Loading...
HomeMy WebLinkAbout20211202 Ver 1_PCN Submittal Mailed to ARO, Recieved 08022021_20210803August 2, 2021 To: Andrew Moore and Kaylie Yankura, NCD`IVR 2090 US HWY. 70 Swannanoa, NC Dear Andrew and Kaylie, I W�1ter QttaNly Regional Operations Asheville Regiorral Office I am trusting the one PCN form will be sufficient for the two of you. Enclosed is the PCN form filled out for the Seventh-Day Adventist river bank restoration, A DWR pre -filing Request was submitted on June 29, 2021, therefore a 30 day period has elapsed to send you now the PCN form. I trust that all the information is included in the forms. If I can be of future help, please call me at (828) 767-9094. I have sent the proper PCN forms to Mr. David Brown, Army Corp of Engineers in Asheville. My understanding is that you will be working with Mr. Brown for the approval of this application. I will eagerly await your approval to be able to begin construction. rely- rPrRde!n N 8111202 t New Submission plvfxkrp nt�Va{Yr aesensrca� Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1, 2021 Ver4.1 AUG '23011 �. Water Quality Regional Opewtiori:� Asheville Regional Of#icx; Please note: fields marked with a red asterisk * below are required. You will not be able to submit fhe form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the F-PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https:ltedocs.deq.nc.govAftterResources/Oledoo/624704/PCN%20Help`/`2oFile%202018-1-3o.pdf (https:lledocs.deq.nc.gov)WaterResources/OldocJao3eloipagel.aspx) A. Processing Information County (or Counties) where the project is located:" Add additional county Is this a NCDMS Project* 0 Yes 0 No Click Yes, only if NIMMS Is the applicant or cwapplice ni. Is this project a public transportation project? 0Yes allo Thla is any publicly funded by municipal, state or federal funds road, rail, airport trsnsporlalion project. la. Types) of approval sought from the Corps:'` * Section 404 Permit (wetlands, streams and waters, Clean Water Act) ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?" ❑ Nationwide Permit (NWP) C' Regional General Permit (RGP) I& Standard (IP) 1c. Has the NWP or GP number been verified by the Corps?* 0Yes 0No 1d. Type(s) of approval sought from the DWR: check all that apply 401 Water Quality Certification - Regular n 401 Water quality Certlftcatien - Express Non-404 Jurisdictional General Permit 0 Ripa ban 13uffer Authorization [] Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval Is not required? ..... .............. ................ .......... .............. .......... . ....... ......... .... .......... ......... ..... . ........ ........ ......... r a For the record only for DWR 401 Certification: 0 Yes 4 No For the record only for Corps Permit: 0 Yes f0 No https:lledocs.deq.ne.gov/Forms/Pre-Consh•uction—Noti fication_Foi m 119 81112021 New 5tlbrnission 1f. Is this an after -the -fact permit application?* 0 Yes 0 No 19. Is payment into a mitigation bank or In - Ile u fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 0 Yes O N❑ Acceptance Letter Attachment Click the upload button or drag and drop Ales here to attach document Upload FILE TYPE MUST BE PDF Sh. Is the project located In any of NC's twenty coastal counties? " 0 Yes J) No 1j. Is the project located in a designated trout watershed9 " 6 Yes D No Link to trout informatEon: http://www.saw.usace.arrny.mlitMissiansdReguIatory-Permit-Program/Agency-Coordinatiort/Trout aspx (http:/Avww.saw.usaee.army.millMisslonstRegulatory- Perm It-P rogra m/Ag a ncy-Coo rd inatio nfTrou L aspx) B. Applicant Information 1a. Who is the Primary Contact?* 1C. Primary Contact Phone:' 1h. Primary Contact Email: * (xxx)xxx-X"X 1d. Who Is applying for the permit?* © Owner 0 Applicant (other than owner) [Check all that apply] le. Is there an Agent/Con s u Its nt for this project?* 0Yes (0No 2.Owner information 2a. Name(s) on recorded deed:* / 2b. Deed book and page no.-. y 2c. Contact Person: (for Corporations) �[ 2d. Address* Street Address Address Line 2 w. T Postal) Zip ['iVde Country https:/Iedoes.deq.ne.gov/Forms/Pre-Coiisti-uctiori,-Noti ricatiozi_Form 219 112D2 i New 5ubrnissioa 2e. Telephone Number:'" [xxx}xxx-xxxx 2L Fax Number: [xxx}xxx-xxxx 2g. Email Address:* c �.