HomeMy WebLinkAbout20211067 Ver 1_Staff Report Ward, Garcy P_20210703 Staff Project Review Form
Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Information
ID#: Version:
20211067 1
Project Name: %Currituck Bridge 7 Interim Repair Project
County(ies):
Currituck
Contact Emails:
pcwilliams2@ncdot.gov
garcy.ward@ncdenr.gov
kyle.w.barnes@usace.army.mil
Project Folder Web Access
Click here to log in to see the project information submitted.
Staff Review Documentation
Check all agencies that need to rJ DCM
receive notification of your decision. r WRC
r DMS
Decision:* No Written Concurrence
Has your decision letter been uploaded into Laserfiche?*
f Yes-Uploaded separately
f Yes-Attaching it to this form
f No-Sent for signature(TPB Unit Only)
C' N/A
Staff Comments and Documentation
......................................................................................................................................................................................................................................................................................................................................................................................................
Staff review documentation:(?) FDForjpgonly
Staff Comments: Paul,
I've reviewed your request and determined these impacts are
covered under Water Quality General Certifications Nos.4132 and
4275.These correspond to the NW 3 and 57 issued by the Corps
of Engineers.Written approval is not required provided the
thresholds listed in the certification are not exceeded and the
conditions can be met.
Staff Report Submitted on: 8/6/2021