Loading...
HomeMy WebLinkAbout20211067 Ver 1_Staff Report Ward, Garcy P_20210703 Staff Project Review Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Information ID#: Version: 20211067 1 Project Name: %Currituck Bridge 7 Interim Repair Project County(ies): Currituck Contact Emails: pcwilliams2@ncdot.gov garcy.ward@ncdenr.gov kyle.w.barnes@usace.army.mil Project Folder Web Access Click here to log in to see the project information submitted. Staff Review Documentation Check all agencies that need to rJ DCM receive notification of your decision. r WRC r DMS Decision:* No Written Concurrence Has your decision letter been uploaded into Laserfiche?* f Yes-Uploaded separately f Yes-Attaching it to this form f No-Sent for signature(TPB Unit Only) C' N/A Staff Comments and Documentation ...................................................................................................................................................................................................................................................................................................................................................................................................... Staff review documentation:(?) FDForjpgonly Staff Comments: Paul, I've reviewed your request and determined these impacts are covered under Water Quality General Certifications Nos.4132 and 4275.These correspond to the NW 3 and 57 issued by the Corps of Engineers.Written approval is not required provided the thresholds listed in the certification are not exceeded and the conditions can be met. Staff Report Submitted on: 8/6/2021