%l�EJ7.. _. Add another owner C. Project information and Prior Project History 1. Project Information 1a. Name of project:' r E 1b. Subdivision name: (if appropriate] 1c. Nearest municipality 1 town: 2. Project identification 2a. Property Identification Number: (tax PIN orparcel ID) 7 2c. Project Address Street Address 2b. Property size: [in acres] Address Line 2 City State 1 Province! Reglon Postal IZip Co a Country 2d. Site coordinates In decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GIPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) ............. ....... Latitude:* Longitude: 3. Surface Waters ht(ps:lledocs.deq.nc.gov/Forms/Pre-Constriiction_Notific.ttioll_Foi lit 319 811l2U21 New Submission 3a. Name of the nearest body of water to proposed project:' gr Cal; e, ,e' le-. 3b. Water Resources Classification of nearest recelving water:" Surface Water Lookup (https:llncdenr.maps.aregis.comlapps/webappviewer/index-html7id=6el25ad7528f494694e25gc8Odc[64265) 3c. What river basin(s) Is your project located fit? Add another river basin 3d. Please provide the 12Aigit HLIC in which the project is located. " River Basin Lookup (http://ncdenr.maps.arcgis.com/apps/Ilubliclnformatio"/index.html7appid=ad3a85aoc6d644iiObg7cdC69db238ac3) 4. Project Description and History 4a. Deseribe the existing conditions on the site and the general land use lit the AOn€ty of the project at the time of this appIicatlon: , _..... _ _ .. _....... ...__�...... ►_... _c...... _ .�...t-1- iJ...c...r�........ it CAS' a . _. ►ne cy--r - 5...©i... _...�,�►� r1i... -4" Alay of 74;9- A c q 4 &o e-li er'OeJe q S►ryrrr' �je�4it7 4 c�a� r'�'ta tb67l�tl+ ��74® ploy ztl-ear I S p A.0 X 4 '1&p 0 Gt r Gcar a h u5 i h y `4"A P L /a �r i e L d., it 4b. Have Corps permits or DWR certifi cat Ion a been obtained for this project (including all prior phases) In the past? t () Yes # No 0 Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 4g. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 4h. Explain the purpose of the proposed project: * _ .....------- a n c -m �r �� c� � �fe �r ►ram �� � � � �. �n�►� � �� ct ��� � ��� y S� ���� . hups://cdoes.deq-tic.gov/Forms!Arc-Consti uctioit_IVolificatioii_Forn) 419 a/ 1/2a7,1 New Submission 4i. Describe the overall project in detail, Including Indirect impacts and the type of equipment to be used:* � h � &cAa e I.0 11 b.0 w.5c-d f6 r-e!00 .re 41]el? eew ►A rPream Ova.,► 1au: o t.v��`%r^. tE' ov 16,�,1 inj �,31C.rf dead "f'�"eL' S hev� w t� w e,' . r�fe, Fhe .-�egnj. d i�Y end d betnAr rrrer5 W+ fb Af' 'fAi 4Pt Aq s been qau#y, kq r/ C46u;.^i,+o br►'c: YJ�cr-#'rhy CTA4 egf"uba!" S'4 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?' © Yes AWNo Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* 0 Preliminary () Approved n Not Verified t7 Unknown (7 N/A Corps AID Number: Example: SAW2017-99999 5c. I 5a Is yes, who delineated the jurisdictlonaI areas? ........... ................. ............ .............. ...........-. .............. .......... Name (if known): AgencyfConsu€tant Company: B. Future Project Plans 6a. Is this a phased project?* 0 Yes No 'Lrly 144ex"o Are any other NWP(s), regional general permlt(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 'I. Impacts Summary 1a. Where are the impacts associated with © Wetlands © Open Waters T Icheck all that apply if Streams -tributaries D fond Construction E. Impact Justification and Mitigation C Buffers htips:lledoes.deq.nc,gov/Forms/Pre-Canstructia:z_ Notificfuion_€--c)rm 519 8/1/2021 New Submission 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed Impacts in designing the project:" Quat-l-y oekc Qsad Fri 1y lr^ —t;1 i------ 1b. Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques: * 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? U Yes APNo NO Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS(hitps:llribits.usace.army.mlllribits ape)lf? p=107:27:2734709611497::NO: RP: P27_BUTTON _KFY:O) website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) —Recent changes to the stownwater rules have required updates to this section. — I. Diffuse Flow Plan 1a. Does the project Include or is it adjacent to protected riparian puffers identified within one of the NO Riparian Buffer Protection Rules? 