HomeMy WebLinkAbout20130629 Ver 1_401 Application_20130613A=TOM AECOM 919 854 6300 tel
701 Corporate Center Drive 919 854 6259 fax
Suite 475
Raleigh, NC 27607
www.aecom.com
20130629
June 14, 2013
Ms. Karen Higgins
NCDENR
Wetlands, Buffers, Stormwater, Compliance and Permitting Unit
1650 Mail Service Center
Raleigh, North Carolina 27699 -1650
Reference: Walnut Creek Sanitary Sewer Stream Crossing Replacement
Walunt Creek [27- 34,(1.7),C,NSW]
Dear Ms. Higgins:
Enclosed please find the Pre Construction Notification (PCN) Form for Buffer Authorization relevant
to replacing some existing sewer and the removal of an existing at grade stream crossing of Walnut
Creek near Lake Dam Road downstream of Lake Johnston. Enclosed are the following:
1. Five copies of the completed application
2. Two copies of completed full size plans
3. Three copies of 11x17 plans
4. Application review fee ($240), check No. 014354511
Please let me know should you have any questions or comments.
Sincerely,
AECOM Technical Services of NC, Inc.
r"' IK444
Larry W. itchell, PE
AECOM Water
Project Manager
Cc: Dennis Lassiter, PE, City of Raleigh Public Utilities Department
1,
�oF WA Leo
�Q
o *�
Office Use Only:
Corps action ID no
DWQ project no.
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information 20130629
1. Processing
1 a. Type(s) of approval sought from the Corps:
❑ Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps?
❑ Yes ❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑ No
For the record only for Corps Permit:
❑ Yes ❑ No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑Yes Q No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2. Project Information
2a. Name of project:
Walnut Creek Sewer Crossing
Wake
2b. County:
2c. Nearest municipality / town:
Raleigh Fur
2d. Subdivision name:
NA JUN 1 7 201
2e. NCDOT only, T.I.P. or state project no: NA AIR 120
3. Owner Information I tLK QtJAUI-V
3a. Name(s) on Recorded Deed: City of Raleigh
3b. Deed Book and Page No.
BM 1960/PG 251 -6; DB 3118/PG 894; BM 1994/PG 1134
3c. Responsible Parry (for LLC if
applicable):
City of Raleigh - Public Utilities Department
3d. Street address:
1 Exchange Plaza, Suite 620
3e. City, state, zip:
Raleigh, NC 27602
3f. Telephone no.:
919-8&74"0 q9 (o —4-540-
3g. Fax no.:
919 - 857 -4545
3h. Email address:
dennis.lassiter @raleighnc.gov
Page 1 of 10
PCN Form — Version 1.4 January 2009
C,
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
Beth Steffens /'V1t -�µ�
5b. Business name
(if applicable):
AECOM
5c. Street address:
701 Corporate Center Drive, Suite 475
5d. City, state, zip:
Raleigh, NC 27607
5e. Telephone no.:
919 - 256 -6311
5f. Fax no.:
919 - 854 -6259
5g. Email address:
beth.steffens @aecom.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
0783 -92 -2203; 0793 -03 -2591; 0783 -81 -3206
1 b. Site coordinates (in decimal degrees):
I Latitude: 35.761483 Longitude: - 78.701961
1c. Property size:
0.1 acres
2. Surface Waters
2a. Name of nearest body of water to proposed project:
Walnut Creek
2b. Water Quality Classification of nearest receiving water:
C, NSW
2c. River basin:
Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Outdoor Cultural
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 340
3d. Explain the purpose of the proposed project:
Replacement of existing 8-inch sewer line with a new 10 -inch sewer line for maintenance reasons
3e. Describe the overall project in detail, including the type of equipment to be used:
The sewer lines will be installed using an open- trench method. Backhoes and trench boxes will be used as applicable.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑ Yes ❑ No ❑X Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made.
❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑Yes El Q Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
❑ Yes Q No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑ Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes /No
W2 -
Choose one
Choose one
Yes /No
W3 -
Choose one
Choose one
Yes /No
W4 -
Choose one
Choose one
Yes /No
W5 -
Choose one
Choose one
Yes /No
-
W6 -
Choose one
Choose one
Yes/No
-
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 -
Choose one
S2 -
Choose one
-
S3 -
Choose one
S4 -
Choose one
S5 -
Choose one
S6 -
Choose one
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form - Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary T
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet )
6g.
Zone 2
impact
(square
feet
B1 T
open trench /refill
Walnut Creek
No
600
2,400
B2 -
Yes /No
B3 -
Yes /No
B4 -
Yes /No
B5 -
Yes /No
B6 -
Yes /No
6h. Total Buffer Impacts:
600
2,400
6i. Comments: All work will occur within existing City of Raleigh sanitary sewer easements.
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
All impacts will be temporary. All areas of disturbance will be returned to grade and contours and seeded.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Erosion and sedimentation control devices will be installed prior to land disturbing activities and the contractor will be instructed to minimize land
disturbance during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes Q No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
❑ Yes ❑X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
Per the NCDENR Buffer Interpretation/Clarification Memo #2011 -001 dated 3/3/2011
6h. Comments: installing a new non - electric utility line within a pre - established maintained corridor (no new buffer impacts) is exempt.
Pa e7of10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes ❑X No
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2. Stormwater. Management Plan
2a. What is the overall percent imperviousness of this project?
0 ova
2b. Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Alo Zn Fewous Mot
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
e rry OF RAal ff
3b. Which of the following locally - implemented stormwater management programs
apply (check all that apply):
❑ Phase If
❑ NSW
❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
El Yes ❑ No
4. DWQ Stormwater Program Review
4a. Which of the following state - implemented stormwater management programs apply
(check all that apply):
OCoastal counties
❑HQW
❑ORW
❑Session Law 2006 -246
❑Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal /state /local) funds or the
MYes
❑ No
use of public (federal /state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
El Yes
No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes
❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑Yes
Q No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after - the -fact permit application?
❑Yes
❑X No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑Yes
Q No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
/�e-�aC,Qrr�Pii7� � ar► ex�`s�YVj �e,w�cr;
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
❑ Yes ® No
5c. If yes, indicate the USFWS Field Office you have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes 14 No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes KNo
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
F/" 67?3J
Applicant/Age4s Printed Name
VaW4JOWAix6
- N -ZO B
Date
plicant/Agent's Signature
(Agent' ignature is valid only if an authorization
letter from the applicant is provided.)
Page 10 of 10
SAMPLE AGENT AUTHORIZATION FORM
PROPMTY LEGAL- CRIPTION: 0783-92-2203;
DriS
-070=02501;
'LOT trio. PLAWN0. PARCEL IDI '010-80206
ml,clmmjk?Ra !"NC;
Xak&Dom-Kd,,%
ST99gr ADIftW, 1320 sigh, N
#16wolm'
ptop -It*
Prop ofiv,Qt ww:
` b@wnq"W -.regtst ct 9�
pro Yners-at'the above. noted pmpw*,, d® -hereby authorize
pro
too -W()M,
n - �-. gm, at-L 91'
0AAWL"PI6 4. " mii of
to a"a *t*hw.atdu*,Al kwrw fi•ec lyfbfihe otomssmol, Of'
ws p&mk*temtftbh andA*and a suedw mw tpgdat
ptdp" 409)
MX 94W
Wq:ITWOY WQfY " 4bqVq,,h
*rM
pqqqqqppjlftdJn this application Is.true and accurate to the
beo,of