Loading...
HomeMy WebLinkAbout20190908 Ver 1_Compliance Evaluation Inspection_20210806Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190908 NCDOT - Replace Bridge 276 on SR 1104 Haywood NCDOT - Replace Bridge 276 on SR 1104 NC DOT Division 14 - Sylva 8/4/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 49' 54''+35° 26' 24'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on August 4, 2021. Site is compliant with the Water Quality Certification and additional conditions. NPDES records were up to date. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190908 8/4/2021 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2