0Yes 10No For a list of options to meet the diffuse flow requirements, click here (https:fffiles.nc.govincdeglWater%200uality/Surface'/o20Water%20Protection/401lBuffer / 20C€arification°/`20MemostOptions°/`20for°/ 20Meetfng°/e2ODiffuse°/o20FIOW`/`20Provisions%20( 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NP DIE S permit NCSO00250?" () Yes 0 No Comments: G. Supplementary Information 9. Environmental Documentation 1a. Does the project involve an expenditure of public (federellstatellocal) funds or the use of public (federallstate) land?* 0 Yes 0 No hqs://edces.deq.nc.gov/Forms/Pre-Cotisti-ttelion_Notificat!oii _Forni fi19 9111202� New Submission 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .i300), or DWR Surface Water or Wetland Standards or Rlpadan Buffer Rules (t5A NCAC 2B .0200)?* 0 Yes 0 No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result In additional development, which could Impact nearby downstream water quality?* 0 Yes V&No 4. Sewage Disposal (DWR Requirement) 4a. fa sewage disposal required by DWR for this project? QYes allo()NIA S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* 0Yes 0No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* 0 Yes JFNo 5d. Is another Federal agency Involved?* 0 Yes & No 0 Unknown 5e. Is this a DOT project located within Division's 1.8?* 0Yes PNo 5f. Will you cut any trees in order to conduct the work in waters of the U.S.?* U Yes it No 5g. Does this project Involve bridge maintenance or removal?* 0 Yes ® No Link to the NLEB SLOPES document: http:Ilsaw-reg.usace.army.milINLEi/1-30-17-signed_NLEB-SLOPES&apps.pdf(hltpJlsaw-reg.usace.army.miI1NLEB11-30.17-signed, NLEB- SLOPES&appz.pdfl 5h. Does this project Involve the construction/Installation of a wind turbines)?** 0 Yes 0 No 51. Does this project Involve (1) blasting, andlor (2) other percussive activities that will be conducted by madhines, such as jackhammers, mechanized pile drivers, etc.?* 0 Yes to No 5j. What data sources did you use to determine whether youraIte would impact Endangered Species or Designated Critical Habitat?* 6. Essential Fish Habitat (Corps Requirement) 0 Yes () No https://edoes.deq.nc.gov/Forms/€'re-Construction_NoIificalioti Fol-m 7/9 81112G12 i Nov Submission 6b. What data sources did you use to determine whether your site would impact an Essential Flsh Habitat?* {Q t sJ1,;,41 heck fOr •14,Vt f : _----- T. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data. bilUg's.n r-g vAjgowe6l [pit p;[Ig1 -n�gov 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant In North Carolina history and archaeology)? " p Yes # No 7b. What data sources did you use to determine whetheryour site would impact historic or archeological resources7" 8. Flood Zone Designation (Corps Requirement) Link to the FEMA FloodplaIn Maps: https:Urnse-fema-govlportaIlsearch(httpsTrnsc. ferna.govlportailsearch) 8a. Will this project occur In a FEMA-designated 100-year flood pIaIn?� 0 Yes :; j No 8c. What source(s) did you use to make the flood lain determination?'` __—r .. Jc r 0.16 .......�..........%�C��{�y¢r........��4�ltT���=t � r jr e,.:)e l Miscellaneous Comments Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined Into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document U load File must be POF or KMZ Slanature J&By checking the box and signing below, I certify that: lrttps:llcdoes.deq,nc.govlForrngPi,c-Coiistrtictiott_Iotification_Fnrni gig 811/2;121 New Submission The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 68. Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name.* riff, 5ignatu " Date %aR/ Date captured ❑ form submission Submit Save as Draft https;lledocs.deq.ne.gov/FornisIPre-Construction_Noti fication_Form 919 . . . . . . . . . . G-graph[e Infbr—nmtion tton Mi. &t A ll'i:, 17,V Z yp, 4 `4 Ij I P48439 4A.1 jjF. A(l ire"U':, 17 ZA hem, - IV. 110 iu 41 8 A .c THIS IS NOTA 11 inforils vid. 6d as N inc y,. 6 in g.th W 1 Ps. to cEgfil Partioul.ar i' war ranties a otherwise distr[Wtbq, t wyhd he.r A at th 14 50. ll, 0 o, .. , I AL1.0,0 Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* 20211202 Version* 1 Is this project a public transportation project?