Loading...
HomeMy WebLinkAbout090014_30 Day POA_20210427PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - Facility Name: A ,F-oorwts Certified Operator fume: avlt9-wL County: oPe.arorz DDZ840 1. Current Liquid level(s) in incises as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Laa;oon Name/Identifier (ID): Spiiilway (Yes or No): Level (inches): Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 I 2. Check all applicable items1NSfOn 41,r7y) Liquid level is within the designed structural freeboard elevations of one or more structures: Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. 1 Liquid level is within the 25year 24 hour storm elevations for one or more structur• es, A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included. within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify.that I have reviewed the lnrorri««on listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct IYArlota_ Facility Owner/Manager (print) Facility Owner/IVlanager (signature) Phone: Date: t_dagi-a1 PaA Cover Page 2121/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Marlowe Finisher line m = 611.6 Ib PAN 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. Plines 1 +2+3+4+5+6= line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 611.6 Ib PAN M. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN O NET LIST FIELDS TO WHH PAN CANNOT BE _ 1State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 864.0 lb. PAN 611.6 Ib. PAN 864.0 lb. PAN -252 Ib. PAN Line y must show as a deficit. If Tine y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. roH i.su uay) z/z-ituu PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Marlowe Finisher 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1 6200 certified herd # 18.0 19.0 inches inches 1.0 inches 148216 ft2 92388 gallons 180 214151 6480 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 3/12/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 204898 ft3 0 89833 ft3 ft3 367431 gallons 1.33 Ibs/1000 gal. 611.6 lbs. PAN PoA (30 Day) 2/21/00