HomeMy WebLinkAbout20170239_7-29-2021_Inspection Report NCDOT TIP U-3109A Mebane Bypass_20210804Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Alamance Project: TIP U-3 109A Mebane Bypass River basin: Cape Fear
Person financially responsible: NCDOT Project #: ALAMA-202 1 -3 01
Address:
1. Project Location: NC HWY 119, Mebane
Pictures: Yes - Digital
2. Weather and soil conditions: 90's, Clear, Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
7. Has sedimentation damage occurred since last inspection? Yes If Yes, where? (check all that apply)
V Lake/Natural watercourse on the tract
Yes
Description: Sediment loss into jurisdictional stream draining to mouth of private pond. Sediment was not
lost beyond the turbidity curtain.
Degree of damage: Slight
8. Contact made with (name): Jerry Parker Title: NC DOT Division 7 Environmental Supervisor
Inspection report: Sent Report Date given/sent: August 03, 2021
9. Corrective action needed: Please follow the guidance provided by Ryan Conchilla, and address site improvements as
outlined below.
10. Comments: This inspection occurred as a result of a self -reported sediment loss; the loss was reported on July 20, 2021,
to Ryan Conchilla, Environmental Specialist II, 401 and Buffer Transportation Permitting Branch (Divisions
7 & 8), NCDEQ DWR, by Jerry Parker, NCDOT Division 7 Environmental Supervisor. Site pictures were
provided. Mr. Conchilla reported the loss to DEMLR the following day, July 21, 2021.
It was determined that the site ESC measures in place held during the strong rain event preceding the release
into the on -site stream. The turbidity curtain was anchored properly and prevented impact beyond the
curtain. During the inspection, the following maintenance recommendations were discussed and requests
for additional ESC measures were made:
1) The wattle at the culvert pipe inlet located between basins 15.1 and 15.4 (the wattle is physically located
in the stream in front of the culvert) needs to be cross -staked and secured.
2) The silt fence to the right of the culvert (facing North) needs to be pulled up and secured.
3) The coir fiber matting along the stream bank to the right of the culvert (facing North) needs to be
cross -staked and secured.
4) The geotextile fabric on the emergency spillway of basin 15.1 needs to be secured and pinned down. The
wattles located at the end of the spillway need to be cross -staked and secured.
5) Install additional wattles to the right of basin 15.1 (facing West) to help prevent the overflow from
bypassing construction stormwater control.
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
6) Sediment needs to be removed from bay 1 and 2 of basin 27.1. It was recommended this be done during
conversion of this basin to a Hazardous Spill Basin.
Note: Sediment located within the culvert pipe flows throughout the length of the pipe. An estimated area
2' x 4'x 4" was observed at the inlet end and a much larger area that was unable to be estimated was
observed at the outlet end. The method of removal is being evaluated by DOT and Mr. Conchilla.
Please contact this office as maintenance items are completed. Photo logs of the maintenance performed and
enhanced ESC measures would be appreciated.
Reported by: Kimberly Turney Others present: Tamera Eplin, Tyler Pearson
Date of inspection: July 29, 2021
Time arriving on site: 1:00 PM Time leaving site: 2:25 PM