* r Yes r No Reviewer List:* Sue Homewood:eads\slhomewood Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Submittal Type:* Individual Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 owed?* r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * r For the Record Only (Courtesy Copy) r New Project r Modification/New Project with Existing ID r More Information Response r Other Agency Comments r Pre -Application Submittal r Re-Issuance\Renewal Request r Stream or Buffer Appeal Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: CC103082021.pdf CC103082021 _2. pdf CC 103082021 _3. pdf Date for Meeting Request 6/29/2021 I D# Project Contact Information Name: ROGER PEDEN Who is subrritting the inforrration? Email Address: pedenroger@yahoo.com Project Information Version Project Name: SDA Church River bank stabalization Is this a public transportation project? r Yes r No 361.8KB 486.8KB 428.99KB Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Polk Please upload all files that need to be submited. dick the upload button or drag and drop files here to attach document PCN Submittal Seventh Day Adventist Church - 403.02K6 Mailed to ARO, Recieved 8.2.2021.pdf Only pdf or Iv17 files are accepted. Describe the attachments or comments: The file uploaded is the PCN form for DWR approval for this project. Sign and Submit V By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the online form. Signature: AOIPFIA r t"Wl Ioe Submittal Date: Is filled in automatically. DWR Pre -Filing Meeting Request Form,6 AL - Contact Name * ROGER PEDEN Contact Email Address` pedenroger@yahoo.com Project Owner* SEVENTH DAY-ADVENTIST CHURCH Project Name* RIVER BANK EROSION RESTORATION Project County* Polk Owner Address:* srreO Aftcss 2820 LYNN ROAD A(Max>s Lim, 2 City Saw/ Rovnxe:i%. W) Tryon NC Fbstal i Zip 0-de (Jccnitry 28782 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - r 401 Water Quality Certification - Regular Express F Individual Permit r! Modification W Shoreline Stabilization Does this project have an existing project ID#? r Yes C No Do you know the name of the staff member you would like to request a meeting with? ANDREW MOORE Please give a brief project description below and include location information. THIS PROPERTY IS BOARDERED BY THE PACOLET RIVER. IN MAY 2018 THERE WAS A SIGNIFICANT FLOOD WHICH CAUSED MAJOR ERROSION ON THE RIVER BANK. THE RIVER BANK WAS ERRODED BECAUSE THE PROPERTY INVOLVED RECEIVED SOIL FROM THE CONSTRUCTION SITE OF 1-26 WHEN BEING BUILT IN THE 1970'S. THE SOIL RAISED THE PROPERTY OUT OF THE FLOOD PLAN. BUT THE SOIL DOES NOT COMPACT WELL AND IS EASILY ERRODED WITHOUT SIGNIFICANT PROTECTION, THE CHURCH OWNERS WOULD LIKE TO ADD LARGE BOULDERS TO REALIGN THE RIVER CHANNEL AND RECLAIM A SIGNIFICANT RIVER BANK AREA THAT RAS BEEN WASHED AWAY. THE PROJECT WOULD NOT ALTER THE COURSE OF THE CHANNEL. BUT WOULD CONFINE IT TO IT'S ORIGINAL LOCATION. SIMILAR ROCK WORK HAS BEEN DONE IN OTHER LOCATIONS OF THE RIVER NEAR BY AND HAS WORKED EFFECTIVELY IN THE RIVER MAINTAINING ITS COURSE. IN ITS PRESENT STATUS, THE RIVER BANK ADJOINS A PLAYFIELD FOR ELEMENTARY STUDENTS AND IS A DANGER AND HAZARD FOR THEIR PLAY GROUND. IN THE BEST INTEREST OF SAFETY, THIS ERROSION ISSUE NEEDS TO BE FIXED. THANKS. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements; • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 61129/2021 From: Iaserfiche@,ncdenr.gov ef Subject: Pre -Filing Meeting Request Acknowledgement - RIVER BANK EROSION RESTORATION Date: June 29, 2021 at 3:19 PM To: pedenroger Ca�yahoo. coin The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for RIVER BANK EROSION RESTORATION that you submitted on 6/29/2021. Attached is a copy of your request. All certification requests (applications) must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. The Division can not accept an application for your project earlier than 30 days from this pre -filing meeting request. Applications that do not meet this 30-day requirement will be returned. Please save this email/attachment; it must be submitted with your application to document that this requirement has been met. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored.