1699
Letter of Approval
Stanly County Airport Authority
February 15, 2021
Page 2 of 2
Title 15A NCAC 4B .01 18(a) and the NCGO 1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided. You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
es Moore
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGOI Fact Sheet
em: ashook@tbeclt.com
cc: Inspection Department
cn
,(:t cn O
r--4 �
as � Ct w g
o cd a �-
Z C
+ct ct+-, 9 .,.1 .,-, o
�; y
N
cn
ct.J
�' N C O
M M r--� U
�I �► �" , o c�CAR
U J Z
ct
424
cn
cn aj .o � Nab
Ct
Cld
ICI � •°� � '� a� � � `� N
E v
•� ( O
m
C)k It
Fact Sheet on the New NCG01 Permit �D_ Q��
April 2019
The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below. Most notably,there is a new
process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions,
contact Annette Lucas at Annette.lucas@ncdenr.gov or(919)707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit
• Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; a-NOI: Notice of Intent, application form for the NCGO1 permit
• Is clearly organized by topic; and a-NOT: Notice of Termination,form for closing out the NCGO1 permit
• Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1
Technical Updates
The new permit:
• Requires that the E&SC Plan meet
SWPPP requirements (p. 2);
• Provides a list of items that must be
included in the SWPPP,such as the
construction sequence, plans,
calculations, etc. (p. 2-4);'
• Has updated language on bypasses and
upsets that is tailored to construction
activities(p. 10);
• Puts all timeframes for inspections,
record-keeping and reporting in The NCGO1 Process
"calendar days"for clarity and The new NCGO1 applies to permits approved on or after April 1,2019.
consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCGO1 permit in the mail
• Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the
(during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each
once per 7 calendar days and after construction project and issue each construction project its own COC.
every storm > 1.0 inch (previously 0.5
inch);'and Under the new NCGO1 process,construction sites will continue to
• Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated
holidays from normal business hours local E&SC program just like before.After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCGO1 by
place (p. 23). completing an e-NOI (available at deq.nc.gov/NCG01). The e-NOI will
only take about 20 minutes to fill out and submit on-line.
1 This list is based on website guidance
by the DEMLR Sediment Program. Initially, there will be no charge associated with applying for an NCGO1
z The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100
selected to be as equivalent as annual general permit fee as required per§143-215.3D.
possible with the previous permit. DEMLR is working on creating a single application form that will allow an
' The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01
to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at
DEMLR.