Loading...
HomeMy WebLinkAbout20130629 Ver 1_401 Application_20130613A=TOM AECOM 919 854 6300 tel 701 Corporate Center Drive 919 854 6259 fax Suite 475 Raleigh, NC 27607 www.aecom.com 20130629 June 14, 2013 Ms. Karen Higgins NCDENR Wetlands, Buffers, Stormwater, Compliance and Permitting Unit 1650 Mail Service Center Raleigh, North Carolina 27699 -1650 Reference: Walnut Creek Sanitary Sewer Stream Crossing Replacement Walunt Creek [27- 34,(1.7),C,NSW] Dear Ms. Higgins: Enclosed please find the Pre Construction Notification (PCN) Form for Buffer Authorization relevant to replacing some existing sewer and the removal of an existing at grade stream crossing of Walnut Creek near Lake Dam Road downstream of Lake Johnston. Enclosed are the following: 1. Five copies of the completed application 2. Two copies of completed full size plans 3. Three copies of 11x17 plans 4. Application review fee ($240), check No. 014354511 Please let me know should you have any questions or comments. Sincerely, AECOM Technical Services of NC, Inc. r"' IK444 Larry W. itchell, PE AECOM Water Project Manager Cc: Dennis Lassiter, PE, City of Raleigh Public Utilities Department 1, �oF WA Leo �Q o *� Office Use Only: Corps action ID no DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 20130629 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑Yes Q No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Walnut Creek Sewer Crossing Wake 2b. County: 2c. Nearest municipality / town: Raleigh Fur 2d. Subdivision name: NA JUN 1 7 201 2e. NCDOT only, T.I.P. or state project no: NA AIR 120 3. Owner Information I tLK QtJAUI-V 3a. Name(s) on Recorded Deed: City of Raleigh 3b. Deed Book and Page No. BM 1960/PG 251 -6; DB 3118/PG 894; BM 1994/PG 1134 3c. Responsible Parry (for LLC if applicable): City of Raleigh - Public Utilities Department 3d. Street address: 1 Exchange Plaza, Suite 620 3e. City, state, zip: Raleigh, NC 27602 3f. Telephone no.: 919-8&74"0 q9 (o —4-540- 3g. Fax no.: 919 - 857 -4545 3h. Email address: dennis.lassiter @raleighnc.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 C, 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Beth Steffens /'V1t -�µ� 5b. Business name (if applicable): AECOM 5c. Street address: 701 Corporate Center Drive, Suite 475 5d. City, state, zip: Raleigh, NC 27607 5e. Telephone no.: 919 - 256 -6311 5f. Fax no.: 919 - 854 -6259 5g. Email address: beth.steffens @aecom.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0783 -92 -2203; 0793 -03 -2591; 0783 -81 -3206 1 b. Site coordinates (in decimal degrees): I Latitude: 35.761483 Longitude: - 78.701961 1c. Property size: 0.1 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Walnut Creek 2b. Water Quality Classification of nearest receiving water: C, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Outdoor Cultural 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 340 3d. Explain the purpose of the proposed project: Replacement of existing 8-inch sewer line with a new 10 -inch sewer line for maintenance reasons 3e. Describe the overall project in detail, including the type of equipment to be used: The sewer lines will be installed using an open- trench method. Backhoes and trench boxes will be used as applicable. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made. ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes El Q Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes /No W2 - Choose one Choose one Yes /No W3 - Choose one Choose one Yes /No W4 - Choose one Choose one Yes /No W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one S2 - Choose one - S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 T open trench /refill Walnut Creek No 600 2,400 B2 - Yes /No B3 - Yes /No B4 - Yes /No B5 - Yes /No B6 - Yes /No 6h. Total Buffer Impacts: 600 2,400 6i. Comments: All work will occur within existing City of Raleigh sanitary sewer easements. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All impacts will be temporary. All areas of disturbance will be returned to grade and contours and seeded. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion and sedimentation control devices will be installed prior to land disturbing activities and the contractor will be instructed to minimize land disturbance during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). Per the NCDENR Buffer Interpretation/Clarification Memo #2011 -001 dated 3/3/2011 6h. Comments: installing a new non - electric utility line within a pre - established maintained corridor (no new buffer impacts) is exempt. Pa e7of10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑X No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater. Management Plan 2a. What is the overall percent imperviousness of this project? 0 ova 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Alo Zn Fewous Mot 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? e rry OF RAal ff 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): ❑ Phase If ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? El Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): OCoastal counties ❑HQW ❑ORW ❑Session Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the MYes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes Q No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. /�e-�aC,Qrr�Pii7� � ar► ex�`s�YVj �e,w�cr; Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ® No 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes 14 No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes KNo 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? F/" 67?3J Applicant/Age4s Printed Name VaW4JOWAix6 - N -ZO B Date plicant/Agent's Signature (Agent' ignature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 SAMPLE AGENT AUTHORIZATION FORM PROPMTY LEGAL- CRIPTION: 0783-92-2203; DriS -070=02501; 'LOT trio. PLAWN0. PARCEL IDI '010-80206 ml,clmmjk?Ra !"NC; Xak&Dom-Kd,,% ST99gr ADIftW, 1320 sigh, N #16wolm' ptop -It* Prop ofiv,Qt ww: ` b@wnq"W -.regtst ct 9� pro Yners-at'the above. noted pmpw*,, d® -hereby authorize pro too -W()M, n - �-. gm, at-L 91' 0AAWL"PI6 4. " mii of to a"a *t*hw.atdu*,Al kwrw fi•ec lyfbfihe otomssmol, Of' ws p&mk*temtftbh andA*and a suedw mw tpgdat ptdp" 409) MX 94W Wq:ITWOY WQfY " 4bqVq,,h *rM pqqqqqppjlftdJn this application Is.true and accurate to the beo,of